Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INSTALLATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Split HPWHs as an Efficient Solution for Multifamily Buildings with In-Unit Water Heaters: Preprint

A quarter of all housing units in the country are found in multifamily buildings but few efficiency innovations have been made to improve electric water heating systems in this building type. Domestic hot water in multifamily buildings can either be provided by a large central water heater or smaller in-unit water heaters. Integrated heat pump water heaters that are installed in single family homes are often a poor fit for individual multifamily units since the water heaters are often located in small internal closets. This confined space can limit the air flow to the heat pump and the cold exhaust air can cause discomfort and reduced efficiency. Split CO2 HPWHs separate the tank from the heat pump, which allows for installation location flexibility. Further, CO2 heat pumps can operate under colder ambient conditions, making them a better fit for multifamily units across a wide range of climate regions. As part of a larger project to characterize split HPWH performance, we evaluated the feasibility of installing an additional, parallel tank that could provide hot water to a second housing unit using a single CO2 heat pump. This approach would reduce the first costs of these more expensive units. Based on the high draw volume that we imposed on both tanks, the same heat pump may be able to support more tanks, depending on hot water usage. This paper will describe the split CO2 HPWH technology, how the two-tank system was controlled, and results from our laboratory evaluation.

CO2 HPWH↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Progress on the Proton Power Upgrade at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory will double the proton power capability from 1.4 to 2.8 MW. This will be accomplished through an energy increase from 1.0 to 1.3 GeV and a beam current increase from 26 to 38 mA. The energy increase will be accomplished through the addition of 7 cryomodules to the linear accelerator (Linac). The beam current increase will be supported by upgrading several radio-frequency systems in the normal-conducting section of the Linac. Upgrades to the accumulator ring injection and extraction regions will accommodate the increase in beam energy. A new 2-MW-capable target and supporting systems will be developed and installed. Conventional facility upgrades include build-out of the existing klystron gallery and construction of a tunnel stub to facilitate future beam transport to the second target station. The project received approval to proceed with construction in October 2020. Procurements are in progress, and some installation activities have already occurred. Most of the installation will take place during three outages in 2022-2023. The project early finish is planned for 2025.

Barbier, Charlotte↗

A Machine Learning-Assisted Framework to Control Thermally Anisotropic Building Envelopes in Residential Buildings

To curb the energy consumption of buildings and their related CO2 emissions, Oak Ridge National Laboratory (ORNL) has developed the thermally anisotropic building envelope (TABE) —a multi-layer design comprising insulation materials and metal foils connected to thermal loops. In this study, a machine learning-assisted framework was developed to control the TABE in residential buildings to reduce the computation load for future optimal rule-based control and application. First, a 2D finite element model was established in COMSOL to calculate the hourly heat flux through exterior walls installed with the TABE. Then, TABE wall heat fluxes were simulated for various given indoor and outdoor boundary conditions, as well as thermal loops fluid temperatures and flow rates. Since the finite element simulations are computationally expensive, an artificial neural network (ANN) was then trained to use as a proxy of the finite element (COMSOL) modeling. Finally, the trained ANN model was coupled with the EnergyPlus model to predict the energy consumption of a US Department of Energy prototype single-family house installed with the TABE. An optimal simple rule-based control was determined from predefined rules for a case study. The results demonstrate that the developed machine learning–assisted framework can reduce 99.9% of the computation time while efficiently managing residential building energy for installed TABE walls.

Shen, Zhenglai↗

High Power Radiofrequency Operation of the Radiofrequency Quadrupoles in the Spallation Neutron Source

The Spallation Neutron Source (SNS) recently took delivery of a third Radiofrequency Quadrupole (RFQ03) that will ultimately be installed on the front-end (FE) of the SNS Linac. The first RFQ (RFQ01) operated in the SNS FE for more than a decade before being replaced with the second RFQ (RFQ02). RFQ01 was relocated to the Beam Test Facility (BTF) where it operated for five more years. The RFQ02 was initially installed in the BTF for high power testing and used with H- beam for BTF operation. It replaced RFQ01 in the SNS FE in 2017 and has been operating for beam production since then. There are some differences between the three RFQs. RFQ01 has a square cross-section with pi-mode stabilizing loops (PISLs) with the structure being fabricated using two layers of materials, GlidCop outside and OFHC inside. RFQ02 and RFQ03 has an octagonal cross-section with end-wall stabilizer rods and was fabricated using OFHC only. RFQ01 suffered some field flatness distortion incidents that resulted in degradation in beam transmission efficiency and required RF tuning. RFQ02 has performed well but had a melted RF seal in the high energy end wall, that was ultimately mitigated by a redesign of the end flange seals. The SNS decided to order RFQ03 that has a design that followed that of RFQ02 closely, but end-wall contacts were modified to prevent RF seal failure. This report presents the testing, installation, high power RF operation, and design improvements of the RFQ03.

