Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Policy Making”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Transactive Energy Practices Survey

For nearly two decades, the idea of using market-based approaches in field deployments that coordinate the flexible operation of electricity customer assets has occupied the efforts of transactive energy practitioners. While the purported benefits of this distributed decision-making approach encourage transactive energy designs have been well explored, the practical aspects of implementing such a system to address real-world problems are just beginning to emerge. This report surveyed 24 field-deployed programs and interviewed experts instrumental in these deployments. The results of the survey and interviews reveal the diversity of designs and applications. They highlight the technical promise of the approaches as well as challenges with system integration, sustainable business strategy, and regulatory policy obstacles. Insights from the survey offer considerations to direct future effort and investment.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA’s Safety, Reliability, and Mission Assurance Digital Future

The evolution from “document-centric” to “data-centric” and “model-centric” information leveraging structured data and model-based approaches is at the heart of digital engineering transformational efforts underway across industry and government. It is these approaches that pave the way for data lakes, Authoritative Sources of Truth (ASOTs), and systems- of-systems interoperability and the corresponding transformational benefits thereof. Such benefits include increased data availability, data access equity, data traceability, real-time analytics, batch analytics, and (most importantly) acceleration of the time-to-value and time-to-insights associated with engineering products and analyses. The longer-term benefits of reusability, customization and traceability are even more promising. For Safety and Mission Assurance (SMA), and Mission Success (SMS) activities; realization of such benefits is essential to provide engineers and analysts alike vital information when needed to support critical decision making throughout the entire life cycle. The SMA community often operate in parallel with engineering activities, for which information exchange with relevant context is paramount. Far too often, such information lags key decision points and/or is absent of the robust, integrated, knowledge needed, given inherent barriers associated with traditional document-centric means to data sharing, analysis, and reporting. This paper provides an overview of how NASA’s Office of Safety and Mission Assurance (OSMA) is evolving its policies, standards, guidance, and training to transform to eliminate such barriers, thus realizing the benefits emerging in this new digital era. A roadmap for achieving this digital future is presented along with key building blocks involving use and implementation of concepts such as: Objectives-Hierarchies, Objective-Driven Requirements, Accepted Standards, Safety and Assurance Cases, data digitization (i.e., ontologies, structured data, and model-centric data), FAIR (Findable, Accessible, Interoperable, & Reusable) and/or FAIRUST (Findable, Accessible, Interoperable, Reusable, Understandable, Secure, and Trusted) principles [1]. This paper also describes how OSMA, leveraging the Agency’s overall commitment to Digital Transformation (DT), is using the power of Policy, “Digital” Domain representation, Product Evolution, and Community Outreach and Engagement as part of a strategic vision and roadmap to evolve and transform its SMA organizations to become better able to serve its stakeholders and customers. Future publications will elaborate on these building blocks and deeper concepts.

Authoritative Source of Truth (ASOT),↗

Optimal Power Management for Large-Scale Battery Energy Storage Systems via Bayesian Inference

Large-scale battery energy storage systems (BESS) have found ever-increasing use across industry and society to accelerate clean energy transition and improve energy supply reliability and resilience. However, their optimal power management poses significant challenges: the underlying high-dimensional nonlinear nonconvex optimization lacks computational tractability in real-world implementation, and the uncertainty of the exogenous power demand makes exact optimization difficult. This paper presents a new solution framework to address these bottlenecks. The solution pivots on introducing power-sharing ratios to specify each cell’s power quota from the output power demand. To find the optimal power-sharing ratios, we formulate a nonlinear model predictive control (NMPC) problem to achieve power-loss-minimizing BESS operation while complying with safety, cell balancing, and power supply-demand constraints. We then propose a parameterized control policy for the power-sharing ratios, which utilizes only three parameters, to reduce the computational demand in solving the NMPC problem. This policy parameterization allows us to translate the NMPC problem into a Bayesian inference problem for the sake of 1) computational tractability, and 2) overcoming the nonconvexity of the optimization problem. We leverage the ensemble Kalman inversion technique to solve the parameter estimation problem. Concurrently, a low-level control loop is developed to seamlessly integrate our proposed approach with the BESS to ensure practical implementation. This low-level controller receives the optimal power-sharing ratios, generates output power references for the cells, and maintains a balance between power supply and demand despite uncertainty in output power. We conduct extensive simulations and experiments on a 20-cell prototype to validate the proposed approach.

