Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Analysis of Electric Vehicle Charging Behavior Patterns with Function Principal Component Analysis Approach

This manuscript focused on analyzing electric vehicles’ (EV) charging behavior patterns with a functional data analysis (FDA) approach, with the goal of providing theoretical support to the EV infrastructure planning and regulation, as well as the power grid load management. 5-year real-world charging log data from a total of 455 charging stations in Kansas City, Missouri, was used. The focuses were placed on analyzing the daily usage occupancy variability, daily energy consumption variability, and station-level usage variability. Compared with the traditional discrete-based analysis models, the proposed FDA modeling approach had unique advantages in preserving the smooth function behavior of the data, bringing more flexibility in the modeling process with little required assumptions or background knowledge on independent variables, as well as the capability of handling time series data with different lengths or sizes. In addition to the patterns revealed in the EV charging station’s occupancy and energy consumption, the differences between EV driver’s charging time and parking time were analyzed and called for the needs for parking regulation and enforcement. The different usage patterns observed at charging stations located on different land-use types were also analyzed.

Engineering↗

SPARTAN and IMPROVE Comparison Experiment (SPICE) Interim Campaign Report

SPICE (the SPARTAN and IMPROVE Comparison Experiment) aims to obtain and quantify comparisons between aerosol PM 2.5 mass concentration measurements from the University of Oklahoma (OU) Surface Particulate Matter Network (SPARTAN) station and the U.S. Environmental Protection Agency (EPA) Interagency Monitoring of Protected Visual Environments (IMPROVE) station hosted by the U.S. Department of Energy Atmospheric Radiation Measurement (ARM) User Facility at ARM’s Southern Great Plains (SGP) observatory in Oklahoma. Aerosols—both natural and anthropogenic—affect human populations in multiple ways. Much of ARM’s research focuses on how aerosols influence weather and climate through their optical and radiative effects, as well as their impacts on clouds and precipitation. However, aerosols also pose direct risks to humans and other organisms through inhalation, with the severity of health impacts depending on particle size, chemical composition, and duration of exposure. The IMPROVE network was established by the U.S. EPA to monitor air quality, including visible clarity as well as total and chemically speciated aerosol mass concentrations. The ARM SGP site hosts the IMPROVE SOGP station. Separately, the SPARTAN network operates a globally distributed set of stations similar to IMPROVE but with an emphasis on remote deployment and semi-autonomous operation for use beyond the borders of the United States (IMPROVE only operates within the U.S.). The University of Oklahoma operates a SPARTAN station. To establish confidence in the OU SPARTAN instrumentation and measurement protocol relative to the EPA-certified IMPROVE station, the OU SPARTAN station is currently deployed at SGP in close proximity to the IMPROVE SOGP station. The SPICE campaign was envisioned as a contiguous calendar-year effort for 2025 to capture seasonal variation in mass loading as well as composition. However, independent of the SPICE campaign, the SPARTAN network adopted a new filter construction part-way through the year, interrupting our contiguous data set. Thus, to obtain a contiguous data set with a uniform consistent configuration, SPICE desires an extension through 2026.

54 ENVIRONMENTAL SCIENCES↗

Kootenay Lake Fertilization Experiment, Year 15 (North Arm) and Year 3 (South Arm) (2006) Report

