Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Energy Management Information Systems Cybersecurity Best Practices

Energy management information systems (EMIS) are a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance. Critical systems are often integrated with or operate on the same networks as EMIS scope systems, necessitating stable, continuous, and secure communication. When connecting EMIS to building automation and utility control systems, there are also many physical assets that could cause harm to the building and its occupants if a malicious act or human error were introduced. It is imperative to ensure all EMIS scope systems are connected securely to the EMIS and do not open vulnerable pathways to other facility networks and operations. The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of EMIS at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. It provides an overview of required EMIS cybersecurity standards for compliance and authority to operate along with additional recommendations.

Cybersecurity↗

Recommended vs. Actual Escalation Rates For ESPCs: Is the Guidance Good?

Escalation rates applied to the savings from energy savings performance contracts (ESPCs) and related financed energy projects play a large role in their scope and costs. The U.S. Department of Energy’sFederal Energy Management Program (FEMP) employs the National Institute of Standards and Technology (NIST) to package projections of real (uninflated) energy prices and general inflation forecasts developed by two other federal government entities. The main output from this exercise is NIST’s Energy Escalation Rate Calculator (EERC), which is strongly recommended by FEMP for use in performance contracts and relied on by federal agencies and others conducting performance contracts as an objective source for their projects’ escalation rates. This study investigated whether the rates prescribed by EERC (and a coarser NIST tool that preceded it) have provided users with estimates that approximate actual changes in energy prices over the years. The results are encouraging: the NIST tools slightly under-estimated actual electricity prices and somewhat over-estimated those for natural gas. Concern regarding the latter is mitigated, however, because a) it is seen as due primarily to the increasing surplus of natural gas from the “fracking revolution” in the 2010s, and b) natural gas savings were found to account for only 14.4% of the total savings from the largest population of federal ESPCs (FEMP’s indefinite quantity ESPC contract, representing roughly 430 projects), compared to almost four times that (56.8%) for electricity savings. Consequently, reliance on EERC appears to be a sound policy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incorporating climate change into risk-informed resilience planning

In response to the development of portfolio-wide Climate Action Plans by federal agencies, federal sites are working to incorporate the impacts of climate change into their resilience assessments. However, it can be challenging to incorporate climate change scenarios into resilience assessments given the uncertainty inherent in climate change modeling. Incorporating these factors into a resilience plan requires an understanding of what the different climate scenarios mean, as well as how to estimate potential impacts of climate change on hazard occurrence on a regional, or even local, scale under different scenarios. We discuss approaches to incorporating this data into risk-informed resilience assessment processes, such as those implemented in the Department of Energy’s (DOE) Federal Energy Management Program’s (FEMP) Technical Resilience Navigator (TRN) and the Sustainability Performance Division’s (SPD) Vulnerability Assessment and Resilience Plan (VARP) Risk Assessment Tool. We also describe the climate scenarios and the availability of hazard data for site resilience planning, based on modeling included in the International Panel on Climate Change (IPCC), the National Climate Assessment (NCA), and state-level reports. We present examples from the TRN risk assessment and the VARP Risk Assessment Tool to illustrate how sensitivity analysis can be used to incorporate climate change projections into the resilience planning process.

Rabinowitz, Hannah S.↗

Virtual Infrastructure Twins: Software Testing Platforms for Computing-Instrument Ecosystems

Science ecosystems are being built by federating computing systems and instruments located at geographically distributed sites over wide-area networks. These computing-instrument ecosystems are expected to support complex workflows that incorporate remote, automated AI-driven science experiments. Their realization, however, requires various designs to be explored and software components to be developed, in order to support the orchestration of distributed computations and experiments. It is often too expensive, infeasible, or disruptive for the entire ecosystem to be available during the typically long software development and testing periods. We propose a Virtual Infrastructure Twin (VIT) of the ecosystem that emulates its network and computing components, and incorporates its instrument software simulators. It provides a software environment nearly identical to the ecosystem to support early development and testing, and design space exploration. We present a brief overview of previous digital infrastructure twins that culminated in the VIT concept, including (i) the virtual science network environment for developing software-defined networking solutions, and (ii) the virtual federated science instrument environment for testing the federation software stack and remote instrument control software. We briefly describe VITs for Nion microscope steering and access to GPU systems.

