Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEEDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Sub-micron Ash Aerosol Formation in Oxycoal Combustion at Atmospheric and Elevated Pressures

Reaction Engineering International (REI) has managed a team of experts from the University of Utah, Southeast University (SEU) in Nanjing, China, Electric Power Research Institute (EPRI), Corrosion Management Ltd. (C-M), Praxair, and Brigham Young University (BYU) to investigate dry pulverized coal feeding for pressurized oxy-coal combustion. Dry feed firing systems for entrained flow, pressurized, oxy-coal combustors have not been well developed, although related technologies have been used in the Shell Gasification Process and for pressurized fluid bed combustion. DOE-funded research recently completed at REI and the University of Utah focused on characterizing impacts of high temperatures and pressures in oxy-coal combustion systems. For high pressure combustion, that research used a coal slurry feed into a 17 bar pressurized combustor. As a consequence of that research, it was identified that fuel feeding and firing system flexibility are challenges that require attention. Based on that experience, the approach of using a coal slurry feed system leads to challenges in producing consistent atomization of the slurry, which causes burnout problems, especially at high pressures. In addition, slurry atomization processes may be difficult to scale to sizes appropriate for practical commercial use. Dry pressurized coal burner systems, on the other hand, have the potential to yield efficiency gains, improve flexibility and facilitate applications at larger scales. Experimental work was conducted at the University of Utah Industrial Combustion and Gasification Research Facility as well as the 100 kW pressurized oxy-coal combustor (POC) facility at Brigham Young University. Mechanism development and CFD-based combustion and dense-phase flow modeling were performed at REI. Successful completion of the project objectives has resulted in the following key deliverables: 1) Design and prototype of a pressurized pulverized coal feeding and oxy-firing system 2) Data from a 100kW, pressurized (15 bar) entrained flow reactor with a dry feeding delivery and burner system that describes flame characteristics, radiative heat flux profiles, carbon burnout, along with characteristics of ash aerosols, fouling, and slagging. 3) Validated and transportable models that describe the relevant conditions in pressurized oxy-combustion systems and that can be used for scale-up and optimization. 4) Principles to guide design of high pressure, pilot-scale and full-scale coal oxy-firing systems. 5) Assessment of pressurized oxy-combustion impacts on key parameters relevant to oxy-coal fired utility boilers such as coal devolatilization, char oxidation, mineral matter transformation, deposition, and corrosion. The experimental data, pressurized oxy-firing system principles, and process mechanisms provided by this work can be used by electric utilities, boiler OEMs, equipment suppliers, design firms, software vendors, consultants and government agencies to assess the use of high temperature and high pressure oxy-combustion in current research and to guide development of new oxy-coal boiler designs.

01 COAL, LIGNITE, AND PEAT↗

Filtration of Hanford Tank 241-AN-107 Supernatant at 16 °C

Approximately 9 liters of supernatant from Hanford waste tank 241-AN-107 was delivered by Washington River Protection Solutions to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory. The thirty-six AN-107 sample bottles consisted of six sets of six samples, with each set pulled from a unique tank sampling level. Prior to testing, samples from each level were composited to provide nominally level-independent feed for dead end filtration and ion exchange testing. The composited 241-AN-107 supernatant was chilled to 16 °C for 1 week prior to testing. Filtration testing was then conducted using a backpulse dead-end filter (BDEF) system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the RPL. The purpose of this testing is to a) demonstrate dead-end filtration (DEF) of AN-107 feed at reduced temperature to obtain prototypic tank side cesium removal (TSCR) flux rates and identify issues that may impact filtration after dilution to 5.5M Na, and b) provide feed for a follow on ion exchange unit operation. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 . During filtration the differential pressure required to effect filtration at 0.065 gpm/ft 2 was slow to increase for most of the filtration campaign. After all the feed bottles had been pumped into the slurry reservoir, the bottoms of the bottles were added to the reservoir and transmembrane pressure (TMP) reached 2.0 psid (the TSCR action limit). The prototypic filter cleaning process was unable to effectively restore filter performance, and cleaning with oxalic acid was required before flow through the filter could be restored. This indicates that the Media Grade 5 filter may require an alternative cleaning protocol when processing AN-107 supernatant. After completing filtration of the AN-107 feed, the filter was cleaned. Solids concentrated from the backpulse solutions were composed of natrophosphate, Mn-Fe phases, and fluoro-natrophosphate that occurred as particle agglomerates. The individual particles were in some cases 100s of micrometers across which is consistent with prior observations from AN-107 supernate waste characterizations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Filtration of Hanford Tank 241-AW-105 Supernatant at 16 °C

