At least 1,351 records · Page 75

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

TREC 2010 legal track: method and results of the ELK collaboration

The ELK team ([E]WA-IIT, [L]os Alamos National laboratory (LANL), and [K]ayvium Corporation (ELK)) used the legal Track task 302 as an opportunity to compare and integrate advanced semantic-automation strategies. The team members believe that enabling parties to discover, consume, analyze, and make decisions in a noisy and information-overloaded environment requires new tools. Together, as well as independently, they are actively developing these tools and view the TREC exercise as an opportunity to test, compare, and complement tools and approaches. Our collaboration is new to TREC, brought together by a shared interest in document relevance, concept-in-context identification and annotation, and the recognition that words out-of-context do not a match make. The team's intent was to lay the foundation for automating the mining and analysis of large volumes of electronic information by litigants and their lawyers, not only in the context of document discovery, but also to support litigation strategy, motion practice, deposition, trial tactics, etc. The premise was that a Subject Matter Expert- (SME-) built model can be automatically mapped onto various search engines for document retrieval, organization, relevance scoring, analysis and decision support. In the end, we ran nearly a dozen models, mostly, but not exclusively, with Kayvium Corporation's knowledge automation technology. The Sal Database Search Engine we used had a bug in its proximity feature, requiring that we develop a workaround. While the work-around was successful, it left us with insufficient time to converge the models to achieve expected quality. However, with optimized proximity processing in place, we would be able to run the model many more times, and believe repeatable quality would be a matter of working through a few requests to get the approach right. We believe that with more time, the results we would achieve might point towards a new way of processing documents for litigation support, so litigators can be confident that results are complete but not overly inclusive.

97 MATHEMATICS AND COMPUTING↗

Governance of the International Linear Collider Project

Governance models for the International Linear Collider Project are examined in the light of experience from similar international projects around the world. Recommendations for one path which could be followed to realize the ILC successfully are outlined. The International Linear Collider (ILC) is a unique endeavour in particle physics; fully international from the outset, it has no 'host laboratory' to provide infrastructure and support. The realization of this project therefore presents unique challenges, in scientific, technical and political arenas. This document outlines the main questions that need to be answered if the ILC is to become a reality. It describes the methodology used to harness the wisdom displayed and lessons learned from current and previous large international projects. From this basis, it suggests both general principles and outlines a specific model to realize the ILC. It recognizes that there is no unique model for such a laboratory and that there are often several solutions to a particular problem. Nevertheless it proposes concrete solutions that the authors believe are currently the best choices in order to stimulate discussion and catalyze proposals as to how to bring the ILC project to fruition. The ILC Laboratory would be set up by international treaty and be governed by a strong Council to whom a Director General and an associated Directorate would report. Council would empower the Director General to give strong management to the project. It would take its decisions in a timely manner, giving appropriate weight to the financial contributions of the member states. The ILC Laboratory would be set up for a fixed term, capable of extension by agreement of all the partners. The construction of the machine would be based on a Work Breakdown Structure and value engineering and would have a common cash fund sufficiently large to allow the management flexibility to optimize the project's construction. Appropriate contingency, clearly apportioned at both a national and global level, is essential if the project is to be realised. Finally, models for running costs and decommissioning at the conclusion of the ILC project are proposed. This document represents an interim report of the bodies and individuals studying these questions inside the structure set up and supervised by the International Committee for Future Accelerators (ICFA). It represents a request for comment to the international community in all relevant disciplines, scientific, technical and most importantly, political. Many areas require further study and some, in particular the site selection process, have not yet progressed sufficiently to be addressed in detail in this document. Discussion raised by this document will be vital in framing the final proposals due to be published in 2012 in the Technical Design Report being prepared by the Global Design Effort of the ILC.