Rao, Nageswara↗

Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Costs - 13422

A major issue facing many government and private industry sites that were previously contaminated with radioactive and chemical wastes is that often the sites cannot be cleaned up enough to permit unrestricted human access. These sites will require long-term management, in some cases indefinitely, leaving site owners with the challenge of protecting human health and environmental quality in a cost effective manner. Long-term monitoring of groundwater contamination is one of the largest projected costs in the life cycle of environmental management at the Savannah River Site (SRS), the larger DOE complex, and many large federal and private sites. Currently, most monitoring strategies are focused on laboratory measurements of contaminants measured in groundwater samples collected from wells. This approach is expensive, and provides limited and lagging information about the effectiveness of cleanup activities and the behavior of the residual contamination. Over the last twenty years, DOE and other federal agencies have made significant investments in the development of various types of sensors and strategies that would allow for remote analysis of contaminants in groundwater, but these approaches do not promise significant reductions in risk or cost. Scientists at SRS have developed a new paradigm to simultaneously improve the performance of long term monitoring systems while lowering the overall cost of monitoring. This alternative approach incorporates traditional point measurements of contaminant concentration with measurements of controlling variables including boundary conditions, master variables, and traditional plume/contaminant variables. Boundary conditions are the overall driving forces that control plume movement and therefore provide leading indication to changes in plume stability. These variables include metrics associated with meteorology, hydrology, hydrogeology, and land use. Master variables are the key variables that control the chemistry of the groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. A robust suite of relatively inexpensive tools is commercially available to measure these variables. Traditional plume/contaminant variables are various measures of contaminant concentration including traditional analysis of chemicals in groundwater samples. An innovative long term monitoring strategy has been developed for acidic or caustic groundwater plumes contaminated with metals and/or radionuclides. Not only should the proposed strategy be more effective at early identification of potential risks, this strategy should be significantly more cost effective because measurement of controlling boundary conditions and master variables is relatively simple. These variables also directly reflect the evolution of the plume through time, so that the monitoring strategy can be modified as the plume 'ages'. This transformational long-term monitoring paradigm will generate significant cost savings to DOE, other federal agencies and industry and will provide improved performance and leading indicators of environmental management performance. (authors)

54 ENVIRONMENTAL SCIENCES↗

Natural Capital Management: An Evolutionary Paradigm for Sustainable Restoration Investment - 13455

