Well Collar Compression at the Bryan Mound SPR Site
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Abstract This paper outlines a data collection and diagnostics case study involving multiple horizontal shale wells. We look at well production profiles using rate transient analysis, differences in near wellbore complexity, geologic variations within the area of interest, as well as compositional differences in the rocks based on cores obtained from within the stimulated reservoir. The Hydraulic Fracturing Test Site is a multi-well experiment involving stimulation of unconventional shale wells in the southeastern Midland portion of the Permian Basin. The targeted formations include both the upper as well as the middle Wolfcamp formations, also referred alternatively as Wolfcamp A and Wolfcamp B. Data integration and analysis shared in this paper help us understand the various geologic controls impacting well productivity, particularly the wide variance observed between the Wolfcamp A and Wolfcamp B formations. Rate transient analysis indicates similar system permeabilities for stimulated wells. However, we observe higher effective fracture half-lengths for upper Wolfcamp wells. Using observations from 3D seismic interpretations (such as pad scale faults) as well as petrophysical and image log data, we highlight the substantial differences in stimulation as we move along the well laterals from the heel toward the toe sections. These differences are further reconciled with observations from zones with high data density at the core locations through stimulated rock, as well as independent data such as microseismic emissions. At the test site, Wolfcamp A was found to be relatively quartz rich with significant heterogeneity whereas Wolfcamp B is richer in clay and organic content. This impacts the geomechanical characteristics of the rock mass with much higher natural fracture density in the shallower interval. Thus, the fracture growth is more uniform in the deeper interval and more heterogeneous with branching likely in upper interval. Increased complexity also leads to consistently better productivity from the wells in the shallower interval as demonstrated from RTA results. This case study is unique because it provides valuable insights from actual sampling of the stimulated zones in hydraulically fractured wells and helps understand impact of various factors that contribute toward variability in well production. The findings from this study provides insights into need for optimization of completion designs in the various Wolfcamp landing zones, such as optimization of cluster or fracture spacing in various Wolfcamp intervals. In addition, it provides a useful template for data collection and research direction in future field test sites of similar nature in unconventional reservoirs.
The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.
Accurately estimating the distribution of aquifer properties is key to understanding contaminant movement in the subsurface. The distribution of aquifer properties is typically addressed using slug or constant-rate well tests, and the pros and cons of these tests are well known. Slug tests are appealing because they avoid removing contaminated water, but their results are affected by well skin and the small volume of displaced water limits the volume of aquifer that can be evaluated. Constant-rate well tests have the disadvantage of requiring disposal of potentially contaminated water, but they can generate properties that are more representative than slug tests, and they can be used to estimate well efficiency and storativity, which are difficult to characterize using slug tests. Periodic pumping tests are appealing because they have many of the advantages and few of the disadvantages of slug and constant-rate well tests. Periodic pumping tests involve cycling the pumping rate with a regular period and measuring the resulting response in monitoring wells. Some of these tests involve imposing a periodic rate on a constant mean rate. However, other tests involve moving water out and back into the well at rates that are balanced so the net rate after each period is zero. Some zero-net-rate (ZNR) well tests use rates that follow a sinusoidal pattern, whereas others use a square wave pattern that switches between a constant rate of pumping and a constant rate of injection to achieve a zero-net rate. ZNR well tests appear to be a useful compromise between slug and constant rate tests, but methods for conducting and analyzing the results from these tests have received limited evaluation. Periodic pumping tests are typically evaluated through recorded pressure responses to a disturbance source. Recent work has demonstrated that the strain field in the vadose zone shows a response to disturbances in the underlying aquifer. Various instrument designs are available that can record vertical and horizontal strain to very precise resolutions (10-9 ε). Measuring the strain in the vadose zone can present lower costs than measuring pressure in a monitoring well, so using strain could improve the resolution of ZNR tests, as well as make these tests potentially cheaper. A ZNR periodic pumping system was constructed and used to perform tests in the Clemson, South Carolina area. The system was designed to pump and inject with a periodic square-wave, so pumping occurs at a constant rate for half the period and is followed by injection