Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Particle Accelerator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

High Field Magnet Programme -- European Strategy Input

In this submission, we describe research goals, implementation, and timelines of the High Field Magnet Programme, hosted by CERN. The programme pursues accelerator-magnet R&D with low-temperature- and high-temperature superconductor technology with a main focus on the FCC-hh. Following a long tradition of magnet R&D for high-energy particle colliders, HFM R&D fosters important societal impact through synergies with other fields.

43 PARTICLE ACCELERATORS↗

Progress and challenges in traveling-wave (TW) SRF cavity

Traveling-wave (TW) technology can push the accelerator field gradient of niobium SRF cavity to 70MV/m or higher beyond the limit of 50~60MV/m in Standing-wave (SW) technology. The early stages of TW SRF cavity developments had been funded by several SBIR grants to Euclid Techlabs and completed in collaboration with Fermilab through a 1-cell prototype and a proof-of-principle 3-cell TW cavity. The TW resonance excitation in the 3-cell TW cavity at 2K was demonstrated through the low power RF test in early 2024. A high-power test of the 3-cell in TW mode being prepared. To advance a design and technology to fabricate a novel high gradient TW SRF cavity, FNAL proposed a half-meter TW RF design and R&Ds to realize that are in progress. Here we will report the recent progress in the 3-cell TW cavity and the challenges towards a half-meter scale TW cavity.

43 PARTICLE ACCELERATORS↗

Accelerators for Electroweak Physics and Higgs Boson Studies

We discuss the goals, the designs, the state of technical readiness, and the critical R&D needs of the accelerators that are currently under discussion as Higgs and electroweak factories. We also address the respective staging options enabling future energy-frontier colliders. The accelerators covered are based on many different techniques and approaches. They include several circular colliders, various linear colliders, colliders based on energy recovery linacs (ERLs), ERL-ring combinations, as well as γγ colliders. The linear colliders proposed consist of options for the International Linear Collider (ILC), for the Compact Linear Collider (CLIC), for the Cold Copper Collider (C 3 ), and for the more recent Higgs-Energy Lepton Collider (HELEN). ERLs are key components of the Recycling Linear e + e - Collider (ReLiC),of the Energy Recovery Linear Collider (ERLC), and of the Circular Energy Recovery Collider (CERC). Among the more conventional ring colliders the following proposals are featured: the Future Circular Collider (FCC-ee), the Circular Electron Positron Collider (CEPC), the Electron Positron Circular Collider at Fermilab (EPCCF), and the Large Electron Positron collider #3 (LEP-3). In addition, we consider the X-ray FEL based gamma- gamma Collider Higgs Factory (XCC) and the High-Energy High-Luminosity γ-γ collider (HE&HL γγ). Finally, a Higgs factory based on a circular muon collider is mentioned for completeness.

43 PARTICLE ACCELERATORS↗

Advanced Material Studies for High Intensity Proton Production Targets and Windows

The titanium alloy Ti6Al4V is widely used in accelerator facilities as beam windows, which are exposed to high cycle compressive stress waves from intense pulsed proton beams. Such materials interacting with the beam are subject to various forms of radiation damage, which can adversely affect their endurance limit. However, no fatigue data is currently available for high energy proton irradiated titanium alloy. Due to limitations in proton irradiation facilities, only miniature flat samples can be used for irradiation. To address this issue, we have developed a custom-made bend fatigue tester at Fermilab specifically for testing proton irradiated titanium alloy. In this presentation, we report on the fatigue test results obtained from this custom-fatigue tester using a non-ASTM standard specimen design. We plan to validate these sparse fatigue data with ASTM standard samples using standard fatigue samples. Furthermore, we have modified another commercial bend fatigue tester to accommodate miniature samples, and discuss some inherent deficiencies of the commercial fatigue tester to test miniature samples. To overcome this issue, a new fixture design is presented, which enables satisfactory fatigue testing on miniature samples over long periods. Finally, we present an upgrade to the custom-fatigue tester, featuring this new fixture design.