Unlike other forms of capital assets (built infrastructure, labor, financial capital), the supply of usable or accessible air, land, and water elements (termed Natural Capital Assets or NCA) available to enterprise processes is structurally shrinking due to increased demand and regulatory restriction. This supply/demand imbalance is affecting all forms of public and private enterprise (including Federal Facilities) in the form of encroachment, production limits, cost increases, and reduced competitiveness. Department of Energy (DOE) sites are comprised of significant stocks of NCA that function as both conserved capital (providing ecosystem services and other reserve capacity), and as natural infrastructure (supporting major Federal enterprise programs). The current rubric of 'Environmental Stewardship' provides an unduly constrained management paradigm that is focused largely on compliance process metrics, and lacks a value platform for quantifying, documenting, and sustainably re-deploying re-capitalized natural asset capacity and capability. By adopting value-based system concepts similar to built infrastructure accounting and information management, 'stewarded' natural assets relegated to liability- or compliance-focused outcomes become 're-capitalized' operational assets able to support new or expanded mission. This growing need for new accounting and management paradigms to capture natural capital value is achieving global recognition, most recently by the United Nations, world leaders, and international corporations at the Rio+20 Summit in June of 2012. Natural Capital Asset Management (NCAM){sup TM} is such an accounting framework tool. Using a quantification-based design, NCAM{sup TM} provides inventory, capacity and value data to owners or managers of natural assets such as the DOE that parallel comparable information systems currently used for facility assets. Applied to Environmental Management (EM) and other DOE program activities, the natural asset capacity and value generated by EM projects and other investment and operational programming can be recorded and then allocated to mission and/or ecosystem needs as part of overall site, complex, and Federal decision-making. NCAM{sup TM} can also document post-restoration asset capability and value for use in weighing loss mitigation and ecosystem damage claims arising from past operational activities. A prototype NCAM{sup TM} evaluation developed at the Savannah River Site (SRS) demonstrates use of this framework as an advanced paradigm for NCA accounting and decision-making for the larger DOE complex and other enterprise using natural capital in operations. Applying a quantified value paradigm, the framework catalogues the results of activities that sustain, restore, and modernize natural assets for enterprise-wide value beyond that of compliance milestones. Capturing and assigning recapitalization value using NCAM{sup TM} concepts and tools improves effective reuse of taxpayer-sustained assets, records ecosystem service value, enables mission and enterprise optimization, and assures the sustainability of shared natural capital assets in regional pools vital to both complex sites and local and regional economies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Siting and Transportation for Consolidated Used Nuclear Fuel Management Facilities: A Proposed Approach for a Regional Initiative to Begin the Dialogue - 13562

The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed in January 2010 to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, and to develop a new national strategy. Over two years, the BRC held dozens of meetings and heard from hundreds of Federal, State, Tribal, and local officials, as well as representatives of trade and labor organizations, technical groups, non-governmental organizations, and other stakeholders. The Commission's final report (issued January 26, 2012) offers a strategy to resolve longstanding challenges to responsible management of the United States' nuclear waste legacy. The Commission recommended Congressional action to rewrite parts of the Nuclear Waste Policy Act (NWPA); however, a comprehensive legislative overhaul will likely take years to fully implement. The nature and characteristics of nuclear waste, the activities that generated it, and the past history of federal efforts to manage the waste make it virtually certain that finding workable solutions will be controversial and difficult. As the BRC report suggests, this difficulty can be made insurmountable if top-down, federally-mandated efforts are forced upon unwilling States, Tribes, and local communities. Decades of effort and billions of ratepayer and taxpayer dollars have been spent attempting to site and operate spent fuel storage and disposal facilities in this manner. The experience thus far indicates that voluntary consent and active partnership of States, Tribes, and local governments in siting, designing, and operating such facilities are critical. Some States, Tribes, and local communities have indicated that, given adequate scientific and technical information, along with appropriate incentives, assurances, and authority, they might be willing to consider hosting facilities for consolidated storage and disposal of spent nuclear fuel. The authors propose a new regional approach to identifying and resolving issues related to the selection of a consolidated storage site. The approach would be characterized by informed discussion and deliberation, bringing together stakeholders from government, the non-governmental (NGO) community, industry, and other sectors. Because site selection would result in regional transportation impacts, the development of the transportation system (e.g., route identification, infrastructure improvements) would be integrated into the issue-resolution process. In addition to laying out the necessary steps and associated timeline, the authors address the challenges of building public trust and confidence in the new waste management program, as well as the difficulty of reaching and sustaining broad-based consensus on a decision to host a consolidated storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Container Approval for the Disposal of Radioactive Waste with Negligible Heat Generation in the German Konrad Repository - 12148

