Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Managing Ada development

The Ada programming language was developed under the sponsorship of the Department of Defense to address the soaring costs associated with software development and maintenance. Ada is powerful, and yet to take full advantage of its power, it is sufficiently complex and different from current programming approaches that there is considerable risk associated with committing a program to be done in Ada. There are also few programs of any substantial size that have been implemented using Ada that may be studied to determine those management methods that resulted in a successful Ada project. The items presented are the author's opinions which have been formed as a result of going through an experience software development. The difficulties faced, risks assumed, management methods applied, and lessons learned, and most importantly, the techniques that were successful are all valuable sources of management information for those managers ready to assume major Ada developments projects.

Green, James R.↗

Power management

The multihundred kW power system management and a distribution program aims to develop critical components, circuits, and subsystems required to manage the generation, storage, and distribution of energy in large, orbital space systems. To accomplish this objective, a reference system including subsystems for the generation and storage of energy and management of electrical and thermal energy was designed and is being used to assess at the system level the impact of changing various subsystem parameters. A power management subsystem will then be designed. The subsystem is autonomous and based on ground utility systems concepts to the maximum extent possible. An agency power system breadboard is under development for characterizing and verifying the various component and subsystem technology developments.

Graves, J.↗

Status of the Landsat Data Continuity Mission

Efforts to begin implementing a successor mission to Landsat 7, called the Landsat Data Continuity Mission (LDCM), suffered a set back in 2003. NASA and the Department of Interior (DOI)/U.S. Geological Survey (USGS) currently manage the Landsat Program as an interagency partnership. The two agencies had planned to purchase data meeting LDCM specifications from a privately owned and commercially operated satellite system beginning in March, 2007. This approach represented a departure from the traditional procurement of a government owned and operated satellite system. NASA, however, cancelled a Request-for-Proposals (RFP) for providing the required data after an evaluation of proposals received from private industry. NASA concluded that the proposals failed to meet a key objective and expectation of the RFP, namely, to form a fair and equitable partnership between the Government and private industry. Alternative strategies for implementing an LDCM are now under consideration. The Executive Office of the President formed an interagency working group on the LDCM following the RFP cancellation. The working group is considering other options for implementing a successor system to Landsat 7 consistent with the Land Remote Sensing Policy Act of 1992 (Public Law 102-555). This Act lists four management options for consideration: 1) private sector funding and management; 2) an international consortium; 3) funding and management by the U.S. Government; and 4) a cooperative effort between the US. Government and the private sector. The working group is currently attempting to minimize the risk of a Landsat data gap through development of a strategy that leads to a Landsat 7 successor mission. The selected strategy and the status of the mission will be presented at the Symposium.

Irons, James R.↗

Some key considerations in evolving a computer system and software engineering support environment for the space station program

The space station data management system involves networks of computing resources that must work cooperatively and reliably over an indefinite life span. This program requires a long schedule of modular growth and an even longer period of maintenance and operation. The development and operation of space station computing resources will involve a spectrum of systems and software life cycle activities distributed across a variety of hosts, an integration, verification, and validation host with test bed, and distributed targets. The requirement for the early establishment and use of an apporopriate Computer Systems and Software Engineering Support Environment is identified. This environment will support the Research and Development Productivity challenges presented by the space station computing system.

Mckay, C. W.↗

An analysis of the technical status of high level radioactive waste and spent fuel management systems

The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

English, T.↗

NASA Procedures and Guidance 7120.5A: An Overview

The 1998 NASA Strategic Plan states that we are to deliver world-class programs and cutting-edge technology through a revolutionized NASA. Process and requirements must change to insure success in delivering those world-class programs. The 1996 Strategic Management Handbook defines the Agency's crosscutting processes: "Manage Strategically," "Provide Aerospace Products and Capabilities," "Generate Knowledge" and "Communicate Knowledge." The focus of this overview, and for the development of programs and projects, is the "Provide Aerospace Products and Capabilities" process. NASA Policy Document 7120.4A specifies the management system policy for the development and operation of programs and projects. NPG 7120.5A describes the next tier of requirements, integrating those crosscutting processes and process-focused requirements, making sure we can be flexible and efficient, providing the right kind of product delivery that meets user requirements.

Griner, Carolyn S.↗

Infusing Stretch Goal Requirements into the Constellation Program

In 2004, the Vision for Space Exploration (VSE) was announced by the United States President's Administration in an effort to explore space and to extend a human presence across our solar system. Subsequently, the National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop a constellation of new capabilities, supporting technologies, and foundational research that allows for the sustained and affordable exploration of space. Then, ESMD specified the primary mission for the Constellation Program to carry out a series of human expeditions, ranging from Low Earth Orbit (LEO) to the surface of Moon, Mars, and beyond for the purposes of conducting human exploration of space. Thus, the Constellation Program was established at the Lyndon B. Johnson Space Center (JSC) to manage the development of the flight and ground infrastructure and systems that can enable continued and extended human access to space. Constellation Program's "Design Objectives" call for an early attention to the program's life cycle costs management through the Program's Need, Goals, and Objectives (NGO) document, which provides the vision, scope, and key areas of focus for the Program. One general policy of the Constellation Program, found in the Constellation Architecture Requirements Document (CARD), states: "A sustainable program hinges on how effectively total life cycle costs are managed. Developmental costs are a key consideration, but total life cycle costs related to the production, processing, and operation of the entire architecture must be accounted for in design decisions sufficiently to ensure future resources are available for ever more ambitious missions into the solar system....It is the intent of the Constellation Program to aggressively manage this aspect of the program using the design policies and simplicity." To respond to the Program's strong desire to manage the program life cycle costs, special efforts were established to identify operability requirements to influence flight vehicle and ground infrastructure design in order to impact the life cycle operations costs, and stretch goal requirements were introduced to the Program. This paper will describe how these stretch goal requirements were identified, developed, refined, matured, approved, and infused into the CARD. The paper will also document several challenges encountered when infusing the stretch goal requirements into the Constellation Program.