This report summarizes results from the fifteenth year (2006) of nutrient additions to the North Arm of Kootenay Lake and three years of nutrient additions to the South Arm. Experimental fertilization of the lake has been conducted using an adaptive management approach in an effort to restore lake productivity lost as a result of nutrient uptake in upstream reservoirs. The primary objective of the experiment is to restore kokanee (Oncorhynchus nerka) populations, which are the main food source for Gerrard rainbow trout (Oncorhynchus mykiss) and bull trout (Salvelinus confluentus). The quantity of agricultural grade liquid fertilizer (10-34-0, ammonium polyphosphate and 28-0-0, urea ammonium nitrate) added to the North Arm in 2006 was 44.7 tonnes of P and 248.4 tonnes of N. The total fertilizer load added to the South Arm was 257 tonnes of nitrogen; no P was added. Kootenay Lake has an area of 395 km{sup 2}, a maximum depth of 150 m, a mean depth of 94 m, and a water renewal time of approximately two years. Kootenay Lake is a monomictic lake, generally mixing from late fall to early spring and stratifying during the summer. Surface water temperatures generally exceed 20 C for only a few weeks in July. Results of oxygen profiles were similar to previous years with the lake being well oxygenated from the surface to the bottom depths at all stations. Similar to past years, Secchi disc measurements at all stations in 2006 indicate a typical seasonal pattern of decreasing depths associated with the spring phytoplankton bloom, followed by increasing depths as the bloom gradually decreases by the late summer and fall. Total phosphorus (TP) ranged from 2-7 {micro}g/L and tended to decrease as summer advanced. Over the sampling season dissolved inorganic nitrogen (DIN) concentrations decreased, with the decline corresponding to nitrate (the dominant component of DIN) being utilized by phytoplankton during summer stratification. Owing to the importance of epilimnetic nitrate that is required for optimal phytoplankton growth discrete depth water sampling occurred in 2006 to measure more accurately changes in the nitrate concentrations. As expected there was a seasonal decline in nitrate concentrations, thus supporting the strategy of increasing the nitrogen loading in both arms. These in-season changes emphasize the need for an adaptive management approach to ensure the nitrogen to phosphorus (N:P) ratio does not decrease below 15:1 (weight:weight) during the fertilizer application period. Phytoplankton composition determined from the integrated samples (0-20m) was dominated by diatoms, followed by cryptophytes and chrysophytes. The contribution of cryptophytes to total biomass was higher in 2006 than in 2005. Cryptophytes, considered being edible biomass for zooplankton and Daphnia spp., increased in 2006. Phytoplankton in the discrete depth samples (2, 5, 10, 15 and 20m) demonstrated a clear north to south gradient in average phytoplankton density and biomass among the three stations sampled, with highest values at the North Arm station (KLF 2) and lowest values in the most southern station in the South Arm (KLF 7). Populations were dominated by flagellates at all stations and depths in June and July, then dominated by diatoms in August and September in the North and South arms of the lake. There were no large bluegreen (cyanobacteria) populations in either arm of the lake in 2006. Seasonal average zooplankton abundance and biomass in both the main body of the lake and in the West Arm increased in 2006 compared to 2005. Zooplankton density was numerically dominated by copepods and biomass was dominated by Daphnia spp. The annual average mysid biomass data at deep stations indicated that the North Arm of Kootenay Lake was more productive than the South Arm in 2006. Mysid densities increased through the summer and declined in the winter; mean whole lake values remain within prefertilization densities. Kokanee escapement to Meadow Creek declined in 2006 to approximately 400,000 spawners. The Lardeau River escapement also declined with approximately 100,000 spawners. Escapement in the South Arm tributaries in 2006 was similar to 2005 with virtually no spawners. The mean size of female and male kokanee from Meadow Creek was larger than the past three years (24.9 cm and 25.2 cm, respectively) and larger than the long term average (25.2 cm). This is indicative of a density dependent growth response as a decline in in-lake abundance and returning spawners occurred. Spring hydroacoustic estimates indicated low densities of South Arm kokanee with most of the North Arm fry remaining at the most northerly stations. By the fall, the distribution of kokanee from the North Arm to the South Arm was fairly uniform, a normal occurrence in Kootenay Lake. Fall hydroacoustic estimates in 2006 increased to approximately 22 million kokanee.

13 HYDRO ENERGY↗

Systems and methods for solar energy storage, transportation, and conversion utilizing photochemically active organometallic isomeric compounds and solid-state catalysts

A system for converting solar energy to chemical energy, and, subsequently, to thermal energy includes a light-harvesting station, a storage station, and a thermal energy release station. The system may include additional stations for converting the released thermal energy to other energy forms, e.g., to electrical energy and mechanical work. At the light-harvesting station, a photochemically active first organometallic compound, e.g., a fulvalenyl diruthenium complex, is exposed to light and is photochemically converted to a second, higher-energy organometallic compound, which is then transported to a storage station. At the storage station, the high-energy organometallic compound is stored for a desired time and/or is transported to a desired location for thermal energy release. At the thermal energy release station, the high-energy organometallic compound is catalytically converted back to the photochemically active organometallic compound by an exothermic process, while the released thermal energy is captured for subsequent use.