43 PARTICLE ACCELERATORS↗

Advanced Material Studies for High Intensity Proton Production Targets and Windows

The titanium alloy Ti6Al4V is widely used in accelerator facilities as beam windows, which are exposed to high cycle compressive stress waves from intense pulsed proton beams. Such materials interacting with the beam are subject to various forms of radiation damage, which can adversely affect their endurance limit. However, no fatigue data is currently available for high energy proton irradiated titanium alloy. Due to limitations in proton irradiation facilities, only miniature flat samples can be used for irradiation. To address this issue, we have developed a custom-made bend fatigue tester at Fermilab specifically for testing proton irradiated titanium alloy. In this presentation, we report on the fatigue test results obtained from this custom-fatigue tester using a non-ASTM standard specimen design. We plan to validate these sparse fatigue data with ASTM standard samples using standard fatigue samples. Furthermore, we have modified another commercial bend fatigue tester to accommodate miniature samples, and discuss some inherent deficiencies of the commercial fatigue tester to test miniature samples. To overcome this issue, a new fixture design is presented, which enables satisfactory fatigue testing on miniature samples over long periods. Finally, we present an upgrade to the custom-fatigue tester, featuring this new fixture design.

43 PARTICLE ACCELERATORS↗

Particle-in-cell techniques for the study of space charge effects in the Advanced Cryogenic Gas Stopper

The Facility for Rare Isotope Beams, FRIB, will significantly increase the rates and varieties of rare isotopes compared to those presently available at existing rare-isotope facilities. The production of stopped beams via the current generation of linear gas stopping devices available is not well matched to the beam intensities that will be available at FRIB. Many experiments that make use of reaccelerated beams, from the ReA facility, greatly benefit from having the highest-intensity, rare-isotope beams possible. Some experiments would also benefit greatly from stopped beams with improved purity. In this paper, the intensity bottlenecks of FRIB’s newest linear gas stopper are studied via experiment and simulation in support of a future detailed conceptual design of a next-generation linear gas stopper that can provide rare-isotope beams with rates of 10^8 pps, a factor of 50 higher than the current state-of-the-art system, with improved beam purity.

43 PARTICLE ACCELERATORS↗

Absorption of relativistic multi-picosecond laser pulses in wire arrays

We study the interaction of intense multi-picosecond laser pulses with arrays of carbon wires attached to solid substrates. Here, we find that laser absorption in wire arrays resembles that in flat targets with very large uniform plasma density gradients. Performing two-dimensional particle-in-cell simulations, we optimize target parameters like wire thickness and -distance for energy absorption of a 2picosecond laser pulse with a large focal spot; this has implications for x-ray- and charged particle source development.

43 PARTICLE ACCELERATORS↗

Designing a Magnetic Measurement Data Acquisition and Control System With Reuse in Mind: A Rotating Coil System Example

Accelerator magnet test facilities frequently need to measure different magnets on differently equipped test stands and with different instrumentation. Designing a modular and highly reusable system that combines flexibility built-in at the architectural level as well as on the component level addresses this need. Specification of the backbone of the system, with the interfaces and dataflow for software components and core hardware modules, serves as a basis for building such a system. The design process and implementation of an extensible magnetic measurement data acquisition and control system are described, including techniques for maximizing the reuse of software. The discussion is supported by showing the application of this methodology to constructing two dissimilar systems for rotating coil measurements, both based on the same architecture and sharing core hardware modules and many software components. The first system is for production testing 10 m long cryo-assemblies containing two MQXFA quadrupole magnets for the high-luminosity upgrade of the Large Hadron Collider and the second for testing IQC conventional quadrupole magnets in support of the accelerator system at Fermilab.

43 PARTICLE ACCELERATORS↗

Accelerator Magnet R&D at Fermilab

The poster describes the main goals and challenges to accelerator magnet R&D, the roadmap for development envisaged at Fermilab as well as recent work toward technology improvements.

43 PARTICLE ACCELERATORS↗

Proceedings of RIKEN BNL Research Center Workshop: Physics Opportunities from the RHIC Isobar Run (Volume 138) [Slides]

This workshop “Physics Opportunities from the RHIC Isobar Run” was held virtually due to the COVID-19 pandemic, with 102 registered participants. We gathered experts from both the experimental and theoretical community to advance our understanding of the physics potential of the isobar dataset by discussing analysis strategies and theoretical predictions. The goal was to explore and identify interesting observables and associated physics which the Isobar Runs can provide. We have identified possible backgrounds and determined the required experimental precisions. Finally, we called for theoretical predictions and interesting isobar species for possible future experiments. We appreciate the effort of, and would like to congratulate, the organizers for conducting a very successful workshop. We also welcome and thank the world-wide participants who attended.