at the same rate for half the period resulting in no net gain or loss of water from the aquifer. The system is designed to generate flow rates from 1 to 3.5 gallons per minute (gpm) with a capacity of 875-gallon per half period. Pressure and strain monitoring points are located in the vicinity of the pumping well. A series of 10 ZNR periodic pumping tests were conducted at the field site, with periods ranging from 2 to 540 minutes. Pressure data were collected and recorded in four monitoring wells in various locations around the pumping well. In addition, vertical and horizontal strain and tilt data were recorded in various locations around the pumping well. Traditional aquifer tests, including slug tests and constant-rate pumping tests were conducted at the field site to provide a baseline of aquifer parameter estimates that are compared the results of ZNR tests. Pressure data measured at monitoring wells during ZNR tests were analyzed utilizing an analytical solution (Streltsova, 1988) that assumes a confined aquifer and estimates hydraulic diffusivity and transmissivity using the time lag and amplitude of the pressure signal. The storativity can be separated out from the hydraulic diffusivity using the transmissivity estimate. The time-lag and amplitude of the pressure signals were estimated using a Fourier transform. The time-lag of the primary period of the pressure increases as a linear function of distance from the pumping well, and it increases as the square root of the period of the ZNR test over a range of periods spanning two orders of magnitudes. The first few harmonics follow similar trends, but the higher frequency harmonics diverge from this trend. Strain and tilt data from various instruments in the vadose and saturated zones are periodic during ZNR tests. The time lags of the strain components increase roughly linearly with distance from the well. Many of the time lags of the strain data from the vadose zone are similar to the time lags observed in the pressure data from a similar distance and pumping period. Theoretical experiments were performed to understand how pressure and strain responds to ZNR periodic pumping. The time-lags of the simulated pressure responses match the field data trends. The results were used to validate the Streltsova (1988) solution for periodic pumping to estimate hydraulic diffusivity. Hydraulic diffusivity was estimated to be 1.8 x 10-2 m2s-1 < Dh < 9.0 x 10-2 m2s-1 using pressure data from all the wells during ZNR tests. Transmissivity was estimated to be 0.8 x 10-4 m2s-1 < T < 4.3 x 10-4 m2s-1. Assuming Storativity = T/Dh gives 1.1 x 10-3 < S < 19 x10-3. Transmissivity is used to estimate the hydraulic conductivity, K, by dividing by the assumed aquifer thickness. Two constant-rate pumping tests were conducted and analyzed using two conceptual models: The Hantush (1961) solution was used to analyze data assuming confined conditions and the Neuman (1974) solution was used to analyze data assuming unconfined conditions. The Hantush (1961) solution estimated transmissivity to be 1.6 x 10-4 m2s-1 < T < 1.8 x 10-4 m2s-1 when using data from all the wells. Storativity was estimated to be 4.4 x 10-3 < S < 8.2 x 10-3. Assuming Dh = T/S gives 0.22 x 10-2 m2s-1 < Dh < 3.6 x 10-2 m2s-1. The Neuman (1974) solution estimated transmissivity to be 0.80 x 10-4 m2s-1 < T < 0.84 x 10-4 m2s-1. Total storativity (S + Sy) was estimated to be 22 x 10-3 < S < 110 x 10-3. Storativity excluding the Sy term was estimated to be 2.2 x 10-3 < S < 2.5 x 10-3. Assuming Dh = T/S gives 0.073 x 10-2 m2s-1 < S < 0.36 x 10-2 m2s-1. Two slug tests were performed on the pumping well, PW-2. The Bouwer and Rice (1976) solution for slug tests was used to analyze the data. This solution works for both confined and unconfined conditions, so both conceptual models were covered through the analysis. Hydraulic conductivity was estimated to be 1.95 x 10-6 ms-1 < K < 2.49 x 10-6 ms-1. Statistical comparison show generally no significant difference in the estimates of Dh, K, or S made using ZNR and conventional pumping tests.. However, the total storage estimated by the Neuman (1974) solution for unconfined settings is larger than that estimate using the Streltsove analysis applied to the ZNR tests. This is likely because the Neuman solution considers delayed yield from storage that the water table, whereas the Streltsova (1988) solution assumes confined conditions. The analysis also indicates that there is a statistically significant difference between parameters estimated with conventional slug tests and those measured with either constant-rate pumping tests or ZNR tests. Hydraulic diffusivity is estimated from the time-lag and the distance from the well. The time-lags of the strain data from the vadose zone are similar to the lags of the pressure data from a similar distance. This indicates that hydraulic diffusivities estimated from the strain data measured in the vadose zone would be similar to the estimates from the pressure data measured in the aquifer. There appear to be sign reversals in some of the strain data that were corrected to estimate the time lag. The dissolved oxygen (CO) concentration was measured during several ZNR tests to evaluate the feasibility of using the procedure to increase contaminant degradation kinetics that are related to DO. The results indicate that DO can be increased during the cycling of ZNR tests in some cases.
