At least 1,351 records · Page 75

Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impacted groundwater

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter). All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 411: Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

The Corrective Action Unit (CAU) 411 Closure Report (CR) was published in June 2016 (NNSA/NFO, 2016). The purpose of this addendum is to clarify language in the CR relating to the field instrument for the detection of low-energy radiation (FIDLER), provide the waste disposal documentation for waste generated during the corrective action investigation (CAI), and reference a letter from the U.S. Air Force (USAF) regarding the closure of CAU 411.

54 ENVIRONMENTAL SCIENCES↗

Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report - December 2016.

This Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report (CCM/CME Report) has been prepared by the U.S. Department of Energy (DOE) and Sandia Corporation (Sandia) to meet requirements under the Sandia National Laboratories-New Mexico (SNL/NM) Compliance Order on Consent (the Consent Order). The Consent Order, entered into by the New Mexico Environment Department (NMED), DOE, and Sandia, became effective on April 29, 2004. The Consent Order identified the Tijeras Arroyo Groundwater (TAG) Area of Concern (AOC) as an area of groundwater contamination requiring further characterization and corrective action. This report presents an updated Conceptual Site Model (CSM) of the TAG AOC that describes the contaminant release sites, the geological and hydrogeological setting, and the distribution and migration of contaminants in the subsurface. The dataset used for this report includes the analytical results from groundwater samples collected through December 2015.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-3-3 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

Well ER-3-3 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from February 21 to March 15, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the WAGTAIL (U3an) underground test.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 1

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter) for a portion of the Tertiary volcanic section near the water table. Tritium concentrations were at or near the field detection limit in the Lower carbonate aquifer (LCA) while drilling. During drilling, a sample was collected while circulating in the LCA. The sample was submitted for off-site laboratory analysis. The sample results indicated low but measurable tritium concentrations. All Fluid Management Plan requirements were met during drilling activities.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-4-1 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

Well ER-4-1 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from March 23 to April 13, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the groundwater flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the STRAIT (U4a) underground test. The completed well includes one piezometer (p1), to a depth of 663.16 meters (m) (2,175.71 feet [ft]) below ground surface (bgs) and open from the Alluvial aquifer (AA3) to the Oak Spring Butte confining unit (OSBCU) hydrostratigraphic units; and a main completion (m1), which includes 6.625-inch (in.) casing with slotted interval (m1) installed to 906.80 m (2,975.05 ft) bgs in the Lower carbonate aquifer (LCA). A 13.375-in. diameter surface casing was installed from the surface to a depth of 809.00 m (2,654.21 ft) bgs. Well ER-4-1 experienced a number of technical issues during drilling, including borehole instability and sloughing conditions. An intermediate, 10.75-in./9.625-in. casing string was installed to 856.94 m (2,811.48 ft) bgs to control these issues. Borehole stability and erosion problems appear to be associated with the Tunnel Formation (Tn) and the Older tunnel beds (Ton). Overall efforts to stabilize the borehole were successful. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), a partial suite of geophysical logs to a maximum depth of 766.57 m (2,515 ft) bgs, water-quality measurements (including tritium), water-level measurements, and two depth-discrete bailer samples collected at 538.89 m and 646.18 m (1,768 ft and 2,120 ft) bgs respectively. The well penetrated 187.45 m (615 ft) of Quaternary/Tertiary alluvium (QTa), 671.47 m (2,203 ft) of Tertiary Volcanic rocks (Tv), and 66.20 m (217.19 ft) of Paleozoic rocks (|). The stratigraphy and lithology were generally as expected with some exceptions. The top of Paleozoic rocks (|) was predicted to occur at 822.35 m (2,698 ft) bgs and was intercepted at 858.93 m (2,818 ft), a difference of 36.58 m (120 ft). As expected, the Paleozoic rocks (|) are the principal water producing formation in Well ER-4-1. Depth to water was measured after drilling as follows: In the piezometers: p1 at 320.39 m (1,051.16 ft) bgs, (measured January 4, 2017); and in the main production casing interval: m1 at 539.17 m (1,768.92 ft) bgs, (measured December 12, 2016) Geophysical logs and depth-discrete bailer sample analytical results suggest likely zones of prompt injection (underground-test-related) fission products from 472.44 to 481.48 m (1,550 to 1,580 ft) bgs and at approximately 539.50 m (1,770 ft) bgs. Subsequent work at Well ER-4-1 will be included in future reports. Field measurements for tritium were mostly below the Safe Drinking Water Act limit (20,000 picocuries per liter) with the exception of two zones showing elevated tritium concentrations. The first zone is located at approximately 365.76 to 390.14 m (1,200 to 1,280 ft) bgs and a second zone at approximately 542.54 to 566.93 m (1,780 to 1,860 ft) bgs. All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Corrections to the General (2,4) and (4,4) FDTD Schemes

The sampling weights associated with two general higher order FDTD schemes were derived by Smith, et al. and published in a IEEE Transactions on Antennas and Propagation article in 2012. Inconsistencies between governing equations and their resulting solutions were discovered within the article. In an effort to track down the root cause of these inconsistencies, the full three-dimensional, higher order FDTD dispersion relation was re-derived using Mathematica TM . During this process, two errors were identi ed in the article. Both errors are highlighted in this document. The corrected sampling weights are also provided. Finally, the original stability limits provided for both schemes are corrected, and presented in a more precise form. It is recommended any future implementations of the two general higher order schemes provided in the Smith, et al. 2012 article should instead use the sampling weights and stability conditions listed in this document.