43 PARTICLE ACCELERATORS↗

Time-of-Flight Calculations with Multiple Beam Phase Monitors: Calibration, Jitter Analysis & Energy Measurement

This report describes time-of-flight (ToF) beam energy measurements with multiple phase monitors in a beam line with no acceleration. Measurement uncertainty is quantified via rigorous treatment of beam-based phase monitor calibration and jitter analysis of the accelerator system. Experimental results in the Superconducting Linac (SCL) of the Spallation Neutron Source (SNS) are presented.

43 PARTICLE ACCELERATORS↗

LAMP Manufacturing Survey (Final Report)

This report presents the results of a market manufacturing survey performed for fabricating radiofrequency quadrupoles (RFQ) and Drift Tube Linear Accelerator (DTL) components needed for the Los Alamos Neutron Science Center (LANSCE) Modernization Project (LAMP). A review on existing RFQs and DTLs with their parameters, a summary of specific capabilities needed to manufacture them, the common issues during the fabrication process, their consequences, and resolutions to these problems is presented in this report. The goal of this study is to identify potential collaborators and companies capable of manufacturing the necessary accelerator equipment, while minimizing cost and schedule risks that could impact the future modernization of the LANSCE facility.

43 PARTICLE ACCELERATORS↗

Initial Assessment of Availability and Reliability for the PIP-II Superconducting Radio Frequency Linear Accelerator Facility

The Proton Improvement Plan -II (PIP-II) is a high intensity and high energy proton accelerator which will be used to support the neutrino program at Fermilab. The accelerator will deliver a 2 mA average beam current at a kinetic energy of 800 MeV. Due to the requirements from experiments, this accelerator is designed to be a highly reliable and available system. A target availability of the complete accelerator facility was prescribed to be 90%. An availability and reliability assessment of the accelerator was carried out to ascertain that the design can meet the target availability specification. The results were estimated for the nominal operational mode, when an 800 MeV beam is delivered on the target and for the critical operational mode, when a 600 MeV output beam was incident on the target. The design of a complete accel-erator system is a complex arrangement of a large number of components. To simplify the analysis, a few components were shortlisted and based on their functions, an accelerator model was created. The model is represented in the form of reliability block diagrams. Availability and reliability were estimated for each operational mode. To increase the availa-bility and reliability of the overall accelerator, redundancy of one cavity per section in the superconducting portion of the Linac was introduced.

43 PARTICLE ACCELERATORS↗

Calculations of detuning with amplitude for the McMillan electron lens in the Fermilab Integrable Optics Test Accelerator (IOTA)

The McMillan electron lens will be one of the experimental implementations of nonlinear integrable lattices in the Fermilab Integrable Optics Test Accelerator (IOTA). We describe the physics of the nonlinear McMillan lens and calculate the tune dependence with amplitude from the experimental parameters. Some of the implications for the design of experiments in IOTA are discussed.

43 PARTICLE ACCELERATORS↗

Design Initiative for a 10 TeV pCM Wakefield Collider

This document outlines a community-driven Design Study for a 10 TeV pCM Wakefield Accelerator Collider. The 2020 ESPP Report emphasized the need for Advanced Accelerator R&D, and the 2023 P5 Report calls for the ``delivery of an end-to-end design concept, including cost scales, with self-consistent parameters throughout." This Design Study leverages recent experimental and theoretical progress resulting from a global R&D program in order to deliver a unified, 10 TeV Wakefield Collider concept. Wakefield Accelerators provide ultra-high accelerating gradients which enables an upgrade path that will extend the reach of Linear Colliders beyond the electroweak scale. Here, we describe the organization of the Design Study including timeline and deliverables, and we detail the requirements and challenges on the path to a 10 TeV Wakefield Collider.

43 PARTICLE ACCELERATORS↗