This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2019 and 2020 at Wilson Corners, Solid Waste Management Unit 001, at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. Sampling of these wells in 2020 was replaced with the direct push technology investigations in October 2020 and April 2021. The activities presented in this report include three field events: (1) December 2019 -groundwater gauging of 38 monitoring wells and sampling of 36 monitoring wells; (2) May 2020 - groundwater sampling of 7 monitoring wells; and (3) December 2020 - groundwater gauging of 49 monitoring wells and sampling of 43 monitoring wells. During the December 2019 and May 2020 events, monitoring wells were sampled using passive diffusion bags and were analyzed for a “full list” of volatile organic compounds (VOCs), including Freon 113. During the December 2020 event, the low flow sampling method was used, and samples were analyzed for a “select list” of VOCs, including Freon 113. The following conclusions can be made based on the 2019 and 2020 LTM results: •In December 2019 and December 2020, groundwater flow for the site was generally to the west with the individual zones only varying by occasional northerly and southerly components. This is generally consistent with historical observations at the site. •The GCTL plume continues to extend both horizontally and vertically beyond our current monitoring well network. •The vertical extent of VOCs was historically generally delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells WILC-MW0078 and WILC-MW0130 that were sampled during the 2019 and 2020 LTM indicate that groundwater VOC concentrations in both wells were greater than the GCTL. •Freon 113 was not detected above GCTLs during the 2019 and 2020 LTM events. Based on groundwater sampling activities performed during this reporting period, including recent DPT groundwater sampling conducted for the implementation of an air sparge system, the following recommendations are provided: •Install 10 new monitoring wells, which will be sampled along with 49 existing monitoring wells, to assist with delineation of the low concentration plume. The wells are listed inTable 4-1, and the proposed locations are presented on Figures4 -1 through 4-5. (Figures 4-1, 4-2, 4-3, and 4-5 also show updated plumes and proposed performance monitoring well locations. This information will be discussed and presented under a separate cover.) •Modify the annual LTM sampling plan as presented inTable 4-1. •Sampling for future events at the site will be conducted using low flow pumping methods. The next annual LTM sampling event is currently planned for December 2021. Please note the 10 new monitoring wells will not be installed before this event but will be installed as part of the upcoming IM construction and will be sampled during baseline sampling, along with the 49 existing monitoring wells. Following this sampling event, it is recommended that the Annual LTM be combined with the performance monitoring under the IM implementation, and LTM be temporarily discontinued. Objectives of the 2021 LTM are to: (i) evaluate groundwater gradient and flow direction by collecting depth to water measurements from LTM wells; (ii) continue monitoring the peripheral VOC trends in the northern, southern, and western portions of the site by monitoring existing wells and installing and monitoring new wells as recommended; and (iii) monitor select internal plume wells.
This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.
Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)
This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.