Operability↗

Evaluation of the Trajectory Operations Applications Software Task (TOAST)

The Trajectory Operations Applications Software Task (TOAST) is a software development project under the auspices of the Mission Operations Directorate. Its purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle program. As an Application Manager, TOAST provides an isolation layer between the underlying Unix operating system and the series of user programs. It provides two main services: a common interface to operating system functions with semantics appropriate for C or FORTRAN, and a structured input and output package that can be utilized by user application programs. In order to evaluate TOAST as an Application Manager, the task was to assess current and planned capabilities, compare capabilities to functions available in commercially-available off the shelf (COTS) and Flight Analysis Design System (FADS) users for TOAST implementation. As a result of the investigation, it was found that the current version of TOAST is well implemented and meets the needs of the real-time users. The plans for migrating TOAST to the X Window System are essentially sound; the Executive will port with minor changes, while Menu Handler will require a total rewrite. A series of recommendations for future TOAST directions are included.

Perkins, Sharon↗

Cleared for Launch - Lessons Learned from the OSIRIS-REx System Requirements Verification Program

Requirements verification of a large flight system is a challenge. It is especially challenging for engineers taking on their first role in space systems engineering. This paper describes our approach to verification of the Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) system requirements. It also captures lessons learned along the way from developing systems engineers embroiled in this process. We begin with an overview of the mission and science objectives as well as the project requirements verification program strategy. A description of the requirements flow down is presented including our implementation for managing the thousands of program and element level requirements and associated verification data. We discuss both successes and methods to improve the managing of this data across multiple organizational interfaces. Our approach to verifying system requirements at multiple levels of assembly is presented using examples from our work at instrument, spacecraft, and ground segment levels. We include a discussion of system end-to-end testing limitations and their impacts to the verification program. Finally, we describe lessons learned that are applicable to all emerging space systems engineers using our unique perspectives across multiple organizations of a large NASA program.

Requirements Verification↗

Building Supply Chain Visibility for Risk Management: Illuminating the COVID-19 Pandemic Impact Upon NASA Suppliers

NASA mission projects rely upon global supply chains subject to an array of risks that threaten to disrupt or deny the timely, affordable provision of products and services as required for mission success. Visibility into these supply chains is key to the management of risks, such as those stemming from the coronavirus pandemic and its associated effects upon suppliers. Accordingly, the Supplier Research and Analysis (SRA) Program within Goddard Space Flight Center’s Safety and Mission Assurance (SMA) Directorate produced the COVID-19 pandemic/NASA suppliers dashboard as part of the NASA Meta Information System. The dashboard provides visibility and situational awareness to aid risk assessment, planning and decision-making over the course of the pandemic recovery phase. The approach of integrating data and information into visual dashboard displays has also been employed by the SRA Program to focus on specific risks pertaining to foreign-based suppliers. This webinar is presented by the NASA Office of SMA and its Supply Chain Risk Management Program, in collaboration with the NASA Safety Center and Goddard’s SMA Directorate.

supplier research and analysis, supply chain risk ↗

Report to the NASA Administrator by the Aerospace Safety Advisory Panel on the Space Shuttle Program. Part 1: Observations and Conclusions

Each system was chosen on the basis of its importance with respect to crew safety and mission success. An overview of the systems management is presented. The space shuttle main engine, orbiter thermal protection system, avionics, external tanks and solid rocket boosters were examined. The ground test and ground support equipment programs were studied. Program management was found to have an adequate understanding of the significant ground and flight risks involved.

Source record↗

Human Research Program Unique Processes, Criteria, and Guidelines (UPCG)

This document defines the processes, criteria, and guidelines exclusive to managing the Human Research Program (HRP). The intent of this document is to provide instruction to the reader in the form of processes, criteria, and guidelines. Of the three instructional categories, processes contain the most detail because of the need for a systematic series of actions directed to some end. In contrast, criteria have lesser detail than processes with the idea of creating a rule or principle structure for evaluating or testing something. Guidelines are a higher level indication of a course of action typically with the least amount of detail. The lack of detail in guidelines allows the reader flexibility when performing an action or actions.

Chin, Duane↗

Skylab profiles

Skylab program organization and management, system design, operations and equipment

Belew, L. F.↗

Natural Resource Information System. Volume 2: System operating procedures and instructions

A total computer software system description is provided for the prototype Natural Resource Information System designed to store, process, and display data of maximum usefulness to land management decision making. Program modules are described, as are the computer file design, file updating methods, digitizing process, and paper tape conversion to magnetic tape. Operating instructions for the system, data output, printed output, and graphic output are also discussed.

Source record↗

C-MOS array design techniques: SUMC multiprocessor system study

The current capabilities of LSI techniques for speed and reliability, plus the possibilities of assembling large configurations of LSI logic and storage elements, have demanded the study of multiprocessors and multiprocessing techniques, problems, and potentialities. Evaluated are three previous systems studies for a space ultrareliable modular computer multiprocessing system, and a new multiprocessing system is proposed that is flexibly configured with up to four central processors, four 1/0 processors, and 16 main memory units, plus auxiliary memory and peripheral devices. This multiprocessor system features a multilevel interrupt, qualified S/360 compatibility for ground-based generation of programs, virtual memory management of a storage hierarchy through 1/0 processors, and multiport access to multiple and shared memory units.

Clapp, W. A.↗