Since the license for the Konrad repository was finally confirmed by legal decision in 2007, the Federal Institute for Radiation Protection (BfS) has been performing further planning and preparation work to prepare the repository for operation. Waste conditioning and packaging has been continued by different waste producers as the nuclear industry and federal research institutes on the basis of the official disposal requirements. The necessary prerequisites for this are approved containers as well as certified waste conditioning and packaging procedures. The Federal Institute for Materials Research and Testing (BAM) is responsible for container design testing and evaluation of quality assurance measures on behalf of BfS under consideration of the Konrad disposal requirements. Besides assessing the container handling stability (stacking tests, handling loads), design testing procedures are performed that include fire tests (800 deg. C, 1 hour) and drop tests from different heights and drop orientations. This paper presents the current state of BAM design testing experiences about relevant container types (box shaped, cylindrical) made of steel sheets, ductile cast iron or concrete. It explains usual testing and evaluation methods which range from experimental testing to analytical and numerical calculations. Another focus has been laid on already existing containers and packages. The question arises as to how they can be evaluated properly especially with respect to lack of completeness of safety assessment and fabrication documentation. At present BAM works on numerous applications for container design testing for the Konrad repository. Some licensing procedures were successfully finished in the past and BfS certified several container types like steel sheet, concrete until cast iron containers which are now available for waste packaging for final disposal. However, large quantities of radioactive wastes had been placed into interim storage using containers which are not already licensed for the Konrad repository. Safety assessment of these so-called 'old' containers is a big challenge for all parties because documentation sheets about container design testing and fabrication often contain gaps or have not yet been completed. Appropriate solution strategies are currently under development and discussion. Furthermore, BAM has successfully initiated and established an information forum, called 'ERFA QM Konrad Containers', which facilitates discussions on various issues of common interest with respect to Konrad container licensing procedures as well as the interpretation of disposal requirements under consideration of operational needs. Thus, it provides additional, valuable supports for container licensing procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Success in commissioning a key U.S. radioactive waste burial site through the technical support of Dufrane Nuclear Shielding Incorporated (DNSI) - 15476

With the -phase out- of the South Carolina based Barnwell Radioactive Waste Burial Site, and the stockpile and storage of radioactive waste and irradiated components throughout the U.S. Nuclear Industry for decades, the opening of the Texas Low-Level Radioactive Waste Disposal Compact Facility by Waste Control Specialists (WCS), is a game changer in solving this industry-wide issue. For the first time in decades, generators now have the opportunity to send their waste to a site specifically designed to permanently sequester the waste in a licensed facility that will protect public health and the environment, better than any built to date. As history has shown through the many decades of the U.S. Commercial and Federal Nuclear Industry, site operators and management have relied heavily on contractors and vendors with exceptional expertise and decades of experience to achieve success and meet their goals. The commissioning of WCS was no exception as DNSI was contracted to design, develop, build and deploy a major component required for the opening and successful operation of the WCS site. This component, being the Modular Concrete Canister (MCC), is the -work horse- of the site. With its enormous size, weight and strength, it provides many functions that meet and comply with the site performance assessment (PA) under 10 CFR Part 61, the site WAC, and Texas Low-Level Radioactive Waste Disposal Authority. Offsite contracting the production and delivery of this critical component was a major step toward success in meeting schedule and cost for the much needed opening of the Texas Compact and Federal site. In selecting a shielding vendor, WCS partnered with a U.S. Nuclear Service company with over 30 years of experience which spans the entire U.S. Commercial, Federal, and Nuclear Industry. The task given DNSI was not a simple one, it involved every aspect from start to finish of the design, production and delivery of rectangular, cylindrical and -irradiated hardware- (IH) MCCs, that could accept waste up to 100 Sv /Hr contact dose rates. The enormity of this project was quite clear and required extensive quality control, construction of batch plants, purchase of huge quantities of raw materials, setting up a production site in a neighboring city, relocation of personnel from company headquarters, and safely transporting 8,000 Tons of MCC components 75 miles one-way on West Texas highways daily. Most important of all, this was accomplished safely with no incidents, no component failures or rejects, and on schedule. The start of receipt, of -in-compact waste- and -out-of-compact waste- was conducted virtually in a 3 month period time span. To help guarantee success and quality of product, all forms had surfaces machined, heavy duty elastomer coatings were applied to concrete surfaces, only galvanized anchors were used, and the batch plant was run to strict ASME standards thus testing every 50 cubic yards of concrete poured. With significant teamwork and success from Vendors such as DNSI, WCS and the Texas Compact has evolved as one of the leading radioactive waste sites in the U.S. and the world, providing safe, secure and compliant permanent waste disposal services by using technical expertise and innovation of the highest standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Texas authorizes disposal of large quantities of depleted uranium at wcs - 15626