Ren, Haitao↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modular, Mobile Systems for the Treatment of Contaminated Water at Three Magnox Sites in the United Kingdom - 20421

Veolia Nuclear Solutions (VNS), and its mitigated entity, Veolia Nuclear Solutions Federal Services (VNSFS), are designing, overseeing the fabrication and installation, and supporting the commissioning of highly mobile and modular skid-based water treatment systems to assist in the decommissioning of three Magnox reactor sites based in the U.K. These Modular Active Effluent Treatment Plants (MAETP) will be deployed at the Chapelcross, Hinkley Point A, and Dungeness A sites to process contaminated water through the use of ion exchange systems and/or filtration units. At the time of writing, two systems have been installed and inactively commissioned, and the third system is expected to be delivered in 2020. Veolia has utilized a multi-national team of engineers, based in the UK and the US, to effectively leverage the best of Veolia expertise in the design and delivery of mobile, modular systems. The VNS team continues to refine the modular, mobile, and scalable approach to water processing system delivery, and has successfully patented the evolving technology for proprietary protection. The intent of this technology investment is to improve the functionality, mobility, and modularity, resulting in a system which can be adapted to a broad range of throughput and isotope removal requirements to achieve the most cost effective, flexible system possible for customers. Designing, fabricating, and factory-testing the modules off site followed by onsite installation, testing, start-up, and commissioning ensures expedited delivery and setup, as well as cost savings for nuclear applications. For the MAETP systems, VNS's previous nuclear site experience and ongoing Research and Development (R and D), combined with the resulting mobile/modular water processing systems developed and successfully deployed by VNS, have proven to be important inputs for the successful end-design of the systems, materials selection, system testing and commissioning. The lessons learned in the development and continued enhancement of the patented systems described in this paper will prove useful in advancing and deploying future systems for other nuclear sites, where rapid customizing and cost-effective implementation are critical factors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Demonstrating Advanced Nuclear Energy Solutions for Net Zero

Background/Objectives. The aggressive goals being set by nation states, communities, and private industry for decarbonization of grid electricity, industrial heat sources, and transportation around the world are imperative to mitigating the devastating effects that we are seeing from climate change. Although many of these goals focus on accomplishments by 2035 or 2050, the decisions that we make today won’t just impact the landscape of energy systems for the next 20 or 30 years—they will shape the world’s environment for centuries to come. That means that we can’t just focus on technologies that will get us to 2050, but technologies that will withstand our energy demands over that long-ranging future. Success will require us to utilize all of the clean energy resources that we have available to meet demands for electricity, heat, and steam, and we will need energy carriers such as hydrogen that do not emit additional greenhouse gases at the point of use. Nuclear energy, ranging from technologies in service today to advanced, higher temperature and modular systems that will be in service this decade, will provide a robust complement to renewable energy resources that operate variably. Researchers across the U.S. Department of Energy laboratory complex are working to advance multiple aspects of these clean energy solutions, with many focusing on integrated energy system solutions that leverage all available clean energy assets to meet wide-ranging energy demands. Approach/Activities. Nuclear energy is a proven, zero-emission option during operation that can provide consistent, dispatchable power to meet electricity demands while also providing high-quality heat that can meet energy demands beyond the electricity sector. Energy system design should seek to maximize these assets. As a dispatchable energy source with a small land utilization footprint, nuclear energy can be collocated with renewable resources, and the smaller systems that will be deployed this decade (ranging from a few megawatts to hundreds of megawatts) can be installed right where that energy is needed. Integrated nuclear and renewable systems will enhance power grid reliability and resilience, and they will help stabilize the grid through their increasingly flexible operation. Licensing, installation, and broad adoption of these advanced nuclear energy systems are expected to progress significantly in the 2020s, but this may be longer than desired by some stakeholders wishing to implement impactful clean energy decisions today. However, one must recall that nuclear energy systems will operate for 80 or more years, as is being demonstrated by current fleet nuclear systems. The nuclear community is extremely thorough in reviewing these systems with regard to safety and security; these efforts ensure that the deployed systems will continue to provide reliable, resilient energy over that operational lifetime. That investment of time up front will ensure that we can support energy demands over the centuries to come. While advanced nuclear technologies move through this process, communities and private industry may choose to install renewable generation systems that can later be coupled to the complementary nuclear systems as they become available—thus moving closer to the net zero goals in the near term. Choosing technologies and deployment configurations that allow small modular nuclear powerhouses to be added to these “energy parks” as they become available will ensure that advanced technologies can be readily adopted to support growing demands for clean energy. Results/Lessons Learned. The primary focus of integrated energy systems (IES) research is to assess the technical and economic potential of novel multi-input, multioutput solutions that are expected to enhance energy system flexibility, reliability, and resilience as we pursue a clean energy transition. Various energy applications and product streams beyond electricity are being evaluated, ranging from generation of potable water to production of hydrogen, fertilizers, synthetic fuels, and various chemicals. In early FY23 Idaho National Laboratory (INL) will commission thermal energy generation systems that emulate nuclear fission energy input using electric heating and will allow for integrated system testing with thermal energy storage, hydrogen production via high temperature electrolysis (HTE), and power systems hardware to demonstrate operation of a clean energy park within a microgrid or larger grid infrastructure, supporting up to 450 kW of heat input via electric heating and demonstrating operation of HTE systems at the multi-hundred kW scale. This presentation will highlight the wide array of RD&D being conducted at INL and partner laboratories to develop and deploy nuclear and renewable-based IES that will be key to achieving our net zero goals, including both computational and experimental demonstrations. By working with key collaborators in industry, analytical st

