Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

NorthernSTAR 1.5-Story Demonstration House of Cold Climate Solutions for Affordable Housing

This is a NorthernSTAR renovation project for Urban Homeworks incorporating installation of a combination space and water heater, Overcoat insulation retrofit on the roof, and Excavationless foundation insulation retrofit. STRUCTURE - 1401 North 16th Ave Minneapolis, MN 55411 Various groups from the affordable housing industry have consulted with the University of Minnesota's Cold Climate Housing Program to solve persistent energy and health-related problems such as ice dams, high energy bills, and mold/moisture issues-especially in complicated house types such as 1.5-story homes in cold climates. The NorthernSTAR Building America Partnership has completed multiple research projects on high-performance measures applied during renovation of single-family homes that could help the affordable housing industry address performance concerns. This demonstration project is an example of three high-performance measures applied to one house in Minneapolis, Minnesota. The selected vacant home was completely renovated by Urban Homeworks (UHW), which is a nonprofit housing partner, with the intent of selling the home to a low-income family. The renovation included the addition of the three advanced-performance technologies that were applied to the overall scope of the project. Single-family homes in urban areas that are available for renovation by nonprofit developers are often in need of repair. Budgeting has historically focused on improving homes to meet basic housing standards. A rising interest in the long-term impact of homeownership has introduced the need to balance basic needs with home performance. The goal of this demonstration project was to help UHW and other nonprofit developers become familiar with three U.S. Department of Energy Building America performance measures-including the installation processes, impacts, and benefits of each. To maximize efficiency of application and to address budget issues, the NorthernSTAR team worked with UHW to identify ways to use volunteers and construction training programs to install the measures. An open invitation to visit the job site was provided to other nonprofit developers and support teams to encourage dialog about the systems during live installation.

affordable housing↗

Independent Confirmatory Survey Summary and Results for the Enrico Fermi Atomic Power Plant, Unit 1, Newport, Michigan (Final Report No. 2)

The Enrico Fermi Atomic Power Plant, Unit 1 (Fermi 1) was a fast breeder reactor design that was cooled by sodium and operated at essentially atmospheric pressure. On May 10, 1963, the Atomic Energy Commission (AEC) granted an operating license, DPR-9, to the Power Reactor Development Company (PRDC), a consortium specifically formed to own and operate a nuclear reactor at the Fermi 1 site. The reactor was designed for a maximum capability of 430 megawatts (MW); however, the maximum reactor power with the first core loading (Core A) was 200 MW. The primary system was filled with sodium in December 1960 and criticality was achieved in August 1963. The reactor was tested at low power during the first couple years of operation. Power ascension testing above 1 MW commenced in December 1965 immediately following the receipt of a high-power operating license. In October 1966 during power ascension, zirconium plates at the bottom of the reactor vessel became loose and blocked sodium coolant flow to some fuel subassemblies. Two subassemblies started to melt and the reactor was manually shut down. No abnormal releases to the environment occurred. Forty-two months later after the cause had been determined, cleanup completed, and the fuel replaced, Fermi 1 was restarted. However, in November 1972, PRDC made the decision to decommission Fermi 1 as the core was approaching its burn-up limit. The fuel and blanket subassemblies were shipped off-site in 1973. Following that, the secondary sodium system was drained and sent off-site. The radioactive primary sodium was stored on-site in storage tanks and 55 gallon (gal) drums until it was shipped off-site in 1984. The initial decommissioning of Fermi 1 was completed in 1975. Effective January 23, 1976, DPR-9 was transferred to the Detroit Edison Company (DTE) as a 'possession only' license (DTE 2010a). This report details the confirmatory activities performed during the second Oak Ridge Institute for Science and Education (ORISE) site visit to Fermi 1 in November 2010. The survey was strategically planned during a Unit 2 (Fermi 2) outage to take advantage of decreased radiation levels that were observed and attributed to Fermi 2 from the operating unit during the first site visit. However, during the second visit there were elevated radiation levels observed and attributed to the partially dismantled Fermi 1 reactor vessel and a waste storage box located on the 3rd floor of the Fermi 1 Turbine Building. Confirmatory surveys (unshielded) performed directly in the line of sight of these areas were affected. The objective of the confirmatory survey was to verify that the final radiological conditions were accurately and adequately described in Final Status Survey (FSS) documentation, relative to the established release criteria. This objective was achieved by performing document reviews, as well as independent measurements and sampling. Specifically, documentation of the planning, implementation, and results of the FSS were evaluated; side-by-side FSS measurement and source comparisons were performed; site areas were evaluated relative to appropriate FSS classification; and areas were assessed for residual, undocumented contamination.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Energy Calculator for Simple Commercial Buildings

