Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Controls”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Advanced, Integrated Control for Building Operations to Achieve 40% Energy Saving

We developed and demonstrated a software based integrated advanced building control platform called Smart Energy Box (SEB), which can coordinate building subsystem controls, integrate variety of energy optimization algorithms and provide proactive and collaborative energy management and control for building operations using weather and occupancy information. The integrated control system is a low cost solution and also features: Scalable component based architecture allows to build a solution for different building control system configurations with needed components; Open Architecture with a central data repository for data exchange among runtime components; Extendible to accommodate variety of communication protocols. Optimal building control for central loads, distributed loads and onsite energy resource; uses web server as a loosely coupled way to engage both building operators and building occupants in collaboration for energy conservation. Based on the open platform of SEB, we have investigated and evaluated a variety of operation and energy saving control strategies on Carnegie Mellon University Intelligent Work place which is equipped with alternative cooling/heating/ventilation/lighting methods, including radiant mullions, radiant cooling/heating ceiling panels, cool waves, dedicated ventilation unit, motorized window and blinds, and external louvers. Based on the validation results of these control strategies, they were integrated in SEB in a collaborative and dynamic way. This advanced control system was programmed and computer tested with a model of the Intelligent Workplace's northern section (IW n ). The advanced control program was then installed in the IW n control system; the performance was measured and compared with that of the state of the art control system to verify the overall energy savings great than 40%. In addition advanced human machine interfaces (HMI's) were developed to communicate both with building occupants and the building operator. Lifecycle cost analyses of the advanced building control were performed, and a Building Control System Guide was prepared and published to inform owners, architects, and engineers dealing with new construction or renovation of buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RBAC Driven Least Privilege Architecture For Control Systems

The concept of role based access control (RBAC) within the IT environment has been studied by researchers and was supported by NIST (circa 1992). This earlier work highlighted the benefits of RBAC which include reduced administrative workload and policies which are easier to analyze and apply. The goals of this research were to expand the application of RBAC in the following ways. Apply RBAC to the control systems environment: The typical RBAC model within the IT environment is used to control a user’s access to files. Within the control system environment files are replaced with measurement (e.g., temperature) and control (e.g. valve) points organized as a hierarchy of control assets (e.g. a boiler, compressor, refinery unit). Control points have parameters (e.g., high alarm limit, set point, etc.) associated with them. The RBAC model is extended to support access to points and their parameters based upon roles while at the same time allowing permissions for the points to be defined at the asset level or point level directly. In addition, centralized policy administration with distributed access enforcement mechanisms was developed to support the distributed architecture of distributed control systems and SCADA; Extend the RBAC model to include access control for software and devices: The established RBAC approach is to assign users to roles. This work extends that notion by first breaking the control system down into three layers 1) users, 2) software and 3) devices. An RBAC model is then created for each of these three layers. The result is that RBAC can be used to define machine-to-machine policy enforced via the IP security (IPsec) protocol. This highlights the potential to use RBAC for machine-to-machine connectivity within the internet of things; and Enable dynamic policy based upon the operating mode of the system: The IT environment is generally static with respect to policy. However, large cyber physical systems such as industrial controls have various operating modes (start-up, normal operation, emergency, shut-down and maintenance are typical). The policy enforcement architecture must be able to support changes in access permissions as the mode of the control system changes. For example an operator’s role may not allow the operator to shut down a pump during “normal operation” but that same operator role may be given permission to shut down the pump if the refinery transitions to “emergency” mode. The effectiveness of the approach was validated by applying it to the Experion Process Knowledge System. This is a large commercial industrial control system often used to control oil refineries and other assets within the oil and gas sector. As a by-product, other industries using Experion (Pharmaceuticals, Specialty Chemicals, etc.) also benefit from increased security. Policies representative of those that would be used within an oil refinery were created and validated against the RBAC model as implemented in the underlying SQL database. The administration of policy is simplified which in turn makes it practical for security administrators to specify policies which enforce least privilege. The result is a qualitative reduction in risk. The benefits of the enhanced RBAC model are clear and as a result. Honeywell is incorporating portions of the RBAC research into the 2014 release of Experion.