14 SOLAR ENERGY↗

Applications of Hyporheic Zone Sampling for Assessing VOC Plume Engineered Remediation and Natural Attenuation Effectiveness - 20414

Determining the efficacy of engineered remedial actions and/or natural attenuation as an acceptable EPA Record of Decision (ROD) must address long-term temporal and spatial variability. Since final plume downslope destinations are aquifers and related surface streams and rivers, hyporheic zone sampling is essential. Comprehensive hyporheic sampling documents plume groundwater remediation prior to upwelling into stream benthic strata and natural attenuation within this dynamic zone itself. Our intensive sampling of the Savannah River Site (SRS) Chemical, Metals, and Pesticides (CMP) Pits VOC plume-fringe from 2005 to 2018 documented PCE natural attenuation and effectiveness of In Situ Thermal Treatment (ISTT). Most plume hyporheic upwelling was delimited to a 20 m inflow reach along Pen Branch. Our study utilized corroborative sampling methodologies: ambient hole-water grab samples: passive diffusion bags (PDB); and hole-core sediment samples to confirm station to station spatial and temporal trends. VOC hot spot detections were confirmed from both groundwater and soil core samples. VOC pathways through the Pen Branch hyporheic zone were assessed at hole-installation using sequential soil samples from augered cores and grab-samples of hole-bottom water. Longer term, composite water samples were collected from PDBs deployed for a minimum two-week equilibration period. Soil samples were collected from the 15 and 65 cm core levels in December 2017 and June 2018 at six stations. Additional core depths of 40 and 85 cm were sampled in June 2018 at the highest VOC station (5DB80). All samples were analyzed in an EPA certified lab by purge and trap GC-MS. Effectiveness of previous ISTT and soil vapor extraction (SVE) for this CMP Pits PCE plume, was clearly documented by significant downward trends in VOC at hyporheic zone stations prior to December 2015. Achieving final stage conversions of PCE daughter products to ethene and CO{sub 2} may be limited depending upon suitable interactions between hyporheic zone sediment morphology, hydrology, and redox conditions. Because declines in VOC daughter products at our hyporheic stations may also be caused by physical actions of dilution and dispersion rather than true biochemical dechlorination, full quantification of natural attenuation requires the use of compound-specific isotope ratio analysis (CSIA) and microbial 16S rRNA with qPCR. To assist these next-phase efforts, a natural attenuation index (NAI) was used to help produce quicker, more cost-effective decision making for locating CSIA and microbial sampling efforts. The NAI used natural logarithm transformed GC-MS results for station VOC degradation compounds versus VOC parent compounds. Wide differences were observed between stations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of transportation hydrogen infrastructure performance and reliability

Hydrogen infrastructure for fueling vehicles has progressed in the last decade from stations with restricted access and limited operating hours to customer-friendly retail stations open to the public. There are now 121 retail hydrogen stations around the world. In California, the number of public retail hydrogen stations has increased from zero to more than 30 in less than two years, and the annual amount of hydrogen dispensed by retail stations has grown from 27,400 kg in 2015 to nearly 105,000 kg in 2016 and more than 440,000 kg in 2017 - an increase of about four times year over year. For more than a decade, government, industry, and academia have studied many aspects of hydrogen infrastructure, from renewable hydrogen production to retail hydrogen station performance. This paper reviews the engineering and deployment of modern hydrogen infrastructure, including the costs, benefits, and operational considerations (including safety, reliability, availability), as well as challenges to the scale-up of hydrogen infrastructure. The results identify hydrogen station reliability as a key factor in the expense of operating hydrogen systems, placing it in the context of the larger reliability engineering field.