According to the EIA, simple commercial buildings account for 97% of total commercial building stock. However, most simple commercial buildings for example small- to mid-sized offices, retail, schools and warehouses do not benefit from the data-driven decision-making capabilities of whole-building energy modeling. The high cost of custom modeling limits the use of energy modeling of simple buildings for new construction or retrofit measures. Lack of tools providing helpful information on interactive savings estimates creates difficulties in meeting aggressive decarbonization and energy efficiency goals for simple building designers and utility program managers. This paper reviews a beta phase Simple Building Calculator with the ability to generate relatively accurate and interactive modeling results based on a limited but robust set of inputs. It can evaluate whole-building or single measure savings in new or existing buildings, compare measure package choices, or provide simplified performance modeling for energy codes and utility incentives. The tool combines physical (annual whole building prototype simulation) and statistical modeling techniques to predict annual energy performance. It supports a variety of building characteristics for envelope, HVAC, and lighting with parameters ranging from vintage to max tech configurations, as well as support for single-zone and simple multi-zone HVAC systems. The Simple Building Calculator was designed to provide immediate feedback for otherwise computationally intensive tasks like measure comparison, development of multiple measure package combinations, or verification that measures meet efficiency targets—all with the goal of providing a tool for quick annual energy simulation of simple commercial buildings.

Hart, Reid↗

MAN-004 Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates.

42 ENGINEERING↗

Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.

42 ENGINEERING↗

Glass Formulation for Next Generation Melters

This report describes glass formulation work performed at the Vitreous State Laboratory (VSL) to support the development and testing of next generation advanced joule-heated ceramic melters (NG AJHCMs). The principal objective was to develop and test new glass formulations to take advantage of the enhanced processing capabilities of the NG AJHCMs. New glass formulations were designed to maximize waste loadings while meeting all processing and product quality requirements. The increase in waste loadings, together with the improvements afforded by the NG AJHCMs, will potentially reduce the glass volumes while increasing the throughput rates. Newly developed glass formulations will be needed in melter testing to demonstrate the feasibility of NG AJHCM technologies. This work builds on previous work performed at VSL to increase waste loading and processing rates for Hanford high-iron and high-chromium high level waste (HLW) streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coal-Filler-Based Thermoplastic Composites as Construction Materials: A New Sustainable End-Use Application

This paper investigates coal’s viability as an alternative filler to wood flour in Wood Plastic Composites (WPCs) – a class of materials used in building applications in lieu of pressure-treated wood. Coal Plastic Composites (CPCs) were fabricat-ed with 15 – 60 wt.% coal combined with high density polyethylene and their physical (mechanical, water absorption and metal leaching) and chemical (oxidative degradation and flammability) properties were compared with commercial WPCs. In addition, mass and energy balances (10 tonne/hr basis) and life cycle analyses (60 wt.% filler and 1 tonne ba-sis) were conducted on CPCs and WPCs to assess environmental impact during manufacturing. At 60 wt.%, CPCs had a higher flexural strength, slower oxidative degradation and burn rate, and lower water absorption in comparison to com-mercial WPCs, suggesting better performance and stability in building applications. Furthermore, CPC manufacturing showed 44% lower greenhouse gas emissions and 62% less energy usage in comparison with WPC. These results indi-cate that direct utilization of coal as a filler in construction composite applications may yield lower cost products with lower associated emissions and energy demand compared to existing WPC materials, potentially yielding a more sustain-able end-use for coal than current uses such as power production.

Coal Plastic Composites, Wood Plastic Composites, ↗

Evaluation of the U.S. Department of Energy Challenge Home Program Certification of Production Builders - Chicago, IL and Devens, MA

