Recent advances in automatic alignment system for the National Iginition Facility

The automatic alignment system for the National Ignition Facility (NIF) is a large-scale parallel system that directs all 192 laser beams along the 300-m optical path to a 50-micron focus at target chamber in less than 50 minutes. The system automatically commands 9,000 stepping motors to adjust mirrors and other optics based upon images acquired from high-resolution digital cameras viewing beams at various locations. Forty-five control loops per beamline request image processing services running on a LINUX cluster to analyze these images of the beams and references, and automaticallys teer the beams toward the target. This paper discusses the upgrades to the NIF automatic alignment system to handle new alignment needs and evolving requirements as related to various types of experiments performed. As NIF becomes a continuously-operated system and more experiments are performed, performance monitoring is increasingly important for maintenance and commissioning work. Data, collected during operations, is analyzed for tuning of the laser and targeting maintenance work. handling evolving alignment and maintenance needs is expected for the planned 30-year operational life of NIF.

42 ENGINEERING↗

The levelized cost of energy for distributed PV : a parametric study.

The maturation of distributed solar PV as an energy source requires that the technology no longer compete on module efficiency and manufacturing cost ($/Wp) alone. Solar PV must yield sufficient energy (kWh) at a competitive cost (c/kWh) to justify its system investment and ongoing maintenance costs. These metrics vary as a function of system design and interactions between parameters, such as efficiency and area-related installation costs. The calculation of levelized cost of energy includes energy production and costs throughout the life of the system. The life of the system and its components, the rate at which performance degrades, and operation and maintenance requirements all affect the cost of energy. Cost of energy is also affected by project financing and incentives. In this paper, the impact of changes in parameters such as efficiency and in assumptions about operating and maintenance costs, degradation rate and system life, system design, and financing will be examined in the context of levelized cost of energy.

14 SOLAR ENERGY↗

RCM and application at Sandia National Labs.

Reliability-Centered Maintenance (RCM) is a process used to determine what must be done to ensure that any physical asset continues to do whatever its users want it to do in its present operating context. There are 7 basic questions of RCM: (1) what are the functions of the asset; (2) in hwat ways does it fail to fulfill its functions; (3) what causes each functional failure; (4) what happens when each failure occurs; (5) in what way does each failure matter; (6) what can be done to predict or prevent each failure; and (7) what should be done if a suitable proactive task cannot be found. SNL's RCM experiences: (1) acid exhaust system - (a) reduced risk of system failure (safety and operational consequences), (b) reduced annual correctiv maintenance hours from 138 in FY06 to zero in FY07, FY08, FY09, FY10 and FY11 so far, (c) identified single point of failure, mitigated risk, and recommended a permanent solution; (2) fire alarm system - (a) reduced false alarms, which cause costly evacuations, (b) precented 1- to 2-day evacuation by identifying and obtaining a critical spare for a network card; (3) heating water system - (a) reduced PM hours on fire-tube boilers by 60%, (b) developed operator tasks and PM plan for modular boilers, which can be applied to many installations; and (4) GIF source elevator system - (a) reduced frequency of PM tasks from 6 months to 1 year, (b) established predictive maintenance task that identified overheating cabinet and prevented potential electrical failure or fire.

99 GENERAL AND MISCELLANEOUS↗

ESTIMATED SIL LEVELS AND RISK COMPARISONS FOR RELIEF VALVES AS A FUNCTION OF TIME-IN-SERVICE

Risk-based inspection methods enable estimation of the probability of spring-operated relief valves failing on demand at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. The paper illustrates an approach based on application of the Frechet and Weibull distributions to SRS and Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD) proof test results. The methodology enables the estimation of ANSI/ISA-84.00.01 Safety Integrity Levels (SILs) as well as the potential change in SIL level due to modification of the maintenance schedule. Current SRS practices are reviewed and recommendations are made for extending inspection intervals. The paper compares risk-based inspection with specific SILs as maintenance intervals are adjusted. Groups of valves are identified in which maintenance times can be extended as well as different groups in which an increased safety margin may be needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combined uranous nitrate production consisting of undivided electrolytic cell and divided electrolytic cell (Electrolysis → Electrolytic cell)