Approximately 9 L of supernatant from Hanford waste tank 241-AW-105 was delivered by Hanford Tank Waste Operations and Closure (H2C) to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory (PNNL). The thirty-six 241-AW-105 sample bottles consisted of four sets of nine samples, with each set pulled from a unique tank sampling level. Prior to testing, samples from each level were composited and diluted to 5.5 M Na to provide nominally level-independent feed for dead-end filtration and ion exchange testing. The composited 241-AW-105 supernatant was chilled to 16 °C for 1 week prior to testing. Filtration testing was then conducted using a backpulse dead-end filter (BDEF) system equipped with a feed vessel and a Mott inline filter (Model 6610, Media Grade 5) in the hot cells of the RPL. The purpose of this testing was to (a) demonstrate dead-end filtration (DEF) of 241-AW-105 feed at reduced temperature to obtain prototypic Tank Side Cesium Removal (TSCR) flux rates and identify issues that may impact filtration after dilution to 5.5 M Na, and (b) provide feed for follow-on ion exchange unit operation. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft2. For most of the filtration campaign, the differential pressure required to effect filtration at 0.065 gpm/ft2 was slow to increase. After all the feed bottles had been pumped into the slurry reservoir, the bottoms of the bottles were added to the reservoir and transmembrane pressure (TMP) reached 2.0 psid (the TSCR action limit). A backpulse was performed after >50 hours of filtration to remove fouled solids and reduce the TMP. The filter was cleaned after completing filtration of the 241-AW-105 feed, and clean water flux tests showed filter performance was effectively restored. Solids concentrated from the backpulse solutions were composed of steel-like particles, uranium-bearing phases, Mn-Fe phases, a Ce-bearing phase, Zr phases, and some smaller Ca-bearing particles. The Ca-bearing and U bearing phases were identified as calcite and clarkeite, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Propellant and Catalyst Bed Temperatures on Thrust Buildup in Several Hydrogen Peroxide Reaction Control Rockets

An investigation was undertaken to determine the effect of chamber and propellant feed temperatures on the starting characteristics of hydrogen peroxide thrust chambers. Start delay times for two types of thrust chamber designs in the 1- to 24-pound-thrust range were obtained over a range of chamber and propellant feed temperatures from 30 to 100 F. Start delay times obtained during the first minute of catalyst bed life and again after 6 minutes of total accumulated running time are presented as a function of chamber and propellant feed temperatures. The initial cold-start delay time of the hydrogen peroxide thrust chambers investigated was approximately 0.150 second to attain 90 percent of steady-state chamber pressure at chamber and propellant feed temperatures of 70 F and above. Both thrust chamber designs could be started at chamber and propellant feed temperatures as low as 30 F; start delay times did, however, generally increase at low temperatures. When the chamber was at an elevated temperature from a preceding firing, the start delay time was reduced to approximately 0.050 second, indicating a marked effect of chamber temperature at constant propellant feed temperatures. Accumulated run time affected the starting characteristics only when both the chamber and propellant feed temperatures were at reduced levels.

Wanhainen, John P.↗

Heat rejection sublimator

A sublimator includes a sublimation plate having a thermal element disposed adjacent to a feed water channel and a control point disposed between at least a portion of the thermal element and a large pore substrate. The control point includes a sintered metal material. A method of dissipating heat using a sublimator includes a sublimation plate having a thermal element and a control point. The thermal element is disposed adjacent to a feed water channel and the control point is disposed between at least a portion of the thermal element and a large pore substrate. The method includes controlling a flow rate of feed water to the large pore substrate at the control point and supplying heated coolant to the thermal element. Sublimation occurs in the large pore substrate and the controlling of the flow rate of feed water is independent of time. A sublimator includes a sublimation plate having a thermal element disposed adjacent to a feed water channel and a control point disposed between at least a portion of the thermal element and a large pore substrate. The control point restricts a flow rate of feed water from the feed water channel to the large pore substrate independent of time.

