Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Upgrading of C1 Building Blocks

This project is developing the centerpiece technology for a market-responsive, integrated biorefinery concept based on the conversion of renewable C1 intermediates (e.g., syngas, CO2, methanol) to a suite of fuels and co-products with improved carbon efficiency, reduced capital expense, and control of the product distribution to meet market demand. Advanced upgrading technologies of syngas are critically needed for the successful commercialization of fuel production at a scale relevant for biomass gasification. Research tasks within this project leverage complementary catalyst and process design for the conversion of CO2-rich syngas (15-20% CO2 in syngas) to achieve high carbon yields of gasoline and jet fuels as the major products. The conversion pathways generate high quality fuels (e.g., high octane gasoline with low aromatics, desirable jet-range hydrocarbons), and potential to achieve favorable cost targets by 2022. Research progress is compared against the Mobil Olefin to Gasoline and Distillate (MOGD) process, which also offers control over the gasoline and distillate products, as an industrial benchmark. The pathway for direct conversion of CO2-rich syngas to hydrocarbon fuels seeks to exceed the carbon efficiency of biomass-sourced MOGD (31.8%). Recent catalyst and process development achievements are highlighted by improvements in carbon-selectivity to fuels and carbon yields, along with evidence of incorporation of carbon from CO2 into the hydrocarbon products.

bioenergy↗

The Spallation Neutron Source Normal Conducting Linac RF System Design for the Proton Power Upgrade Project

The Proton Power Upgrade (PPU) project at the Spallation Neutron Source will double the available proton beam power from 1.4 to 2.8 MW by increasing the beam energy from 1.0 to 1.3 GeV and the beam current from 26 to 38 mA. The increase in beam current resulted in the need to redesign the existing normal conducting linac (NCL) RF Systems. High-power testing of the existing NCL RF Systems configured to accelerate PPU-level beam provided the data used to make the final design decisions. This paper describes the development and execution of those in-situ tests and the subsequent results.

Moss, John↗

Simulations of Beam Chopping for Potential Upgrades of the SNS LEBT Chopper

The LEBT chopper is a critical element of the SNS accelerator system. In this work, the benefit of increasing the chopping voltage amplitude for the present chopping pattern is shown with beam simulations, and an ongoing hardware upgrade of the chopper pulser units is discussed. In addition, with the prospect of higher voltage capability of the new pulser design, two alternative chopping patterns which reduce the switching frequency of the chopper pulsers down to 1/2 or 1/4 of the present chopping pattern, are also explored with beam simulations.

Han, Baoxi↗

The Phase-2 Upgrade of the CMS Tracker

This is a draft version of the CMS TDR devoted to the upgrade of the CMS tracker in view of the HL-LHC running. The final document will be uploaded in a future occasion. This version is only meant to start the procedure and get the LHCC report number, so that we can conclude the preparation of the final document.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The Phase-2 Upgrade of the CMS Level-1 Trigger

This Technical Design Report describes the ongoing developments and plans towards the upgrade of the CMS Level-1 trigger for the High-Luminosity Large Hadron Collider.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integration of CO2 Electrolysis with Microbial Syngas Upgrading to Rewire the Carbon Economy

This project has worked towards demonstrating and understanding the conversion of waste CO2 into value added fuels and chemicals. If successful, our proposed technology will incentivize CO2 capture and can add carbon efficiency to biorefineries. We have integrated two conversion technologies to demonstrate a novel approach of combining electrolytic CO2 reduction with biocatalytic CO upgrading. Industrial partners 3M and Dioxide Materials have recently demonstrated electrolytic conversion of CO2 and water to syngas using inexpensive renewable energy. Concurrently, supporting partner Lanzatech has demonstrated industrial scale CO fermentation using steel mill waste CO as a substrate. This presentation will highlight the investment BETO has made to establish a CO2 electrolysis test station and CO fermentation at NREL. We will also discuss the process of increasing the size of the electrolyzers to meet fermentation needs, along with the investigation into the affect CO2 concentration and contaminates have on electrolyzer efficiency, lifetime, and specificity. Additionally, we have begun to examine the downstream impact of electrolyzer off-gas CO:H2 ratios have on the metabolism of C. autoethanologen. Experimental results along input from our industrial partners have led to a baseline techno-economic and life cycle analyses. These results enabled the identification of key cost drivers and carbon intensity of the process. We have used these metrics to identify technology gaps to iteratively inform the process optimization and potential deployment siting to achieve economically viable, sustainable conversion of biopower-derived flue gases to fuels and chemical intermediates.

bioenergy↗

Megawatt upgrade of NuMI target system

Fermilab operates the world’s highest power neutrino target system, called the Neutrinos at the Main Injector (NuMI) to provide intense neutrino flux to the NuMI Off-axis $\nu_{\mu}$ Appearance (NOvA) near and far neutrino detectors to reveal mysterious property of neutrinos. We report a progress of the NuMI beam power upgrade plan at Fermilab to transport a 1-Mega Watt (MW) proton beam to the high power neutrino target. The latest beam power record is 870 kW in Fall 2021.

