Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ESA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Improved Spacecraft Tracking and Navigation Using a Portable Radio Science Receiver

The Portable Radio Science Receiver (PRSR) is a suitcase-sized open-loop digital receiver designed to be small and easy to transport so that it can be deployed quickly and easily anywhere in the world. The PRSR digitizes, downconverts, and filters using custom hardware, firmware, and software. Up to 16 channels can be independently configured and recorded with a total data rate of up to 256 Mbps. The design and implementation of the system's hardware, firmware, and software is described. To minimize costs and time to deployment, our design leveraged elements of the hardware, firmware, and software designs from the existing full-sized operational (non-portable) Radio Science Receivers (RSR) and Wideband VLBI Science Receivers (WVSR), which have successfully supported flagship NASA deep space missions at all Deep Space Network (DSN) sites. We discuss a demonstration of the PRSR using VLBI, with one part per billion angular resolution: 1 nano-radian / 200 ?as synthesized beam. This is the highest resolution astronomical instrument ever operated solely from the Southern Hemisphere. Preliminary results from two sites are presented, including the European Space Agency (ESA) sites at Cebreros, Spain and Malargue, Argentina. Malargue's South American location is of special interest because it greatly improves the geometric coverage for spacecraft navigation in the Southern Hemisphere and will for the first time provide coverage to the 1/4 of the range of declination that has been excluded from reference frame work at Ka-band.

Delta Differential One-Way (DOR)↗

Titan Saturn System Mission

Titan is a high priority for exploration, as recommended by NASA's 2006 Solar System Exploration (SSE) Roadmap. NASA's 2003 National Research Council (NRC) Decadal Survey and ESA's Cosmic Vision Program Themes. Recent revolutionary Cassini-Huygens discoveries have dramatically escalated interest in Titan as the next scientific target in the outer solar system. This study demonstrates that an exciting Titan Saturn System Mission (TSSM) that explores two worlds of intense astrobiological interest can be initiated now as a single NASA/ESA collaboration.

Titan Saturn System Mission (TSSM)↗

The U.S. Rosetta Project: Preparations for Prime Mission, 2014

In 2014, the International Rosetta mission will place a spacecraft in orbit around comet 67P/Churyumov-Gerasimenko and deliver a lander to the comet's surface. The National Aeronautics and Space Administration's (NASA) contribution to the International Rosetta mission, designated the U.S. Rosetta Project, includes several instruments, tracking support, and science support for some non-US payloads. In July 2011 the spacecraft was placed in a long-duration hibernation mode planned to last approximately 37 months to conserve electrical power. Rosetta will rendezvous with 67P/Churyumov-Gerasimenko in 2014. On the eve of the mission's arrival at its target, this paper highlights three issues related to Rosetta's looming prime mission: (A) measures taken in 2009 to prepare the US Rosetta Project for the long-duration hibernation mode; (B) risk reviews conducted in 2013 to prepare the US Rosetta Project for exit from hibernation; (C) ESA and NASA preparations for use of NASA Deep Space Network (DSN) assets related to keyword files.

hibernation↗

Relay Support for the Mars Science Laboratory Mission

The Mars Science Laboratory (MSL) mission landed the Curiosity Rover on the surface of Mars on August 6, 2012, beginning a one-Martian-year primary science mission. An international network of Mars relay orbiters, including NASA's 2001 Mars Odyssey Orbiter (ODY) and Mars Reconnaissance Orbiter (MRO), and ESA's Mars Express Orbiter (MEX), were positioned to provide critical event coverage of MSL's Entry, Descent, and Landing (EDL). The EDL communication plan took advantage of unique and complementary capabilities of each orbiter to provide robust information capture during this critical event while also providing low-latency information during the landing. Once on the surface, ODY and MRO have provided effectively all of Curiosity's data return from the Martian surface. The link from Curiosity to MRO incorporates a number of new features enabled by the Electra and Electra-Lite software-defined radios on MRO and Curiosity, respectively. Specifically, the Curiosity-MRO link has for the first time on Mars relay links utilized frequency-agile operations, data rates up to 2.048 Mb/s, suppressed carrier modulation, and a new Adaptive Data Rate algorithm in which the return link data rate is optimally varied throughout the relay pass based on the actual observed link channel characteristics. In addition to the baseline surface relay support by ODY and MRO, the MEX relay service has been verified in several successful surface relay passes, and MEX now stands ready to provide backup relay support should NASA's orbiters become unavailable for some period of time.