Dingell, Charles W.↗

AUXILIARY FEEDWATER REHEATING TO MITIGATE PRIMARY AND SECONDARY SIDE THERMAL STRESSORS

A consequence of operating steam cycles under time varying loads, is the variability of the feedwater temperature entering the bottom of the steam generators. This variability is a direct result of changes in turbine impulse pressure and subsequently turbine tap pressures in response to the load changes, with a reduction in feed temperature during periods of low turbine demand. These fluctuations over time will increase thermal cycling and threaten the integrity of the tube bundle as well as other components in the feed system. Sensible heat, TES systems have been shown to be an effective load management strategy allowing nuclear reactor systems to operate at effectively 100% full power while storing excess thermal energy for recovery later. A byproduct of the TES system is the availability of large amounts of low grade waste heat that can be used for ancillary applications, including auxiliary feed heating during periods of low turbine demand. The addition of an auxiliary feed heater at the end of the traditional feed train can minimize feed temperature variations during periods of low turbine demand, reducing the effects of thermal cycling and increasing overall thermodynamic efficiency. This paper discusses the design, operation and control strategies for an auxiliary feed water system as an integral component of a coupled Thermal Energy Storage system and Integral Pressurized Water Reactor. The impact on system performance, particularly as it affects reactor dynamic response and reductions in thermal cycling will be addressed. In addition to the improved thermal efficiency, a benefit of this approach is the relocation of thermal stressors from the reactor coolant system to more easily managed Balance of Plant systems

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dual-band GPS antenna with horizontal polarization

An antenna array is described herein that is suitable for dual-band GPS reception. The antenna array includes a plurality of dipole antennas arranged in a circular pattern. The antenna array further includes a feed network, separated from the dipole antennas by an insulating plate, and that passes electrical signals output by the dipole antennas to a feed line. The feed network comprises a central plate in contact with the feed line, and a plurality of arms aligned with the dipoles and extending from the center plate toward the outer edges of the circular pattern. The arms cross over slots in each of the dipole antennas. Electromagnetic waves that impinge on the dipoles induce signals that travel down the slots in the dipoles and couple to the arms of the feed network where the arms cross over the slots. The signals then travel along the feed network to the feed line.

42 ENGINEERING↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Development of In-Can Melting Process Applied to Vitrification of High Activity Waste Solutions (HAWS): Glass characterizations and process tests results - 12442

The CEA has selected vitrification for specific High-Activity nuclear Waste Solutions (HAWS) containing large quantities of salts. This choice has led the CEA Marcoule to develop a compact 'in-can' batch melting process in which the melting pot is disposable and serves as the primary canister for the solidified glass. This process is particularly suitable for the treatment of small waste quantities (less than 10 m{sup 3} per year) and low flow rates (5 to 10 L/h) which do not justify the use of a Cold Crucible Induction Melter. The unit capacity is approximately one hundred kilograms of glass a week operating alternately between feeding during the day and surveillance at night. In order to be fully representative of the glove box to be implemented, a new nonradioactive pilot-scale unit in which the core process (furnace and dust scrubber) is completely enclosed with glove box simulation was built at CEA Marcoule in 2008. The equipment includes all the systems and components necessary to perform full-scale tests: feed system, furnace and complete off-gas treatment system. The nominal tests were performed in 2009 and 2010 to verify that no problems arose in vitrifying solutions under the specified conditions. Two different liquid feeds representatives of the current HAWS stored and future solutions were used. The transient runs were carried out in this facility in 2010. Their objectives were to validate the glass product with different operating conditions and to determine optimum parameters for transient phases such as decreased volatility during standby phases. Finally, all the material obtained under nominal conditions or different operating conditions (e.g. initial glass frit quantity, standby temperature or restart procedure of feeding after night surveillance) have been characterized and described. The impact of transient phases on the process is then discussed in terms of volatility, thermal balance, etc., and compared with nominal tests results. Off-gas treatment system (OGTS) assessments determined preliminary decontamination factors for the OGTS components and allowed comparison between the two types of solutions and for different operating parameters. Since 2005 CEA Marcoule has been developing an 'in-can melting' vitrification process for specific High Activity Nuclear Waste Solutions. The tests carried out to date have validated the feasibility of this process and confirmed the direct vitrification option in which the liquid and solid feed streams are supplied directly to a disposable melting pot. CEA Marcoule began process qualification testing in 2009 in a new facility using equipment representative of the devices that will be installed in a glove box. The nominal mode tests performed in 2009 and 2010 were used to determine nominal operating conditions for the process: - a nominal process temperature of 1100 deg. C; - a maximum glass production rate of 5 kg/h; - a liquid feed solution flow rate of 5 L/h or less if the glass production rate exceeds the preceding maximum value; - a liquid recycle rate of 0.5 L/h for a nominal solution feed rate 5 L/h. They also produced glass samples generally meeting our expectations, and allowed us to measure the characteristic properties (viscosity, density, thermal conductivity, chemical durability). The first test of transient operation in 2010 yielded glass consistent with expectations and showed that reducing the temperature had no significant effect on the volatility of the constituent elements. However, a significant impact on the release of elements at the beginning of the test was observed with a larger initial quantity of glass frit on startup. The process qualification program will now continue with tests of degraded operating modes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated sampling and data flow for Hanford vitrification - 15337