43 PARTICLE ACCELERATORS↗

US/UK Loan Account Project Status PMOD477

The viewgraphs describe the status of PMOD477 for LANL. The meeting will occur at DOE-HQ with NA-11 and Military Applications personnel in attendance. Serves to repatriate material with a balance to zero by December 2012. Phase 1 -- Establish formality of operations for War Reserve (WR): Complete surrogate taskings to A90 through a Materials Channel and perform US/UK lessons learned; Complete the US/UK agreed Quality Acceptance Plan, Materials Plan, Shipping procedure, and establish the formal UK/US point of contacts. Phase 2 -- Metal Manufacture (WR): Process material and store material as electrorefined metal (ER) rings, with initial assay and isotopic analysis, prior to manufacturing. Material is cast into accepted configuration and appropriate acceptance document for each aliquot will be generated. Phase 3 -- Intermediate Material Manufacture, Packaging and Shipping (WR): Continue processing of the material in accepted configuration with appropriate acceptance documentation for each aliquot. Provide an initial tasking of the material owed to UK including appropriate quality acceptance documentation. Phase 4 -- Complete Tasking (WR). Phase 5 -- Residue Processing (Non-WR): Complete processing of residue material and waste into accepted configuration with appropriate acceptance document for disposal.

CONFIGURATION↗

Semiotic indexing of digital resources

A method of classifying a plurality of documents. The method includes steps of providing a first set of classification terms and a second set of classification terms, the second set of classification terms being different from the first set of classification terms; generating a first frequency array of a number of occurrences of each term from the first set of classification terms in each document; generating a second frequency array of a number of occurrences of each term from the second set of classification terms in each document; generating a first similarity matrix from the first frequency array; generating a second similarity matrix from the second frequency array; determining an entrywise combination of the first similarity matrix and the second similarity matrix; and clustering the plurality of documents based on the result of the entrywise combination.

97 MATHEMATICS AND COMPUTING↗

Supervised Gamma Process Poisson Factorization

This thesis develops the supervised gamma process Poisson factorization (S- GPPF) framework, a novel supervised topic model for joint modeling of count matrices and document labels. S-GPPF is fully generative and nonparametric: document labels and count matrices are modeled under a uni ed probabilistic framework and the number of latent topics is controlled automatically via a gamma process prior. The framework provides for multi-class classification of documents using a generative max-margin classifier. Several recent data augmentation techniques are leveraged to provide for exact inference using a Gibbs sampling scheme. The first portion of this thesis reviews supervised topic modeling and several key mathematical devices used in the formulation of S-GPPF. The thesis then introduces the S-GPPF generative model and derives the conditional posterior distributions of the latent variables for posterior inference via Gibbs sampling. The S-GPPF is shown to exhibit state-of-the-art performance for joint topic modeling and document classification on a dataset of conference abstracts, beating out competing supervised topic models. The unique properties of S-GPPF along with its competitive performance make it a novel contribution to supervised topic modeling.

97 MATHEMATICS AND COMPUTING↗

Supporting the future nuclear workforce with computer-based procedures

Here we see that computer-based tools have dramatically increased ease and efficiency of everyday tasks. Gone are the days of paging through a paper catalog, transcribing product numbers, and calculating totals. Today, a consumer can find a product online with a simple search engine, and then purchase it in a matter of a few clicks. Paper catalogs have their place, but it is hard to imagine life without on-line shopping sites. All tasks conducted in a nuclear power plant are guided by procedures, which helps ensure safe and reliable operation of the plants. One prominent goal of the nuclear industry is to minimize the risk of human errors. To achieve this goal one has to ensure tasks are correctly and consistently executed. This is partly achieved by training and by a structured approach to task execution, which is provided by procedures and work instructions. Procedures are used in the nuclear industry to direct workers' actions in a proper sequence. The governing idea is to minimize the reliance on memory and choices made in the field. However, the procedure document may not contain sufficient information to successfully complete the task. Therefore, the worker might have to carry additional documents such as turnover sheets, operation experience, drawings, and other procedures to the work site. The nuclear industry is operated with paper procedures like paper catalogs of the past. A field worker may carry a large stack of documents needed to complete a task to the field. Even though the paper process has helped keep the industry safe for decades, there are limitations to using paper. Paper procedures are static (i.e., the content does not change after the document is printed), difficult to search, and rely heavily on the field worker’s situational awareness and ability to consistently meet the high expectation of human performance excellence. With computer-based procedures (CBPs) that stack of papers may be reduced to the size of a small tablet or even a smart phone. Instead of manually matching equipment identification numbers listed in the procedure with the number on the physical equipment the field worker can simply scan a barcode to ensure the correct valve is opened while simultaneously creating a record. Instead of navigating through a maze of cross-references, CBPs enable intelligent work path navigation which accounts for past decisions and observation, thereby enabling more efficient and safe task completion.