08 HYDROGEN↗

Novel Instrumentation for Advanced Quantum Chromodynamics Studies with Flavor Sensitivity

The true nature of ordinary matter has always fascinated humankind, whose imagination has been pointed to the right direction since the 5th century BC with the first known atomic theory by Leucippus and Democritus. They described the matter as formed by small, invisible, indivisible, and eternal particles: the atoms. A long investigation followed them, including contributions from several of history?s greatest philosophers and scientists. The progress led to the understanding that atoms have an internal structure consisting of a central nucleus composed of protons and neutrons, surrounded by a cloud of electrons. About 50 years ago, scientists discovered that nucleons also have an internal structure. Through the Deep Inelastic Scattering (DIS) experiments, on which a lepton is scattered off a nucleon, it was possible to access the distribution of partons inside the nucleon along the longitudinal direction defined by the hard-scale probe. It was a crucial step in developing Quantum Chromodynamics (QCD), currently the best theory describing the subatomic matter. Ultimately, DIS was recognized as a limited tool to investigate the nucleon structure because it is mainly sensitive to observables at the probe?s energy scale. In recent decades, theoretical developments have allowed defining soft-scale observables by measuring more complex processes. Reactions such as Semi-Inclusive Deep Inelastic Scattering (SIDIS) with single or di-hadron production, can provide information about the momentum of parton inside the nucleon. In particular, polarized SIDIS allows access to the Transverse-Momentum-Dependent (TMD) parton distributions describing the correlations of the quark and gluon degrees of freedom in transverse momentum and spin. This study can provide three-dimensional imaging of nucleon structure and inner dynamics, as long as the hadronic component in the final state can be measured. Identifying the species of the produced particles provides information on the quark flavor and assumes a crucial role in this context. The thesis describes the work carried out by the author in preparing novel instrumentation for particle identification in the final state of DIS experiments, to support modern analysis of the parton dynamics within the basic confined object (nucleon) with flavor sensitivity. The work has been focused on the CLAS12 spectrometer in operation at Jefferson Laboratory (JLab), Newport News, VA, USA, and the ePIC experiment in preparation for the future Electron-Ion Collider (EIC) at Brookhaven National Laboratory (BNL), Long Island, NY, USA. CLAS12 is a fixed-target experiment using a 12 GeV beam of polarized electrons scattering off polarized nuclear targets. In 2018 and 2022, two Ring Imaging Cherenkov (RICH) detector modules were installed to improve the ?±/K± separation in the high-momentum region (3÷8 GeV/c) of the experiment. The author contributed to the assembly, installation, and com- missioning of the second RICH module, to the efficiency studies of the first module, and to the first SIDIS analysis with high-momentum kaons identified by the RICH. These studies led to the observation of the first spin asymmetry with high-momentum kaons from the CLAS12 experiment, and an initial assessment of the systematic error associated with the hadron identification. ePIC will be the first experiment at the future EIC, the new collider designed to expand the frontiers of QCD. The author was involved in the development of the dual-radiator Ring Imaging Cherenkov (dRICH). This detector will interpolate the measurements of the Cherenkov angles of photons produced by relativistic particles crossing two different radiators to identify charged hadrons. The author contributed to the studies conducted with the dRICH prototype, developing the reconstruction and analysis software and simulations, characterizing the aerogel radiator samples, and being responsible for the tracking system used during the beam tests. The performance obtained by the prototype has been progressively improved and the results are now comparable with the expectation derived from the simulation and satisfy the requirements of the experiment. In Chapter 1, the SIDIS theory is briefly introduced, outlying the connection with the experimental measurement. Chapter 2 includes the description of the CLAS12 RICH, its assembly and installation, and the efficiency study. In Chapter 3, the analysis of the Beam-Spin Asymmetry associated with SIDIS kaons is described. Chapter 4 describes the contribution to the dRICH for EIC, starting from a description of the ePIC experiment and focusing on the studies performed for the dRICH prototype. The conclusions of this work are summarized at the end.