97 MATHEMATICS AND COMPUTING↗

Final Technical and Scientific Report: Advanced Control of the Azura Wave Energy Device

The objective of the project was to develop a model predictive controller and associated hydraulic PTO for the Azura wave energy device to improve the annual energy production (AEP) and reduce the levelized cost of electricity (LCOE) of the device. Performance of the controller and hydraulic PTO were validated in a 1/15th scale wave tank test performed at the University of Maine. Three controllers, with three corresponding PTOs, were developed and tested as part of the project. The three controllers are an ideal MPC controller paired with an ideal PTO, an MPC controller with a heuristic paired with a directional force control hydraulic PTO, and a preliminary study of an MPC controller applied to a variable force hydraulic PTO. Experimental data was used to estimate the controller paired with the directional force control would increase the annual energy production of the Azura at WETS by 12%, with a corresponding reduction in LCOE of 10.8%. Preliminary testing of the variable force hydraulic PTO paired with a MPC shows this configuration has the potential to increase the AEP of the Azura at WETS by at least 33%. Further design and development work is necessary to develop the PTO technology to achieve these gains. Additionally, all control schemes require additional work to address the short-term wave prediction method needed to implement the control. In addition to validation of these control methods, NWEI demonstrated careful design of a wave tank test model, PTO, and instrumentation yields high quality test data, and the ability to test advanced control algorithms and include complex PTO dynamics via hardware-in-the-loop testing techniques.

16 TIDAL AND WAVE POWER↗

Optimal control system design of an acid gas removal unit for an IGCC power plants with CO2 capture

Future IGCC plants with CO{sub 2} capture should be operated optimally in the face of disturbances without violating operational and environmental constraints. To achieve this goal, a systematic approach is taken in this work to design the control system of a selective, dual-stage Selexol-based acid gas removal (AGR) unit for a commercial-scale integrated gasification combined cycle (IGCC) power plant with pre-combustion CO{sub 2} capture. The control system design is performed in two stages with the objective of minimizing the auxiliary power while satisfying operational and environmental constraints in the presence of measured and unmeasured disturbances. In the first stage of the control system design, a top-down analysis is used to analyze degrees of freedom, define an operational objective, identify important disturbances and operational/environmental constraints, and select the control variables. With the degrees of freedom, the process is optimized with relation to the operational objective at nominal operation as well as under the disturbances identified. Operational and environmental constraints active at all operations are chosen as control variables. From the results of the optimization studies, self-optimizing control variables are identified for further examination. Several methods are explored in this work for the selection of these self-optimizing control variables. Modifications made to the existing methods will be discussed in this presentation. Due to the very large number of candidate sets available for control variables and due to the complexity of the underlying optimization problem, solution of this problem is computationally expensive. For reducing the computation time, parallel computing is performed using the Distributed Computing Server (DCS®) and the Parallel Computing® toolbox from Mathworks®. The second stage is a bottom-up design of the control layers used for the operation of the process. First, the regulatory control layer is designed followed by the supervisory control layer. Finally, an optimization layer is designed. In this paper, the proposed two-stage control system design approach is applied to the AGR unit for an IGCC power plant with CO{sub 2} capture. Aspen Plus Dynamics® is used to develop the dynamic AGR process model while MATLAB is used to perform the control system design and for implementation of model predictive control (MPC).

97 MATHEMATICS AND COMPUTING↗

EVALUATION OF CONTROLLED END GAS AUTO IGNITION WITH EXHAUST GAS RECIRCULATION IN A STOICHIOMETRIC, SPARK IGNITED, NATURAL GAS ENGINE