The U.S. Nuclear Regulatory Commission (NRC) has been actively engaged in a rulemaking process that would revise Title 10 of the Code of Federal Regulations (CFR), Part 61, Licensing Requirements for Land Disposal of Radioactive Waste, to govern the disposal of large quantities of Depleted Uranium (DU) and Blended Waste (referred to as Unique Waste Streams). While the NRC plans to propose a Site Specific Analysis (SSA) rulemaking in early 2015, they have already issued guidance to Agreement States which identified general disposal criteria that could be used should a licensee propose to dispose of Unique Waste Streams before their rulemaking was completed. On August 5, 2013, Waste Control Specialists LLC (WCS) submitted a major license amendment application for review and approval to the Texas Commission on Environmental Quality (TCEQ). This major license amendment request proposed, among other things, authorization to dispose of large quantities of DU at its Federal Facility Waste Disposal Facility (FWF). Pursuant to Title 30 of the Texas Administrative Code (TAC), Rule 336.709, Technical and Environmental Analyses, disposal of waste must be sufficient to meet the radiological dose criteria for a minimum period of performance of 1,000 years after closure or the period where peak dose occurs, whichever is longer. These regulations are more stringent than those of any other state that hosts a facility authorized to dispose of Low-Level Radioactive Waste (LLW) in the U.S. On August 28, 2014, the TCEQ approved the major amendment request authorizing disposal of large quantities of DU. During the licensing review process, significant technical issues were successfully resolved ensuring that large quantities of DU could be safely isolated from the biosphere for long time periods after site closure. Many important lessons were learned during the licensing proceedings that have potential significant impacts to the licensed community. Namely that a modern, well designed disposal facility that is properly sited geologically and in an arid environment is ideal for ensuring that long-lived alpha emitting radionuclides are sufficiently isolated to protect public health for long into the future. The DOE is currently finalizing plans to complete a Supplemental Environmental Analysis (EA) to support shipments of DU for disposal at WCS' FWF as required under the National Environmental Policy Act of 1970. The DOE may begin shipments of DU for disposal to WCS FWF that was licensed and constructed to support disposal of waste that is the responsibility of the federal government as stipulated in the Low-Level Radioactive Waste Policy Amendments Act of 1985. This paper will present the regulatory history of events that initiated the NRC's rulemaking for Unique Waste Streams and the technical analysis that were conducted in support of WCS' major amendment that has been approved by the TCEQ. A description of the geological characteristics and engineering designs used to support the Performance Assessment will be included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Legislative and Regulatory Histories Related to Greater-Than-Class-C Low-Level Radioactive Waste - 18602