Telecommunications↗

Technology for Future Exoplanet Missions

A central theme in NASA's and ESA's vision for future missions is the search for habitable worlds and life beyond our Solar System. This presentation will review the current state of the art in planet-finding technology, with an emphasis on methods of starlight suppression. At optical wavelengths, Earth-like planets are about 10 billion times fainter than their host stars. Starlight suppression is therefore necessary to enable measurements of biosignatures in the atmospheres of faint Earth-like planets. Mission concepts based on coronagraph, starshade, and interferometers will be described along with their science objectives and technology requirements.

interferometer↗

Cassini Titan Science Integration: Getting a 'Jumpstart' on the Process

The Cassini spacecraft has been in orbit for five years, returning a wealth of scientific data from Titan and the Saturn system. The mission is a cooperative undertaking between NASA, ESA and the Italian Space Agency and the project is currently planning for a second extension of the mission. The Cassini Solstice Mission (CSM) will extend the mission's lifetime until Saturn's northern summer solstice in 2017. The Titan Orbiter Science Team (TOST) has the task of integrating the science observations for all 126 targeted Titan flybys (44 in the Prime Mission, 26 in the first extension (Equinox Mission), and 56 in the second extension (Solstice Mission)) contained in the chosen trajectory. Cassini science instruments are body-fixed with limited ability to articulate; thus, the spacecraft pointing during the flybys must be allocated among the instruments to accomplish the mission's science goals. The science that can be accomplished on each Titan flyby also critically depends on the closest approach altitude, which is in turn determined by the attitude, but changing the altitude impacts the overall trajectory for the Solstice Mission. During the Prime and Extended missions, TOST has learned that the best way to achieve Cassini's Titan science goals is via a 'jumpstart' process prior to final delivery of the trajectory. The jumpstart is driven by the desire to balance Titan science across the entire set of flybys during the CSM, and to influence any changes (tweaks) to the flyby altitudes. By the end of the jumpstart, TOST produces Master Timelines for each flyby, identifying each flyby's prime science observations and allocating control of the spacecraft attitude to specific instrument teams. In addition, developing timelines early, while the science and operations teams are still fully funded, decreases the future workload in integration and implementation.

Steadman, Kimberly B.↗

Relay Telecommunications for the Coming Decade of Mars Exploration

Over the past decade, an evolving network of relay-equipped orbiters has advanced our capabilities for Mars exploration. NASA's Mars Global Surveyor, 2001 Mars Odyssey, and Mars Reconnaissance Orbiter (MRO), as well as ESA's Mars Express Orbiter, have provided telecommunications relay services to the 2003 Mars Exploration Rovers, Spirit and Opportunity, and to the 2007 Phoenix Lander. Based on these successes, a roadmap for continued Mars relay services is in place for the coming decade. MRO and Odyssey will provide key relay support to the 2011 Mars Science Laboratory (MSL) mission, including capture of critical event telemetry during entry, descent, and landing, as well as support for command and telemetry during surface operations, utilizing new capabilities of the Electra relay payload on MRO and the Electra-Lite payload on MSL to allow significant increase in data return relative to earlier missions. Over the remainder of the decade a number of additional orbiter and lander missions are planned, representing new orbital relay service providers and new landed relay users. In this paper we will outline this Mars relay roadmap, quantifying relay performance over time, illustrating planned support scenarios, and identifying key challenges and technology infusion opportunities.