Many stationary and heavy-duty on-road natural gas fueled engines today operate under stoichiometric conditions with a three-way catalyst. The disadvantage of stoichiometric natural gas engines compared to lean-burn natural gas and diesel engines is lower efficiency, resulting primarily from lower power density and compression ratio. Exhaust gas recirculation (EGR) coupled with advanced combustion controls can enable operation with higher compression ratio and power density, which yields higher efficiency. This also results in engine operation between the limits of knock and misfire. Operation between these limits has been named controlled end gas auto-ignition (C-EGAI) and can be used to improve the brake efficiency of the engine. Various methods of cylinder pressure-based knock quantification were explored to implement C-EGAI. The indicated quantification methods are used for the implementation of a control scheme for C-EGAI with a relation to the fractional heat release due to auto-ignition. A custom EGR system was built and the effect of EGR on the performance of a stochiometric, spark ignited, natural gas engine is evaluated. C-EGAI is implemented and the optimal parameters are determined for peak performance under EGR and C-EGAI conditions. In this study, knock detection is used for the recognition, magnitude, and location of the auto-ignition events. Cylinder pressure-based knock detection was the primary method for determining the occurrence and location of knock but was also used for implementing the ignition control scheme for controlled end gas auto-ignition. The combustion intensity metric (CIM) enabled parametric ignition timing control which allowed for the creation of a relationship between fractional heat release due to auto-ignition and CIM. Many stationary and heavy-duty on-road natural gas fueled engines today operate under stoichiometric conditions with a three-way catalyst. The disadvantage of stoichiometric natural gas engines compared to lean-burn natural gas and diesel engines is lower efficiency, resulting primarily from lower power density and compression ratio. Exhaust gas recirculation (EGR) coupled with advanced combustion controls can enable operation with higher compression ratio and power density, which yields higher efficiency. This also results in engine operation between the limits of knock and misfire. Operation between these limits has been named controlled end gas auto-ignition (C-EGAI) and can be used to improve the brake efficiency of the engine. Various methods of cylinder pressure-based knock quantification were explored to implement C-EGAI. The indicated quantification methods are used for the implementation of a control scheme for C-EGAI with a relation to the fractional heat release due to auto-ignition. A custom EGR system was built and the effect of EGR on the performance of a stochiometric, spark ignited, natural gas engine is evaluated. C-EGAI is implemented and the optimal parameters are determined for peak performance under EGR and C-EGAI conditions. In this study, knock detection is used for the recognition, magnitude, and location of the auto-ignition events. Cylinder pressure-based knock detection was the primary method for determining the occurrence and location of knock but was also used for implementing the ignition control scheme for controlled end gas auto-ignition. The combustion intensity metric (CIM) enabled parametric ignition timing control which allowed for the creation of a relationship between fractional heat release due to auto-ignition and CIM. Both exhaust gas recirculation and controlled end gas auto-ignition were analyzed with a cooperative fuel research (CFR) engine modified for boosted fuel/air intake. The data was interpreted to provide a proper evaluation of unique analytical methods to quantify the results of C_EGAI and characterize the live auto-ignition events. The control variables for this method of C-EGAI were optimized with EGR conditions to generate the point of peak performance on the CFR engine under stoichiometric, spark ignited, natural gas conditions.

Bayliff, Scott Michael↗

Distributed Energy Communications & Controls, Lab Activities - Summary

The purpose is to develop controls for inverter-based renewable and non-renewable distributed energy systems to provide local voltage, power and power quality support for loads and the power grid. The objectives are to (1) develop adaptive controls for inverter-based distributed energy (DE) systems when there are multiple inverters on the same feeder and (2) determine the impact of high penetration high seasonal energy efficiency ratio (SEER) air conditioning (A/C) units on power systems during sub-transmission faults which can result in an A/C compressor motor stall and assess how inverter-based DE can help to mitigate the stall event. The Distributed Energy Communications & Controls Laboratory (DECC) is a unique facility for studying dynamic voltage, active power (P), non-active power (Q) and power factor control from inverter-based renewable distributed energy (DE) resources. Conventionally, inverter-based DE systems have been designed to provide constant, close to unity power factor and thus not provide any voltage support. The DECC Lab interfaces with the ORNL campus distribution system to provide actual power system testing of the controls approach. Using mathematical software tools and the DECC Lab environment, we are developing and testing local, autonomous and adaptive controls for local voltage control and P & Q control for inverter-based DE. We successfully tested our active and non-active power (P,Q) controls at the DECC laboratory along with voltage regulation controls. The new PQ control along with current limiter controls has been tested on our existing inverter test system. We have tested both non-adaptive and adaptive control modes for the PQ control. We have completed several technical papers on the approaches and results. Electric power distribution systems are experiencing outages due to a phenomenon known as fault induced delayed voltage recovery (FIDVR) due to air conditioning (A/C) compressor motor stall. Local voltage collapse from FIDVR is occurring in part because modern air-conditioner and heat pump compressor motors are much more susceptible to stalling during a voltage sag or dip than older motors. These motors can stall in less than three cycles (0.05 s) when a fault, for example, on the sub-transmission system, causes voltage on the distribution system to sag to 70% or less of nominal. We completed a new test system for A/C compressor motor stall testing at the DECC Lab. The A/C Stall test system is being used to characterize when and how compressor motors stall under low voltage and high compressor pressure conditions. However, instead of using air conditioners, we are using high efficiency heat pumps. We have gathered A/C stall characterization data for both sustained and momentary voltage sags of the test heat pump. At low enough voltage, the heat pump stalls (compressor motor stops and draws 5-6 times normal current in trying to restart) due to low inertia and low torque of the motor. For the momentary sag, we are using a fast acting contactor/switch to quickly switch from nominal to the sagged voltage in cycles.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nonlinear control of the minimum safety factor in tokamaks by optimal allocation of spatially moving electron cyclotron current drive