Hydraulic Fracturing Test Site-2 (HFTS-2) is a field-based research experiment performed in the Permian (Delaware) Basin. The unique aspect of this program was the acquisition of a unique, comprehensive, diagnostic dataset. Additionally, shorter parent wells drilled three years before the child wells offered clear distinction between the stages influenced by parent-child effects and the stages without any effects. The goal of this study was to analyze and integrate this comprehensive diagnostic dataset to understand the areal and vertical extent of hydraulic fractures (HF). The paper also provides insights on the effects of parent wells’ depletion on child well HF geometry based on various monitoring methods and subsurface models. Areal and vertical coverage for all HFTS-2 wells during stimulation and depletion was estimated based on analysis and interpretation of diagnostics and advanced modeling results. HFTS-2 diagnostics included microseismic (MS), pre- and post-stimulation logs and cores, bottomhole gauges, and fiber optic (FO) data. The diagnostics results (MS, FO, image logs) were integrated and used to calibrate subsurface models. Additional field tests were designed and implemented for depletion monitoring. The tailored program for monitoring depletion included vertical and slant well pressures, interference testing, and a vertical strain depletion trial. Areal Coverage: Conventional MS (and FO MS) were used to compute HF dimensions, which were compared with diagnostics (FO strain, gauge, image logs) observations and calibrated subsurface models. A post-production interference test did not show offset well communication. Vertical Coverage: Vertical coverage during stimulation was monitored using a vertical monitoring well. The stronger mechanical strain signals showed good correlation with MS event intensities, geomechanical properties, and gauge inferences. Vertical depletion was estimated based on vertical/slant well gauges and strain depletion tests. Parent-Child Effects: Diagnostics and calibrated subsurface models show asymmetry in child well fracture geometries for stages that overlap parent wells. Child well image logs serve as a good indicator for parent Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/2-21URTC/D021S031R004/2477423/urtec-2021-5241-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5241 well HF tracking. Child well MS events had an eastward bias, in line with pre-stimulation image logs, and was confirmed by parent well frac hits. Novel/Additive Information: The dataset presents a unique, over-constrained problem space to compare independent techniques to arrive at HF metrics (i.e., stimulation height and/or half-length), unlike a single source dataset, in which calibration is done using available data to guide predictions. Here, the asymmetry in HF geometry seen in the stages influenced by parent-child effects offers unique insights into well spacing and landing, which are key capital decisions the unconventional resources industry is seeking to optimize.
This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.
This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.
This repository contains simulated outputs from superwell – a hydro-economic tool for long-term assessment of groundwater cost and supply – providing globally gridded groundwater extractable volumes and associated unit costs ($/km³) for accessible groundwater production, based on a variety of user-defined depletion and ponded depth scenarios. Key model documentation: Niazi, H., Ferencz, S. B., Graham, N. T., Yoon, J., Wild, T. B., Hejazi, M., Watson, D. J., & Vernon, C. R. (2025). Long-term hydro-economic analysis tool for evaluating global groundwater cost and supply: Superwell v1.1. Geoscientific Model Development, 18(5), 1737-1767. https://doi.org/10.5194/gmd-18-1737-2025 Find the source code of the superwell model on GitHub: https://github.com/JGCRI/superwell Repository Overview Main output: superwell_outputs.7z contains 6 files (4.5 GB) named as superwell_py_deep_all_0.*PD_0.