The electrochemical reduction of uranyl nitrate is a green, mild way to make uranous ions. Undivided electrolyzers whose maintenance is less but their conversion ratio and current efficiency are low, have been chosen. However, at the beginning of undivided electrolysis, high current efficiency can also be maintained. Divided electrolyzers' conversion ratio and current efficiency is much higher because the re-oxidation of uranous on anode is avoided, but their maintenance costs are more, because in radioactive environment the membrane has to be changed after several operations. In this paper, a combined method of uranous production is proposed which consists of 2 stages: undivided electrolysis (early stage) and divided electrolysis (late stage) to benefit from the advantages of both electrolysis modes. The performance of the combined method was tested. The results show that in combined mode, after 200 min long electrolysis (80 min undivided electrolysis and 120 min divided electrolysis), U(IV) yield can achieve 92.3% (500 ml feed, U 199 g/l, 72 cm{sup 2} cathode, 120 mA/cm{sup 2}). Compared with divided mode, about 1/3 working time in divided electrolyzer is reduced to achieve the same U(IV) yield. If 120 min long undivided electrolysis was taken, more than 1/2 working time can be reduced in divided electrolyzer, which means that about half of the maintenance cost can also be reduced. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Low Level and Transuranic Waste Segregation and Low Level Waste Characterization at the 200 Area of the Hanford Site - 12424

This paper describes the waste measurement and waste characterization activities carried out by ANTECH Corporation (ANTECH) and CH2M Hill Plateau Remediation Company (CHPRC) at the 200 Area of the Hanford Site under Contracts No. 22394 and No. 40245 for the US Department of Energy (DOE). These include Low Level Waste (LLW) and Transuranic (TRU) Waste segregation and LLW characterization for both 55-gallon (200-litre) drums with gross weight up to 454 kg and 85-gallon over-pack drums. In order to achieve efficient and effective waste drum segregation and assay, ANTECH deployed an automated Gamma Mobile Assay Laboratory (G-MAL) at the trench face in both 200 Area West and East. The unit consists of a modified 40 foot ISO shipping container with an automatic flow through roller conveyor system with internal drum weigh scale, four measurement and drum rotation positions, and four high efficiency high purity Germanium (HPGe) detectors with both detector and shadow shields. The unit performs multiple far-field measurements and is able to segregate drums at levels well below 100 nCi/g. The system is sufficiently sensitive that drums, which are classified as LLW, are characterized at measurement levels that meet the Environmental Restoration Disposal Facility (ERDF) Waste Acceptance Criteria (WAC). With measurement times of between 20 and 30 minutes the unit can classify and characterize over 40 drums in an 8-hour shift. The system is well characterized with documented calibrations, lower limits of detection (LLD) and total measurement uncertainty. The calibrations are confirmed and verified using nationally traceable standards in keeping with the CHPRC measurement requirements. The performance of the system has been confirmed and validated throughout the measurement process by independent CHPRC personnel using traceable standards. All of the measurement and maintenance work has been conducted during the period under a Quality Assurance Plan (QAP) compliant with the applicable criteria of NQA-1 (2000). This includes not only the calibrations and measurements but also the data analysis activities of the ANTECH Subject Matter Experts (SME) and ANTECH support and maintenance activities as well as the activities of CHPRC staff who recover, transport and load waste drums and disposition measured and characterized drums. The overall processes of drum recovery and analysis are described in the paper. Specific spectral data is presented which illustrates the segregation, sentencing and assay process for different types of drums with different radionuclide profiles. The process of identifying and quantifying a wide range of non-TRU radionuclide isotopes is explained and illustrated with spectral examples. The difficulties associated with the measurement of drums with a high gamma ray background, usually arising from high levels of Cs-137 are considered. These drums, which would normally be declared indeterminate and treated as TRU, are addressed under contract No. 40245 by the deployment of the ANTECH Neutron Mobile Assay Laboratory. This is an Active-Passive neutron assay system housed in a modified ISO shipping container. The unit is designed for the measurement and assay of both drums and crates (including B-25 boxes and SWB containers) and will quantify the content of both plutonium and uranium. The neutron system has been employed to perform further evaluation on indeterminate drums to classify them to either LLW or TRU. The experiences of both gamma ray and neutron system operation in different conditions are described; as are the issues of throughput, drum handling and system maintenance. All of these are considered in the overriding context of safe drum handling and safe assay system operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons learned in the hot cell at the transuranic waste processing center - 15336