The minimum value of the safety factor profile is related to the magnetohydrodynamic (MHD) stability of the plasma confined in a tokamak. Therefore, active control of the minimum safety factor may mitigate MHD instabilities that can degrade or even terminate plasma confinement. Typically, in most tokamak scenarios, the minimum safety factor evolves spatially with time, i.e., the location at which the safety factor achieves the minimum value changes with time. In addition to the inherent nonlinearities in the minimum safety factor evolution, its spatial variation makes the control design challenging. In particular, complexity in control design may arise from the need for time-dependent nonlinear models that account for spatial variation of the minimum safety factor. Furthermore, the minimum safety factor may drift to locations where the actuator authority is low. The problem of minimum safety factor control with target location tracking and moving electron cyclotron current drive (ECCD) is addressed in this work. A nonlinear time-dependent model that incorporates the spatial variation of the minimum safety factor is presented. A nonlinear controller based on optimal feedback linearization is developed to track a target minimum safety factor. The proposed controller treats the ECCD position as a controllable variable. In other words, the controller prescribes the ECCD position (in addition to the non-inductive powers) in real time based on an optimal criterion that is defined a priori. This work also presents the steps necessary to integrate the minimum safety factor controller with a total energy controller to achieve multiple control objectives simultaneously. In conclusion, the proposed integrated control algorithm is tested using nonlinear simulations in the Control Oriented Transport SIMulator (COTSIM) for a DIII-D tokamak scenario.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Disturbance accommodating control design for wind turbines using solvability conditions

In this study, solvability conditions for disturbance accommodating control (DAC) have been discussed and applied on wind turbine controller design in above-rated wind speed to regulate rotor speed and to mitigate turbine structural loads. DAC incorporates a predetermined waveform model and uses it as part of the state-space formulation, which is known as the internal model principle to reduce or minimize the wind disturbance effects on the outputs of the wind turbine. An asymptotically stabilizing DAC controller with disturbance impact on the wind turbine being totally canceled out can be found if certain conditions are fulfilled. Designing a rotor speed regulation controller without steady-state error is important for applying linear control methodology such as DAC on wind turbines. Therefore, solvability conditions of DAC without steady-state error are attractive and can be taken as examples when designing a multitask turbine controller. DAC controllers solved via Moore-Penrose Pseudoinverse and the Kronecker product are discussed, and solvability conditions of using them are given. Additionally, a new solvability condition based on inverting the feed-through D term is proposed for the sake of reducing computational burden in the Kronecker product. Applications of designing collective pitch and independent pitch controllers based on DAC are presented. Recommendations of designing a DAC-based wind turbine controller are given. A DAC controller motivated by the proposed solvability condition that utilizes the inverse of feed-through D term is developed to mitigate the blade flapwise once-per-revolution bending moment together with a standard proportional integral controller in the control loop to assist rotor speed regulation. Simulation studies verify the discussed solvability conditions of DAC and show the effectiveness of the proposed DAC control design methodology.