08 HYDROGEN↗

RELAP-7 Simulation Resolving an SBO Scenario on a Simplified Geometry of a BWR

The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). RELAP-7 will become the main reactor systems toolkit for the Risk-Informed Safety Margin Characterization Pathway of the Light Water Reactor Sustainability Program and the next generation tool in the RELAP reactor safety/systems analysis application series (i.e., the replacement for RELAP5). The code is being developed based on Idaho National Laboratory’s modern scientific software development framework – MOOSE (the Multi-Physics Object-Oriented Simulation Environment). During Fiscal Year 2013, a number of physical components with two-phase flow capability have been developed to support the simplified boiling water reactor (BWR) station blackout analyses. The case selected for demonstration calculation is built from the specifications documented in an Organization for Economic Cooperation and Development benchmark problem for BWR turbine trip analysis. The reference design for the benchmark problem was from the Peach Bottom-2 nuclear station, which is a General Electric BWR-4 design. The demonstration case includes the major components for the primary system of a BWR, as well as the safety system components for reactor core isolation cooling (RCIC) and the wet well of a BWR containment. The case was initially run to steady-state with RELAP-7. The station blackout transient simulations were subsequently initiated by using the INL-developed RAVEN code. Two scenarios for the station blackout simulations have been considered. Scenario I represents an extreme station blackout accident with no safety injection functioning. The reactor core could experience dry out fairly quickly with this scenario. Scenario II represents a more probable station blackout accident progression with the RCIC system functioning. In this scenario, the RCIC system is fully coupled with the reactor primary system and the safety injection to provide makeup cooling water to the reactor core from the suppression pool is dynamically simulated. With the RCIC system functioning, the core dry out is significantly postponed when compared to the results from Scenario I. This fully coupled RCIC system simulation capability represents the first-of-a-kind simulation capability. Sensitivity studies have also been carried out to study the effect of RCIC control strategy with varying core makeup cooling water mass flow rates. The next stage of development will be to demonstrate more refined BWR station blackout analyses with more realistic geometries, to be reported in the next demonstration simulation report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DIURNAL CYCLE OF PRECIPITABLE WATER VAPOR OVER SPAIN

Despite the importance of the diurnal cycle of precipitable water vapor (PWV), its knowledge is very limited due to the lack of data with sufficient temporal resolution. Currently, from GPS receivers, PWV can be obtained with high temporal resolution in all weather conditions for all hours of the day. In this study we have calculated the diurnal cycle of PWV for ten GPS stations over Spain. The minimum value is reached approximately at the same time at all the stations, ~0400-0500 UTC, whereas the maximum is reached in the second half of the day, but with a larger dispersion of its occurrence between stations. The amplitude of the cycle ranges between 0.72 mm and 1.78 mm. The highest values are recorded at the stations on the Mediterranean coast, with a doubling of the values of the stations on the Atlantic coast or inland. The amplitude of the PWV cycle, relative to the annual mean value, ranges between 8.8 % on the Mediterranean coast and 3.6 % on the Atlantic coast. Two distinctly different seasonal diurnal cycles have been identified, one in winter and other in summer, with spring and autumn being only transition states. The winter cycle is quite similar at all locations, whereas in summer, local effects are felt strongly, making the diurnal cycle quite different between stations. The amplitude of the summer cycle is 1.69 mm, it is almost double the winter one (0.93 mm). Analogous to the annual cycles, the seasonal cycles of the different stations are more similar during the night and early morning hours than during the afternoon. The observed features of the PWV diurnal cycle are explained in a qualitative way on the basis of the air temperature, the transport of moisture by local winds, and the turbulent vertical mixing.