Yonehara, Katsuya↗

Best Practices for Upgrading Fluorescent Troffers to LED

This fact sheet provides guidance on the various factors to consider when deciding on an LED upgrade for a fluorescent system, such as installation costs, operating costs, desired lighting levels, and performance criteria.

lighting, LED, troffer, retrofit, fluorescent, lum↗

SLAC LINAC Sub-booster Modulator Upgrading with Solid State Switch

The LINAC sub-booster modulator was designed in last 60s decade and has serviced SLAC LINAC about 60 years without primary switching upgrade. The primary switch for high power pulse is vacuum tetrode switch. Recently the vacuum switch price has surged, probably because more and more customers have shifted to the solid-state switch from the vacuum switch. With the foresight of the vacuum switch will finally become obsolete in market, the solid-state switch has been tested in SLAC LINAC sub-booster modulator and the performance is evaluated. In this paper, the design and performance will be reported.

Chen, Xupeng↗

Rare Higgs Processes at CMS and Precision Timing Detector Studies for HL-LHC CMS Upgrade

This thesis describes the search for two rare Higgs processes. The first analysis describes the CMS Run 2 search for $H$ $\rightarrow$ $\mu$$\mu$ decays, with 137.3 fb$^{-1}$ of data at $\sqrt{s}$ = 13 TeV. The analysis targeted four different Higgs production modes: the gluon fusion (ggH), the vector boson fusion (VBF), the Higgs-strahlung process (VH), and the production in association with a pair of top quarks (ttH). Each category used a dedicated machine learning based classifier to separate the signal from the background processes. A combined fit from all these categories saw a slight excess in the data corresponding to 3.0 standard deviations at $M$$_{H}$ = 125.38 GeV, and gave the first evidence for the Higgs boson decay to second-generation fermions. The best-fit signal strength and the corresponding 68% CL interval was found to be +0.17?????? = 1.19 $_{-0.39}^{+0.41}$ (stat)$_{-0.16}^{+0.17}$(syst) at $M$$_{H}$ = 125.38 GeV. The second analysis describes the CMS Run 2 search for 𝐻𝐻 → 𝑏𝑏𝑏𝑏 with highly boosted Higgs bosons. This analysis used a dedicated jet identification algorithm based on graph neural networks (ParticleNet) to identify boosted H→ bb jets. This search targeted the gluon fusion and the vector boson fusion HH production modes, and put constraints on the allowed values of the various Higgs couplings as: 𝜅𝜆 ∈ [−9.9, 16.9] when 𝜅𝑉 = 1, 𝜅2𝑉 = 1; 𝜅𝑉 ∈ [−1.17, −0.79] ∪ [0.81, 1.18] when 𝜅𝜆 = 1, 𝜅2𝑉 = 1; 𝜅2𝑉 ∈ [0.62, 1.41] when 𝜅𝜆 = 1, 𝜅𝑉 = 1. A scenario with 𝜅2𝑉 = 0 was excluded with a significance of 6.3 standard deviations for the first time, when other H couplings are fixed to their SM values. The combined observed (expected) 95% upper limit on the HH production cross section was found to be 9.9 (5.1) × SM. Finally, this thesis also discusses the planned MIP Timing Detector (MTD) upgrade for CMS at the HL-LHC. The MTD will be a time-of-flight (TOF) detector, designed to provide a precision timing information for charged particles using SiPMs + LYSO scintillating crystals, with a time resolution of ∼30 ps. This thesis describes several R&D tests that have been performed for characterizing the sensor properties (time resolution, light yield, etc.) and optimizing the sensor design geometry. This thesis also contains a description of mock test setups for cooling the sensors, since it is known to be an effective way of mitigating the increased dark current rates in the sensors due to radiation damage.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assembly and Test of a 120 mm Bore 15 T Nb(3)Sn Quadrupole for the LHC Upgrade

In support of the Large Hadron Collider (LHC) luminosity upgrade, the US LHC Accelerator Research Program (LARP) has been developing a 1-meter long, 120 mm bore Nb$_3$Sn IR quadrupole magnet (HQ). With a design short sample gradient of 219 T/m at 1.9 K and a peak field approaching 15 T, one of the main challenges of this magnet is to provide appropriate mechanical support to the coils. Compared to the previous LARP Technology Quadrupole and Long Quadrupole magnets, the purpose of HQ is also to demonstrate accelerator quality features such as alignment and cooling. So far, 8 HQ coils have been fabricated and 4 of them have been assembled and tested in HQ01a. This paper presents the mechanical assembly and test results of HQ01a.