The hot cell at the Transuranic Waste Processing Center (TWPC) has been in operation for seven years. Its mission is to empty, process, and repackage the contents Remote Handled (RH) concrete waste casks. The sequence of operation for processing the RH casks includes using a remotely operated manipulator (manipulator) to remove the cask contents and deliver them to a work table where operators process the waste into RH-TRU, CH-TRU, LLW drums using Master Slave Manipulators (MSMs). The manipulator is the only piece of equipment that can remove material from the cask and represents a single point failure that can shut down hot cell processing should it fail. During the first six years of operation the project processing goals were constantly in jeopardy due to the high frequency and extent of manipulator failures that forced unplanned down time in the hot cell to facilitate repairs. In 2013 a hot cell maintenance outage was planned and executed to improve the operability and reduce the equipment failure rate. A new remotely operated manipulator, purchased as a spare before the outage, was installed in the hot cell during the outage. Prior to installing the manipulator into the hot cell several major and minor modifications were made to the manipulator to incorporate improvements manipulator reliability and maintainability based upon operating and maintenance lessons learned from the previous years of operation. Additionally a maintenance glovebox was added to the hot cell for servicing the removable manipulator components. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Magnox Clean-Up Programme - Integrating and Making Best Use of the Supply Chain - 16603

In 2010, the UK Nuclear Decommissioning Authority (NDA) secured a funding settlement of British Pounds 2.5 Bn from the Government for the period to 2015 for the Magnox Care and Maintenance programme. This settlement was a reflection of the importance placed on discharging the decommissioning liability associated with the UK's first generation Magnox reactors. It also reflected the NDA's confidence in the Magnox Optimised Decommissioning Plan (MODP), which aimed to accelerate entry into Care and Maintenance and reduce the Magnox decommissioning liability by British Pounds 1.2 Bn. Despite the settlement, huge challenges remained if the MODP was to be delivered within the funding envelope. Essentially, the supply chain had to be able to participate in the delivery of the MODP and make the investment in skills and techniques required to minimise the threats and uncertainties remaining in the Programme. The Magnox Commercial and Supply Chain Strategy was, therefore, an integral part of the MODP. At the highest level, the Strategy involved: - Classifying and segregating procurements by risk and value - Moving the contracting philosophy from risk transfer to risk management - Focusing on relationships and results rather than activities and processes By aligning the supply chain to the MODP, Magnox was able to better organise itself to deliver against the MODP, to act on feedback from suppliers and enable a culture of 'Lead and Learn' to take root. Using feedback and learning from other organisations and applying these to contract management approaches improved project outcomes. In particular, learning from previous experience of dealing with Programme 'unknowns' increased the company's ability to control and improve on the overall Programme cost and schedule. The impact of the MODP was to reduce the Magnox baseline by over British Pounds 1.5 Bn and remove 34 reactor-years from the Care and Maintenance preparations period. This huge gain resulted from a range of technical, process and commercial improvements across the organisation. Perhaps the greatest achievement of the MODP and its supply chain strategy was to quantify and stabilise the Magnox Life-cycle scope and cost and enable the successful competition and transfer of the Management and Operating (M and O) contract in 2014 and lay the foundations for further cost-savings to the UK taxpayer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ROV used in Sludge Retrieval and Treatment Project - 18575