17 WIND ENERGY↗

Sparsity-Promoting Optimal Wide-Area Control of Power Networks

Inter-area oscillations in bulk power systems are typically poorly controllable by means of local decentralized control. Recent research efforts have been aimed at developing wide-area control strategies that involve communication of remote signals. In conventional wide-area control, the control structure is fixed a priori typically based on modal criteria. In contrast, here we employ the recently-introduced paradigm of sparsity-promoting optimal control to simultaneously identify the optimal control structure and optimize the closed-loop performance. To induce a sparse control architecture, we regularize the standard quadratic performance index with an ℓ 1 -penalty on the feedback matrix. The quadratic objective functions are inspired by the classic slow coherency theory and are aimed at imitating homogeneous networks without inter-area oscillations. We use the New England power grid model to demonstrate that the proposed combination of the sparsity-promoting control design with the slow coherency objectives performs almost as well as the optimal centralized control while only making use of a single wide-area communication link. In addition to this nominal performance, we also demonstrate that our control strategy yields favorable robustness margins and that it can be used to identify a sparse control architecture for control design via alternative means.

25 ENERGY STORAGE↗

Planning and Analyses Performed to Install Halden’s Advanced Control Room Concept in the Human Systems Simulation Laboratory

The United States (U.S.) Department of Energy (DOE) sponsors the Light Water Reactor Sustainability (LWRS) Program, which has the goal of sustaining U.S. nuclear assets through conducting high-quality, value-added research and development (R&D) that provides the technical bases to extend the operating life of commercial NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics, conducts targeted R&D to address aging and reliability concerns with the legacy instrumentation and control (I&C) and related information systems in NPPs. LWRS program researchers have been conducting R&D that enables the modernization of the I&C technologies in NPP main control rooms and have authored numerous reports on those research activities. Interestingly, however, virtually all of the control room modernization activities that have been researched in collaboration with various U.S. utility partners has been on upgrades that are the first steps to position these legacy control rooms for further full nuclear plant modernization. So, while many nuclear utility owners and operators have taken the first steps toward the digitalization of the control room I&C, LWRS program researchers are not aware of what any utility’s end-state vision is for full control room modernization. Thus, the purpose of this LWRS R&D activity is to start developing an advanced control room interface concept for legacy NPPs and to demonstrate it in the Human Systems Simulation Laboratory (HSSL) at Idaho National Laboratory (INL) so that utility partners can see what a potential end state is for their control room upgrade activities. The end state shows what a fully modernized control room looks like and how it works, and is the result of HFE and I&C work to transition the existing control room and its concept of operations to a new advanced control room configuration. This report documents the planning and analyses performed to install an advanced control room concept in the HSSL. Future LWRS reports will document the process to set up the HSSL and the gPWR with the HSI developed in Halden, and then document how LWRS program researchers at INL and Halden are supporting the capability to conduct future studies by creating additional HSIs that support control room modernization.

99 GENERAL AND MISCELLANEOUS↗

Development of Integrated Biomimetic Framework with Intelligent Monitoring, Cognition and Decision Capabilities for Control of Advanced Energy Plants

The objective of the project entitled “Development of Integrated Biomimetic Framework with Intelligent Monitoring, Cognition, and Decision Capabilities for Control of Advanced Energy Plants” is to develop algorithms and methodologies for designing a biomimetic control system for optimal control of advanced energy plants. Traditionally, control systems have been designed based on assumed a priori knowledge of the process system. A number of variables are manipulated to accomplish disturbance rejection and/or servo control performance. While it is possible to adapt the process model based on available data, the control structure and the controllers rarely change. Thus, the knowledge learnt during process operation is lost or remains underutilized. In addition, the business models of today, especially for power plants, are rapidly changing. The power plant operators are being pushed to the edge due to the penetration of renewable energy derived power to the grid, the demand for high efficiency, ever-tightening environmental regulations, and requirements for increased plant availability. Thus, power plant operations need to be agile and should adapt quickly to the dynamic requirements. A number of characteristics distinguish biological systems from the traditional process control systems. Self-organization, distributed intelligence, adaptability, intelligent monitoring, cognition, and decision capabilities are some of the powerful characteristics of the biological world that can be effectively utilized in process control. At the top, the central nervous system (CNS) integrates the information from and coordinates the activities of all parts of the bodies (for bilaterian animals). Inspired by these distinct characteristics, this project seeks to develop methodologies and algorithms to accomplish: (i) self-organization of the control structure for maximizing the plant’s operating profit by mimicking the function of the cortical areas in the human brain, (ii) distributed and adaptive controllers that mimic the rule of pursuit present in ants, (iii) intelligent monitoring of the controllers powered with cognition and decision capabilities that mimic the artificial immune systems, and (iv) seamless coordination and integration in the control system that mimics the CNS.