Battery energy storage systems (BESSs)↗

NASA Publications Guide

The publication programs and management policies of NASA are described and the details that authors and publication specialists need to know to carry out the agency's mission of disseminating the scientific and technical information derived from its activities are highlighted. Topics covered include the various kinds of NASA formal publications; selection of publication medium; printing and distribution; and requirements concerning style and format standards, copyright transfers, the cover, color, and foldouts. The sections of a report are delineated and editorial and page make-up responsibilities are also discussed.

Source record↗

Enhanced Communication Network Solution for Positive Train Control Implementation

The commuter and freight railroad industry is required to implement Positive Train Control (PTC) by 2015 (2012 for Metrolink), a challenging network communications problem. This paper will discuss present technologies developed by the National Aeronautics and Space Administration (NASA) to overcome comparable communication challenges encountered in deep space mission operations. PTC will be based on a new cellular wireless packet Internet Protocol (IP) network. However, ensuring reliability in such a network is difficult due to the "dead zones" and transient disruptions we commonly experience when we lose calls in commercial cellular networks. These disruptions make it difficult to meet PTC s stringent reliability (99.999%) and safety requirements, deployment deadlines, and budget. This paper proposes innovative solutions based on space-proven technologies that would help meet these challenges: (1) Delay Tolerant Networking (DTN) technology, designed for use in resource-constrained, embedded systems and currently in use on the International Space Station, enables reliable communication over networks in which timely data acknowledgments might not be possible due to transient link outages. (2) Policy-Based Management (PBM) provides dynamic management capabilities, allowing vital data to be exchanged selectively (with priority) by utilizing alternative communication resources. The resulting network may help railroads implement PTC faster, cheaper, and more reliably.

Policy-Based Management (PBM)↗

Great Lakes Energy-Water Model

The nexus between thermoelectric power production and water use is not uniform across the U.S., but rather differs according to regional physiography, demography, power plant fleet composition, and the transmission network. That is, in some regions water demand for thermoelectric production is relatively small while in other regions it represents the dominate use. The later is the case for the Great Lakes region, which has important implications for the water resources and aquatic ecology of the Great Lakes watershed. This is today, but what about the future? Projected demographic trends, shifting lifestyles, and economic growth coupled with the threat of global climate change and mounting pressure for greater U.S. energy security could have profound effects on the region's energy future. Planning for such an uncertain future is further complicated by the fact that energy and environmental planning and regulatory decision-making is largely bifurcated in the region, with environmental and water resource concerns generally taken into account after new energy facilities and technologies have been proposed, or practices are already in place. Based on these confounding needs, the objective of this effort is to develop Great Lakes-specific methods and tools to integrate energy and water resource planning and thereby support the dual goals of smarter energy planning and development, and protection of Great Lakes water resources. Guiding policies for this planning are the Great Lakes and St. Lawrence River Basin Water Resources Compact and the Great Lakes Water Quality Agreement. The desired outcome of integrated energy-water-aquatic resource planning is a more sustainable regional energy mix for the Great Lakes basin ecosystem.

Tidwell, Vincent↗

Methods for Translating ReEDS Solutions to Production Cost Modeling Tools

Capacity expansion modeling tools are increasingly being utilized to investigate a wide range of potential future scenarios, particularly with high penetrations of variable and energy-constrained resources that may be operated differently than current dispatch paradigms. While capacity expansion models are particularly adept at making investment decisions for future years, they must make compromises in operational aspects to maintain computational tractability. However, it is of high interest to determine if such future systems would be able to maintain reliability during a variety of grid conditions, and to identify any potential operational challenges for these systems at finer temporal resolution than is typically captured in CEMs. As such, there is value in having an automated tool that can convert many CEM investment pathways into inputs for a more detailed production cost model, in this case the PLEXOS commercial software package. This paper describes the methodology used to make that translation for the NREL-developed ReEDS model, making use of two internally developed tools - PIDG and beetle - along with a set of processing scripts. We describe the current assumptions, data sets, and important operational characteristics of these translations along with an example of the extended analyses that may be done through this connection.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Emerging Best Practices for Electric Utility Planning with Climate Variability: A Resource for Utilities and Regulators