The Orano-operated waste treatment site at La Hague, France, has treated large quantities of nuclear waste through-out its many decades of operation. During a period of over twenty years, a significant amount of the radioactive sludge resulting from the liquid waste treatment processes was placed into a set of adjoining tanks, called the STE2 silos. Now that those tanks are reaching capacity, a project has begun to retrieve this waste, transfer it to another location for homogenisation and characterization, and to then send it to another facility for conditioning and long-term storage. Because of the conditions inside and around these tanks, the waste retrieval process has many limitations. For example, the high radiation levels require that the retrieval be done efficiently, with a high removal rate and that operation be done remotely. The sludge retrieval tool will be operated and navigated while hidden inside the tank, under a significant amount of supernatant liquid, but needs to be accessible for maintenance and modifications and able to be transferred from one tank to the next. Additionally, the highly viscous consistency of the sludge requires special suction capabilities. All of these conditions need to be met, by a system that fits into the tanks' 900 mm (<3 ft) access ports. After almost three years of profound engineering, construction and testing efforts, a final design has been approved. The tool consists of a 250 kg (∼550 lb), remotely-operated vehicle (ROV) with an Archimedes-type screw attachment. It is delivered into and retrieved from the tank through a shielded glovebox that allows for maintenance and exchange of attachments. Sludge is sucked through a rotating screw and out a second tank opening with a consideration for limiting external water usage. To locate and navigate the tool, cameras detect LEDs attached to the ROV's buoys, and then calculate the ROV's position and orientation. With preliminary design and testing of the prototype complete, the project is preparing to award the ROV manufacturing contract and finalize the design of auxiliary systems, such as the rinsing and maintenance processes and localization instrumentation. After extensive final testing, the gloveboxes will be placed over the tanks in mid-2020, with entry into the first tank expected in April 2024. The ideas and experiences Orano is currently gathering during this effort will be of interest to laboratories and facilities that will soon be retrieving waste sludge from their aging storage tanks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Competing Interests and Creating Value - Balancing Durable and Enforceable Institutional Controls with Beneficial Reuse - 20320

US DOE LM has various real property interests at the 100 sites within its current portfolio, with an anticipated total of 127 sites within the next 5 years. Each site has its own narrative with respect to the real property assets. Since the regulatory time frame for long-term surveillance and maintenance activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's unique mission as a federal land manager and steward. More than half of the sites currently in LM's inventory do not allow unrestricted use, and institutional controls (ICs) are required to limit human and environmental exposures to residual contamination. LM's Asset Management program balances protection of human health and the environment with a goal of optimizing its land portfolio through mitigation of risk, limiting liability, and creating value, whether tangible or intangible, in these types of assets. The IC layering strategy utilizes multiple types, restrictions, and legal authorities to protect human health and the environment. This layering strategy influences the transition of these properties into LM's portfolio to assess potential beneficial reuses. The LM's beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. LM strives to create value in a perceived valueless asset and reevaluates and revisits the potential opportunities for these sites as long-term surveillance and maintenance activities are performed and objectives are achieved. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment as well as ensuring activities are environmentally sound by retaining good stewardship of natural resources. LM has recently revised both the Institutional Control Program Guidance and its Beneficial Reuse Management Plan to integrate the issues of land use with ICs, creating value in these impaired assets. This paper presents the following topics: (1) a general overview of LM's IC and beneficial reuse programs; (2) the unique aspects of each of these programs as a result of the multiple regulatory requirements and programs that affect LM sites; (3) case studies of LM sites to show examples of how LM created value while complying with the ICs and layering strategies; and (4) the most common challenges to beneficial reuses at LM sites and potential options for value creation in impaired assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On-Line Monitoring to Detect Sensor and Process Degradation under Normal Operational Transients - 327