The history surrounding the legislative and regulatory developments regarding Greater-Than-Class C Low Level Radioactive Waste (GTCC LLW) is both interesting and complex. On October 25, 1978, the U.S. Nuclear Regulatory Commission (NRC) published an Advanced Notice of Proposed Rulemaking pertaining to the development of regulations for the land disposal of LLW. This regulation was one of the first undertaken by NRC since its inception pursuant to the Energy Reorganization Act of 1974. Given the problematic challenges that many States were facing with releases of radioactivity from waste disposal facilities at the time, the technical bases supporting this rulemaking were both forward-thinking and comprehensive. The rule included a waste classification system that was tiered in four waste classes: Class A, B, C and GTCC LLW. On December 27, 1982, the NRC finalized the requirements for disposing of these classes of radioactive waste in Title 10 of the Code of Federal Regulations, Part 61 (10 CFR 61). The NRC established the waste classification system to protect both members of the public and individuals that may someday inadvertently intrude in the waste placed in the disposal facility after expiration of the institutional control period. This waste classification was developed to ensure that radiation doses to members of the public and an inadvertent intruder would not exceed 0.25 mSv y{sup -1} (25 mrem y{sup -1}) or 5.0 mSv y{sup -1} (500 mrem y{sup -1}), respectively. At the time the regulation was promulgated, GTCC LLW was considered generally not suitable for near surface disposal. It was recognized that disposal of GTCC LLW would require disposal technologies having greater confinement capacity or protection than 'normal' near-surface disposal. In 1980 Congress enacted the Low-Level Waste Policy Act of 1980, as amended in 1985 (LLWPAA of 1985) that assigned responsibility of disposing of GTCC LLW generated in the commercial sector or owned or generated by the federal government to the U.S. Department of Energy (DOE). At the time States were having difficulties in developing disposal facilities within the time constraints mandated in the LLWPA of 1980. Therefore, Congress believed that if DOE was assigned responsibility of developing disposal facilities for GTCC LLW, then the States would be more likely to develop new LLW disposal facilities. Congress also assigned the NRC with the responsibility to license the disposal of GTCC LLW generated or owned by the federal government or by the commercial sector. Lastly, Congress changed the definition of LLW that had been defined in the LLWPA of 1980 removing the 'transuranic' exclusionary language. Four years later, on May 25, 1989, the NRC promulgated its regulation needed to implement the mandates specified in the LLWPAA of 1985. The NRC revised 10 CFR 61.55 specifying that the NRC was responsible for licensing the disposal of GTCC LLW. However, it inadvertently did not revise the definition of LLW needed to remove the 'transuranic' exclusionary language in this rulemaking consistent with the LLWPAA of 1985. This seemingly inconsequential omission was not discovered until a Petition for Rulemaking was filed in Texas in July 2014. Moreover, this omission has effectively orphaned waste with certain transuranic radionuclides with concentrations exceeding 100 nanocuries per gram (100 nCi/g). In December 2015, the NRC Commissioners directed its staff to move forward with a rulemaking to resolve this issue and to perform a regulatory analysis to determine whether or not an Agreement State can license the disposal of GTCC LLW pursuant to Section 274 of the Atomic Energy Act of 1954. The paper will discuss past and current legislation, rulemaking, and regulatory developments pertaining to resolving the transuranic waste discrepancy and providing a pathway to disposition GTCC LLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evolution of Stakeholder Relations at the Mound Laboratory-End of DoE's Mission to the Present - 19551