This report is intended to support electric utilities and regulators as they work together to increase the climate resilience of the power system in the United States. It focuses on best practice methods and examples of conducting utility forecasting with climate change (Section 2) as well as three overlapping types of electric utility planning for climate change: resource planning (Section 3), asset planning (Section 4), and contingency planning (Section 5). This report also addresses data development and access (Section 6), emerging pathways for planning including decision-making under deep uncertainty and storylines approaches (Section 7), regulatory considerations (Section 8), and coordination and innovative funding and cost sharing approaches to planning for climate variability (Section 9).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Increased Electric Vehicle Shares on Decarbonized Bulk Power Systems

Transportation electrification and power sector decarbonization - the convergence of these two trends present a complex planning problem requiring realistic, region-specific modeling and analysis to ensure that both can happen rapidly and cost effectively. This project, funded through the U.S. Department of Energy's Vehicle Technologies Office, models the evolution of the U.S. bulk power system (through 2050) in response to large-scale EV charging across all on-road vehicle segments. We will assess the opportunity and value of demand-side flexibility (i.e., "smart" charging) for reducing energy costs, increasing renewable generation shares, and managing future EV loads on the bulk power system. Overall, this study aims to provide an improved understanding of least-cost solutions for managing EV load growth on the grid and will make high-resolution EV load data sets publicly available for further analysis.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Energy Technologies Research and Education Initiative

For this project, the intended goal of the microgrid component was to investigate issues in policy and technology that would drive higher penetration of renewable energy, and to demonstrate implementation in a utility system. The work accomplished on modeling the dynamics of photovoltaic (PV) penetration can be expanded for practical application. Using such a tool those involved in public policy can examine what the effect of a particular policy initiative, e.g., renewable portfolio standards (RPS) requirements, might be in terms of the desired targets. The work in the area of microgrid design, protection, and operation is fundamental to the development of microgrids. In particular the “Energy Delivery” paradigm provides new opportunities and business models for utilities. Ultimately, Energy Delivery could accrue significant benefits in terms of costs and resiliency. The experimental microgrid will support continued research and allow the demonstration of technology for better integration of renewables. The algal biofuels component of the project was developed to enhance the test facility and to investigate the technical and economic feasibility of a commercial-scale geothermal algal biofuels operation for replication elsewhere in the arid Southwest. The project was housed at New Mexico State University’s (NMSU’s) Geothermal Aquaculture Facility (GAF) and a design for the inoculation train and algae grow-out process was developed. The facility was upgraded with modifications to existing electrical, plumbing and structural components on the GAF and surrounding grounds. The research work was conducted on biomass-processing, harvesting, dewatering, and extraction. Additionally, research was conducted to determine viability of using low-cost, wastewater from municipal treatment plants in the cultivation units as make-up water and as a source of nutrients, including nitrogen and soluble phosphorus. Data was collected on inputs and outputs, growth evaluation and chemical composition of algal biomass feedstock. Also, research was completed on evaluating inoculation train, algae grow-out units, indoor cultivation units and the algal biomass dewatering units to identify opportunities for recapturing waste energy, water and biomass in the individual units or any combination of these units. A preliminary economic analysis was conducted.

09 BIOMASS FUELS↗

Future private car stock in China: current growth pattern and effects of car sales restriction

Car stock projection is essential to evaluating the energy and environmental impacts of private cars in China. Since the private car ownership rate in China has not reached its saturation level, limited and outdated data used in previous studies has resulted in high uncertainties regarding the functions of car ownership and significantly reduced the robustness of the projection of private car stocks. In this work, we estimate China's current growth pattern of private car ownership by analyzing more than 6300 pairs of private car ownership and income data collected from various official statistics at the national, provincial, and city levels in the period of 1997-2017. The dataset covers a much wider per-capita disposable income range than national-level data alone and allows us to make satisfactory projections of private car stocks in China up to 2040. We project that the private car stock in China could reach 403 million in 2040, if the current growth pattern of car ownership continues. Significant discrepancies in private car ownership curves are observed for cities with and without car sales restrictions. Without car sales restrictions, we estimate that the private car stock would be even higher at 455 million by 2040, demonstrating the effectiveness of the current restriction policy in controlling car stocks in China. We further quantify the potential impacts of car sales restrictions on future car stock levels by implementing hypothetical national car sales caps. Results show that, although the private car stocks would still continue to grow before 2030, the stock levels would be stable at ~ 280 and ~ 350 million by 2040 for scenarios of 20 and 25 million sales caps, respectively. The impact of private car stock growth on energy consumption in China is also examined. Pump-to-wheels energy consumption of the private car fleet is projected to be 131, 147, 90, and 113 million tonnes of oil equivalent by 2040 for scenarios of the current growth pattern, no sales restriction, the 20 million sales cap, and the 25 million sales cap, respectively. Analysis reveals that private car sales restriction and vehicle population growth control could be an effective strategy for energy consumption reduction (thus greenhouse gas emission mitigation) in China, although the development of the automotive industry may be restrained.

