Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Uncertainties”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Space Policy Directive-1 has led to NASA partnerships with commercial entities on procurement which includes the development of the Human Landing System (HLS) [1]. With the goal of delivering human crew to the lunar surface by 2024, system uncertainties become an important obstacle to the maturation of multiple new, driving technologies and mission concepts of the HLS program. As unmitigated uncertainties have previously led to failed development programs, these risks and their impacts must be understood and handled to ensure program success [2]. Sources of uncertainty include novel engine designs and configurations, increased reliance on cryogenic fluid management(CFM), and refueling technologies—which propagate as high-level performance metrics such as overall propellant mass and engine performance. Also, the occurrence of operational uncertainties—e.g. launch conditions or need to abort during the mission—can cause cascading effects on the rest of the mission that are difficult to definitively quantify, and are outside the scope of control. These concrete examples and other occurrences can be categorized as either epistemic or aleatory uncertainties.Epistemic uncertainty arises due to a lack of knowledge and can be alleviated with design and program maturation. Aleatory uncertainty is due to the inherent randomness of the system and cannot be directly reduced, unlike epistemic uncertainty. Robust design and probabilistic methods can compensate for aleatory effects. A taxonomy of uncertainty is referred to for this work [3]. In this paper, a probabilistic methodology to handle uncertainties has been demonstrated on a three-element HLS concept [1, 4], which allows tracking of current best estimates of the concept and assessment of concept design robustness against uncertainties. A sample case has been completed for this abstract, and an expansion on the methodology will be included in the final paper. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. This abstract will cover the basics of the approach used, and further details and justifications will be in the final paper.The mission profile associated with this three-element concept (Fig 1) was modeled as a set of mission events that facilitated mass changes, idles, or spacecraft maneuvers. The mission profile scope starts with each element’s NRHO orbit insertion and aggregation and ends at post-sortie rendezvous with Orion. More detail on the mission profile will be in the final paper. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as the physics framework to model the HLS architecture for applying the probabilistic methodology [5, 6]. Specifically, a parametric representation of the lander, ascent, and transfer elements and the mission profile of each element was established, with vehicle and mission parameters available as inputs to allow for a dynamic model. Each vehicle stage was modeled with high-level performance metrics, using Isp and propellant mass fraction (PMF) to remain parametric. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. These parameters were frozen at their nominal values for the purposes of baselining architecture performance and sizing the vehicle appropriately based on reference documentation [1]. Range estimating—a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities—is traditionally used with Mass Equipment Lists (MELs), but has been adapted with operational parameters as well as vehicle parameters in theDYREQT model to capture mission uncertainty alongside vehicle uncertainty [7, 3]. This method was selected due to its application and insight on a system from a bottom-up perspective, independence from historical rules of thumb, and ability to generate sensitivities based on design decisions and uncertainties. As a sample case for the abstract, the boiloff rates of the vehicle elements and the loiter times during the mission (simulating launch time variations and changing window of opportunities) were used with range estimating to provide preliminary results. To perform the range estimation portion of this methodology (depicted in Fig. 3, further details in final paper), the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the sample set of uncertainty parameters; 5,000 cases via Latin Hypercube Sampling were computed on the DYREQT architecture model. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Range estimating was applied to the surrogates instead of the actual models, which saves computational expense due to the bulk of cases needed for the Monte Carlo simulation as part of range estimating. Uncertainty parameters were sampled independently from triangular distributions using the DoE ranges as ‘min’ and ‘max’, and the nominal value as ‘most likely’. Based engineering intuition, some uncertainty parameters are correlated—e.g. if the main propellant has a high boil-off rate, the oxidizer should follow suit as both are related to CFM technology.While a Monte Carlo simulation samples all inputs as independent, the results would show model correlations; thus, it is efficient to sample the inputs as correlated. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo. A table for the DoE ranges and probability distribution parameters is shown in Table 1, and more details on Correlated Monte Carlo Simulations will be discussed in the final paper. The model’s resulting DoE showed that multivariate polynomial equations fit via least squares method captured its behavior accurately for the sample case. For the Correlated Monte Carlo Simulation, a positive correlation between fuel and oxidizer boiloff rates was used as a demonstration. 10,000 cases were computed with the surrogates and the launched masses for each vehicle element was collated. The results can be displayed in a probability density function (PDF), showing the impact of the uncertainty parameters chosen. Integrating the PDFs will yield a cumulative distribution function (CDF) that shows the cumulative probability of a given value on the x-axis. For the sample case, the elements’ launch mass margin was calculated and represented in as CDFs, as a demonstrated representation of figures of merit for the HLS concept. For the lander and ascent elements, the NRHO mass insertion limit is 16t; the transfer element has a limit of 30t [1]. It can be seen with Figure 2 that this probabilistic methodology can provide insight into mass margin with respect to the uncertainties being modeled. Currently, the results show that the lander (descent) vehicle element has the most restrictive design space; it is the only element to show a 10% probability of negative margin. Further analysis on the Monte Carlo results will show sensitivities for driving constraints and parameters for architecture feasibility, which can lead to establishing potential mission rules.The combination of range estimating with a parametric architecture model for HLS demonstrated the capability of this probabilistic methodology in a sample case. As the HLS development progresses, this methodology has the potential for keeping current best estimates of architecture performance for awarded concepts due to the flexibility in DYREQT’s modeling framework and its parametric nature. Concept maturation and increased epistemic knowledge can be injected into the model probabilistic modeling, and thus continue to track probability of mission success.