Vallarino, Simone↗

Spatiotemporal Automatic Calibration of Infrastructure Lidar, Radar, and Camera with a Global Navigation Satellite System: Preprint

Robust and accurate perception is important for modern intelligent transportation systems (ITS), which use sensors of various modalities for data fusion to create a digital twin of an intersection. Sensor calibration is an important process that creates a unified coordinate frame for the sensor output data so that it can be used for data fusion. Classical approaches for sensor calibration are time-consuming, require an overlapping field of view for feature matching, and are not feasible for ITS application as they cause disruptions in the flow of traffic. In this paper, we present a spatiotemporal automatic calibration approach to calibrate multiple infrastructure lidar, radar, and cameras installed at a traffic intersection. The approach uses global navigation satellite system (GNSS) positioning information shared by connected vehicles, and when the vehicle is detected by the sensor, we match the sensor detections with the GNSS coordinates. The proposed algorithm is evaluated with a real-world dataset utilizing detections from two radars, cameras, and lidars with a test vehicle instrumented with a post-processing kinematic (PPK)-corrected GNSS driving past the sensors installed at a four-way traffic intersection. The experimental results show that the proposed automatic calibration approach can achieve the transformation with a root mean squared error of less than 0.5 for radar and lidar and less than 2 for camera detections. The ability to rapidly calibrate sensors not only benefits initial installations, but can also be used for system health monitoring, while utilizing available connected vehicle data to test the real-time sensor fidelity and operational status.

ADVANCED PROPULSION SYSTEMS↗

Field Study of 120-volt Heat Pump Water Heaters in the Big Easy

To meet long-term goals for reducing carbon emissions and lessen the impacts of climate change, the U.S. plans to decarbonize its building stock, which includes the replacement of fossil fuel-burning end uses with energy efficient electric alternatives. As part of this strategy, the replacement of fossil fuel water heaters with heat pump water heaters (HPWH) has the potential to avoid substantial carbon emissions. An estimated 10-15 million single-family homes with fossil fuel water heaters do not have the electrical panel capacity to install a 240-volt, 30-amp HPWH. For these homes, a technology recently introduced to the market, the 120-volt plug-in HPWH, can provide energy efficient electrification of water heating without an expensive panel and wiring retrofit. This paper presents the results of an ongoing 120-volt HPWH field study conducted in 17 homes in New Orleans, LA. Key installation scenarios are profiled for retrofitting from gas-fired water heaters to 120-volt HPWHs, accounting for space, air volume, air temperature, condensate drainage, and electrical. Each HPWH had its surrounding air temperature, relative humidity, inlet and outlet water temperature, flow, and energy consumption monitored. Using these data, hot water delivery and energy efficiency performance were analyzed based on home characteristics. Hot water run outs were investigated to understand how hot water usage, inlet water temperature, and surrounding air temperature impact the HPWH’s ability to meet load. From these results, best practices for 120-volt HPWH siting, sizing, and installation were developed. In addition, results are explored further to add insight for electrification policies and product development.