33 ADVANCED PROPULSION SYSTEMS↗

Resources Available for Hazards Analysis of Aerospace Fluids

In recent years, the legislative and executive branches of the federal government have pushed to make government more efficient and responsive to the needs of the marketplace. One of these initiatives, Public Law 104-113, also known as the National Technology Transfer and Advancement Act of 1995 (NTTAA), is designed to accelerate technology transfer to industry and promote government-industry partnership. Summarized, NTTAA states that '... all Federal agencies and departments shall use technical standards that are developed or adopted by voluntary consensus standards bodies, using such technical standards as a means to carry out policy objectives or activities determined by the agencies and departments. Government agencies must now determine if their in-house requirement-setting activities are sufficiently unique that no public interest is served by having them adopted by a voluntary consensus organization (VCO), or if not, to use or develop voluntary consensus standards. The Office of Management and Budget (OMB) is chartered by the law to monitor federal agency progress and report the results to Congress. In response to NTTAA, agency-wide oxygen and hydrogen safety standards sponsored by the NASA Headquarters (HQ) Office of Safety and Mission Assurance (OSMA) were obvious choices for early adoption by VCOs. In 1996, HQ sought assistance from the Johnson Space Center (JSC) White Sands Test Facility (WSTF), the technical lead for development of these safety standards, to evaluate their adoption by VCOs. At that time, WSTF-developed propellant hazards manuals were likewise identified for possible VCO adoption. Subsequently, WSTF was asked to represent NASA for development of an international ISO safety standard for hydrogen use. Concurrent with these WSTF standards activities are related efforts to develop and publish propellant hazards analysis protocols and safety courses for the industrial, propellant use of oxygen, hydrogen, and hypergols. This paper reports on these efforts and describes WSTF's overall voluntary consensus standards program to coordinate the interchange of NASA's propellant hazards and safety information with industry.

Woods, S. S.↗

Opportunities and Challenges for Remote Microreactor Operations

The nuclear industry is developing new advanced reactor technologies, and many companies are embracing this advancement by pursuing the development of microreactors. The term microreactor generally refers to a nuclear reactor with an operating power of 20 MW or less. The power range of microreactors makes them appealing for many use cases, such as powering remote communities, mining sites, and military bases. Most of the microreactor designs being pursued will incorporate remote facility operations into the final product. However, no framework has yet been developed to determine what remote operations systems require for reliable, resilient, and secure operation of a microreactor. This work identifies the challenges unique to remote operations and monitoring for microreactors specifically regarding instrumentation and control, communication methods, regulatory requirements, and operational policies. The types of commands and sensor measurements that must be transmitted between the facilities as well as methods for verifying the trustworthiness of these signals are assessed. This work evaluates the security, reliability, and performance requirements that must be met when considering the selection of communication hardware and protocols for use in remote operations. Also, an assessment was performed to study how remote operations fit within current regulatory requirements and what may need to be updated in regulatory policy to allow for remote operation. Finally, the operational contingencies unique to remote operations that must be in place for response to abnormal events are identified. This paper details these challenges and research opportunities to provide a foundation for the design of remote operation systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Right-Sized Reuse - Use a Systematic Process, and Design for a Specialized, Yet Flexible Result - 13558