Stephanie Y Zhu↗

Probability Bounds Analysis Applied to Multi-Purpose Crew Vehicle Nonlinearity

The Multi-Purpose Crew Vehicle (MPCV) Program Orion vehicle finite element model (FEM) was updated based on a modal test performed by Lockheed Martin. Due to nonlinearity observed in the test results, linear low force level (LL) and high force level (HL) FEMs were developed for use during various Space Launch System (SLS) flight regimes depending on expected forcing levels. Uncertainty models were derived for the combined MPCV and MPCV Stage Adaptor LL and HL Hurty/Craig-Bampton (HCB) components based on the MPCV structural test article Configuration 4 modal test-analysis correlation results. Subsequently, system-level uncertainty quantification analyses were performed using both models for various SLS flight configurations to determine the impact of the nonlinearity on important system metrics. The system metrics included both transfer functions associated with attitude control and dynamic loads associated with aerodynamic buffeting during ascent. In each case, an independent Monte Carlo (MC) analysis was performed, and no attempt was made to combine the results. The Hybrid Parametric Variation (HPV) method was used to develop the LL and HL MPCV HCB uncertainty models. The HPV method provides both parametric and non-parametric components of uncertainty. The non-parametric uncertainty accounts for the difference in model-form between the linearized analytical model and the corresponding linearized component test results in the form of mode shapes and frequencies at that force level. This linear model-form uncertainty is implemented in the HPV method using random matrix theory. However, the HPV uncertainty models developed for the linear LL and HL MPCV components do not account for the nonlinearity in the MPCV. With respect to the linearized models, this nonlinearity is also an uncertainty in model form, but in this case, it must be treated independently as an epistemic uncertainty. It represents a lack of knowledge, in contrast to an aleatory uncertainty due to the randomness of a variable. In the case of an epistemic variable, the true value is unknown, only the interval within which it lies is known. Epistemic uncertainty can be reduced with increased knowledge, while in general, aleatory uncertainty cannot. This work combines the epistemic uncertainty due to the MPCV nonlinearity with the parametric and non-parametric uncertainty within the HPV method using a second order propagation approach. The LL and HL test data is augmented with surrogate test data derived from a nonlinear MPCV representation. The impact of the MPCV nonlinearity on system response statistics is determined using a series of cumulative distribution functions in the form of a horsetail plot, or p-box. This results in an interval of probabilities for a specific response value, or an interval of response values at a specific probability.

Daniel C Kammer↗

Variational Coupled Loads Analysis using the Hybrid Parametric Variation Method

Time-domain coupled loads analysis (CLA)is used to determine the response of a launch vehicle and payload system to transient forces, such as liftoff, engine ignitions and shutdowns, jettison events, and atmospheric flight loads, such as buffet. CLA, using Hurty/Craig-Bampton (HCB)component models, is the accepted method for the establishment of design-level loads for launch systems. However, uncertainty in the component models flows into uncertainty in predicted system results. Uncertainty in the structural responses during launch is a significant concern because small variations in launch vehicle and payload mode shapes and their interactions can result in significant variations in system loads. Uncertainty quantification (UQ)is used to determine statistical bounds on prediction accuracy based on model uncertainty. In this paper uncertainty is treated at the HCB component-model level. In an effort to account for model uncertainties and statistically bound their effect on CLA predictions, this work combines CLA with UQ in a process termed variational coupled loads analysis (VCLA). The modeling of uncertainty using a parametric approach, in which input parameters are represented by random variables, is common, but its major drawback is the resulting uncertainty is limited to the form of the nominal model. Uncertainty in model form is one of the biggest contributors to uncertainty in complex built-up structures. Model-form uncertainty can be represented using a nonparametric approach based on random matrix theory (RMT). In this work, UQ is performed using the hybrid parametric variation (HPV)method, which combines parametric with nonparametric uncertainty at the HCB component model level. The HPV method requires the selection of dispersion values for the HCB fixed-interface (FI)eigenvalues, and the HCB mass and stiffness matrices. The dispersions are based upon component test-analysis modal correlation results. During VCLA, random component models are assembled into an ensemble of random systems using a Monte Carlo (MC)approach. CLA is applied to each of the ensemble members to produce an ensemble of system-level responses for statistical analysis. The proposed methodology is demonstrated through its application to a buffet loads analysis of NASA’s Space Launch System (SLS)during the transonic regime fifty seconds after liftoff. Core stage (CS)section shears and moments are recovered, and statistics are computed.

