Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CHAINS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Future Proofing the Aerospace Supply Chain

New aircraft, such as electric vertical take-off and landing vehicles, are being developed to support advanced air mobility. This talk will address gaps and risks in the aerospace supply chain and discuss how to identify and develop resiliency approaches.

Aerospace Supply Chain↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines: Preprint

The global geothermal electricity market has significantly grown over the last decade and is expected to reach a total installed capacity of 18.4 GWe in 2021 (GEA, 2016). Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. In particular, the turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. This study focuses on analysis of the global supply chain and manufacturing costs for Organic Rankine Cycle (ORC) turboexpanders and steam turbines used in geothermal power plants. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). MSP is the minimum price that a company must sell its product for in order to pay back the capital and operating expenses during the plant lifetime (CEMAC, 2017). The results showed that MSP could highly vary between 893 dollar/kW and 30 dollar/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. Sensitivity analysis indicated these savings come largely from reduced labor costs for design and engineering and manufacturing setup.

15 GEOTHERMAL ENERGY↗

Hydropower Manufacturing and Supply Chain Analysis

Hydropower Manufacturing and Supply Chain Analysis presentation from the WPTO FY14-FY16 Peer Review. The project objective is to provide data and insights to inform investment strategies, policy, and other decisions to promote economic growth and manufacturing.

13 HYDRO ENERGY↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

The global geothermal electricity market has significantly grown over the last decade and is expected to reach a total installed capacity of 18.4 GWe in 2021 (GEA, 2016). Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. In particular, the turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. This study focuses on analysis of the global supply chain and manufacturing costs for Organic Rankine Cycle (ORC) turboexpanders and steam turbines used in geothermal power plants. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). MSP is the minimum price that a company must sell its product for in order to pay back the capital and operating expenses during the plant lifetime (CEMAC, 2017). The results showed that MSP could highly vary between 893 dollar/kW and 30 dollar/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. Sensitivity analysis indicated these savings come largely from reduced labor costs for design and engineering and manufacturing setup.

15 GEOTHERMAL ENERGY↗

NREL Supply Chain & Circular Economy Capabilities

NREL and JISEA have many supply chain competencies and capabilities. Utilizing these tools and with funding by the DOE Office of Science through the National Virtual Biotechnology Laboratory, a consortium of DOE national laboratories focused on response to COVID-19, provided by the Coronavirus CARES Act, an NREL team prepared case studies regarding necessary PPE to combat COVID.

analysis↗

Energy Supply Chain Strategic Plan

With energy demand rising and the desire to reduce carbon emissions becoming more prominent, government and industry are increasingly interested in developing an emissions-free, power generation source that is safe, resilient and dependable. The world is looking to expand clean energy capabilities and develop the next generation of nuclear reactors. Not only is building next-generation energy systems Idaho National Laboratory’s opportunity, it is also Idaho’s opportunity. With this in mind, INL launched Supply Chain Initiative to leverage INL’s energy projects to build an energy talent pipeline and develop a robust business ecosystem to support current and future projects.

99 GENERAL AND MISCELLANEOUS↗

Supply Chain for Energy Technologies

Understanding manufacturing cost implications of technologies is critical to aid adoption of next-generation energy solutions. It is important to understand not only of the manufacturing costs and value-add along the supply chain, but also gain understanding of manufacturing location decisions. By identifying a technology's competitive strengths and weaknesses, analyses give researchers and program decision makers the data and insights needed to create strategies and plans that better promote U.S. economic growth and pursue R&D activities that have the greatest long-term potential to yield significant energy savings for U.S. consumers. In this talk, we present examples of analysis from a variety of energy technologies to demonstrate how manufacturing cost analysis can be used to answer specific policy or research questions. In addition, we present case studies showing the importance of understanding trade flow, manufacturing locations, and capacity and utilization to inform economic growth and potential for technology adoption.

benchmarking↗