*DL.csv. These files present superwell outputs of global groundwater extraction volumes and cost estimates on a 0.5° scale for six scenarios with different Ponded Depth (PD; 0.3 and 0.6 m) and Depletion Limit (DL; 5%, 25%, and 40% of available volume) targets over the entire pumping lifetime of a grid cell superwell_py_deep_all_0.3PD_0.25DL_sample_100.csv contains superwell outputs for 100 data points sampled to match the global inputs' distribution superwell_py_deep_all_0.3PD_0.25DL_Grid_72548.csv contains superwell output for a single grid cell concept_v5.png provides an overview of the superwell workflow Outputs Description year_number: year of pumping depletion_limit: set depletion limit (DL) as a volume fraction of total available groundwater Mappings: continent, country, gcam_basin_id, Basin_long_name, grid_id: geographic identifiers and basin information Inputs: grid_area (km²): area of the grid cell whyclass: hydrogeological classification of the aquifer permeability (m/day), porosity (%), total_thickness (m), depth_to_water (m): aquifer properties. The geo-processed input data has been published separately: https://doi.org/10.57931/2307831 Model outputs: orig_aqfr_sat_thickness (m), aqfr_sat_thickness (m): original and remaining/instantaneous saturated thickness of the aquifer hydraulic_conductivity (m/day), transmissivity (m²/day): hydraulic properties of the aquifer radius_of_influence (m), areal_extent (km²): well radius and area of influence from the center of the well number_of_wells (-): number of wells in a grid cell determined by a ratio of well area and grid area max_drawdown (m), drawdown (m), drawdown_interference (m): well and aquifer drawdown during extraction total_head (m): total lift for the groundwater (depth to water plus drawdown) total_well_length (m): total depth of wells drilled well_yield (m³/day): pumping rate or well yield power (kW), energy (kWh): power and energy required for pumping groundwater Volume Outputs: volume_produced_perwell (m³), cumulative_vol_produced_perwell (m³): production volume metrics per well volume_produced_allwells (m³), cumulative_vol_produced_allwells (m³): aggregate extraction volumes for all wells in a grid cell available_volume (m³): available groundwater in storage for the grid cell as determined by aquifer properties depleted_vol_fraction: fraction of total volume pumped over available volumes in a grid cell (same as depletion limit) Cost Outputs: well_installation_cost ($): well installation cost based on the hydrogeological complexity of the aquifer annual_capital_cost, maintenance_cost, nonenergy_cost ($): nonenergy costs energy_cost_rate ($/kWh): electricity rate energy_cost ($): energy cost of pumping groundwater total_cost_perwell ($), total_cost_allwells ($): total annual energy and non-energy cost for each and all wells in a grid cell a unit_cost ($/m³), unit_cost_per_km3 ($/km³), unit_cost_per_acreft ($/acre-ft): total cost of pumping a unit of groundwater, indicated for different spatial units Key Resources Model documentation: Niazi, H., Ferencz, S., Graham, N., Yoon, J., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024; In-prep). Long-term Hydro-economic Assessment Tool for Evaluating Global Groundwater Cost and Supply: Superwell v1. Geoscientific Model Development. Input data: Niazi, H., Watson, D., Hejazi, M., Yonkofski, C., Ferencz, S., Vernon, C., Graham, N., Wild, T., & Yoon, J. (2024). Global Geo-processed Data of Aquifer Properties by 0.5° Grid, Country and Water Basins. MSD-LIVE Data repository. https://doi.org/10.57931/2307831 superwell source code: https://github.com/JGCRI/superwell Cite as Niazi, H., Ferencz, S., Yoon, J., Graham, N., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024). Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets. MSD-LIVE Data repository. https://doi.org/10.57931/2307832 Contact Reach out to Hassan Niazi or Stephen Ferencz or open an issue in the superwell repository for questions or suggestions.
This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.