Uncertainty Quantification↗

Searching for the Beginning of the Ozone Turnaround Using a 22-Year Merged Satellite Data Set

We have used the data from six satellite instruments that measure the total column amount of ozone to construct a consistent merged data set extending from late 1978 into 2000. The keys to constructing a merged data set are to minimize potential drift of individual instruments and to accurately establish instrument-to-instrument offsets. We have used the short-wavelength D-pair measurements (306nm-313nm) of the SBUV and SBUV/2 instruments near the equator to establish a relatively drift-free record for these instruments. We have then used their overlap with the Nimbus 7 and EP TOMS instruments to establish the relative calibration of the various instruments. We have evaluated the drift uncertainty in our merged ozone data (MOD) set by examining both the individual instrument drift uncertainty and the uncertainty in establishing the instrument- to-instrument differences. We conclude that the instrumental drift uncertainty over the 22-year data record is 0.9 %/decade (2-sigma). We have compared our MOD record with 37 ground stations that have a continuous record over that time period. We have a mean drift with respect to the stations of +0.3 %/decade which is within 1-sigma of our uncertainty estimate. Using the satellite record as a transfer standard, we can estimate the capability of the ground instruments to establish satellite calibration. Adding the statistical variability of the station drifts with respect to the satellite to an estimate of the overall drift uncertainty of the world standard instrument, we conclude that the stations should be able to be used to establish the drift of the satellite data record to within and uncertainty of 0.6 %/decade (2-sigma). Adding to this an uncertainty due to the-incomplete global coverage of the stations, we conclude that the station data should be able to establish the global trend with an uncertainty of about 0.7 %/decade, slightly better than for the satellite record. We conclude that merging the two records together gives only a slight improvement in the uncertainty. Keeping them separate gives the greater confidence of two independent measures of the ozone trend and potential recovery. We fit the trend in our MOD record through May of 1991 and then extrapolated forward to see if the data at the end of the record was above the statistical model as a measure of ozone recovery as was done in the last WMO/UNEP assessment report. Because our data set drifts with respect to the ground-stations through May of 1991, we calculated a smaller global trend (-1.1 %/decade) than in the WMO/UNEP report. Our data in 1998 and 1999 was, on average 2 DU above the extrapolated statistical model with a 2-sigma uncertainty of 6 DU. For the combined mid-latitudes of the northern and southern hemispheres, the data was 5 DU above the extrapolated statistical model with a 2-sigma uncertainty of 10 DU. These may be signs of recovery, but they are still statistically insignificant.

Stolarski, Richard S.↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y Zhu↗

Probabilistic Modeling of a Three-Stage Human Landing System Architecture

Unmitigated uncertainties are known to have previously led to failed development programs; in order to combat these uncertainties, risks and their impacts must be understood and handled to ensure program success. In this paper, a probabilistic methodology to handle uncertainties is demonstrated on a three-element Human Landing System (HLS) concept, which allows tracking of current best estimates of the vehicle’s performance and assessment of its robustness against uncertainties. This methodology has two key parts: first, the creation of a dynamic architecture model of a three-element HLS concept; and second, its use with surrogate modeling and range estimating techniques to capture and propagate uncertainties. The DYnamic Rocket EQuation Tool (DYREQT), a space systems synthesis and sizing framework used by NASA, was used as to model the HLS architecture. For the probabilistic analysis, uncertainties of interest within the HLS concept were enumerated and represented as parameters within the DYREQT model as inputs for vehicle stages or mission profile events. Range estimating — a probabilistic method that combines Monte Carlo sampling, focus on critical parameters, and heuristics to assess risk and opportunities — is then adapted with operational parameters as well as vehicle parameters in the DYREQT model to capture mission uncertainty alongside vehicle uncertainty. To perform the range estimation portion of this methodology, the DYREQT model was sampled using a Design of Experiments (DoE) to efficiently explore the architecture design space with respect to the set of uncertainty parameters. Then, the results were used to create surrogate models, multivariate regressions that can visualize hypercube trends in the design space, of the architecture with respect to the uncertainty parameters. Using a correlation matrix constructed for the uncertainty parameters, previously independent samples were transformed to perform a Correlated Monte Carlo on the surrogate models. This probabilistic methodology was proved to provide insight into the underlying uncertainties of the three-element HLS architecture.

Stephanie Y. Zhu↗