Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power System Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Design and optimization of a modular hydrogen-based integrated energy system to maximize revenue via nuclear-renewable sources

Here, this paper demonstrates a novel modular distributed framework that uses optimal energy-dispatching strategies to enable greater flexibility and profitability in nuclear-renewable integrated energy systems (NR-IES). Hydrogen is used as a commodity in this framework since its production can improve grid stability and system operational flexibility, decarbonize heavy industry, and create an additional revenue stream for electricity generators, particularly nuclear power plants with high operational expenses. The proposed solution addresses the challenges associated with merging multiple software and services from various domains by using functional mock-up units (FMU) to co-simulate diverse subsystems designed in various platforms. The tightly coupled integrated energy system (IES) is optimized to maximize revenue by utilizing the deep reinforcement learning (DRL) technique to make smart dispatching decisions based on variable electricity prices and the availability of renewable energy. Proximal policy optimization (PPO) algorithm is used in training and testing the DRL agent. Over a period of 120 days, the proposed hydrogen-based IES framework showed about 10% revenue boost compared to a non-hydrogen generating baseline IES while also providing an easily-adoptable framework which can help to improve the flexibility of future generation nuclear power plants.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cycloidal wave energy converter using fixed differential buoyancy to control operating torques

A floating mooring system for a single CycWEC applies counter forces and torques to keep a generator suitably stationary for power generation without requiring fixed attachments to the ocean floor or requiring a large frame interconnecting multiple CycWECs. The mooring system uses floats or floatation structure with differential ballasting to counter operating torque and drag plates to counter reactive forces. The floatation structures may be used to float the CycWEC for transport to a deployment location, where changing the overall ballasting of the floatation structures submerges the CycWEC to a desired depth and differential ballasting in the floatation structures counts expected operating torques.

Siegel, Stefan G.↗

A Framework to Evaluate the Grid Impacts of EV Fleet Charging Solutions

Growing Electric vehicle (EV) adoption in residential and commercial applications is driving the need for the charging infrastructures required to fulfill the charging needs. The resulting increase in demand for electric power will add a significant load to the electric grid, which could negatively impact the grid operation. EVs are power electronic loads and draw harmonic currents which can lead to a host of power quality issues. Therefore, it is crucial to assess the grid impacts and management of EV charging loads to ensure the reliable operation of the electric grid. In this paper, we develop a framework to help determine power-quality impacts given an EV charging schedule on the system. We compare the performance of unmanaged and managed charging solutions on factors like voltage drop, flicker, harmonic distortion and the peak site load - based on the EV depot in Hazelwood school district. The results allow insights into operation and site design of EV depots.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Development of Digital Twin Predictive Model for PWR Components: Updates on Multi Times Series Temperature Prediction Using Recurrent Neural Network, DMW Fatigue Tests, System Level Thermal-Mechanical-Stress Analysis