Edwards, C.↗

ATHLETE: Lunar Cargo Handling for International Lunar Exploration

As part of the Human-Robot Systems Project within the NASA Exploration Technology Development Program, the Jet Propulsion Laboratory is developing a vehicle called ATHLETE: the All-Terrain Hex-Limbed Extra-Terrestrial Explorer. The basic idea of ATHLETE is to have six relatively small wheels on the ends of legs. The small wheels and associated drive actuators are much less massive than the larger wheels and gears needed for an "all terrain" vehicle that cannot "walk" out of extreme terrain. The mass savings for the wheels and wheel actuators is greater than the mass penalty of the legs, for a net mass savings. Starting in 2009, NASA became engaged in detailed architectural studies for international discussions with the European Space Agency (ESA), the Japanese Space Agency (JAXA), and the Canadian Space Agency (CSA) under the auspices of the International Architecture Working Group (IAWG). ATHLETE is considered in most of the campaign options considered, providing a way to offload cargo from large Altair-class landers (having a cargo deck 6+ meters above the surface) as well as offloading international landers launched on Ariane-5 or H-2 launch vehicles. These international landers would carry provisions as well as scientific instruments and/or small rovers that would be used by international astronauts as part of an international effort to explore the moon.Work described in this paper includes architectural studies in support of the international missions as well as field testing of a half-scale ATHLETE prototype performing cargo offloading from a lander mockup, along with multi-kilometer traverse, climbing over greater than 1 m rocks, tool use, etc.

International Collaboration in Space↗

An Overview of the Jupiter Europa Orbiter Concept's Europa Science Phase Orbit Design

Jupiter Europa Orbiter (JEO), the proposed NASA element of the proposed joint NASA-ESA Europa Jupiter System Mission (EJSM), could launch in February 2020 and conceivably arrive at Jupiter in December of 2025. The concept is to perform a multi-year study of Europa and the Jupiter system, including 30 months of Jupiter system science and a comprehensive Europa orbit phase of 9 months. This paper provides an overview of the JEO concept and describes the Europa Science phase orbit design and the related science priorities, model pay-load and operations scenarios needed to conduct the Europa Science phase. This overview is for planning and discussion purposes only.

Lock, Robert E.↗

Commercial Crew Program Crew Safety Strategy

The purpose of this presentation is to explain to our international partners (ESA and JAXA) how NASA is implementing crew safety onto our commercial partners under the Commercial Crew Program. It will show them the overall strategy of 1) how crew safety boundaries have been established; 2) how Human Rating requirements have been flown down into programmatic requirements and over into contracts and partner requirements; 3) how CCP SMA has assessed CCP Certification and CoFR strategies against Shuttle baselines; 4) Discuss how Risk Based Assessment (RBA) and Shared Assurance is used to accomplish these strategies.

Crew Safety↗

International Space Station Columbus Payload SoLACES Degradation Assessment

SOLAR is a European Space Agency (ESA) payload deployed on the International Space Station (ISS) and located on the Columbus Laboratory. It is located on the Columbus External Payload Facility in a zenith location. The objective of the SOLAR payload is to study the Sun. The SOLAR payload consists of three instruments that allow for measurement of virtually the entire electromagnetic spectrum (17 nm to 2900 nm). The three payload instruments are SOVIM (SOlar Variable and Irradiance Monitor), SOLSPEC (SOLar SPECctral Irradiance measurements), and SolACES (SOLar Auto‐Calibrating Extreme UV/UV Spectrophotometers).

Hartman, William A.↗

Comparison of SMOS and Aquarius Sea Surface Salinity and Analysis of Possible Causes for the Differences

Two ongoing space missions share the scientific objective of mapping the global Sea Surface Salinity (SSS), yet their observations show significant discrepancies. ESA's Soil Moisture and Ocean Salinity (SMOS) and NASA's Aquarius use L-band (1.4 GHz) radiometers to measure emission from the sea surface and retrieve SSS. Significant differences in SSS retrieved by both sensors are observed, with SMOS SSS being generally lower than Aquarius SSS, except for very cold waters where SMOS SSS is the highest overall. Figure 1 is an example of the difference between the SSS retrieved by SMOS and Aquarius averaged over one month and 1 degree in longitude and latitude. Differences are mostly between -1 psu and +1 psu (psu, practical salinity unit), with a significant regional and latitudinal dependence. We investigate the impact of the vicarious calibration and some components of the retrieval algorithm used by both mission on these differences.