Calibration assessment of nuclear plant sensors and transmitters is currently performed through periodic maintenance actions during plant refueling outages. On-line monitoring (OLM) can be used to reduce the time and cost of this maintenance process by using empirical models to evaluate sensor calibration. The implementation of OLM can also mitigate human error associated with unnecessary maintenance on sensors operating within calibration tolerances. OLM has been studied and validated for plants under steady-state baseload operation, but the extension to load-following operation is not well-documented in the literature. Auto-associative kernel regression (AAKR) provides an error-corrected prediction of process sensor measurements for OLM through a weighted average of historic data. The current study evaluates the performance of AAKR for prediction under normal operational transients (such as expected under load-following operation). Performance of the AAKR model with two anomaly detection routines, error uncertainty limit monitoring (EULM) and sequential probability ratio test (SPRT), was evaluated for normal operation, sensor faults, and process degradation. The data used to develop and evaluate the OLM system were collected from a forced flow loop with temperature and flow sensors. Three models of well-correlated groups of sensors are trained to predict normal system behavior under planned transients. The anomaly detection routines are tested for sensor faults and process faults. The results of this experimental study suggest AAKR and an appropriate anomaly detection routine can be applied for sensor calibration and process fault detection under transient operation. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

On-line monitoring for static and dynamic performance verification of I and C systems at Sizewell B nuclear power station - 329

Plant operations and maintenance (O and M) activities account for nearly 75% of the generation cost of a modern nuclear power plant (NPP). This is largely due to time-based maintenance strategies that are expensive, time-consuming, prone to error, and sometimes detrimental to plant equipment. In contrast, condition-based maintenance via on-line monitoring (OLM) can reduce costs, increase equipment availability, and improve safety. OLM uses signals from existing plant sensors to verify the performance of plant instrumentation and equipment while the plant is operating. The Sizewell B nuclear power station in the United Kingdom, a four-loop pressurized water reactor (PWR), uses OLM techniques for several condition-based performance verification activities including pressure, level, and flow transmitter calibration monitoring, resistance temperature detector (RTD) cross calibration, and dynamic performance monitoring of pressure, level, and flow sensing systems. The implementation of OLM has enabled the plant to extend the calibration intervals of its pressure, level, and flow transmitters from 18 to 54 months and has significantly reduced the amount of critical path time needed to perform RTD cross calibration testing (up to 36 hours). Dynamic performance monitoring of its pressure, level, and flow transmitters with OLM has enabled the plant to monitor transmitter and sensing line response degradation while the plant is operating at 100% power and has dramatically reduced testing time versus the traditional hydraulic ramp testing method. The Sizewell B OLM implementation provides valuable insights into on how to overcome the technical and regulatory challenges for widespread OLM adoption by the nuclear industry. This paper describes the technical and regulatory aspects of this implementation and includes detailed examples of static and dynamic performance testing results to demonstrate the types of capabilities of OLM. Analyzing existing signals with OLM technologies can provide significant cost and safety benefits for the existing fleet of nuclear power plants. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improving plant efficiency through the installation of TecSOLCEP online monitoring system - 362

In February 2016, Nuclear Energy Institute (NEI) launched its 'Delivering the Nuclear Promise (DNP)' strategic plan with the objective of reducing electric generating costs by 30% across the nuclear power industry by 2018. Improving efficiency has been addressed as one of the strategic focus areas in the plan. In nuclear power plants (NPPs) there is room for improvement in main components efficiency and TecSOLCEP is a software tool that has proved its value for that purpose. TecSOLCEP is a software tool for monitoring, diagnosing and quantifying performance deviations in Power Plants. It faithfully follows the methodology of ASME standards. Over 15 years of success stories in more than 50 electric power plants of different technologies worldwide, justify the benefits for the plants. The implicit concept in TecSOLCEP is 'Benefit based Maintenance' (BbM) as complementary to usual maintenance strategies like time-based, condition-based or predictive. These maintenance strategies are oriented to obtain the Safety and Reliability goals shared by all the electricity generation technologies. BbM is oriented to get the maximum economic benefit by Efficiency care, which historically has not been a priority, especially in nuclear plants. BbM applied with the help of performance monitoring tools like TecSOLCEP, is called to play an important role to improve efficiency which, in plants mainly operating at full power, is equivalent to increase the maximum power. Nuclear power plants that intend to extend their lives may also take advantage of identifying and quantifying inefficiencies in equipment to better address necessary investments. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

REMOTE IN-CELL SAMPLING IMPROVEMENTS PROGRAM AT THESAVANNAH RIVER SITE (SRS) DEFENSE WASTE PROCESSING FACILITY (DWPF)