heat pump water heater, 120-volt, Residential buil↗

Mu2e Tracker Electronics - Construction of a Straw Tracker

The Mu2e experiment, located at the Fermi National Accelerator Laboratory (FNAL), also known as Fermilab, in Batavia, Illinois, is an in-progress particle physics experiment aiming to detect Charged Lepton Flavor Violation (CLFV) via the $\mu^-Al\rightarrow e^-Al$ interaction, a Beyond the Standard Model (BSM) process. One of the sections of the Mu2e experiment is the Tracker, which aims to identify the signal and reject the background while the experiment is running. A total of 20,736 Calibration (CAL) and High-Voltage (HV) preamplifiers (preamps) are being installed within 36 planes that make up the Tracker. During this process, MHz oscillations were discovered on the CAL preamps, obscuring desired signal detection in the \~kHz range. To solve this issue, copper clips are installed onto the CALs to remove the MHz oscillations. The installation of electronics into the Tracker will be discussed in depth.

Lynch, Alec Michael [UC, Berkeley; Fermilab]↗

Digital Safety Analysis for Small Modular Nuclear Reactors (SMRs)

The licensing process for any nuclear installation generally requires the review and approval of numerous documents by a regulatory body. Alternate approaches are needed where similar nuclear installations are planned to be built and operated at multiple sites around the world. Such is the case for the deployment of small modular nuclear reactors (SMRs) under development by multiple enterprises in multiple countries. As a use case for this paper, the authors propose an alternative to the Documented Safety Analysis (DSA) required by the United States Department of Energy (DOE) for the licensing of its nuclear installations. The DSA is a DOE construct that requires the review and approval of numerous documents. It includes an in-depth description of hazards, safe boundaries, and hazard controls.

Microreactors↗

SPC-71260 Rev 0 MARVEL Heat Extraction Subsystem Secondary Coolant Equipment (SCE) Design/Build

A. The Microreactor Applications Research Validation and Evaluation (MARVEL) reactor will offer experimental capabilities that are not currently available at DOE’s national laboratories. Idaho National Laboratory (INL), operated for the U.S. Department of Energy (DOE) by Battelle Energy Alliance, LLC (BEA) (Contractor hereafter) is procuring services for the design, analysis, fabrication, testing and delivery of a Secondary Coolant Equipment system (SCE). This specification contains the requirements for design, analysis, fabrication, testing and delivery of the SCE as described herein. The MARVEL reactor is a microreactor which uses eutectic sodium-potassium alloy (NaK) as a primary coolant. The primary coolant is circulated through four primary loops by natural convection of the coolant. In each loop is a closed well which will accommodate an intermediate heat exchanger (IHX) for extracting heat from the loop. These wells will be referred to in this specification as the “IHX wells.” It is intended for the IHX containment to also be filled with NaK. The MARVEL design team has determined that a Heat Extraction System (HES) using pumped NaK will be used to extract heat from the IHXs and deliver it to a downstream system for power generation or alternate process heat users. This Heat Extraction System will enable MARVEL operations including the ability to test, demonstrate, and address issues related to installation, startup, and operations. In addition, it will allow down-stream utilization of process heat for various uses. The objective of this specification is to develop the final design for the HES Secondary Coolant Equipment system (SCE) that will be used as the core of the HES. This system provides control of the NaK circulation between the MARVEL reactor and the subsequent process heat utilization systems. It does not include design of the Intermediate Heat Exchangers and piping inside the T-REXc pit in which the reactor is located. B. The MARVEL microreactor will be installed in the Transient Reactor Test Facility (TREAT) building in the Transient Reactor Test (TREAT) Micro-Reactor Experiment Cell (T-REXc) C. An INL Subcontractor has developed a conceptual design for this system per SPC-71145, referred to in that specification as the Process Heat Extraction System. SPC-71260 is based on the pumped NaK loop concept developed under SPC-71145. D. The SCE system design and (as option scope) fabrication shall be provided by the awardee of the subcontract (Subcontractor hereafter) pertaining to this Specification. Prior to shipment, the SCE will be fabricated, assembled, and tested at the Subcontractor’s facility. After successful completion of acceptance testing, the SCE and associated equipment will be shipped to the Materials and Fuels Complex (MFC) at the INL (Contractor’s Facility hereafter) to be installed by others in TREAT/T-REXc.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