Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Replication of Segments of STS-94 as a Lunar Surface Mission

The Artemis program established the goal to land the first woman and first person of color on the Moon, but that is only the beginning of the program. Artemis plans to move towards a sustainable phase, with four crew living on the lunar surface for roughly 30-day annual missions, operating from a Pressurized Rover (PR) and a Surface Habitat (SH). The crew will split up – two living and operating from the PR and the others in the SH, perhaps swapping places halfway through the surface mission. There is a significant degree of maturity surrounding PR operations due to the NASA Desert Research and Technology Studies field tests from 2007-2011. However, there is a degree of uncertainty surrounding activity in the SH, with anecdotal speculation among some Artemis lunar surface engineers that the SH crew might not be fully utilized. Contrary to this belief, there is evidence in US human spaceflight history that the SH crew may instead be extremely busy. In particular, portions of the STS-94 Microgravity Science Lab mission demonstrate a science-based use case for crew activity in the SH. Fifteen Spacelab missions (not including STS-83, which was terminated early due to a fuel cell problem and reflown as STS-94) and eight Spacehab missions used the previously mentioned modules as science labs to expand the science capability of shuttle orbital missions, most flown prior to the assembly of the International Space Station. STS-94 is selected as an example of these flights. STS-94 was a 15.7-day mission with a 7-person crew. The crew operated in split 12-hour shifts, enabling 24-hour science operations. STS-94 used the space shuttle Columbia with the Spacelab module and Extended Duration Orbiter pallet in the cargo bay. The STS-94 physical science investigations were intended to explore various physical aspects of microgravity. These same investigations can be conducted on the Moon to explore 1/6 gravity. The Spacelab module was outfitted with several key facilities to enable this research: Large Isothermal Furnace, Combustion Module-1, Droplet Combustion Experiment, EXPRESS Rack, TEMPUS, Gravity Measurement Devices, and Middeck Glovebox. The current reference concept for the SH is a hybrid inflatable in a vertical orientation. Fairly typical of hybrid inflatables, the SH has an aluminum core pressurized section and a larger inflatable volume, in this case attaching to the top of the core. Two crew will live in the SH at a time, though four can briefly occupy the habitat, such as for contingency or handover activities. This paper will discuss use of the STS-94 physical science equipment in the SH and options for the architectural layout of a resulting physics laboratory. It will also discuss how this laboratory may accompany other science facilities such as biology, human research, and geology. The person hours used by the STS-94 crew to conduct physical science research will be estimated and then mapped to a two-person SH crew, making it possible to determine how many days are required in the SH to complete the lunar gravity physical science investigations at varying levels of crew availability.

STS-94↗

NASA's Composite Overwrap Lessons Learned on 40k Thrust Chamber Assemblies

Filament wound carbon fiber/polymer composite overwraps combined with additively manufactured (AM) copper alloy combustion chambers are a critical part of NASA’s Rapid Analysis and Manufacturing Propulsion Technology (RAMPT) project. The composite overwrap is a high strength-to-weight material and allows for significant weight reduction of the high-pressure thrust chamber assembly, reduction of overall cost, and reduced fabrication time while offering structural robustness. Integrated AM/composite overwrap chamber assemblies using 2,000 lbf (2k) and 7,000 lbf (7k) thrust were successfully hot fire tested at NASA Marshall Space Flight Center (MSFC). These assemblies allowed the team to learn lessons related to the design, analysis, and manufacturing of these integrated assemblies. A final goal of the RAMPT project is to design and test a 40,000 lbf (40k) thrust chamber assembly. The40k chamber presented the team several new challenges including an integral inlet port in the main body of the composite overwrap. Through multiple iterations of manufacturing techniques, varied materials, and Non-Destructive Evaluations (NDE), many lessons were learned to obtain a final design solution that would not only allow for the interrupted port inlet but also allow for sufficient material margins for the most critically stressed part of the chamber. This paper will cover the manufacturing techniques exploring fabric designs to help subsidize the coverage in the areas left bare by the inlet port during the filament winding process and custom tooling needed for the final full chamber processing. The original material choice of bismaleimide (BMI) 5250-4 from the 7k chamber performed well for the extreme environment of hot fire testing but proved to be difficult with the increased scale and interrupted port design of the 40kchamber. Discussion in this paper will cover these changes, including evaluation of the design, comparison to the prior 2k and 7k designs, and show the final hardware that will be tested. One primary goal of this work and RAMPT project is to provide this development process and data to industry for infusion into future engine designs.