47 OTHER INSTRUMENTATION↗

A High Performance Content Based Recommender System Using Hypernym Expansion

There are two major limitations in content-based recommender systems, the first is accurately measuring the similarity of preferred documents to a large set of general documents, and the second is over-specialization which limits the "interesting" documents recommended from a general document set. To address these issues, we propose combining linguistic methods and term frequency methods to improve overall performance and recommendation.

Potok, Thomas E↗

Tarjetas v.1.2015.7.23

Tarjetas is used to generate requirements from source documents. These source documents are in a hierarchical XML format that have been produced from PDF documents processed through the “Reframe” software package. The software includes the ability to create Topics and associate text Snippets with those topics. Requirements are then generated and text Snippets with their associated Topics are referenced to the requirement. The software maintains traceability from the requirement ultimately to the source document that produced the snippet

Burchard, Ross L.↗

DeepPDF: A Deep Learning Approach to Extracting Text from PDFs

Scientific publications contain a plethora of important information, not only for researchers but also for their managers and institutions. Many researchers try to collect and extract this information in large enough quantities that it requires machine automation, but because publications were historically intended for print and not machine consumption, the digital document formats used today (primarily PDF) have created many hurdles for text extraction. Primarily, tools have relied on trying to convert PDF's to plain text documents for machine processing by reverse engineering the PDF standard. A complex process because once a PDF is created it is more closely related to an image file than a document markup language. In this paper we explore the feasibility of treating these PDF documents as images as opposed to a proprietary markup language. We believe that by using deep learning and image analysis we can create more accurate PDF to text extraction tools than those that currently exist. \\ \newline \Keywords{deep learning, text extraction, information extraction, PDF extraction, scholarly publications.

Stahl, Christopher↗

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Readiness Assessments Supporting a Nuclear-enabled NASA Mission

Idaho National Laboratory Radioisotope Power Systems Nuclear Operations: Preparations, Documentation, Readiness Assessments and Conduct of Operations Supporting a Nuclear-enabled NASA Mission Kelly L. Lively, Eric S. Clarke, Robert P. Gomez Idaho National Laboratory, Idaho Falls, ID 83415 208-533-7388; Kelly.Lively@inl.gov Abstract. The Radioisotope Power Systems (RPS) Program, located at Idaho National Laboratory (INL), is responsible for assembling, testing, and delivering plutonium oxide-fueled RPSs for use in powering missions in remote, harsh environments such as deep space. An informative presentation will be given discussing the preparations, documents, readiness assessments, human capital and conduct of operations involved in performing nuclear operations to support providing these systems to end users for the Department of Energy (DOE). DOE is the start-up authority for performing nuclear operations. Readiness for start-up is determined through independent assessment against established acceptance criteria to ensure activities can be performed safely and within a well defined nuclear safety envelope. There is also an RPS Program approval element requiring additional readiness review before nuclear operations can begin. The programmatic readiness review is performed to ascertain readiness to proceed with nuclear operations from the perspective of product quality. The assessments and reviews are conducted in series in the following order of progression: Management Self Assessment (MSA), Contractor Readiness Assessment (CRA), DOE Readiness Assessment (DOE RA) and lastly, the Programmatic Production Readiness Review (PRR). The CRA, DOE RA, and PRR requires an independent technical review team. Twelve assessment criteria are reviewed and a selection of the criteria is identified for review on a graded approach. Typically, the assessments/review criteria requires, at a minimum, review of operating instructions to ensure technical safety requirements are adequately identified, review of training records to ensure personnel are adequately trained to perform the specified work scope, personnel are interviewed to determine adequacy of level of knowledge for work scope, and a high-fidelity performance of the operation to ensure the operating instructions and conduct of operations are adequate to perform the work scope. As each assessment/review is conducted a formal report delineating any issues in the form of findings, observations, and noteworthy practices will be issued. Before start-up approval is obtained all issues must be resolved to the satisfaction of the individual teams. Start-up notification is formally communicated by memorandum from DOE. Programmatic approval is documented in a Segmented Readiness Review where vested Program representatives in the RPS community (to include DOE NE 75 and DOE ID representatives) ensure personnel, documentation, and materials are in place to perform the activity. The four assessments/reviews can be completed in a 16-week period of time, provided ample resources and a relatively small work scope is identified. RPS assembly and testing operations to support the Mars 2020 Mission, the next planned space mission using a nuclear power system, will require about of year of assessments/reviews before the nuclear operations are performed. Keywords: INL, Operations, Assessments, DOE