54 ENVIRONMENTAL SCIENCES↗

Aerosol sources in subway environments

Highlights: • PM{sub 2.5} concentrations varied widely among subway platforms (26–86 µg m{sup −3}). • Main PM{sub 2.5} component in metro microenvironment is iron oxide. • Subway sources contribution account for up to 91% of ambient subway PM{sub 2.5}. • From the five subway-specific sources identified, brakes contributed the most. • Elements related with health issues are apportioned mostly by subway sources (> 60%). Millions of people use rail subway public transport around the world, despite the relatively high particulate matter (PM) concentrations in these underground environments, requiring the identification and quantification of the aerosol source contributions to improve the air quality. An extensive aerosol monitoring campaign was carried out in eleven subway stations in the Barcelona metro system, belonging to seven subway lines. PM{sub 2.5} samples were collected during the metro operating hours and chemically analysed to determine major and trace elements, inorganic ions, and total carbon. The chemical compositions of subway components such as brake pads, rail tracks and pantographs were also determined. The mean PM{sub 2.5} concentrations varied widely among stations, ranging from 26 µg m{sup −3} to 86 µg m{sup −3}. Subway PM{sub 2.5} was mainly constituted by Fe{sub 2}O{sub 3} (30–66%), followed by carbonaceous matter (18–37%) for the old stations, while for new stations equipped with Platform Screen Doors (PSD) these percentages go down to 21–44% and 15–30%, respectively. Both the absolute concentrations and the relative abundance of key species differed for each subway station, although with common patterns within a given subway line. This is a result of the different emission chemical profiles in different subway lines (using diverse types of brakes and/or pantographs). The co-emission of different sources poses a problem for their separation by receptor models. Nevertheless, receptor modelling (Positive Matrix Factorization) was applied resulting in ten sources, five of them subway-specific: RailWheel, RailWheel+Brake, Brake{sub A}, Brake{sub B}, Pb. The sum of their contributions accounted for 43–91% of bulk PM{sub 2.5} for the old stations and 21–52% for the stations with PSD. The decrease of the activity during the weekends resulted in a decrease (up to 56%) in the subway-specific sources contribution to the –already lower– bulk PM{sub 2.5} concentrations compared to weekdays. The health-related elements are mainly apportioned (> 60%) by subway sources.

54 ENVIRONMENTAL SCIENCES↗

An optimization model for collection, haul, transfer, treatment and disposal of infectious medical waste: Application to a Greek region

Highlights: • We developed an optimization model to minimize cost of infectious waste management. •Two different software were used for model solution. • Model optimizes locations and capacities of treatment plants and transfer stations. • The higher percentage of total cost was due to construction of the treatment plant. • Sensitivity analysis with respect to fuel cost and waste production was conducted. - Abstract: The objective of this work was to develop an optimization model to minimize the cost of a collection, haul, transfer, treatment and disposal system for infectious medical waste (IMW). The model calculates the optimum locations of the treatment facilities and transfer stations, their design capacities (t/d), the number and capacities of all waste collection, transport and transfer vehicles and their optimum transport path and the minimum IMW management system cost. Waste production nodes (hospitals, healthcare centers, peripheral health offices, private clinics and physicians in private practice) and their IMW production rates were specified and used as model inputs. The candidate locations of the treatment facilities, transfer stations and sanitary landfills were designated, using a GIS-based methodology. Specifically, Mapinfo software with exclusion criteria for non-appropriate areas was used for siting candidate locations for the construction of the treatment plant and calculating the distance and travel time of all possible vehicle routes. The objective function was a non-linear equation, which minimized the total collection, transport, treatment and disposal cost. Total cost comprised capital and operation costs for: (1) treatment plant, (2) waste transfer stations, (3) waste transport and transfer vehicles and (4) waste collection bins and hospital boxes. Binary variables were used to decide whether a treatment plant and/or a transfer station should be constructed and whether a collection route between two or more nodes should be followed. Microsoft excel software was used as installation platform of the optimization model. For the execution of the optimization routine, two completely different software were used and the results were compared, thus, resulting in higher reliability and validity of the results. The first software was Evolver, which is based on the use of genetic algorithms. The second one was Crystal Ball, which is based on Monte Carlo simulation. The model was applied to the Region of East Macedonia – Thrace in Greece. The optimum solution resulted in one treatment plant located in the sanitary landfill area of Chrysoupolis, required no transfer stations and had a total management cost of 38,800 €/month or 809 €/t. If a treatment plant is sited in the most eastern part of the Region, i.e., the industrial area of Alexandroupolis, the optimum solution would result in a transfer station of 23 m{sup 3}, located near Kavala General Hospital, and a total cost of 39,800 €/month or 831 €/t. A sensitivity analysis was conducted and two alternative scenarios were optimized. In the first scenario, a 15% rise in fuel cost and in the second scenario a 25% rise in IMW production were considered. At the end, a cost calculation in €/t/km for every type of vehicle used for haul and transfer was conducted. Also, the cost of the whole system was itemized and calculated in €/t/km and €/t. The results showed that the higher percentage of the total cost was due to the construction of the treatment plant.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Emulation of seismic-phase traveltimes with machine learning