Filament Wound↗

Effect of Pressure on Trace Element Activity Coefficients in Metal-Silicate Systems

The partitioning of trace elements between metal and silicate melts serves as the foundation for understanding the differentiation of a planetary body into a metallic core and silicate mantle. Element activity influences metal-silicate partitioning behavior. Activity coefficients are directly dependent on composition and temperature, and can be indirectly dependent on oxygen fugacity and pressure. Distinguishing the effect of pressure from other variables on the activity coefficients and partitioning is important for understanding the chemical evolution of different planetary bodies during differentiation. In this study, we investigated the influence of pressure on the activity coefficients of Cu, Mo, Pd, Pt, As, Sb, and Bi in Fe-Si metallic liquids. All of these elements exhibit moderate to high activity coefficients in Fe-Si liquids at low pressure, which significantly controls their metal-silicate partitioning behavior. Identifying whether this strong dependence persists at higher pressures is critical to modeling and understanding the chemical consequences of core formation. New experiments at 10 GPa were used to derive activity coefficients for these metals which can be compared to activity coefficients determined at 1 GPa. Experiments were conducted at 10 GPa and 2373K using a 10/5 assembly in the 880-ton multi-anvil press at NASA Johnson Space Center. The standard 10/5 COMPRES assembly was slightly modified to accommodate a sample capsule machined from single-crystal MgO that minimizes melt percolation out of the sample volume during the experiment. Experiment starting materials were comprised of 70 wt.% Knippa basalt and 30 wt.% metal. The metal mixture (~85 wt.% Fe) was created by adding the elements of interest (Cu, Mo, Pd, Pt, As, Sb, Bi) to Fe metal powder. Varied amounts of Si metal (0-10 wt.% Si) were added to the metal-silicate mixtures to generate a systematic series of starting materials. For each element, an epsilon interaction parameter in Fe-Si liquid was derived from the results of our 0-10 wt.% Si metal series. To investigate whether pressure influences the trace element activity coefficients in the 1-10 GPa pressure range, we compared our results at 10 GPa to those at 1-4 GPa [1-3]. Our results can also be directly compared to interaction parameters for Au, P, V, Mn, Ga, Zn, Cd, Sn, W, Pb, and Nb previously determined at 10 GPa and 2373K following the same methods [4]. Combined, this suite of interaction parameters will directly inform metal-silicate partitioning between 1 and 10 GPa, and assess whether these values can be extrapolated to modeling differentiation processes at pressures >10 GPa.

Kelsey Prissel↗

Sphero STEM Symposium Keynote

Explore the source record for details and available documents.

In-Space Servicing Assembly and Manufacturing↗

Ground Test Stand Development for One-step Electrochemical Production of High-Pressure Oxygen

NASA designed a test rig, High-Pressure Oxygen Generation Assembly (HPOGA) to test a novel method of electrolysis as an alternative technology to the state-of-the-art Oxygen Generation Assembly (OGA) currently on the International Space Station (ISS). This approach involves utilizing a specialized electrolysis cell stack designed to both generate and compress high-pressure oxygen up to 3600 PSIG. The design eliminates the need for an external compressor and hydrogen separator, streamlining the oxygen generation process. HPOGA tests the viability of an electrolysis cell stack for extended life usage. Within the system, there are several key subsystems: nitrogen, high/low pressure oxygen, hydrogen, water recirculation, and water injection. The water injection subsystem supplies deionized (DI) water to a centralized reservoir for consumption. Subsequently, a water recirculation loop transfers the DI water across the cathode side of the electrolysis cell stack with constant flow rate. The result is a supply of hydrogen in the water loop and oxygen accumulation on the anode side of the cell stack. Hydrogen is evaporated out as part of the hydrogen sub-system which also measures hydrogen/oxygen concentration for safety. The oxygen subsystem is responsible for managing high pressure oxygen, O2 exhaust, and conducting hydrogen/oxygen concentration measurements. The nitrogen subsystem serves dual functions, purging the hydrogen/oxygen subsystems, and regulating pressure in both high/low-pressure O2 sections via pneumatic back pressure regulators. Various sensors monitor pressure, temperature, humidity, gas concentration and flow rate in each subsystem. This paper presents the design and testing of a comprehensive test stand, which serves to operate and functionally verify the performance of the electrolysis cell while offering valuable lessons learned.

electrolysis↗

Thermally driven electrokinetic energy conversion with liquid water microjects

Embodiments relate to materials, methods to prepare, and methods of use of a thermal electrokinetic microjet apparatus. The electrokinetic microjet apparatus includes a reservoir; a jet assembly fluidly communicating with at least the reservoir; and a target electrode spaced from at least the jet assembly.