Electrical responses in the vicinity of energized steel-cased well sources offer significant potential for monitoring induced fractures. However, the high complexity of well-fracture-host models spanning multiple length scales compels analysts to simplify their numerical models due to enormous computational costs. This consequently limits our understanding regarding monitoring capabilities and the limitations of electrical measurements on realistic hydraulically fracturing systems. In this paper, we use the hierarchical finite element approach to construct geoelectric models in which geometrically complex fractures and steel-cased wells are discretely represented in 3D conducting media without sacrificing the model realism and computation efficiency. We have discovered systematic numerical analyses of the electrical responses to evaluate the influences of borehole material conductivity and the source type as well as the effects of well geometry, conductivity contrast, source location, fracture growth, and fracture propagation. Furthermore, the numerical results indicate that the borehole material property has a strong control on the electrical potentials along the production and monitoring wells. The monopole source located at a steel-cased well results in a current density distribution that decays away from the source location throughout the well length, whereas the dipole source produces a current density that dominates mainly along the dipole length. Moreover, the conductivity contrast between the fractures and host does not change the overall pattern of the electrical potentials but varies its amplitude. The fracture models near different well systems indicate that the well geometry controls the entire distribution of potentials, while the characteristics of the voltage difference profiles along the wells before and after fracturing are insensitive to the well geometry and the well in which the source is located. Further, the hydraulic-fracturing models indicate that the voltage differences along the production well before and after fracturing have strong sensitivity to fracture growth and fracture set propagation.
The aim of this study is generation and validation of a proppant log using analysis of drilling mud returns for child wells. Proppant log provides qualitative as well as quantitative insights into spatial distribution of proppant sand particles from prior stimulation of parent wells. While the basic methodology was developed and formalized during analysis of material collected from through fracture cores at Hydraulic Fracturing Test Site in Midland Basin (HFTS – 1), the test wells at HFTS – 2 in the neighboring Delaware Basin allowed the opportunity to validate the workflow on actual mud return samples from subsurface. As a child well is being drilled, periodic mud return samples are collected at the rig site and preserved for analysis. The workflow involves systematic cleaning of the samples including various steps such as washing, drying and segregation of samples into relevant size fractions of interest (< Mesh 20) based on specifications of pumped sand during stimulation of the parent well. Clean samples are imaged using high resolution transparency scanning. Scan images are then systematically analyzed for particles of interest using computer vision techniques. Sample counts are further validated using elemental analysis of smaller sub-samples at various depths of interest. This step is necessary to isolate proppant versus other naturally occurring minerals such as sulphates and carbonates which show similar optical properties. We successfully correlated proppant distribution against the existing parent well and validated propped versus relatively un-propped zones for a child well at the test site. The advantage of testing the proppant log concept at the HFTS – 2 site is the plethora of additional diagnostic data that is available to validate our primary observations. We can correlate spatial proppant distribution against variability in stimulation response based on independent observations such as image logs, microseismic attributes as well as DAS response, all of which tend to corroborate one another. One of our significant successes was being able to describe varying degrees of impact of the parent well along the lateral length of a stimulated child well. Our workflow represents a systematic and one-of-a-kind interpretation of spatial proppant distribution while drilling child wells. This provides unique opportunities to better understand the current state of the Downloaded from http://onepetro.org/URTECONF/proceedings-pdf/21URTC/2-21URTC/D021S031R003/2477415/urtec-2021-5189-ms.pdf/1 by Carol Worster on 28 February 2022 URTeC 5189 2 reservoir being targeted including zones which are likely more drained relative to others and how the planned completion of the child well can be improved. Lastly, this log can be useful is validating optimal well spacing in relatively new fields under development.