SUMMARY We present a machine learning (ML) method for emulating seismic-phase traveltimes that are computed using a global-scale 3-D earth model and physics-based ray tracing. Accurate traveltime predictions based on 3-D earth models are known to reduce the bias of event location estimates, increase our ability to assign phase labels to seismic detections and associate detections to events. However, practical use of 3-D models is challenged by slow computational speed and the unwieldiness of pre-computed lookup tables that are often large and have prescribed computational grids. In this work, we train a ML emulator using pre-computed traveltimes, resulting in a compact and computationally fast way to approximate traveltimes that are based on a 3-D earth model. Our model is trained using approximately 850 million P-wave traveltimes that are based on the global LLNL-G3D-JPS model, which was developed for more accurate event location. The training-set consists of traveltimes between 10 393 global seismic stations and randomly sampled event locations that provide a prescribed, distance-dependent geographic sample density for each station. Prediction accuracy is dependent on event-station distance and whether the station was included in the training set. For stations included in the training set the mean absolute deviation (MAD) of the difference between traveltimes computed using ray tracing through the 3-D model and the ML emulator for local, regional, and teleseismic distances are 0.090, 0.125 and 0.121 s, respectively. For tested station locations not included in the training set, MAD values for the three distance ranges increase to 0.173, 0.219 and 0.210 s, respectively. Empirical traveltime residuals for a global reference data are indistinguishable when ML emulation or the 3-D model is used to compute traveltimes. This result holds regardless of whether the recording station is used in ML training or not.

58 GEOSCIENCES↗

Crustal and uppermost mantle structure in the Middle East: assessing constraints provided by jointly modelling Ps and Sp receiver functions and Rayleigh wave group velocity dispersion curves

Seismic velocity models are found, along with uncertainty estimates, for 11 sites in the Middle East by jointly modelling Ps and Sp receiver functions and surface (Rayleigh) wave group velocity dispersion. The approach performs a search for models that satisfy goodness-of-fit criteria guided by a variant of simulated annealing and uses statistical tools to assess these products of searches. These tools, a parameter correlation matrix and marginal posterior probability density (PPD) function, allow us to evaluate quantitatively the constraints that each data type imposes on model parameters and to identify portions of each model that are well-constrained relative to other portions. This joint modelling technique, which we call ‘multi-objective optimization for seismology’, does not require a good starting solution, although such a model can be incorporated easily, if available, and can reduce the computation time significantly. Applying the process described above to broadband seismic data reveals that crustal thickness varies from 15 km beneath Djibouti (station ATD) to 45 km beneath Saudi Arabia (station RAYN). A pronounced low velocity zone for both Vp and Vs is present at a depth of ~12 km beneath station KIV located in northern part of greater Caucasus, which may be due to the presence of a relatively young volcano. Similarly, we also noticed a 6-km-thick low velocity zone for Vp beginning at 20 km depth beneath seismic station AGIN, on the Anatolian plateau, while positive velocity gradients prevail elsewhere in eastern Turkey. Beneath station CSS, located in Cyprus, an anomalously slow layer is found in the uppermost mantle, which may indicate the presence of altered lithospheric material. Crustal P- and S-wave velocities beneath station D2, located in the northeastern portion of central Zagros, range between 5.2–6.2 and 3.2–3.8 km s -1 , respectively. Finally, in Oman, we find a Moho depth of 34.0 ± 1.0 km and 25.0 ± 1.0 to 30.0 ± 1.0 km beneath stations S02 and S04, respectively.