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind nuclear facility being designed, built, and commissioned for the U.S. Department of Energy (DOE) by Bechtel National, Inc. and its subcontractor URS Corporation. The WTP facilities are under construction to complete the design and construction, as well as planning to support the startup, commissioning, and operation for vitrifying the radioactive waste stored in aging underground tanks at the Hanford Site. The work progress includes development of waste feed acceptance and qualification program, including methodologies for processing feed batches. Qualification data from staged feed samples will support the verification that waste acceptance criteria (WAC) and processability requirements are met. This verification is required to ensure safe operation of WTP processes for vitrifying the waste, while establishing specific campaign and batch sheets to comply with glass form acceptance requirements. Sampling and data integration are critical for process control and monitoring of the feed through unit operations. Data collection begins with process knowledge of staged feed for determining the required WAC analyses and testing for unit operations. The waste feed qualification data form the baseline information for WTP operation. The qualification data will be tracked and compared with sample analyses at different steps in vitrification operation. All aspects of data life cycle will be managed by the WTP Plant Engineering organization. The data management approach is established in this manner to allow maintaining campaign traceability through glass production records, while safely processing the corresponding feed campaigns and complying with permitting requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Flowsheet Definition for the Tank Side Cesium Removal Unit and the Importance of Early Communication - 19142

The U.S. Department of Energy (DOE) tank operations contractor Washington River Protection Solutions, LLC (WRPS) is working toward the start of low-activity waste (LAW) treatment in direct feed mode as soon as 2022. WRPS is responsible for providing the pre-treated feed for this direct feed mode and had originally planned to use the Low Activity Waste Pretreatment System (LAWPS) to supply the initial feed in 2021. In September 2017, in response to a DOE-sponsored LAWPS program review, a new system was proposed to provide the initial feed during direct feed mode until a supplemental pretreatment capability is ready to begin processing feed. This system, known as the Tank Side Cesium Removal (TSCR) system, is based on the Savannah River Tank Closure Cesium Removal (TCCR) system and technology used to separate cesium out of reactor water at Fukushima. A preliminary flowsheet was needed to form the initial basis for future decisions and allow discussions between operations, project management, and the customer. The main goal of the TSCR flowsheet was to form a process flow diagram, process description, and much of the preliminary information to be used to help inform future decisions. When flowsheet development first began, little to no information was readily known and what was known needed to be compiled in one place and digestible by several audiences. The impacts of various parameters on the system also needed a vehicle for clear communication to varying audiences. While a more complicated model was being completed, a model of the process was created using Microsoft Excela which could have several parameters changed while maintaining basic logical requirements (such as treated waste volume cannot exceed the volume of the Interim LAW Storage Tank [ILST], must shutdown for so many days for column changeout, etc.). This program allowed the unit downtime, start dates, treatment rates, and several other variables to be modified and reflect the ILST storage volume as a function of mission progression. The model with several different parameters gathered from the various groups was combined into an early flowsheet of the TSCR process and created one of the first citable documents about TSCR implementation at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold Crucible Induction Melter Testing at The Idaho National Laboratory for the Advanced Remediation Technologies Program