The long-term operation (LTO) of nuclear power plant (NPP) beyond their original design life of 40 years, can lead to more material damage associated with cyclic fatigue under thermal-mechanical loading cycles and associated long-term exposure of reactor material to the deleterious reactor-coolant environments. However, under this LTO condition the reactor components can still safely operate but may require more frequent Nondestructive Evaluation (NDE) of reactor components. Frequent NDE requirement may lead to frequent shutdown of the NPP. This in turn can lead to power outage and additional NDE-inspection-cost related economic loss. The economic loss can be minimized by reducing uncertainty in life estimation of safety-critical pressure boundary components and by implementing more digital approach such as by using upcoming digital-twin (DT) technology for predicting the structural states (e.g., time and location dependent inside/outside thickness temperature, stress, strain, plastic deformation, etc.) and associated fatigue life of a component in real time. Towards this goal Argonne National Laboratory (ANL) with the sponsorship of DOE Light Water Reactor Sustainability (LWRS) program is working on the development of a DT framework that can be used for real time environmental fatigue prediction of reactor components. The DT framework is based on limited experiment-data, Artificial-intelligence (AI) – Machine-Learning (ML) - Deep-Learning (DL) based techniques and Multiphysics-computational-mechanics such as finite element (FE) based modeling tools. Towards this overall goal, following are some of the major contributions made during the FY21: 1) Multiple 82/182 dissimilar metal weld (DMW) specimens (both solid-weld and joint-weld representing the actual reactor multi-metal nozzles) were fatigue tested. The resulting fatigue lives were compared to the NUREG-6909 based best-fit and design fatigue curves. Additionally, the results of 52/152 DMW fatigue specimens (which were recently tested at Republic of Korea under the sponsorship of International Nuclear Energy Research Initiative - INERI program) were compared to the NUREG-6909 based best-fit and design fatigue curves. From the comparison of 82/182 and 52/152 DMW test data with NUREG-6909 best-fit curve, most of the reported test data fall way away from the NUREG-6909 suggested best-fit or mean curve. The NUREG-6909 suggested best-fit curve is the best-fit curve of austenitic stainless steel and due to lack of enough data on Nickel-based welds, this is currently being used for predicting the life of Nickel-alloy-based welded components. However, the above observation may require higher scaling factor (e.g., ASME suggested factor of 20 on cycles rather than the current NUREG-6909 suggested factor of 12 on cycles) for scaling the austenitic-stainless-steel best-fit-curve for estimating the design or safe-life of a welded component. Accordingly, for example, if a DMW component experience a strain amplitude of 0.6% the PWR-water life of the component would be 52 cycles instead of 85 cycles. However, more DMW tests are required to further ascertain the above-mentioned observations. 2) A system level CAD and finite element model were developed which consists of reactor pressure vessel (RPV), part of steam generator (SG), part of pressurizer (PRZ), hot leg (HL), and surge line (SL). This is with detailed nozzle geometry and thermal-mechanical material properties of different metals to simulate realistic thermal-mechanical stress under connected system global thermal-mechanical boundary conditions. 3) Different system level heat transfer analyses were performed with estimation of relevant heat transfer coefficients. The resulting data were used in subsequent system level thermal-mechanical stress analysis and for generating spatial-temporal training and validation data for a system level digital-twin based temperature predictor. Transient heat transfer analyses were performed considering thermal boundary condition under design-basis (DB) loading and EDF (Électricité de France) data-based grid-load-following (EDF-GLF) loading cycles. 4) System level thermal-mechanical stress analysis was performed for identifying damage-prone hotspots and for future extension of the model for cyclic state prediction. From the system-level model simulation under DB loading cycle it is found that HL and the SL nozzle that connect to the HL can experience significant stress and strain and could be one of the weakest links in the overall reactor coolant system (RCS). 5) An AI/ML based DT model was developed for multi-time-series temperature prediction at any inside/outside thickness locations of PWR pressure boundary components. This is by using Recurrent-neural-network (RNN) and keras machine learning libraries. The RNN model was validated against two laboratory test-based data sets with one obtained through ANL’s in-air fatigue test system and other through PWR-water test loop. The experimentally validated DT model further validated against FE model results to predict thermal scarification related spatialtemporal temperatures at random locations of a component. The well validated DT model was then used for demonstrating spatial-temporal temperature prediction under 100+ years of reactor operation subjected to combined DB, EDF-GLF and randomized grid-load-following (RANDOMGLF) loading Cycles. The expert-elicitation DT model framework was developed assuming field/input/process measurements can be available from a few existing plant sensors and can readily be used by the NPP operators. The above temperature prediction model will feed to the next-step stress analysis model based on which the life of a component can be predicted in realtime, which is one of our future works.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Effects of Reactive Power on Photovoltaic Inverter Reliability and Lifetime

This paper performs research on predicting Photovoltaic (PV) inverters reliability and lifetime based on thermal cycling. Thermal cycling is considered the most important stressors in an inverter system. In order to achieve this, a detailed electro-thermal model of the PV inverter will be developed along with their controllers capable of providing voltage support through reactive power. An in-house inverter was built, and a PV inverter model was developed to match the physical inverter. The PV inverter electrothermal model was validated for different ambient temperatures to match the in-house inverter hardware. The in-house inverter was placed inside a thermal chamber to emulate different ambient temperatures and their losses and temperature rises within the system were measured. After the validation of the model, a reduced order model of the inverter will be implemented to translate the mission profile of ambient temperature and solar irradiance into load profile of junction temperatures of the switches. The junction temperature data will be used to identify the reliability indices and hence predict the useful lifetime of the inverter system. Along with the model to predict useful lifetime of the system, the impact of reactive power on the overall reliability of the system will be studied. The key observation in this paper shows that lifetime of the inverter decreases as the operating power factor moves away from unity.

14 SOLAR ENERGY↗

Enhanced Depolarized Electro-Membrane System (EDEMS) for Direct Capture of Carbon Dioxide from Ambient Air (Final Report)

The goal of this final project report is to summarize the work conducted on project DE-FE0031962. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed an intensified process to capture CO2 from ambient conditions (400 ppm CO2). The process combines low-temperature solvent-aided membrane capture with electrochemically-mediated solvent regeneration to simultaneously capture ambient CO2 while regenerating the solvent. The technology employs only two primary units (regenerator and absorber/contactor) while generating high purity hydrogen as a co-product that can be sold, used for energy storage, or cost-saving depolarization of the direct air capture (DAC) system during the grid peak demand, allowing for flexible operation. When depolarization is employed, the operating voltage is reduced by more than 1 V. Since the technology is powered directly by DC electricity, it can seamlessly tie in with power sources like solar cells without the need for AC/DC converters, therefore allowing for a remote operation to further mitigate greenhouse gas generation toward deploying a negative carbon emissions technology that is completely decoupled from the carbon emissions from the power source for the DAC unit. The project results verified that UK CAER’s integrated approach addressed the complexities of incumbent DAC systems by demonstrating at ambient conditions, including (1) low gas-side pressure-drop facile CO2 capture via a membrane contactor with in-situ generated hydroxide as capture solvent, (2) multi-functional electrochemical regenerator for hydroxide regeneration, CO2 concentration and hydrogen production, and (3) depolarization using cathode-produced hydrogen to reduce energy requirement. The EH&S Assessment of the process did not identify any obvious concern for the bench-scale operation and no apparent barriers to implementing UK CAER’s carbon capture and solvent regeneration system at a larger scale.