20 FOSSIL-FUELED POWER PLANTS↗

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY↗

A neural-network-enhanced parameter-varying framework for multi-objective model predictive control applied to buildings

Management of the electrical grid is becoming more complex due to the increased penetration of alternative energy generation technologies and a broadening diversity of electric loads. This complexity creates challenges in balancing demand and generation that can increase the potential for grid instabilities. One effective way to address this issue is to leverage previously unexploited demand flexibility through advanced control strategies. In this work, we propose an advanced control method, called adaptive neural parameter-varying model predictive control (ANPV-MPC), to control the temperature and energy consumption of a building via its Heating, Ventilation, and Air Conditioning system. ANPV-MPC combines key ideas in parameter-varying control, adaptive control, and online learning strategies to bridge the gap between computationally efficient linear model predictive control and more accurate nonlinear model predictive control. The novelty in ANPV-MPC is the use of a physics-inspired Bayesian neural network to estimate the coefficients of the parameter-varying linear control model. The Bayesian neural network additionally provides uncertainty estimates, triggering online training to capture evolving building system conditions. We show that ANPV-MPC can approximate the building system dynamics with a 28.39% higher accuracy than traditional linear model predictive control, resulting in 36.23% better control performance without increasing complexity of the optimal control problem. ANPV-MPC also adapts in real time to previously unseen conditions using online learning, further improving its performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Yaw-Augmented Control for Wind Farm Power Tracking: Preprint

This paper presents an inner-outer control loop structure which uses wake steering (yaw control) to augment pitch control for wind farms to track a power reference signal. The outer-loop yaw controller employs a recently proposed dynamic yaw model with a time-varying graph structure that accounts for dynamic changes in the farm wake interactions due to the yaw action of upstream turbines. The wake interactions within the model include the physics of the streamwise and lateral wake evolution, which collectively determine its impact on downstream turbines. The inner-loop employs a compensation scheme to account for the slow timescale effects of the yaw control actions within the faster timescale pitch control. The controller is applied to track two power trajectories (typical of secondary frequency regulation signals) using a large eddy simulation wind farm plant. The results demonstrate that the additional control authority from yaw provides some added benefit in reducing the required turbine derates needed for wind farms to track transient power increases in the proposed setting. However, the benefit decreases and pitch control alone is sufficient when the turbines are derated beyond a certain level. These findings suggest that augmenting pitch control with yaw may provide financial incentives in terms of allowing wind farms to maximize power supply to the bulk power market while still providing regulation services. Further work is needed analyze the costs versus benefits of the additional control complexity versus bandwidth in augmenting pitch control with wake steering offers in these applications.