AREVA Federal Services (AFS) is performing a multi-year, multi-phase Advanced Remediation Technologies (ART) project, sponsored by the U.S. Department of Energy (DOE), to evaluate the feasibility and benefits of replacing the existing joule-heated melter (JHM) used to treat high level waste (HLW) in the Defense Waste Processing Facility (DWPF) at the Savannah River Site with a cold crucible induction melter (CCIM). The AFS ART CCIM project includes several collaborators from AREVA subsidiaries, French companies, and DOE national laboratories. The Savannah River National Laboratory and the Commissariat a l’Energie Atomique (CEA) have performed laboratory-scale studies and testing to determine a suitable, high-waste-loading glass matrix. The Idaho National Laboratory (INL) and CEA are performing CCIM demonstrations at two different pilot scales to assess CCIM design and operation for treating SRS sludge wastes that are currently being treated in the DWPF. SGN is performing engineering studies to validate the feasibility of retrofitting CCIM technology into the DWPF Melter Cell. The long-term project plan includes more lab-testing, pilot- and large-scale demonstrations, and engineering activities to be performed during subsequent project phases. This paper provides preliminary results of tests using the engineering-scale CCIM test system located at the INL. The CCIM test system was operated continuously over a time period of about 58 hours. As the DWPF simulant feed was continuously fed to the melter, the glass level gradually increased until a portion of the molten glass was drained from the melter. The glass drain was operated semi-continuously because the glass drain rate was higher than the glass feedrate. A cold cap of unmelted feed was controlled by adjusting the feedrate and melter power levels to obtain the target molten glass temperatures with varying cold cap levels. Three test conditions were performed per the test plan, during which the melter was operated with a target melt temperature of either 1,250oC or 1,300oC, and with either a partial or complete cold cap of unmelted feed on top of the molten glass. Samples of all input and output streams were collected for analysis. Laboratory analyses and mass balances will be used to determine the fate of feed constituents, especially Cs. The melter off-gas composition was measured at the melter outlet duct. Sample analyses are still in progress; but preliminary conclusions are possible using the continuous emissions monitoring system (CEMS) data. The concentrations of CO2, CO, CH4, total hydrocarbons (THC), and NOx increased with increasing feedrate of the feed containing water, nitrates, and formate. Over 90% of the formate (a reductant used in the simulant feed) was converted to CO2 and water vapor. Under 6-9% of the H in the formate converted to H2, and under 1% of the formate decomposed to gaseous hydrocarbons. This small degree of formate conversion to potentially flammable off-gas species reduces off-gas flammability concerns. About 36-61% of the NOx in the off-gas (evolved from nitrites and nitrates in the feed) was destroyed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

{beta} decay of the {pi}f{sub 5/2} ground state of {sup 77}Cu studied with 225 MeV and 0.2 MeV purified radioactive beams

Isobarically purified beams of {sup 77}Cu with energies of 225 and 0.2 MeV were used at the Holifield Radioactive Ion Beam Facility of Oak Ridge National Laboratory to study {beta} decay into states in {sup 77}Zn. Data taken at 225 MeV allowed the determination of absolute branching ratios relative to the decay of {sup 77}Cu for this {beta} decay as well as its daughters. From these we obtained a refined {beta}-delayed neutron emission probability of 30.3(22)% and a probability that the decay proceeds through {sup 77}Zn{sup g} of 49.1(26)%. A total of 64 {gamma} rays were placed in a level scheme for {sup 77}Zn containing 35 excited states including one state above the neutron separation energy, whereas two {gamma} rays were observed for the {beta}n branch to states in {sup 76}Zn. The growth and decay curves of some prominent {gamma} rays indicate a single {beta}-decaying state with a half-life of 480(9) ms. The decay pattern for {sup 77}Cu, with observed feeding of 8(3)% to 7/2{sup +} {sup 77}Zn{sup g} and 6(3)% to 1/2{sup -} {sup 77}Zn{sup m}, in contrast to the large feeding observed for decay of {pi}p{sub 3/2} {sup 73}Cu{sup g} to 1/2{sup -} {sup 73}Zn{sup g}, strongly suggests a {pi}f{sub 5/2} ground state for the studied {sup 77}Cu activity.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Direct measures of mechanical energy for knife mill size reduction

Lengthy straw/stalk of biomass may not be directly fed into grinders such as hammer mills and disc refiners. Hence, biomass needs to be preprocessed using coarse grinders like a knife mill to allow for efficient feeding in refiner mills without bridging and choking. Size reduction mechanical energy was directly measured for switchgrass (Panicum virgatum L.), wheat straw (Triticum aestivum L.), and corn stover (Zea mays L.) in an instrumented knife mill. Direct power inputs were determined for different knife mill screen openings from 12.7 to 50.8 mm, rotor speeds between 250 and 500 rpm, and mass feed rates from 1 to 11 kg/min. Overall accuracy of power measurement was calculated to be 0.003 kW. Total specific energy (kWh/Mg) was defined as size reduction energy to operate mill with biomass. Effective specific energy was defined as the energy that can be assumed to reach the biomass. The difference is parasitic or no-load energy of mill. Total specific energy for switchgrass, wheat straw, and corn stover chopping increased with knife mill speed, whereas, effective specific energy decreased marginally for switchgrass and increased for wheat straw and corn stover. Total and effective specific energy decreased with an increase in screen size for all the crops studied. Total specific energy decreased with increase in mass feed rate, but effective specific energy increased for switchgrass and wheat straw, and decreased for corn stover at increased feed rate. For knife mill screen size of 25.4 mm and optimum speed of 250 rpm, optimum feed rates were 7.6, 5.8, and 4.5 kg/min for switchgrass, wheat straw, and corn stover, respectively, and the corresponding total specific energies were 7.57, 10.53, and 8.87 kWh/Mg and effective specific energies were 1.27, 1.50, and 0.24 kWh/Mg for switchgrass, wheat straw, and corn stover, respectively. Energy utilization ratios were calculated as 16.8%, 14.3%, and 2.8% for switchgrass, wheat straw, and corn stover, respectively. These data will be useful for preparing the feed material for subsequent fine grinding operations and designing new mills.