20 FOSSIL-FUELED POWER PLANTS↗

Industrial Load Flexibility, the U.S. Power Grid and Ammonia

A variable renewable power grid is a new technological regime that involves real time harvesting and low-cost availability of energy resources coupled with storage to meet additional needs. Decarbonization through electrification of end uses formerly met by combustion processes will be a concurrent trend. Taken together, these two changes may make flexibility on the demand side more valuable to the grid and to industrial users. Industry accounted for 26% of US power demand in 2021. Traditionally, industrial processes for producing ammonia and other basic materials have been optimized for a system based on fossil resources, where energy can be called upon according to needs. Large capital expenditures as well as safety considerations have favored plants running at steady state at close to their maximum capacity. It is possible, however, that the renewable energy transition will offer opportunities to sectors that can operate in a more flexible manner. Innovations that make use of flexibility to enhance their business model to move forward, individuals and groups active in their development, use and regulation, together with institutions and infrastructures, can be considered as a technological innovation system (TIS). Beyond economic and technical factors on their own, the TIS is an important analysis framework for studying the development and diffusion of technologies. This work attempts to map the TIS of flexible industrial loads and their interaction with electric power in the US, with a particular focus on ammonia as a case study. We have conducted interviews with stakeholders involved in ammonia projects, working in system operators, trade groups, regulators and utilities. We assess to what extent a technological innovation system is functioning and document characteristics that allow industries to operate flexibly.

ammonia↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Welcome to the Special Issue on Grid-Edge Computing With Behind-the-Meter Resources [Guest Editorial]

The integration of distributed energy resources (DERs), such as solar photovoltaic systems, as well as other synergistic assets, including electric vehicles, energy storage, and smart appliances, in electric power systems has been dramatically increasing in the past few years. These assets have the capability to provide much-needed flexibility to electric power systems for improved grid reliability, resilience, and economic efficiency; however, most of these resources are located behind the meter (BTM) on customer premises, and their flexibility is not fully used in current grid operations. Grid-edge computing plays an important role in unlocking the great benefits and potential that BTM resources could provide to electric power systems by enhancing visibility and controllability at the grid edge.

behind-the-meter resources↗

Multi-Edge Graph Convolutional Networks for Power Systems

The exponential electrification of transportation has contributed to highly intermittent load variations in the distribution grid. This uncertainty has raised challenges for distribution system operation and control. Accurate nodal voltage estimation is highly essential for the safe and reliable operation of the grid. Graph convolutional networks have been used in machine-learning-based models for power grid applications like voltage estimation for their ability to capture the network topology of the grid. This paper presents a novel multi-edge graph convolutional layer that considers resistance and reactance as edge attributes. This layer is created by modifying the message-passing function within the graph convolutional network. The novel layer is then used to create a multi-edge graph convolutional network-based surrogate model for estimating voltage in the distribution network with highly uncertain electric vehicle loads. Results indicate improved performance of the multi-edge graph convolutional network model when compared to a standard graph convolutional network model.

Ravi, Abhijith↗

Holistic Small-Signal Stability Analysis for Large-Scale Inverter-Intensive Power Systems with Coupled and Full-Order Dynamics from Control Systems and Power Networks

The increasing penetration of inverter-based resources (IBRs) into the existing power systems introduces tremendous benefits for enhanced sustainability but also poses inevitable challenges in terms of insufficient inertia, potential instability, and complex network dynamics, among others. However, the additional coupling introduced by the interactions among gridfollowing (GFL) and grid-forming (GFM) IBRs and the other components (i.e., synchronous generators [SGs], loads, and network, etc.) has not been clearly explored. A holistic, scalable, and quantitative stability analysis framework with the control systems and power networks is still missing. Here, in this paper, to fill in the technical gaps, a holistic small-signal model of the entire system with both rotating generation units and IBRs is established. An extended power flow model with operation dynamics from both generator control schemes and power networks is proposed to provide the varying steady-state operating points for small-signal modeling. The proposed method is compared with MATLAB solvers, and the results show that the proposed approach has a minimum calculation time, which can be less than 12 seconds for a large-scale power system with up to 2,000 buses. Furthermore, a quantitative method is developed to identify the impacts of IBRs on system performance with emphases on the potential stability issues with GFL IBRs, additional benefits of employing GFM IBRs, the feasibility of replacing SGs with GFM IBRs, and the impact of penetration level of different kinds of generation units. Finally, a field island power system is used to verify the proposed approach, and hardware-in-the-loop (HIL) tests are provided to further demonstrate the effectiveness of the proposed analysis.

14 SOLAR ENERGY↗