This document presents the findings of the 2015 Long Term Monitoring (LTM) that was completed at the Wilson Corners site, located at the National Aeronautics and Space Administration John F. Kennedy Space Center, Florida. The objectives of the 2015 LTM event were to evaluate the groundwater flow direction and gradient, to monitor the vertical and horizontal extent of the volatile organic compounds (VOCs; including the upgradient and sidegradient extents, which are monitored every five years), and to monitor select locations internal to the dissolved groundwater plume. The 2015 LTM event included several upgradient and sidegradient monitoring wells that are not sampled annually to verify the extent of VOCs in this portion of the site. The December 2015 LTM groundwater sampling event included, depth to groundwater measurements, 40 VOC samples collected using passive diffusion bags, and one VOC sample collected using low-flow techniques. Additionally, monitoring well MW0052DD was overdrilled and abandoned using rotasonic drilling techniques. The following conclusions can be made based on the 2015 LTM results: groundwater flow is generally to the west with northwest and southwest flow components from the water table to approximately 55 feet below land surface (ft BLS); peripheral monitoring wells generally delineate VOCs to groundwater cleanup target levels (GCTLs) except for monitoring wells MW0088, MW0090, MW0095, and NPSHMW0039, which had vinyl chloride (VC) concentrations near the GCTL and MW0062, which had trichloroethene (TCE), cis-1,2-dichloroethenen (cDCE), and VC concentrations above natural attenuation default concentrations (NADCs); VOCs in interior downgradient wells generally fluctuate within historic ranges except for monitoring wells in the north-northwest portion of the site, which have increasing VC concentrations indicating potential plume migration and expansion; Historically, the vertical extents of the VOCs were delineated by monitoring wells screened greater than 60 ft BLS (MW0083 through MW0086, and MW0078). The 2015 LTM results indicate that concentrations of daughter product cDCE is greater than the NADC in MW0078 and that cDCE and VC are greater than NADCs in MW0130. TCE was greater than the GCTL in monitoring well MW130 and not detected above method detection limits (9 micrograms per Liter) in monitoring well MW0078. No GCTL exceedances were identified in monitoring wells MW0083 or MW0086; the dissolved plume footprint appears generally stable, though not fully delineated by monitoring well data in the northeast portion of the site; and 2015 LTM results generally support the existing Conceptual Site Model. Geosyntec recommends modifying the LTM program, collecting a verification sample from monitoring well MW0062, and performing a direct push technology instigation in the northnortheastern portion of the site. A cluster of monitoring wells (MW0132 [2 to 12 ft BLS], MW0133 [15 to 25 ft BLS], and MW0134 [29 to 34 ft BLS]) is proposed to delineate impacts in the northnortheast portion of the site. Geosyntec recommends installation of a vertical extent well in the center of the site (Hot Spot 2 area) post-remediation implementation.
The Big Sky Carbon Sequestration Partnership (BSCSP) pursued a Phase III demonstration project at Kevin Dome in north central Montana. Kevin Dome covers approximately 700 square miles and is a naturally occurring CO 2 reservoir that is flanked by oil and gas fields. The carbon dioxide (CO 2 ) is in the upper Devonian Duperow (carbonate) formation and does not reach the spill point of the dome; therefore, the dome has potential as a CO 2 sequestration reservoir, a CO 2 supply, or as both if anthropogenic sources and enhanced oil recovery (EOR) operations are associated with the dome. Kevin Dome could potentially act as a buffer to continue accepting anthropogenic CO 2 when EOR flooding operations are interrupted or completed. The project objective was to produce one million tonnes of CO 2 from the gas cap of Kevin Dome, pipe it laterally, inject, and re-store it in the brine leg of the same formation to test the hub / buffer storage concept. This was to be accomplished by drilling up to five production wells, building a short pipeline and compression facilities, and drilling an injection well and several monitoring wells. BSCSP commenced outreach and site characterization activities including acquiring baseline data for near-surface insurance monitoring, acquiring 3-dimensional, 9-component surface seismic over the project area, drilling two test wells (one in the production area and one in the injection area), coring key intervals, and performing comprehensive logging. Well tests of those wells revealed two barriers to the project. The production (Danielson 33-17) well was perforated in multiple zones but failed to produce any significant CO 2 . This was despite being drilled in the near vicinity of a historic well that had produced 3700 MCF per day in a drill stem test. Modeling indicated that this was likely due to a phase change during production causing a temperature drop resulting in hydrate and/or water ice formation that clogged the formation. Tests of the injection zone (Wallewein 22-1) well indicated total dissolved solids (TDS) slightly below the EPA required 10,000 parts per million (ppm) for a Class VI underground injection control permit. While