TO4 Task 3.1 - K Hovnanian Chicago, IL DOE Challenge Home Program Certified Home Constructed and Verified Specifications DOE Challenge Home Building envelope Ceiling R-49 blown fiberglass, Grade I Walls 2x4 framing @ 16 o.c. with R-13 fiberglass batts, Grade I and 1"" R-5 extruded polystyrene (XPS) insulating sheathing Frame Floors R-38 blown fiberglass, Grade I Basement Walls R-19 fiberglass batts draped full height, Grade I Basement Slab uninsulated Windows Above Grade: ENERGY STAR certified, U=0.29, SHGC=0.28 Basement: Non ENERGY STAR certified, U=0.29, SHGC=0.24 Infiltration 2 ACH 50 Mechanical systems Heat 95% AFUE sealed combustion natural gas furnace in conditioned space Goodman GMH950703BXAF Cooling 13 SEER split system Goodman GSX130301BC DHW AO Smith Vertex 100 0.96 EF natural gas tank water heater in 2nd floor utility closet Hot Water Distribution Redesigned trunk and branch Compliant with EPA WaterSense Efficient Distribution Requirements Ducts Located 100% in conditioned space via floor joists leak free to outside (5% or less) Ventilation Central Fan Integrated Supply (CFIS) ventilation with 6"" insulated outside air duct Fan Controller: Air Cycler FRV, with 6"" motorized damper 50 CFM outside air flow, 33% duty cycle (10 minutes on, 20 minutes off); ASHRAE 62.2-2010 compliance via an exhaust fan - Panasonic FV-08VQ5 WhisperCeiling Rerturn Pathways Active Return at Master Bedroom Transfer Grilles in Secondary Bedrooms Appliances, Lighting, MELs Lights 80% ENERGY STAR certified CFL Appliances ENERGY STAR certified refrigerator, dishwasher, and clothes washer; Natural gas range/oven and clothes dryer" STRUCTURE - Test House Lot 145 - 2013 DOE Challenge Test House Task 3.1 Bolingbrook, IL 60490 House is constructed and is DOE Challenge Verified by Don Nelson, a local rater. The purpose of this project was to evaluate integrated packages of advanced measures in individual test homes to assess their performance with respect to Building America Program goals, specifically compliance with the DOE Challenge Home Program. To that end, Building Science Corporation (BSC) consulted on the construction of five test houses by three cold climate production builders in three separate U.S. cities. (1) K. Hovnanian Homes, Chicago, Illinois (2) David Weekley Homes, Denver, Colorado (3) Transformations, Inc., Devens, Massachusetts. Overall, the builders have concluded that the energy related upgrades (either through the prescriptive or performance path) represent reasonable upgrades. The builders commented that while not every improvement in specification was cost effective (as in a reasonable payback period), many were improvements that could improve the marketability of the homes and serve to attract more energy efficiency discerning prospective homeowners. However, the builders did express reservations about the associated checklists and added certifications. An increase in administrative time was observed with all builders. The checklists and certifications also inherently increase cost due to: (1) Adding services to the scope of work for various trades, such as HERS Rater and heating, ventilation, and air conditioning contractor. (2) Increased material costs related to the checklists, especially the U.S. Environmental Protection Agency Indoor airPLUS and WaterSense Efficient Hot Water Distribution requirement. Ceiling - 18" cellulose Walls - 12" open cell spray foam in double stud walls Foundation - R-10 under slab, 3 1/2" closed-cell spray foam at walls Windows - Harvey U=0.20, SHGC=0.22 Infiltration - 1.0 sq in per 100 sq ft Heating - Mini split heat pump, 10.6 HSPF, 23 SEER Cooling - Mini split heat pump, 10.6 HSPF, 23 SEER DHW - 0.97 EF instantaneous propane water heater Ventilation - bathroom exhaust fans as basic option, HRV upgrade option Adams Circle Devens MA 01434 Cavite Street Devens, MA 01434

Array↗

New Whole-House Solutions Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania

In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania, to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. The team evaluated a market-available through-wall air transfer fan system that provides air to the bedrooms.The relative ability of this system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability.

50% Building America Benchmark↗

Concurrent Mission and Systems Design at NASA Glenn Research Center: The Origins of the COMPASS Team

Established at the NASA Glenn Research Center (GRC) in 2006 to meet the need for rapid mission analysis and multi-disciplinary systems design for in-space and human missions, the Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team is a multidisciplinary, concurrent engineering group whose primary purpose is to perform integrated systems analysis, but it is also capable of designing any system that involves one or more of the disciplines present in the team. The authors were involved in the development of the COMPASS team and its design process, and are continuously making refinements and enhancements. The team was unofficially started in the early 2000s as part of the distributed team known as Team JIMO (Jupiter Icy Moons Orbiter) in support of the multi-center collaborative JIMO spacecraft design during Project Prometheus. This paper documents the origins of a concurrent mission and systems design team at GRC and how it evolved into the COMPASS team, including defining the process, gathering the team and tools, building the facility, and performing studies.