97 MATHEMATICS AND COMPUTING↗

Revised Tijeras Arroyo Groundwater Current Conceptual Model and Corrective Measures Evaluation Report - February 2018.

The U.S. Department of Energy (DOE) and the management and operating (M&O) contractor for Sandia National Laboratories beginning on May 1, 2017, National Technology & Engineering Solutions of Sandia, LLC (NTESS), hereinafter collectively referred to as DOE/NTESS, prepared this Revised Tijeras Arroyo Groundwater Current Conceptual Model (CCM) and Corrective Measures Evaluation (CME) Report , referred to as the Revised CCM/CME Report, to meet requirements under the Sandia National Laboratories-New Mexico (SNL/NM) Compliance Order on Consent (Consent Order). The Consent Order became effective on April 29, 2004. The Consent Order identifies the Tijeras Arroyo Groundwater (TAG) Area of Concern (AOC) as an area of groundwater contamination requiring further characterization and corrective action. In November 2004, New Mexico Environment Department (NMED) approved the July 2004 CME Work Plan. In April 2005, DOE and the SNL M&O contractor at the time, Sandia Corporation (Sandia), hereinafter collectively referred to as DOE/Sandia, submitted a CME Report, but NMED did not finalize review of that document. In December 2016, DOE/Sandia submitted a combined and updated CCM/CME Report. NMED issued a disapproval letter in May 2017 that included comments on the December 2016 CCM/CME Report. In August 2017, NMED and DOE/NTESS staff held a meeting to discuss and clarify outstanding issues. This Revised CCM/CME Report addresses (1) the issues presented in the NMED May 2017 disapproval letter and (2) findings from the August 2017 meeting.

54 ENVIRONMENTAL SCIENCES↗

AFCI Glovebox Radiological Release - Evaluation, Corrective Actions and Testing

Scope of Report Releases of airborne radioactivity occurred in the Advanced Fuel Cycle Initiative (AFCI) glovebox enclosure (room) located in the Fuel Manufacturing Facility (FMF) at the Idaho National Laboratory (INL) in late August and early September, 2014. The subsequent investigation activities identified two primary issues: 1) The AFCI glovebox confinement was compromised providing a pathway for airborne radiological contamination releases, particularly when arc melting activities with transuranics were performed. 2) The Continuous Air Monitors (CAMs) located in the AFCI enclosure did not correctly identify americium (Am)-241 (predominant isotope in release) and provided nonconservative responses. This report documents the results of the investigations into both issues and the corrective actions taken. Finally, lessons learned are provided.

99 GENERAL AND MISCELLANEOUS↗

Doppler Broadening Resonance Correction for Free-gas Scattering in MCNP6.2

The traditional treatment for epithermal neutron scattering in continuous-energy Monte Carlo codes is the free-gas scattering model with the scattering cross-section assumed constant in energy. Ouislomen and Sanchez demonstrated in 1991 that scattering resonances can cause significant departures from the free-gas model, and Becker proposed a correction to the Monte Carlo free-gas scattering model in 2009. Becker’s Doppler Broadening Resonance Correction was tested in mcnp5 in 2011 and recently implemented in mcnp6.2 .

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Investigation of Computational Corrections to X-Ray Computed Tomography for Dimensional Metrology of Complex Additively Manufactured Parts

X-ray computed tomography (CT) is a nondestructive evaluation technique that may be used to image complex internal features without the line-of-sight restrictions inherent in conventional optical and contact (stylus) metrology instrumentation. Applications of CT metrology include material defects (porosity), dimensions and surface texture. However, scan artifacts, such as streaking, caused primarily by beam hardening and scatter, limit the accuracy of CTbased metrology. Reduction of these artifacts would improve the accuracy material properties and dimensional metrology information. This paper reports on the development of additively manufactured (AM) Ti5553 and 316L measurement phantoms with integral lattice (lattice) structures specifically designed to exhibit these artifacts. The phantoms were scanned in three CT systems and a scanning-probe CMM measurement. Surfaces generated from uncorrected CT data exhibited “dimple” defects that are not present in the CMM measurement. Correction methods were developed in Livermore Tomography Tools (LTT) software and this paper reports on the successful correction of these artifacts. This work is expected to have application in areas where characterization of defects, dimensions and surface texture using CT are critical.