58 GEOSCIENCES↗

Regional Multistation Discriminants: Magnitude, Distance and Amplitude Corrections and Sources of Error

Magnitude, distance and amplitude corrections (MDAC) made to observed regional amplitudes are necessary so that what remains in the corrected amplitude is mostly information about the seismic source-type. Corrected amplitudes can be used in ratios to discriminate between earthquakes and explosions. However, there remain source effects such as those due to depth, focal mechanism, local material property and apparent stress variability that cannot easily be determined and applied as amplitude corrections. We develop a mathematical model to capture such effects as random (unknown) giving an error partition of two sources: model inadequacy and station noise. This mathematical model is the basis for a general multi-station regional discriminant formulation. The standard error of the discriminant includes the variances of model inadequacy and station noise in its formulation. The developed methods are demonstrated for a suite of Nevada Test Site (NTS) events observed at regional stations. Importantly, the proposed formulation includes all corrected amplitude information through the construction of multi-station discriminants. In contrast, previous studies have only computed discriminants from single stations having both P and S amplitudes. The proposed multi-station approach has similarities to the well established mb versus Ms discriminant.

58 GEOSCIENCES↗

Michigan E85 Infrastructure

This is the final report for a grant-funded project to financially assist and otherwise provide support to projects that increase E85 infrastructure in Michigan at retail fueling locations. Over the two-year project timeframe, nine E85 and/or flex-fuel pumps were installed around the State of Michigan at locations currently lacking E85 infrastructure. A total of five stations installed the nine pumps, all providing cost share toward the project. By using cost sharing by station partners, the $\$$200,000 provided by the Department of Energy facilitated a total project worth $\$$746,332.85. This project was completed over a two-year timetable (eight quarters). The first quarter of the project focused on project outreach to station owners about the incentive on the installation and/or conversion of E85 compatible fueling equipment including fueling pumps, tanks, and all necessary electrical and plumbing connections. Utilizing Clean Energy Coalition (CEC) extensive knowledge of gasoline/ethanol infrastructure throughout Michigan, CEC strategically placed these pumps in locations to strengthen the broad availability of E85 in Michigan. During the first and second quarters, CEC staff approved projects for funding and secured contracts with station owners; the second through eighth quarters were spent working with fueling station owners to complete projects; the third through eighth quarters included time spent promoting projects; and beginning in the second quarter and running for the duration of the project was spent performing project reporting and evaluation to the US DOE. A total of 9 pumps were installed (four in Elkton, two in Sebewaing, one in East Lansing, one in Howell, and one in Whitmore Lake). At these combined station locations, a total of 192,445 gallons of E85, 10,786 gallons of E50, and 19,159 gallons of E30 were sold in all reporting quarters for 2011. Overall, the project has successfully displaced 162,611 gallons (2,663 barrels) of petroleum, and reduced regional GHG emissions by 375 tons in the first year of station deployment.

09 BIOMASS FUELS↗

NetMOD Version 2.0 Mathematical Framework

NetMOD ( Net work M onitoring for O ptimal D etection) is a Java-based software package for conducting simulation of seismic, hydroacoustic and infrasonic networks. Network simulations have long been used to study network resilience to station outages and to determine where additional stations are needed to reduce monitoring thresholds. NetMOD makes use of geophysical models to determine the source characteristics, signal attenuation along the path between the source and station, and the performance and noise properties of the station. These geophysical models are combined to simulate the relative amplitudes of signal and noise that are observed at each of the stations. From these signal-to-noise ratios (SNR), the probabilities of signal detection at each station and event detection across the network of stations can be computed given a detection threshold. The purpose of this document is to clearly and comprehensively present the mathematical framework used by NetMOD, the software package developed by Sandia National Laboratories to assess the monitoring capability of ground-based sensor networks. Many of the NetMOD equations used for simulations are inherited from the NetSim network capability assessment package developed in the late 1980s by SAIC (Sereno et al., 1990).