In November 1989, the same month the Berlin Wall fell, the US Environmental Protection Agency (EPA) placed the Mound Laboratory (Mound Plant or Mound site) in Ohio on the National Priorities List (NPL) due to volatile organic compound contamination in the groundwater. As a result of the Cold War ending, the United States sought to greatly reduce the nation's nuclear weapons arsenal, consolidate the US Department of Energy's (DOE) mission, and close many DOE facilities. In 1991, the City of Miamisburg learned that DOE was planning to close the Mound Laboratory. The city spent two years lobbying in Washington, DC, to keep the facility open; however, that effort was not successful. By 1993, DOE, EPA, and Ohio EPA had signed a Federal Facility Agreement that formalized EPA and Ohio EPA oversight of the DOE environmental cleanup of the Mound NPL site under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The decontamination and cleanup of the Mound site fell under two federal laws, CERCLA and the Resource Conservation and Recovery Act. DOE, EPA, Ohio EPA, the City of Miamisburg, and other local stakeholders all agreed that the Mound site should be cleaned up to an industrial/commercial land use standard. This would allow the site to transition into a privately owned business park. In 1994, the City of Miamisburg created the nonprofit Miamisburg Mound Community Improvement Corporation (MMCIC) that would own, market, and redevelop the site. The City also chartered the Mound Reuse Committee to act as an independent advisory organization, composed of representatives from the local community and business, government, education, and special interest groups. In 1994, DOE and the MMCIC entered into a lease agreement that facilitated immediate reuse of site buildings that were no longer required by DOE and did not require remediation. In 1995, DOE, EPA, and Ohio EPA developed the Mound 2000 Process to more effectively use CERCLA Removal Action authority to evaluate and remediate, as necessary, disparate areas of the Mound site. The Mound 2000 process divided the site into smaller, more manageable areas that accelerated cleanup and allowed areas to be reused more quickly. All areas of the Mound site were cleaned up to meet the EPA standard for industrial/commercial land use. The CERCLA process included opportunities for the public to review proposed cleanup strategies. Public input on cleanup and reuse included that from local citizens, businesses, Miamisburg City Council, local schools and financial institutions, Ohio EPA, Montgomery County, and the State of Ohio. In 1998, while site cleanup was still in process, DOE agreed to sell the entire Mound property to the MMCIC for $10.00. The site sales agreement accelerated reuse by allowing DOE to offer ownership of discrete land parcels to MMCIC as soon as EPA confirmed those areas met CERCLA standards for property transfer. This allowed the Mound site to become one of the first former DOE weapons sites to transition to reuse as a privately owned and operated community asset. Many other former DOE production facilities require continued federal ownership to protect the integrity of the environmental cleanup. In 2011, the MMCIC changed its name to the Mound Development Corporation (MDC) and continued to transition the site for reuse as part of the Mound Business Park. The MMCIC/MDC is a nonprofit economic development arm of the City of Miamisburg. DOE supported the economic development efforts with grants and matching funds. Individual land parcels were transferred from DOE to the MDC according to the DOE Mound Land Transfer Process. Ownership of parcels was transferred to the MDC via quitclaim deeds with no repair, replacements, or rebuild of areas. Each parcel's quitclaim deed contains the CERCLA institutional controls. To reduce the property tax burden, the Miamisburg City Council passed an ordinance that allowed the City to accept temporary ownership of specific parcels and hold ownership until the MDC could either lease or sell them. With the exception of one 23-acre parcel that includes the Operable Unit 1 area (site of former sanitary landfill), the entire site has been transferred to the MDC. Today, the former Mound Laboratory site is home to the vibrant Mound Business Park operated by the MDC. The site contains numerous buildings with active businesses and multiple areas suitable for new construction. Private companies continue cutting-edge work that carries forward the legacy of more than 50 years of DOE research, development, production, and inspiration from the former Mound Laboratory scientists, engineers, technicians, and support personnel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidance Development: Management of Low Activity Waste After a Radiological Incident - 19616

The EPA, as the coordinating federal agency for long-term environmental recovery under the National Response Framework, is considering working with other Federal agencies, states and others to develop planning guidance for the management of the large volumes of waste that could result from a radiological incident. The 2017 revision of the PAG Manual contained, for the first time, limited generalized planning guidance on waste disposal; however, more detailed guidance that supports federal, state, and local planning efforts and can be initiated at the earliest stages of an incident would be desirable. This paper provides some of the considerations that EPA is exploring. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 078 - Panel: Start-Up of Three Major DOE Treatment Facilities -SWPF, IWTU and DFLAW (2/2) (R2.4)

This panel focused on the successes and challenges of the DOE High-Level radioactive tank waste management program, with an emphasis on the completion of construction and startup of three major treatment facilities - the Salt Waste Processing Facility (SWPF) at Savannah River, the Integrated Waste Treatment Unit (IWTU) at Idaho, and Direct Feed Low-Activity Waste (DFLAW) processing at Hanford. As a companion to Session 23, DOE managers and federal project directors discussed the status of facility startup efforts from a federal management and oversight perspective, highlighting readiness planning, challenges and lessons learned. Panelists with presentations: Transitioning Oversight: A Project Becomes an Operating Facility (James Folk); Tools for SU/C (Tom Fletcher); Startup and Commissioning -Integrate Waste Treatment Unit-Federal Perspective (Joel Case)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