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fuel Safety Research Plan for Accident Tolerant Fuels

This document outlines a strategic plan for a safety research program for accident tolerant fuels. Accident tolerant fuels (ATFs) are nuclear fuel materials and designs for existing and future light water reactors. This effort is under the Department of Energy Office of Nuclear Energy’s Nuclear Technology Research and Development Advanced Fuels Campaign. The development of ATF is an industry lead initiative with fuel designs being championed by Westinghouse, Framatome, and General Electric. Industry goals for ATF deployment include implementing the first batch reloads of coated cladding and doped fuel designs into commercial reactors by 2023 and having the first batch reloads of more advanced designs into commercial reactors by 2026. Follow on goals include implementing the first full cores of coated cladding and doped fuel designs into commercial reactors by 2026 and implementing full cores of more advanced designs by 2030. The objectives of the national laboratory research programs within the Advanced Fuels Campaign related to ATF are: 1. Develop and maintain of unique nuclear testing infrastructure, which includes test reactors, hot cell PIE equipment, and unique out of pile separate effects testing facilities. 2. Respond directly to industry requests for support by partnering with the ATF vendors and executing experiments and/or analysis on their behalf. 3. Conduct independent scientific investigations into the performance of the different ATF concepts that are relevant to Industry designs. To achieve these objectives, the safety research program will execute transient irradiation experiments at the TREAT facility at Idaho National Laboratory with the aim of identifying the relevant transient fuel behaviors for each fuel design in order to establish appropriate fuel safety criteria and thresholds. Two test series are described in this plan, (1) an Integral Test Series, and (2) a Focused Effects Test Series. In fulfillment of the first objective for the safety research program, Integral Effects Tests will be developed and demonstrated using standard UO2 Zircaloy fuel designs in both the fresh and previously irradiated case. The Integral Test Series will consist of three campaigns to evaluate transient fuel performance in Reactivity Initiated Accidents, Loss of Coolant Accidents, and in generalized Power Cooling Mismatch scenarios. Development of these test programs also enables the safety research program to fulfill its second objective by making these three test programs available to each industry team. Initially, priority will be given in the integral test series to the coated cladding and doped fuel concepts as their deployment schedule is the most aggressive. To fulfill the third objective of the safety research program, a Focused Effects Test Series is also being developed which will examine specific transient fuel behaviors that are of general interest to all the ATF designs under development. These tests look at transient fuel behavior related to pellet cladding mechanical interaction, coated cladding swelling, rupture, and time at temperature behavior, non oxide fuel melting and mechanical interaction with Silicon Carbide cladding, UO2 and doped UO2 fuel fragmentation and transient fission gas release, and finally fuel coolant interaction. This document provides a general overview of the objectives of the safety research program as well as providing background into how programs like this have been used in the past to develop the criteria necessary for the safe operation of the present fuel designs. An overview of the materials and methods used for safety testing is presented. Finally the Integral and Focused Effects tests series are introduced and described. This document will be maintained as a “living” document with annual updates to reflect evolving requirements and needs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Acceptable Knowledge Summary Report for REMOTE-HANDLED DEPLETED URANIUM INGOTS FROM MATERIALS AND FUELS COMPLEX

This Acceptable Knowledge (AK) Summary Report has been prepared for the Central Characterization Program (CCP) for remote-handled (RH) transuranic (TRU) waste generated and managed by the Materials and Fuels Complex (MFC), formerly Argonne National Laboratory-West (ANL-W) and part of the Idaho National Laboratory (INL). The waste described in this report, depleted uranium ingots (waste stream ID-MFC-DU-INGOT), was historically generated in Building 765, the Fuel Conditioning Facility (FCF), formerly, Hot Fuel Examination Facility (HFEF)-South. This AK Summary Report, along with the referenced supporting documents, provides a defensible and auditable record of AK for the designated waste stream, depleted uranium ingots, produced from the FCF electrorefining process. The references and AK source documents used to prepare this report are listed in Sections 8.0 and 9.0 respectively. The source documents cited throughout this report are identified by alphanumeric designations corresponding to a unique Source Document Tracking Number (e.g., AKA01, C001, CCE01, DR001, M001, P001, and U001).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Command and Control of Utilities Systems