42 ENGINEERING↗

Investigation of Automated Corrective Actions for Special Protection Schemes

The constantly evolving nature of the grid is compelling the design process of Remedial Action Schemes (RAS) to keep up with the changes. This document proposes a flexible and computationally efficient approach to automatically determine RAS corrective actions that alleviate line overloading violations. Statistical and functional characteristics summarized from RAS implemented in real power systems are used to guide the design parameters. This report also leverages sensitivity-based techniques to determine corrective actions for specific contingencies quickly without repeated numerical simulations. Finally, future directions for implementing this approach for a fully automated, online RAS are discussed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pahute Mesa-Oasis Valley Hydrostratigraphic Framework Model for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada (Rev. 0)

A new, revised three-dimensional (3-D) hydrostratigraphic framework model (HFM) for the Central and Western Pahute Mesa Corrective Action Units 101 and 102 was completed in 2019. The initial (Phase I) model was completed in 2002 and was documented in A Hydrostratigraphic Model and Alternatives for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada (BN, 2002). Subsequent flow and transport modeling revealed the need to collect additional data to reduce uncertainties. The Phase II data collection and characterization effort included extensive well drilling and testing activities, and rebuilding of the Phase I 3-D HFM, resulting in the Phase II HFM (NSTec, 2014). Further drilling (Well ER-20-12), data collection, and interpretive work (e.g., Thirsty Canyon Lineament [Wurtz and Day, 2018]) were incorporated into the Pahute Mesa-Oasis Valley (PM-OV) HFM. The PM-OV HFM incorporates the area of interest from the Phase II HFM and adds additional areas, primarily to the north and west with minor additions to the south and east. The new, expanded area matches the PM-OV groundwater basin as defined in Fenelon et al. (2016) and includes Pahute Mesa, a former nuclear testing area at the Nevada National Security Site; and Oasis Valley, a groundwater discharge area downgradient from contaminant source areas on Pahute Mesa. The data and information necessary to build the PM-OV HFM are provided in Navarro (2019). The PM-OV HFM will be used by hydrologic modelers who are tasked with developing a model to determine how contaminants are transported by groundwater flow in an area of complex geology. The model area is large (more than 6,250 square kilometers) and geologically complex, including Paleozoic- to Mesozoic-age structures (e.g., thrust faults, Thirsty Canyon Lineament), at least seven Tertiary-age calderas, several intrusive bodies, and many relatively recent basin-and-range normal faults. Investigators from the U.S. Geological Survey; National Security Technologies, LLC; National Laboratories; and U.S. Department of Energy contractors have organized the more than 300 volcanic units and other rocks in the model area into 77 hydrostratigraphic units (HSUs). The volcanic rocks are subdivided into 42 aquifers, 11 confining units, and 9 composite units (containing both aquifer and confining unit rocks). The underlying pre-Tertiary rocks were divided into 5 HSUs, comprising 2 aquifers and 3 confining units. The model also includes 1 alluvial aquifer unit, 8 intrusive confining units, and 1 granite confining unit. The model depicts the thickness, extent, and geometric relationships of these HSUs (“layers” in the model) along with all the major structural features that control them, including calderas and faults. The most substantive differences between the Phase II HFM and the PM-OVHFM include (1) addition of the new data and resulting revised interpretations from the additional area encompassed by the PM-OV groundwater basin; (2) incorporation of 16 new faults; (3) 12 boreholes from the northern extension; (4) 2 additional caldera-collapse collars; and (5) correlation of the simulated faulting and hydrostratigraphy in the eastern part of the model domain with the delineations represented in the neighboring Rainier Mesa-Shoshone Mountain HFM-Prime and Yucca Flat-Climax Mine HFM. All PM-OV HFM delineations were based on published and unpublished data from geophysical investigations, surface geologic maps, and drill-hole records. Phase II approached model uncertainty using the model-building software to test model configurations and hydrologic consequences using a range of values for parameters such as fault offset amounts and HSU elevations. The PM-OV HFM expands on this approach to encompass the entire PM-OV groundwater basin.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area (UGTA) Closure Report for Corrective Action Unit 99: Rainier Mesa/Shoshone Mountain, Nevada National Security Site, Nevada

This closure report (CR) has been prepared for Corrective Action Unit (CAU) 99, Rainier Mesa/Shoshone Mountain (RM/SM), Nevada National Security Site (NNSS), Nevada. Rainier Mesa (RM) was the site of 61 underground nuclear tests, and Shoshone Mountain (SM) was the site of 6 underground nuclear tests. The corrective action for the RM/SM CAU is closure in place with long-term monitoring and institutional controls; and involves a balance of modeling, monitoring, and institutional controls.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area (UGTA) Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada (Closure Report)

This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from groundwater impacted by the underground nuclear testing within the YF/CM CAU. The purpose of the CR is to describe the selected corrective action. Summarize previous activities and conclusions that support CAU closure. Present final contaminant boundaries, use restriction (UR) boundaries, and regulatory boundaries. Provide an implementation plan for long-term monitoring and well network maintenance and identify the approaches and policies for institutional controls.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