McGuire, Melissa L.↗

Orion Flight Test-1 Thermal Protection System Instrumentation

The Orion Crew Exploration Vehicle (CEV) was originally under development to provide crew transport to the International Space Station after the retirement of the Space Shuttle, and to provide a means for the eventual return of astronauts to the Moon. With the current changes in the future direction of the United States human exploration programs, the focus of the Orion project has shifted to the project s first orbital flight test, designated Orion Flight Test 1 (OFT-1). The OFT-1 is currently planned for launch in July 2013 and will demonstrate the Orion vehicle s capability for performing missions in low Earth orbit (LEO), as well as extensibility beyond LEO for select, critical areas. Among the key flight test objectives are those related to validation of the re-entry aerodynamic and aerothermal environments, and the performance of the thermal protection system (TPS) when exposed to these environments. A specific flight test trajectory has been selected to provide a high energy entry beyond that which would be experienced during a typical low Earth orbit return, given the constraints imposed by the possible launch vehicles. This trajectory resulted from a trade study that considered the relative benefit of conflicting objectives from multiple subsystems, and sought to provide the maximum integrated benefit to the re-entry state-of-the-art. In particular, the trajectory was designed to provide: a significant, measureable radiative heat flux to the windward surface; data on boundary transition from laminar to turbulent flow; and data on catalytic heating overshoot on non-ablating TPS. In order to obtain the necessary flight test data during OFT-1, the vehicle will need to have an adequate quantity of instrumentation. A collection of instrumentation is being developed for integration in the OFT-1 TPS. In part, this instrumentation builds upon the work performed for the Mars Science Laboratory Entry, Descent and Landing Instrument (MEDLI) suite to instrument the OFT-1 ablative heat shield. The MEDLI integrated sensor plugs and pressure sensors will be adapted for compatibility with the Orion TPS design. The sensor plugs will provide in-depth temperature data to support aerothermal and TPS model correlation, and the pressure sensors will provide a flush air data system for validation of the entry and descent aerodynamic environments. In addition, a radiometer design will be matured to measure the radiative component of the reentry heating at two locations on the heat shield. For the back shell, surface thermocouple and pressure port designs will be developed and applied which build upon the heritage of the Space Shuttle Program for instrumentation of reusable surface insulation (RSI) tiles. The quantity and location of the sensors has been determined to balance the needs of the reentry disciplines with the demands of the hardware development, manufacturing and integration. Measurements which provided low relative value and presented significant engineering development effort were, unfortunately, eliminated. The final TPS instrumentation has been optimized to target priority test objectives. The data obtained will serve to provide a better understanding of reentry environments for the Orion capsule design, reduce margins, and potentially reduce TPS mass or provide TPS extensibility for alternative missions.

Kowal, T. John↗

Commercial Building Operator Certificate Program [Final Report]

The overall objective of this project is for the Steven L. Newman Real Estate Institute, Baruch College, City University of New York (NREI) to create and deliver a web-based certificate program specifically designed for Commercial Building Operators, defined as Property Managers and Portfolio Asset Managers. The certificate program will consist of three 15-hour courses and will instruct students on how planning a path to Net Zero Energy (NZE) can be an effective element in creating asset value. NREI will develop curriculum with the help of dedicated staff working with consultants in the energy management and web-based education fields.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

End-to-end interoperability and workflows from building architecture design to one or more simulations

An end-to-end interoperability and workflows from building architecture design to one or more simulations, in one aspect, may comprise establishing a BIM enablement platform architecture. A data model defines data entities and entity relationships for enabling the interoperability and workflows. A data definition language may be implemented that defines and creates a table schema of a database associated with the data model. Data management services and/or application programming interfaces may be implemented for interacting with the data model. Web services may also be provided for interacting with the data model via the Web. A user interface may be implemented that communicates with users and uses the BIM enablement platform architecture, the data model, the data definition language, data management services and application programming interfaces to provide functions to the users to perform work related to building information management.

97 MATHEMATICS AND COMPUTING↗

End-to-end interoperability and workflows from building architecture design to one or more simulations

An end-to-end interoperability and workflows from building architecture design to one or more simulations, in one aspect, may comprise establishing a BIM enablement platform architecture. A data model defines data entities and entity relationships for enabling the interoperability and workflows. A data definition language may be implemented that defines and creates a table schema of a database associated with the data model. Data management services and/or application programming interfaces may be implemented for interacting with the data model. Web services may also be provided for interacting with the data model via the Web. A user interface may be implemented that communicates with users and uses the BIM enablement platform architecture, the data model, the data definition language, data management services and application programming interfaces to provide functions to the users to perform work related to building information management.