The utilities systems that encompass the Y-12 National Security Complex are an integral part of the entire campus, and are essential to maintaining critical mission focus for the site. Although the utilities systems each differ in function, the central production and distribution model creates a common thread on which each system is run. Several incidents in FY 2018 and FY 2019 documented a lack of overall systems control and highlighted the need to create a better command system that could maintain system availability and decrease possible impacts to the surrounding environment. An initial system was started in September of 2019 to better control mechanical utility distribution systems. The measurement of the system can be modeled against a standard command and control related incident. The corresponding work hours from a typical control-related incident were used as key component to this system model. System effectiveness is modeled against utility’s incidents that demonstrate a loss of command and control. The increased simulations of the model also document control can only be effectively contained within the stated time (3-5 years) by yielding more engineers to complete alignments, or drastically reducing the amount of time for alignments. The total control points of the model document a clear correlation between alignments, control points, and the amount of man-hours per incident. Current data shows that actual incident man-hours (1.88 manhours/ incident since initial system implementation) are near expected incident man-hours (1.81 manhours/ incident) with command and control for October 2021, which documents a 33.3% reduction in man-hours/incident since initial system implementation. A conclusion can be drawn that focus on increasing the amount of controlled points in the system can reduce incidents and the decrease the amount of non-value added work to employee’s day-to-day lives, while also achieving a culture that enhances and sustains utilities reliability.

99 GENERAL AND MISCELLANEOUS↗

Structural Characterization of the 216-Z-9 Crib Prior to Decontamination and Demolition Using Robot Crawler and High Resolution Photography

The Department of Energy, Richland Operations Office is preparing to conduct a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action for the decontamination and demolition of the above-grade mining structures and equipment at the 216-Z-9 Crib. An investigation of the condition of the mining complex was initiated to determine constraints necessary for safely conducting the removal of the buildings. While crib headspace chemical analysis and nondestructive analysis of the interior of the buildings was completed to address radiological contamination concerns, the primary concern regarding the removal of the above-grade structures located on the crib cover involves determining the loading capacity and structural integrity of the crib cover slab. Additional concerns included headspace gases and radionuclide contamination. Until the structural analysis was completed, loading limits on the crib cover had been restricted. Photographic documentation revealed the loss of protective tiles and acid resistant coating from the underside of the cover raising a question of concrete stability. The investigation relied heavily on the use of high resolution photography with high intensity lighting for photographic documentation of the underside of the crib cover, followed by structural analysis of the documentation by a team of qualified engineers. Deployment of a robot crawler with attached camera and positioning of a fixed camera were integral to this structural characterization effort. Results of the photographic documentation were of sufficient quality to allow for bounding decisions to be made regarding the loading of the crib cover while performing the demolition of the mining structures (glovebox, excavator, bucket) and the associated buildings. The 216-Z-9 Crib, also known as the 216 Z-9 Recuplex CAW (CA column waste) Waste Disposal Cavern, the Z-9 Trench and the Z-9 Crib was constructed as an engineered trench with an open area beneath a concrete slab. The crib is located near the Plutonium Finishing Plant (PFP) facility, at the Hanford Nuclear Reservation in Eastern Washington State. The crib was used as a disposal site for effluent chemical and radiological wastes from the recovery of uranium and plutonium through extraction or RECUPLEX process, a method that recovered uranium and plutonium from liquid and solid wastes and scraps from other PFP processes. During its operating life, from 1955 through 1962, the Z-9 Crib received liquid wastes totaling approximately four million liters, or one million gallons. Analyses of the crib soil in seven locations to a depth of up to two meters (six feet) beneath the crib floor indicated that the plutonium content of the crib soil ranged from 50 to 150 kg (the highest concentration measured was 34.5 g/L of soil). While performing the structural evaluation of the crib cover, additional characterization information was obtained on the radiological and chemical conditions of the crib and structures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closeout of the Melton Valley Completion Project at the Oak Ridge National Laboratory