Remote Systems Engineering (RSE) of the Savannah River National Lab (SRNL) in combination with the Defense Waste Processing Facility(DWPF) Engineering and Operations has evaluated the existing equipment and processes used in the facility sample cells for 'pulling' samples from the radioactive waste stream and performing equipment in-cell repairs/replacements. RSE has designed and tested equipment for improving remote in-cell sampling evolutions and reducing the time required for in-cell maintenance of existing equipment. The equipment within the present process tank sampling system has been in constant use since the facility start-up over 17 years ago. At present, the method for taking samples within the sample cells produces excessive maintenance and downtime due to frequent failures relative to the sampling station equipment and manipulator. Location and orientation of many sampling stations within the sample cells is not conducive to manipulator operation. The overextension of manipulators required to perform many in-cell operations is a major cause of manipulator failures. To improve sampling operations and reduce downtime due to equipment maintenance, a Portable Sampling Station (PSS), wireless in-cell cameras, and new commercially available sampling technology has been designed, developed and/or adapted and tested. The uniqueness of the design(s), the results of the scoping tests, and the benefits relative to in-cell operation and reduction of waste are presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Compact Stellarator Engineering Trade Studies

number of technical requirements and performance criteria can drive stellarator costs, e.g., tight tolerances, accurate coil positioning, low aspect ratio (compactness), choice of assembly strategy, metrology, and complexity of the stellarator coil geometry. With the completion of a seven-year design and construction effort of the National Compact Stellarator Experiment (NCSX) it is useful to interject the NCSX experience along with the collective experiences of the NCSX stellarator community to improving the stellarator configuration. Can improvements in maintenance be achieved by altering the stellarator magnet configuration with changes in the coil shape or with the combination of trim coils? Can a mechanical configuration be identified that incorporates a partial set of shaped fixed stellarator coils along with some removable coil set to enhance the overall machine maintenance? Are there other approaches that will simplify the concepts, improve access for maintenance, reduce overall cost and improve the reliability of a stellarator based power plant? Using ARIES-CS and NCSX as reference cases, alternative approaches have been studied and developed to show how these modifications would favorably impact the stellarator power plant and experimental projects. The current status of the alternate stellarator configurations being developed will be described and a comparison made to the recently designed and partially built NCSX device and the ARIES-CS reactor design study.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Results of Compact Stellarator Eengineering Trade Studies

A number of technical requirements and performance criteria can drive stellarator costs, e.g., tight tolerances, accurate coil positioning, low aspect ratio (compactness), choice of assembly strategy, metrology, and complexity of the stellarator coil geometry. With the completion of a seven-year design and construction effort of the National Compact Stellarator Experiment (NCSX) it is useful to interject the NCSX experience along with the collective experiences of the NCSX stellarator community to improving the stellarator configuration. Can improvements in maintenance be achieved by altering the stellarator magnet configuration with changes in the coil shape or with the combination of trim coils? Can a mechanical configuration be identified that incorporates a partial set of shaped fixed stellarator coils along with some removable coil set to enhance the overall machine maintenance? Are there other approaches that will simplify the concepts, improve access for maintenance, reduce overall cost and improve the reliability of a stellarator based power plant? Using ARIES-CS and NCSX as reference cases, alternative approaches have been studied and developed to show how these modifications would favorably impact the stellarator power plant and experimental projects. The current status of the alternate stellarator configurations being developed will be described and a comparison made to the recently designed and partially built NCSX device and the ARIES-CS reactor design study.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Chapter 15: Reliability of Wind Turbines

The global wind industry has witnessed exciting developments in recent years. The future will be even brighter with further reductions in capital and operation and maintenance costs, which can be accomplished with improved turbine reliability, especially when turbines are installed offshore. One opportunity for the industry to improve wind turbine reliability is through the exploration of reliability engineering life data analysis based on readily available data or maintenance records collected at typical wind plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. This chapter discusses wind turbine reliability by highlighting the methodology of reliability engineering life data analysis. It first briefly discusses fundamentals for wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.

17 WIND ENERGY↗