active power control↗

Comparison of Mutual Awareness in Analog vs. Digital Control Rooms

Control rooms in nuclear power plants are complex, collaborative working environments rife with potential for human error. As control rooms evolve from analog to digital interface environments, crew communication strategies must change as well. Operators in the analog control room operate the plant and communicate with each other with the help of control boards with large control panels, meters, and switches. Reactor operators could choose a particular set of controls on the particular control board which corresponds to the part of the system of interest. Visual display units (VDU), which became a fixture in the control rooms with the shift to digital human-machine interfaces (HMI), bring benefits for safety and flexibility combining information from various sources. With the increase in automation and the use of digital HMIs operators received their personal sitting workstations where they are able to navigate and operate the plant. The amount of information increased as well as the complexity of monitoring and analyzing the system states. Also computerized systems cause operators to get absorbed by their personal screens and reduce interaction between the crew members. Therefore, the collaboration and coordination of task demands requires vigilance and mutual awareness. The level of automation has an influence on the level of mutual awareness experienced by operators in the control rooms. Teams function to carry out highly interdependent tasks, requiring synthesis and sharing of information to achieve common goals. Improving the performance of the team necessitates the operators to focus on the system, the surrounding environment, and situational awareness about the system states. Collaboration of team members is critical when employing the digital operating systems as the acute awareness of the overall progress of the group and individual activities of the operators drives the team to the desired end-states of the plant operations. Out-of-the loop (OOTL) performance problems can be referred to as the lack of supervisory control, system monitoring, and information processing in the digital HMIs. Under some circumstances Senior Reactor Operators (SRO) struggle to follow the actions of other Reactor Operators (RO) because with the new digital interfaces SROs lose track of how the procedures are carried out by ROs, which results in the loss of three way communication. Mutual awareness plays a significant role in keeping the SROs in the loop of plant operations. This paper will investigate, through literature review and expert interviews, the impact and human errors attributed to the increasing complexity of new digital main control rooms. Comparison of the new digital interfaces with the analog interfaces in nuclear power plants has the potential to shed light on increasing mutual awareness and three way communications between the SROs and ROs. Further, identification of the human errors and human actions can provide beneficial information, suggesting significant and critical improvements that can be implemented in the main control rooms to increase safety and reliability of new technology. Additionally, insights on mutual awareness for analog vs. digital control rooms can serve to improve human reliability.

99 GENERAL AND MISCELLANEOUS↗

Inverse reinforcement learning control for building energy management

Reinforcement learning (RL) based control is widely considered a promising approach in building automation and control as it has demonstrated the potential to deal with complex objectives in adjacent domains like robotics, autonomous vehicles, gaming applications, and advertisement recommendations. When applied to any environment, model-free RL learns to improve its control performance over time without requiring a control model, by receiving and then analyzing feedback from the building environment after each control action. Operational objectives are becoming increasingly complex through the simultaneous consideration of thermal comfort, carbon emissions, grid services, and indoor air quality. In this context, conventional rule-based control approaches are proving sub-optimal, mostly heuristic, and inadequate. The model-free and self learning nature of RL appears promising and attractive as it may address the scalability issues associated with advanced control approaches. However, it suffers from long training times and unstable control behavior during the early stages of its learning process, which makes it unsuitable to be applied directly to buildings. This paper addresses these issues using an inverse reinforcement learning approach (IRL), a technique utilized to learn the objective of a controller agent which is considered an expert in its respective domain. Here, we consider a rule-based control as the expert demonstrator. IRL is different from a direct imitation (i.e., direct mapping of states to actions) of control actions as it tries to find the underlying intent of an expert's policy, providing the controller with a better-generalized policy for unseen states or environments with slightly different dynamics. This approach propels the RL controller's policy to levels similar to or better than that of a rule-based policy before it starts learning by interacting with the building. This makes RL for building energy management applications more practical as it prevents the erratic and exploratory behavior in the initial training period, simultaneously speeding up the learning process when compared to applying an untrained RL agent directly to a building environment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Regulation of flow through a T-Shaped open cavity by temperature dependent P, PI, and PID controllers

P (proportional), PI (proportional-integral), and PID (proportional-integral-derivative) controllers are popular means of controlling industrial processes. Due to superior response, accuracy, and stable performance, PID controllers are mostly used in control systems. This paper presents a mathematical model and subsequent response analysis regarding regulation of flow in mixed convection through a T-shaped open cavity by temperature dependent controllers. The T-shaped cavity has cold top and hot bottom walls, while air is flowing through the inlet at surrounding temperature. The inflow is regulated by a controlled gate which operates according to the signal received from the controller. Values of proportional gain (k{sub p}), integral gain (k{sub i}), and derivative gain (k{sub d}) are varied to obtain the desired system response and to ensure a stable system with fastest response. At first, only P controller is used and eventually PI and finally PID control scheme is applied for controller tuning. Tuning of different controllers (P, PI, and PID) are carried out systematically based on the reference temperature which is continuously monitored at a certain location inside the cavity. It is found that PID controller performs better than P or PI controller.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Performance Analysis: Work Control Events Identified January - August 2010

This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting in each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.

99 GENERAL AND MISCELLANEOUS↗