The U.S. Department of Energy DOE Order 413.3A (Program and Project Management for the Acquisition of Capital Assets) identifies major milestones in a project life cycle that require approval upon achievement, including Critical Decision-4 (CD-4), the project completion milestone. A CD-4 document is required for all DOE projects in accordance with DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. A conditional CD-4 report was prepared for the Melton Valley Completion Project (MVCP) in order to document the completion of the remedial action in the Melton Valley watershed. Approval of the MVCP CD-4 was 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in one of the waste trenches that were to be remediated as part of the completion project. This paper will provide an overview of the MVCP remediation work and the process successfully used to demonstrate closeout of a major CERCLA project in accordance with DOE requirements. In summary: The MV ROD was planned to be completed in 12 years; however, under the ACP the remedial activities were completed 6 years ahead of schedule (September 2006). Highlights of the remedial actions include: - Completion of remedial action activities at 219 release sites identified in the MV ROD. - Construction of 58 hectares of multilayer caps for SWSA 4, SWSA 5, SWSA 6, Pits 2, 3 and 4 and Trenches 5, 6, and 7; - Complete excavation, retrieval and over-pack of 204 casks, 8 boxes, and 530 m{sup 3} of loose waste from the TRU waste retrieval project; - Complete demolition and disposition of approx. 557 m{sup 2} of various buildings such as HRE ancillary facilities, NHF, Liquid LLW pumping stations, 7841 Scrap Yard, misc. storage buildings, and well P and A; - Removal of LLW sludges and stabilization of T-1, T-2, and HFIR tanks; - In situ grouting/stabilization of approx. 12 km of inactive waste pipelines; - Excavation and disposition of approx. 38,000 m{sup 3} of soil from HFIR impoundments, HRE cryogenic pond, IHP and contaminated soil from miscellaneous leak sites; - Completion of in-situ grouting of LLLW matrix at Trenches 5 and 7. The CD-4 document to demonstrate attainment of the project completion milestone was prepared to document close-out activities. Approval of the MVCP CD-4 was obtained but deemed 'conditional' pending final resolution of a small quantity of unexpected pyrophoric material, with no current disposition pathway, remaining in Trench 13 of the 22 Trench Area in SWSA 5N. DOE is currently evaluating options for the final disposition of this material and has committed to resolution of the issue by the end of Fiscal Year 2008. At that time, all aspects of the Melton Valley Completion Project will be complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expediting Groundwater Sampling at Hanford and Making It Safer - 13158

The CH2M HILL Plateau Remediation Company (CHPRC) manages the groundwater monitoring programs at the Department of Energy's 586-square-mile Hanford site in southeastern Washington state. These programs are regulated by the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), and the Atomic Energy Act (AEA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. Each year, more than 1,500 wells are accessed for a variety of reasons. Historically, the monitoring activities have been very 'people intensive'. Field personnel or 'samplers' have been issued pre-printed forms showing information about the well(s) for a particular sampling evolution. This information is taken from two official electronic databases: the Hanford Well Information System (HWIS) and the Hanford Environmental Information System (HEIS). The samplers traditionally used these hardcopy forms to document the groundwater samples and well water-levels. After recording the entries in the field, the samplers turned the forms in at the end of the day and other personnel posted the collected information. In Automating Groundwater Sampling at Hanford (HNF-38542-FP Revision 0, Presented at Waste Management 2009 Conference, March 1 - March 5, 2009, Phoenix, AZ), we described the methods, tools, and techniques that would be used in automating the activities associated with measuring water levels. The Field Logging and Electronic Data Gathering (FLEDG) application/database that automates collecting the water-level measurement data has now been implemented at Hanford. In addition to eliminating the need to print out documents, the system saves three-to-four man days each month for the field personnel taking the measurements and the scientists and administrators managing the data and the documentation. After the information has received technical review, FLEDG automatically updates the database for water-level measurements and loads the document management system with the completed sampling report. Due to safety considerations, access to wells is conditional. A spreadsheet with appropriate data not only lists the wells that are cleared for work, but also the safety personnel who must be present before work can start. This spreadsheet is used in planning daily activities. Daily plans are structured to ensure that the wells to be sampled are cleared for work and the appropriate safety personnel have been assigned and are present before the work starts. Historically, the spreadsheets have been prepared manually, and as a result, are potentially subject to human error. However, a companion database application has been developed to work with FLEDG - making the entire sampling process more efficient and safer for personnel. The Well Access List - Electronic, WAL-E, is a database that contains much the same information that was previously manually loaded into the spread sheet. In addition, WAL-E contains a managed work-flow application that shows the access requirements and allows for appropriate reviews of the compiled well. Various CHPRC organizations, including Industrial Hygiene, RADCON, and Well Maintenance and Sample Administration are able to enter and review the wells added or deleted from the WAL-E database. The FLEDG system then accesses this database information to identify appropriate support personnel and provide safety requirements to field personnel. In addition, WAL-E offers the assurance that wells have appropriate locks and are correctly labeled and electrically grounded as required, before well activities begin. This feature is an extremely important aspect of the FLEDG/WAL-E system because it adds another safety check to the work evolution and reduces the potential for unsafe conditions to exist that would lead to a stop-work situation. This paper will further describe the technical aspects of both electronic programs/databases and their successful application at Hanford. (authors)