Saykally, Richard J.↗

Evaluation of beryllium for space shuttle components

Application of beryllium to specific full-scale space shuttle structural components and assemblies was studied. Material evaluations were conducted to check the mechanical properties of as-received material to gain design information on characteristics needed for the material in the space shuttle environment, and to obtain data needed for evaluating component and panel tests. Four beryllium structural assemblies were analyzed and designed. Selected components of these assemblies, representing areas of critical loading or design/process uncertainty, were designed and tested, and two panel assemblies were fabricated. Trends in cost and weight factors were determined by progressive estimation at key points of preliminary design, final design, and fabrication to aid in a cost/weight evaluation of the use of beryllium.

Trapp, A. E.↗

Gamma ray astrophysics to the year 2000. Report of the NASA Gamma Ray Program Working Group

Important developments in gamma-ray astrophysics up to energies of 100 GeV during the last decade are reviewed. Also, the report seeks to define the major current scientific goals of the field and proposes a vigorous program to pursue them, extending to the year 2000. The goals of gamma-ray astronomy include the study of gamma rays which provide the most direct means of studying many important problems in high energy astrophysics including explosive nucleosynthesis, accelerated particle interactions and sources, and high-energy processes around compact objects. The current research program in gamma-ray astronomy in the U.S. including the space program, balloon program and foreign programs in gamma-ray astronomy is described. The high priority recommendations for future study include an Explorer-class high resolution gamma-ray spectroscopy mission and a Get Away Special cannister (GAS-can) or Scout class multiwavelength experiment for the study of gamma-ray bursts. Continuing programs include an extended Gamma Ray Observatory mission, continuation of the vigorous program of balloon observations of the nearby Supernova 1987A, augmentation of the balloon program to provide for new instruments and rapid scientific results, and continuation of support for theoretical research. Long term recommendations include new space missions using advanced detectors to better study gamma-ray sources, the development of these detectors, continued study for the assembly of large detectors in space, collaboration with the gamma-ray astronomy missions initiated by other countries, and consideration of the Space Station attached payloads for gamma-ray experiments.

Source record↗

Welding/brazing for Space Station repair

Viewgraphs on welding/brazing for space station repair are presented. Topics covered include: fabrication and repair candidates; debris penetration of module panel; welded repair patch; mechanical assembly of utility fluid line; space station utility systems; Soviet aerospace fabrication - an overview; and processes under consideration.

Dickinson, David W.↗

Parametric Cost Model for Ground and Space Telescopes

Parametric cost models can be used by designers and project managers to compare cost between major architectural cost drivers and allow high-level design trades; enable cost-benefit analysis for technology development investment; and, provide a basis for estimating total project cost between related concepts. The NASA Marshall Space Flight Center has developed a 5-parameter first-article optical telescope assembly cost model OTA$ (FY17) = $20M x 30(S/G)x D(1.7)x λ(-0.5)x T(-0.25)x e(-0.028) (Y-1960)Where S/G = 1 for space and 0 for ground telescopes, D = diameter, λ= diffraction limited wavelength, T = operating temperature and Y = year of development. The model explains 92% (Adjusted R2) of the cost variation in a database of 47 total ground and space telescope assemblies (OTA). The MSFC model estimates the most likely cost for only the OTA. Where an OTA is defined as the subsystem which collects electromagnetic radiation and focuses it (focal) or concentrates it (afocal) into the science instruments. An OTA consists of the primary mirror, secondary mirror, auxiliary optics and support structure (such as optical bench or truss structure, primary support structure, secondary support structure or spiders, straylight baffles, mechanisms for adjusting the optical components, electronics or power systems for operating these mechanisms, etc.). Finally, duplication only reduces cost for the manufacture of identical systems(i.e. multiple aperture sparse arrays or interferometers). And, while duplication does reduce the cost of manufacturing the mirrors of segmented primary mirror, this cost savings does not appear to manifest itself in the final primary mirror assembly(presumably because the structure for a segmented mirror is more complicated than for a monolithic mirror).

Space Telescope Cost Model, Parametric Cost Model↗

Space station support of manned Mars missions

The assembly of a manned Mars interplanetary spacecraft in low Earth orbit can be best accomplished with the support of the space station. Station payload requirements for microgravity environments of .001 g and pointing stability requirements of less than 1 arc second could mean that the spacecraft may have to be assembled at a station-keeping position about 100 meters or more away from the station. In addition to the assembly of large modules and connective structures, the manned Mars mission assembly tasks may include the connection of power, fluid, and data lines and the handling and activation of components for chemical or nuclear power and propulsion systems. These assembly tasks will require the use of advanced automation and robotics in addition to Orbital Maneuvering Vehicle and Extravehicular Activity (EVA) crew support. Advanced development programs for the space station, including on-orbit demonstrations, could also be used to support manned Mars mission technology objectives. Follow-on studies should be conducted to identify space station activities which could be enhanced or expanded in scope (without significant cost and schedule impact) to help resolve key technical and scientific questions relating to manned Mars missions.