microwave remote sensing↗

Telecommunications Relay Support of the Mars Phoenix Lander Mission

The Phoenix Lander, first of NASA's Mars Scout missions, arrived at the Red Planet on May 25, 2008. From the moment the lander separated from its interplanetary cruise stage shortly before entry, the spacecraft could no longer communicate directly with Earth, and was instead entirely dependent on UHF relay communications via an international network of orbiting Mars spacecraft, including NASA's 2001 Mars Odyssey (ODY) and Mars Reconnaissance Orbiter (MRO) spacecraft, as well as ESA's Mars Express (MEX) spacecraft. All three orbiters captured critical event telemetry and/or tracking data during Phoenix Entry, Descent and Landing. During the Phoenix surface mission, ODY and MRO provided command and telemetry services, far surpassing the original data return requirements. The availability of MEX as a backup relay asset enhanced the robustness of the surface relay plan. In addition to telecommunications services, Doppler tracking observables acquired on the UHF link yielded an accurate position for the Phoenix landing site.

Edwards, Charles D., Jr.↗

Broad Search Solar Electric Propulsion Trajectories to Saturn with Gravity Assists

Solar electric propulsion (SEP) trajectories to Saturn using multiple gravity assists are explored for the joint NASA and ESA Titan Saturn System Mission study. Results show that these new trajectories enable greater performance compared to chemical propulsion with similar gravity assists or SEP without gravity assists. This paper describes the method used in finding these interplanetary trajectories and examines variations in the performance for different SEP systems, flight times, and flyby sequences. The benefits of the SEP trajectories for a mission to Saturn are also discussed.

Titan↗

The Continuing Exploration of Saturn by Cassini

The Cassini/Huygens mission to explore the Saturn system is a joint international endeavor among NASA, the European Space Agency (ESA), and the Italian Space Agency. The original mission as agreed to and funded by the partner agencies was for four years of active science data collection from in orbit about Saturn, which began on July 1, 2004. When this part of the mission was completed and the spacecraft was still in an excellent state of health with much valuable science still remaining to be accomplished, a mission extension of 27 months was approved. This first extension is now more than half completed and a proposal is being developed for a further extension with one of the primary science goals being the observation and study of seasonal change at Saturn as it moves into summer in its northern hemisphere for the first time since Cassini arrived. This paper describes highlights of the mission to date, summarizes the current spacecraft health and status of its consumables, and gives an overview of what is planned for further exploration of the Saturn system by the Cassini Project.

Mitchell, Robert T.↗

Development of NASA's Sample Cartridge Assembly: Design, Thermal Analysis, and Testing

NASA's Sample Cartridge Assembly (SCA) project is responsible for designing and validating a payload that contains a materials research sample in a sealed environment. The SCA will be heated in the European Space Agency's (ESA) Low Gradient Furnace (LGF) that is housed inside the Material Science Research Rack (MSRR) located in the International Space Station (ISS). Sintered metals and crystal growth experiments in microgravity are examples of some of the types of materials research that may be performed with a SCA. The project's approach has been to use thermal models to guide the SCA through several design iterations. Various layouts of the SCA components were explored to meet the science and engineering requirements, and testing has been done to help prove the design. This paper will give an overview of the SCA design. It will show how thermal analysis is used to support the project. Also some testing that has been completed will also be discussed, including changes that were made to the thermal profile used during brazing.

O'Connor, Brian↗

The 2016 Perseids

The Perseid meteor shower has been observed since ancient times. One of the most prolific annual showers, the Perseids have also been known to outburst. At least two spacecraft have suffered anomalies potentially caused by meteoroid impacts during Perseid outbursts. Olympus, an ESA telecommunications satellite, was likely impacted by a Perseid meteoroid during the 1993 outburst that ultimately led to the termination of the spacecraft's mission. Landsat-5, an imaging satellite jointly managed by NASA and the USGS, lost gyro stability during the peak of the Perseids in 2009. The Perseid meteor shower is expected to outburst again in 2016. Stream model predictions place the peak activity on the night of August 11-12 (UT) as the Earth passes through several old debris trails from parent comet 109P/Swift-Tuttle. Observing geometry favors Europe at the onset, but increased activity for about half a day means that North America is also well-placed for observations. A call for observations to characterize the stream and constrain numerical models is made. Modeling results, observing geometry, and spacecraft risk during the 2016 Perseids will be discussed.

Moser, D. E.↗