58 GEOSCIENCES↗

NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2013 and FY2014

The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. Emphasis is given to collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate appropriate closure design and postclosure monitoring. Desert Research Institute installed two meteorological monitoring stations south (station number 1) and north (station number 2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA in 2011. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters is recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during FY2013 and FY2014.

54 ENVIRONMENTAL SCIENCES↗

NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2015

Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil transport from the Plutonium Valley Contamination Area (CA) as a result of wind transport and storm runoff in support of National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the contamination areas. The DRI work is intended to confirm the likely mechanism(s) of transport and determine the meteorological conditions that might cause movement of contaminated soils. The emphasis of the work is on collecting sediment transported by channelized storm runoff at the Plutonium Valley investigation sites. These data will inform closure plans that are being developed, which will facilitate the appropriate closure design and post-closure monitoring. In 2011, DRI installed two meteorological monitoring stations south (station #1) and north (station #2) of the Plutonium Valley CA and a runoff sediment sampling station within the CA. Temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and airborne particulate concentration are collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters are recorded for each 10-minute interval. The sediment sampling station includes an automatically activated ISCO sampling pump with collection bottles for suspended sediment, which is activated when sufficient flow is present in the channel, and passive traps for bedload material that is transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2015.

54 ENVIRONMENTAL SCIENCES↗

Boil-off losses along LH2 pathway

Losses along the LH 2 pathway are intrinsic to the utilization of a cryogenic fluid. They occur when the molecule is transferred between 2 vessels (liquefaction plant to trailer, trailer to station storage, station storage to pump or compressor, then fuel cell electric vehicles …) and when the fluid is warmed up due to heat transfer with the environment. Those losses can be estimated with good accuracy using thermodynamic models based on conservation of mass and energy, providing the thermodynamic states are correctly described. Indeed, the fluid undergoes various changes as it moves along the entire pathway (2 phase transition, super-heated warming, non-uniform temperature distributions across the saturation film) and accurate equations of state and 2 phase behavior implementations are essential. The balances of mass and energy during the various dynamics processes then enable to quantify the boil-off losses. In this work, a MATLAB code previously developed by NASA to simulate rocket loading is used as the basis for the LH 2 transfer model. This code implements complex physical phenomena such as the competition between condensation and evaporation and the convection vs. conduction heat transfer as a function of the relative temperatures on both sides of the saturated film. The original code was modified to consider real gas equations of state, and some semi-empirical relationships, such as between the heat of vaporization and the critical temperature, were also replaced by a REFPROP equivalent expression, assumed to be more accurate. Non-constant liquid temperature equations were added to simulate sub-cooled conditions. It is shown that although trailer depressurization and transfer losses from the receiving vessel during a LH 2 delivery may constitute the largest sources of losses, those can be greatly reduced and even eliminated if CFR/DOT regulations are properly applied and if no-vent fill methods are implemented, particularly for a stationary LH2 storage operating at reasonably low pressure (45 psia or so). As such, it is expected that the only remaining boil-off losses for a refueling station would come from the LH 2 pump (utilization and idling), pump vessel cool down/warm up, and environment heat transfer. Based on experimental data measured at LLNL on the Linde 875 bar LH 2 cryo-pump and results from the model, and extrapolating for refueling stations of various sizes, it can be shown that boil-off losses can vary from 15% of delivered LH 2 for a 100 kg/day, 5% at 400 kg/day, and down to less than 2% for stations above 1,800 kg/day (for a system similar to the one at LLNL). Less boil-off is to be expected for LH 2 pumps dispensing at 350 bar, so that less than 0.7% can be expected above 1,800 kg/day station capacities. At last, boil-off recovery solutions are briefly analyzed, including compressors, cryo-coolers and stationary fuel cell. Their economic value is strongly related to the costs of H2 and of the electricity needed to perform the recovery, on top of the initial capital expenditures. Effective boil-off could be reduced to 0.6-1% for a 2,000 kg/day station if adequate recovery solutions are used.

08 HYDROGEN↗