09 BIOMASS FUELS↗

Cost details from front-end engineering design of piperazine with the advanced stripper

This Front-End Engineering Design (FEED) was funded by the U.S. Department of Energy (DOE) to estimate the cost to capture and compress 90% of the CO 2 from an existing natural gas combined cycle (NGCC) in Denver City, Texas, USA. The FEED used the PZAS (Piperazine with the Advanced Stripper) 2G amine scrubbing technology developed and modeled by The University of Texas at Austin. This FEED is unique in providing more public cost details than other FEEDs funded by DOE. The primary objective of the FEED was to provide a comprehensive estimate for the total installed cost of the capture plant. The estimated capital cost of NGCC at the Mustang Station is $\$727$ million for a capacity of 460 MW and 1.6 million tonnes CO 2 /yr. This includes a contingency of $\$104.6$ million and a contractor’s profit of $\$60.1$ million. The total direct field cost is $\$384.1$ million. With an optimistic fuel value of $\$3$/MMBtu, the estimated cost of capture varies from $\$85$/t at 4% IRR/85% load to $\$170$/t at 10% IRR/52% load. Air cooling is technically feasible but expensive. The air cooling systems for the water wash and pump-around intercooling account for 23.4% of the direct cost. The gas-fired boilers represent only 4% of the direct costs, but steam extraction would reduce energy cost, free up cooling water, and reduce the direct costs of processing additional flue gas and CO 2 from the boilers. The absorbers represent 9.6% of the direct cost in this FEED with no direct contact cooler and only 7.6 m of packing. Furthermore, the solvent cross exchangers are less expensive than expected (2.5% of direct costs). Doubling the number of these exchangers could reduce the heat duty from 3.0 to 2.5 GJ/t CO 2 .

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Outflow Feedback Regulated Massive Star Formation in Parsec-Scale Cluster Forming Clumps

We investigate massive star formation in turbulent, magnetized, parsec-scale clumps of molecular clouds including protostellar outflow feedback using three dimensional numerical simulations of effective resolution 2048{sup 3}. The calculations are carried out using a block structured adaptive mesh refinement code that solves the ideal MHD equations including self-gravity and implements accreting sink particles. We find that, in the absence of regulation by magnetic fields and outflow feedback, massive stars form readily in a turbulent, moderately condensed clump of {approx} 1,600 M{sub {circle_dot}} (containing {approx} 10{sup 2} initial Jeans masses), along with a cluster of hundreds of lower mass stars. The massive stars are fed at high rates by (1) transient dense filaments produced by large-scale turbulent compression at early times, and (2) by the clump-wide global collapse resulting from turbulence decay at late times. In both cases, the bulk of the massive star's mass is supplied from outside a 0.1 pc-sized 'core' that surrounds the star. In our simulation, the massive star is clump-fed rather than core-fed. The need for large-scale feeding makes the massive star formation prone to regulation by outflow feedback, which directly opposes the feeding processes. The outflows reduce the mass accretion rates onto the massive stars by breaking up the dense filaments that feed the massive star formation at early times, and by collectively slowing down the global collapse that fuel the massive star formation at late times. The latter is aided by a moderate magnetic field of strength in the observed range (corresponding to a dimensionless clump mass-to-flux ratio {lambda} {approx} a few); the field allows the outflow momenta to be deposited more efficiently inside the clump. We conclude that the massive star formation in our simulated turbulent, magnetized, parsec-scale clump is outflow-regulated and clump-fed (ORCF for short). An important implication is that the formation of low-mass stars in a dense clump can affect the formation of massive stars in the same clump, through their outflow feedback on the clump dynamics. In a companion paper, we discuss the properties of the lower mass cluster members formed along with the massive stars, including their mass distribution and spatial clustering.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