43 PARTICLE ACCELERATORS↗

Separation, recovery and upgrading of biomass derived 2,3-butanediol

The invention relates to a two-way approach to isolate, recover and upgrade 2,3-Butanediol (2,3-BDO) from fermentation broth. A complete separation and recovery process for 2,3-BDO using acetalization and trans-acetalization sequence. Acetalization with butyraldehyde using heterogeneous catalysts, either Amberlyst-15® or Nafion NR50®, efficiently isolates 2,3-BDO as phase-separated protected dioxolane. The approach provides significant process advantages with easy product recovery and high recyclability of the catalyst. Trans-acetalization of dioxolane with methanol (methanolysis) followed by distillation of acetal, yielded very high purity 2,3-BDO with about 90% isolated yield. Alternatively, dioxolane is used in a process direct to methyl ethyl ketone (MEK) as a BDO synthon allowing for recovery of the aldehyde.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Role of the CEBAF Element Database in Commissioning the 12GeV Accelerator Upgrade

The CEBAF Element Database (CED) was first developed in 2010 as a resource to support model-driven configuration of the Jefferson Lab Continuous Electron Beam Accelerator (CEBAF). Since that time, its uniquely flexible schema design, robust programming interface, and support for multiple concurrent versions has permitted it to evolve into a more broadly useful operational and control system tool. The CED played a critical role before and during the 2013 startup and commissioning of CEBAF following its 18-month long shutdown and upgrade. Information in the CED about hardware components and their relations to one-another facilitated a thorough Hot Checkout process involving more than 18,000 system checks. New software relies on the CED to generate EDM screens for operators on-demand thereby ensuring that the information on those screens is correct and up-to-date. The CED also continues to fulfill its original mission of supporting model-driven accelerator setup. Using the new ced2elegant and eDT (elegant Download Tool), accelerator physicists have proven able to compute and apply energy-dependant set points with greater efficiency than ever before.

Larrieu, T.↗

Higher Order Modes Damping and Multipacting Analysis for the SPX Deflecting Cavity in APS Upgrade

A single-cell superconducting deflecting cavity operating at 2.815 GHz has been proposed and designed for the Short Pulse X-ray (SPX) project for the Advanced Photon Source (APS) upgrade. Each deflecting cavity is equipped with one fundamental power coupler (FPC), one lower order mode (LOM) coupler, and two higher order mode (HOM) couplers to achieve the stringent damping requirements for the unwanted modes. Using the electromagnetic simulation suite ACE3P, HOM damping will be calculated for the cavity including the full engineering design waveguide configurations and rf windows. Trapped modes in the bellows located in the beampipes connecting the cavities in a cryomodule will be computed and their effects on heating evaluated. Furthermore, multipacting activities at the end groups of the cavity will be identified to assess possible problems during high power processing.

Li, Z.↗

Electrons to Molecules by Engineering and Evolution: Biological Upgrading of Formate by Cupriavidus necator

Waste carbon from industrial point sources can be captured, stored, and/or transformed using electrochemical conversion or "electrons to molecules" technologies using low-cost renewable electricity. One such process involves electrocatalytic reduction of CO2 to generate formate/formic acid, a C1 carboxylic acid. Formate is a promising potential feedstock for microbial upgrading, as it is water soluble and can be consumed as the sole source of carbon and energy by some microbial species, such as the soil bacterium Cupriavidus necator. Here we will present progress toward improving C. necator as a host for biological conversion of formate to value-added products. Using the power of adaptive laboratory evolution, we were able to isolate mutants of C. necator with significantly faster growth rates on formate. We then sequenced the genomes of these strains, elucidated the metabolic role of the mutations we found, and then used these insights to build rationally engineered strains that outperform even the best evolved isolates. These results highlight the utility of "genome streamlining" as a route for generating platform strains with potential industrial applications.

adaptive laboratory evolution↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration: Preprint

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Digital I and C system upgrade integration technique

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Darlington tritium removal facility and station upgrading plant dynamic process simulation

Ontario Power Generation Nuclear (OPGN) has a 4 x 880 MWe CANDU nuclear station at its Darlington Nuclear Div. located in Bowmanville. The station has been operating a Tritium Removal Facility (TRF) and a D{sub 2}O station Upgrading Plant (SUP) since 1989. Both facilities were designed with a Distributed Control System (DCS) and programmable logic controllers (PLC) for process control. This control system was replaced with a DCS only, in 1998. A dynamic plant simulator was developed for the Darlington TRF (DTRF) and the SUP, as part of the computer control system replacement. The simulator was used to test the new software, required to eliminate the PLCs. The simulator is now used for operator training and testing of process control software changes prior to field installation. Dynamic simulation will be essential for the ITER isotope separation system, where the process is more dynamic than the relatively steady-state DTRF process. This paper describes the development and application of the DTRF and SUP dynamic simulator, its benefits, architecture, and the operational experience with the simulator. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