Holt, Alan C.↗

Overview and Recent Accomplishments of Advanced Mirror Technology Development Phase 2 (AMTD-2)

AMTD uses a science-driven systems engineering approach to define & execute a long-term strategy to mature technologies necessary to enable future large aperture space telescopes. Because we cannot predict the future, we are pursuing multiple technology paths including monolithic & segmented mirrors. Assembled outstanding team from academia, industry & government; experts in science & space telescope engineering. Derived engineering specifications from science measurement needs & implementation constraints. Maturing 6 critical technologies required to enable 4 to 8 meter UVOIR space telescope mirror assemblies for both general astrophysics & ultra-high contrast exoplanet imaging. AMTD achieving all its goals & accomplishing all its milestones.

Mirror↗

Design considerations for large space antennas

Performance requirements and costs for transportation, fabrication, and orbital assembly are the drivers in the design of large space antennas will range in size from approximately 30 m to 1 km in diameter and include radiometers, multibeam lens antennas, and microwave power transmission systems. Research and development is required to define comprehensive structural criteria for specific missions, to determine optimized geometries for truss elements and truss configurations and to establish requirements for joint design with consideration of tolerances, load transfer, thermal compatibility, and assembly and disassembly. Candidate structural elements, materials systems for the low pressure rapid cure of advanced composite materials, and various on orbit assembly and fabrication techniques must also be developed.

Johnson, R., Jr.↗

Advanced Mirror Technology Development

The Advanced Mirror Technology Development (AMTD) project matures critical technologies required to enable ultra-stable 4-m-or-larger monolithic or segmented ultraviolet, optical, and infrared (UVOIR) space telescope primary-mirror assemblies for general astrophysics and ultra-high-contrast observations of exoplanets.

Space Mirror Technology↗

A monograph of the National Space Transportation System Office (NSTSO) integration activities conducted at the NASA Lyndon B. Johnson Space Center for the EASE/ACCESS payload flown on STS 61-B

The integration process of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) for the Experimental Assembly of Structures in Extravehicular activity (EASE)/Assembly Concept for Construction of Erectable Space Structures (ACCESS) payload is provided as a subset to the standard payload integration process used by the NASA Space Transportation System (STS) to fly payloads on the Space Shuttle. The EASE/ACCESS payload integration activities are chronologically reviewed beginning with the initiation of the flight manifesting and integration process. The development and documentation of the EASE/ACCESS integration requirements are also discussed along with the implementation of the mission integration activities and the engineering assessments supporting the flight integration process. In addition, the STS management support organizations, the payload safety process leading to the STS 61-B flight certification, and the overall EASE/ACCESS integration schedule are presented.

Chassay, Charles↗

Planar GaAs diodes for THz frequency mixing applications

Schottky barrier diodes for terahertz applications are typically fabricated as a micron to sub-micron circular anode metallization on GaAs which is contacted with a sharp wire (whisker). This structure has the benefits of the simplicity of the fabrication of the diode chip, the minimal shunt capacitance of the whisker contact and the ability of the whisker wire to couple energy to the diode. However, whisker-contacted diodes are costly to assembly and difficult to qualify for space applications. Also, complex receiver systems which require many diodes are difficult to assemble. The objective of this paper is to discuss the advantages of planar Schottky diodes for high frequency receiver applications and to summarize the problems of advancing the planar technology to the terahertz frequency range. Section 2 will discuss the structure, fabrication and performance of state-of-the-art planar Schottky diodes. In Section 3 the problems of designing and fabricating planar diodes for terahertz frequency operation are discussed along with a number of viable solutions. Section 4 summarizes the need for further research and cooperation between diode designers and RF engineers.

Bishop, William L.↗

Summary of problems of greatest urgency

A description is presented of the activities which would be important in connection with the objective to find a course of action to achieve permanent occupancy of space. One of the technical problems to be solved is related to the development of a closed ecological system in space. Lunar material transportation and collection is a second major problem. The development of either automated, manned, or mixed construction technologies for the assembly of large structures in space is also important. Attention is also given to the design of the habitat, the need for a better understanding of the genetic effects of an increased radiation dosage over long periods of time, and the current status of space activities.

Freitag, R. F.↗

Design and implementation of a compliant robot with force feedback and strategy planning software

Force-feedback robotics techniques are being developed for automated precision assembly and servicing of NASA space flight equipment. Design and implementation of a prototype robot which provides compliance and monitors forces is in progress. Computer software to specify assembly steps and makes force feedback adjustments during assembly are coded and tested for three generically different precision mating problems. A model program demonstrates that a suitably autonomous robot can plan its own strategy.

Premack, T.↗