97 MATHEMATICS AND COMPUTING↗

Solar heating system installed at Blakedale Professional Center, Greenwood, South Carolina

Information on the solar heating system installed at the Blakedale Professional Center, in Greenwood, South Carolina is presented. The information consists of site and building description, solar system description, performance evaluation, system problems and installation drawings. The solar system was designed to provide approximately 85 percent of the building's heating requirements. The system was installed concurrently with building construction and heats 4,440 square feet of the building. There are 954 square feet of liquid flat plate collectors that are proof-mounted and have a drain-down system to protect the collectors from freezing. A 5,000 gallon steel, polyurethane insulated tank buried underground provides storage. The system was fully instrumented for performance evaluation and integrated into the National Solar Data Network.

Source record↗

Demonstration Assessment of Light Emitting Diode (LED) Residential Downlights and Undercabinet Lights in the Lane County Tour of Homes, Eugene, Oregon

In August 2008 the Pacific Northwest National Laboratory (PNNL) conducted a light emitting diode (LED) residential lighting demonstration project for the U.S. Department of Energy (DOE), Office of Building Technologies, as part of DOE’s Solid State Lighting (SSL) Technology Demonstration Gateway Program. Two lighting technologies, an LED replacement for downlight lamps (bulbs) and an LED undercabinet lighting fixture, were tested in the demonstration which was conducted in two homes built for the 2008 Tour of Homes in Eugene, Oregon. The homes were built by the Lane County Home Builders Association (HBA), and Future B Homes. The Energy Trust of Oregon (ETO) also participated in the demonstration project. The LED downlight product, the LR6, made by Cree LED Lighting Solutions acts as a screw-in replacement for incandescent and halogen bulbs in recessed can downlights. The second product tested is Phillips/Color Kinetics’ eW® Profile Powercore undercabinet fixture designed to mount under kitchen cabinets to illuminate the countertop and backsplash surfaces. Quantitative and qualitative measurements of light performance and electrical power usage were taken at each site before and after initially installed halogen and incandescent lamps were replaced with the LED products. Energy savings and simple paybacks were also calculated and builders who toured the homes were surveyed for their responses to the LED products. The LED downlight product drew 12 Watts of power, cutting energy use by 82% compared to the 65W incandescent lamp and by 84% compared to the 75W halogen lamp. The LED undercabinet fixture drew 10 watts, cutting energy use by 83% to 90% compared to the halogen product, which was tested at two power settings: a low power 60W setting and a high power 105W setting. The LED downlight consistently provided more light than the halogen and incandescent lamps in horizontal measurements at counter height and floor level. It also outperformed in vertical illuminance measurements taken on the walls, indicating better lateral dispersion of the light. The undercabinet fixture’s light output was midway between the low and high power halogen undercabinet fixture light outputs (35.8 foot candle versus 13.4 fc and 53.4 fc) but it produced a more uniform light (max/min ratio of 7.0 versus 10.8). The color correlated temperature (CCT, the blue or yellowness) of the LED light correlated well with the halogen and incandescent lights (2675 K vs 2700 K). The color rendering of the LED downlight also correlated well at 92 CRI compared to 100 CRI for the halogen and incandescent lamps. The LED undercabinet fixture had measures of 2880 K CCT and 71 CRI compared to the 2700 K and 100 CRI scores for the halogen undercabinet fixture. Builders who toured the homes were surveyed; they gave the LED downlight high marks for brightness, said the undercabinet improved shadows and glare and said both products improved overall visibility, home appearance, and home value. Paybacks on the LED downlight ranged from 7.6 years (assuming electricity cost of 11 c/kWh) to 13.5 years (at 5C/kWh). Paybacks on the LED undercabinet fixture in a new home ranged from 4.4 years (11c/kWh electricity) to 7.6 years (5c/kWh) based on product costs of $95 per LED downlight and $140 per LED undercabinet fixture at 3 hrs per day of usage for the downlight and 2 hrs per day for the undercabinet lighting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning: A Highly Cost-Effective Building Energy Management Strategy

Quality assurance and optimization are essential elements of any serious technological endeavor, including efforts to improve energy efficiency. Commissioning is an important tool in this respect. The aim of commissioning new buildings is to ensure that they deliver-if not exceed-the performance and energy savings promised by their design. When applied to existing buildings, one-time or repeated commissioning (often called retrocommissioning) identifies the almost inevitable drift in energy performance and puts the building back on course, often surpassing the original design intent. In both contexts, commissioning is a systematic, forensic approach to improving performance, rather than a discrete technology.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