54 ENVIRONMENTAL SCIENCES↗

Transuranic Waste Processing Center (TWPC) Legacy Tank RH-TRU Sludge Processing and Compliance Strategy - 13255

The U.S. Department of Energy (DOE) needs to safely and efficiently treat its 'legacy' transuranic (TRU) waste and mixed low-level waste (LLW) from past research and defense activities at the Oak Ridge National Laboratory (ORNL) so that the waste is prepared for safe and secure disposal. The TWPC operates an Environmental Management (EM) waste processing facility on the Oak Ridge Reservation (ORR). The TWPC is classified as a Hazard Category 2, non-reactor nuclear facility. This facility receives, treats, and packages low-level waste and TRU waste stored at various facilities on the ORR for eventual off-site disposal at various DOE sites and commercial facilities. The Remote Handled TRU Waste Sludge held in the Melton Valley Storage Tanks (MVSTs) was produced as a result of the collection, treatment, and storage of liquid radioactive waste originating from the ORNL radiochemical processing and radioisotope production programs. The MVSTs contain most of the associated waste from the Gunite and Associated Tanks (GAAT) in the ORNL's Tank Farms in Bethel Valley and the sludge (SL) and associated waste from the Old Hydro-fracture Facility tanks and other Federal Facility Agreement (FFA) tanks. The SL Processing Facility Build-outs (SL-PFB) Project is integral to the EM cleanup mission at ORNL and is being accelerated by DOE to meet updated regulatory commitments in the Site Treatment Plan. To meet these commitments a Baseline (BL) Change Proposal (BCP) is being submitted to provide continued spending authority as the project re-initiation extends across fiscal year 2012 (FY2012) into fiscal year 2013. Future waste from the ORNL Building 3019 U-233 Disposition project, in the form of U-233 dissolved in nitric acid and water, down-blended with depleted uranyl nitrate solution is also expected to be transferred to the 7856 MVST Annex Facility (formally the Capacity Increase Project (CIP) Tanks) for co-processing with the SL. The SL-PFB project will construct and install the necessary integrated systems to process the accumulated MVST Facilities SL inventory at the TWPC thus enabling safe and effective disposal of the waste. This BCP does not include work to support current MVST Facility Surveillance and Maintenance programs or the ORNL Building 3019 U-233 Disposition project, since they are not currently part of the TWPC prime contract. The purpose of the environmental compliance strategy is to identify the environmental permits and other required regulatory documents necessary for the construction and operation of the SL- PFB at the TWPC, Oak Ridge, TN. The permits and other regulatory documents identified are necessary to comply with the environmental laws and regulations of DOE Orders, and other requirements documented in the SL-PFB, Safety Design Strategy (SDS), SL-A-AD-002, R0 draft, and the Systems, Function and Requirements Document (SFRD), SL-X-AD-002, R1 draft. This compliance strategy is considered a 'living strategy' and it is anticipated that it will be revised as design progresses and more detail is known. The design basis on which this environmental permitting and compliance strategy is based is the Wastren Advantage, Inc., (WAI), TWPC, SL-PFB (WAI-BL-B.01.06) baseline. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