The process of transferring real property from the U.S. Department of Energy (DOE) is always the same - except when it's not. The most frequently asked questions in the process are: how can this take so long and be so complex, and why is it different every time? The process of transferring real property from the Department of Energy is always the same - except when it's not. Repeat as needed. The authority for DOE to transfer property is found in the Atomic Energy Act of 1954 (AEA). Specifically, the transfer of real property for mission-related purposes is done pursuant to the AEA Section 161(g). Another rule that can provide certain unique benefits to the transferee is found in 10 Code of Federal Regulations (CFR) Part 770, Transfer of Real Property at Defense Nuclear Facilities for Economic Development; it can be followed for economic development purposes at defense nuclear facilities. All federal real property transfers include at minimum a National Environmental Policy Act (NEPA) review and a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) chap. 120(h) environmental due diligence evaluation. The end-point objective is to be able to demonstrate that a transfer is protective of human health and the environment - typically attained via a risk evaluation. That's it...mostly. None of these requirements are new; their processes are well-known. So, why is it different every time there is a transfer and what can be done to move things along? Time and the perception of open-ended schedules kill projects. Economic development projects that are proposed by Community Reuse Organizations (CROs) and others or by parties who need private capital are especially time-sensitive. It is not reasonable to expect business interests or investors to wait two years while the property transfer process is carried out. Lenders are also risk-sensitive and not solely business-risk sensitive. After all, these are federal properties where contamination is a factor. What are some of the things you can do to address those time and risk issues? Issues of time and complexity arise from several variables. Short-sighted vision and lack of project definition lead to wasted effort and lengthy delays. Some variability on the input side of the process can be controlled in a way that will save you time and actually work to your advantage. Steps can be taken to systematize the transfer process on the agency's part and on the requester/grantee's part. Having the right mix of dedicated people from the beginning, planning with flexibility, coordinating with the clean-up program at your site, knowing the interests and issues of your stakeholders, and working with the CRO/economic development authorities - all of these measures and others can and will help you. The key is not simply knowing the steps and making a punch-list, but understanding the steps and how to work with and use them. These concepts can be applied to create a vision of success for those engaged in real property transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Guidelines for Datacenter Energy Information System

The purpose of this document is to provide structured guidance to data center owners, operators, and designers, to empower them with information on how to specify and procure data center energy information systems (EIS) for managing the energy utilization of their data centers. Data centers are typically energy-intensive facilities that can consume up to 100 times more energy per unit area than a standard office building (FEMP 2013). This guidance facilitates “data-driven decision making,” which will be enabled by following the approach outlined in the guide. This will bring speed, clarity, and objectivity to any energy or asset management decisions because of the ability to monitor and track an energy management project’s performance.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements

This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. This guide explicitly focuses on comprehensive energy upgrades, those that involve multiple measures and are targeted toward achieving significant energy savings. Successful implementation of clean energy upgrades in schools is a matter of understanding the opportunity, making the commitment, and creatively tapping into available financing. This guide attempts to provide the foundation needed for successful projects in U.S. schools. It walks through the financing options available to K-12 schools and provides case studies of six school districts from around the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancing the Useability of the IAEA's Physical Model: An Analysis of User Feedback

This study presents the results of Physical Model user interviews conducted with 12 people who have International Atomic Energy Agency (IAEA) safeguards experience. The goal of this report is to provide additional context for policy makers when prioritizing the needs of the IAEA regarding support for enhancements to the Physical Model. The interviews covered the general usability of the Physical Model, its effectiveness as a technical reference, and the scope and utility of the Physical Model's indicators and content. The key conclusions from these interviews are as follows: 1) The Physical Model is difficult to find and not well advertised. 2) The Physical Model can be difficult to use due to its format, which makes searching for information difficult, and lack of visual content. Therefore, the Physical Model should be supported in multiple formats (print, PDF, web) to maximize its usability for different stakeholders. 3) The scope of the Physical Model's content and indicators is likely sufficient, and translating indicators into other languages is unlikely to be worth the effort. 4) Despite its inefficiencies and other issues, the Physical Model in its current form is a vital (albeit under-utilized) resource for key stakeholders. 5) Despite its broad use case the Physical Model is not a catch-all tool and force-fitting the Physical Model into functions for which it has not been designed for would likely diminish its value. 6) It can be difficult to disentangle challenges related to the Physical Model and its usability from broader challenges at the Agency, such as general issues with communication and coordination. Based on these conclusions and considering the results of past studies on the Physical Model funded by NA-241, the analysis team developed a list of recommendations and associated actions for IAEA consideration. These recommendations are prioritized based on the assessed level of difficulty for the IAEA to implement a recommendation, emphasizing low hanging fruit then building to more ambitious changes to the Physical Model's format and content.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Communities LEAP: Microgrids 101 [Slides]

Through the Communities Local Energy Action Program (LEAP), NREL is providing technical assistance to a coalition of stakeholders from Oakridge, Oregon. The coalition includes community-based non-profit organizations, the city government, the local utility, and others. Technical assistance provides analysis and information to support Oakridge stakeholders with their goals to increase energy reliability and resilience in the community, while promoting economic development. The Grid Resilience and Microgrids Learning Session was presented to the Oakridge coalition to provide foundational technical knowledge that can support decision-making about energy-related issues in the community.

24 POWER TRANSMISSION AND DISTRIBUTION↗