the project was initiated before Class VI rules were promulgated, and this was an experimental project (seemingly qualified for a Class V permit), the Environmental Protection Agency (EPA) indicated that injection would require a Class VI permit. The low salinity result was unexpected as contours plotted based on regional formation water quality data indicated an expected TDS above 20,000 ppm, and wells between the recharge zone and the Wallewein well tested above 10,000 ppm. Faced with the inability to obtain an injection permit, the demonstration project could not proceed. However, the project had generated valuable samples and data on a large natural analog including 32 sq. mi. of 3-D, 9-C seismic, 430 ft. of carbonate core covering seven different depositional environments taken from areas with, and without the presence of CO 2 , 30 ft. of core of two caprocks, a tight carbonate and an anhydrite, a full set of modern logs on both wells, and well tests. DOE decided to re-scope the project around completing studies utilizing this data. This report covers both the initial scope and the re-scope (Task / Section numbers preceded with an R). While the report covers a wide range of project activities, highlights of this work include: Development of a geostatic model using neural nets to match well logs to facies and using multi-waveform seismic to inform reservoir heterogeneity; Unique mechanical testing of permeability – stress relationship in two caprock materials; Development of full waveform inversion to generate a high resolution velocity model; Model development for dual permeability (fracture and matrix) systems to better account for matrix-matrix interactions; Joint seismic wave inversion (including the first quadr-joint inversion) exhibiting better imaging of a challenging reservoir zone in stiff rock; Core flow and core flood results on a reactive carbonate; and Innovative laboratory measurements of seismic response of fractured core as a function of fluid fill.
This white paper summarizes NASA research results that have informed Special Committee 228 (SC-228) discussions and decisions regarding the inclusion of a warning-level alert within the detect and avoid (DAA) alerting structure for unmanned aircraft systems (UAS). For UAS, the removal of the pilot from onboard the aircraft has eliminated the ability of the ground-based pilot in command (PIC) to use out-the-window visual information to make judgments about a potential threat of a loss of well clear with another aircraft. As a result, the DAA traffic display will be the primary source of information that the PIC can use to execute the three primary well clear functions: 1) detect a potential loss of well clear, 2) determine a resolution maneuver, and 3) upload that maneuver to the aircraft via the ground control station (GCS). In addition, pilots are required to coordinate with air traffic control (ATC) prior to maneuvering off of their approved flight plan. In determining an appropriate resolution maneuver to avoid a loss of well clear, the PIC must decide both when and how to maneuver, and both the timeliness and the accuracy (i.e., correctness) of the maneuver are critical to reducing the likelihood and/or severity of a loss of well clear. Alerting information is one of three critical components of the DAA display, along with traffic information elements (e.g., relative heading, speed and altitude) and maneuver guidance. Alerting information and maneuver guidance, in particular, have been found to have a significant impact, both statistically and practically, on pilots' ability to avoid and minimize the severity of losses of well clear While all three display components are key to pilots performing the traffic avoidance task of remaining well clear, in general, alerting information provides crucial information about when a resolution maneuver is required while maneuver guidance assists the pilot in determining how best to maneuver. A fundamental task of the DAA alerting system is to provide critical timing information to the pilot about the potential for a loss of well clear with another aircraft. This is done by employing both temporal and spatial thresholds that indicate to the pilot the likelihood and imminence of a loss of well clear. The design of the DAA alerting thresholds is a balancing act between eliciting the desired pilot response in real loss of well clear threat events and reducing excessive, unnecessary, and/or uncoordinated UAS maneuvering within the air traffic environment; larger thresholds, both spatially and temporally, may increase the likelihood of a pilot avoiding a loss of well clear, but it can also increase the frequency of maneuvering - especially in cases where a maneuver is not actually needed to maintain well clear. A series of human in the loop (HITL) simulations have been conducted as part of NASA's Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) project. The purpose of these HITLs has been to provide empirical results in order to inform development of the minimum human-machine interface requirements for the DAA system. This white paper will present those results which provide evidence of a human performance benefit (in terms of response times and ability to remain well clear of other aircraft) of the DAA warning alert both with and without a collision avoidance system on board the aircraft.