Task 4 supporting technology. Densification requirements definition and test objectives. Propellant densification requirements definition

The primary challenge of the X-33 CAN is to build and test a prototype LO2 and LH2 densification ground support equipment (GSE) unit, and perform tank thermodynamic testing within the 15 month phase 1 period. The LO2 and LH2 propellant densification system will be scaled for the IPTD LO2 and LH2 tank configurations. The IPTD tanks were selected for the propellant technology demonstration because of the potential benefits to the phase 1 plan: tanks will be built in time to support thermodynamic testing; minimum cost; minimum schedule risk; future testing at MSFC will build on phase 1 data base; and densification system will be available to support X-33 and RLV engine test at IPTD. The objective of the task 1 effort is to define the preliminary requirements of the propellant densification GSE and tank recirculation system. The key densification system design parameters to be established in Task 1 are: recirculation flow rate; heat exchanger inlet temperature; heat exchanger outlet temperature; maximum heat rejection rate; vent flow rate (GN2 and GH2); densification time; and tank pressure level.

Lak, Tibor↗

Error Cost Escalation Through the Project Life Cycle

It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

Stecklein, Jonette M.↗

Supercritical Water Mixture (SCWM) Experiment

The subject presentation, entitled, Supercritical Water Mixture (SCWM) Experiment, was presented at the International Space Station (ISS) Increment 33/34 Science Symposium. This presentation provides an overview of an international collaboration between NASA and CNES to study the behavior of a dilute aqueous solution of Na2SO4 (5% w) at near-critical conditions. The Supercritical Water Mixture (SCWM) investigation, serves as important precursor work for subsequent Supercritical Water Oxidation (SCWO) experiments. The SCWM investigation will be performed in DECLICs High Temperature Insert (HTI) for the purpose of studying critical fluid phenomena at high temperatures and pressures. The HTI includes a completely sealed and integrated test cell (i.e., Sample Cell Unit SCU) that will contain approximately 0.3 ml of the aqueous test solution. During the sequence of tests, scheduled to be performed in FY13, temperatures and pressures will be elevated to critical conditions (i.e., Tc = 374C and Pc = 22 MPa) in order to observe salt precipitation, precipitate agglomeration and precipitate transport in the presence of a temperature gradient without the influences of gravitational forces. This presentation provides an overview of the motivation for this work, a description of the DECLIC HTI hardware, the proposed test sequences, and a brief discussion of the scientific research objectives.

Hicks, Michael C.↗

Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ISS SGANT Group Level Offloading Test Mechanism

The International Space Station (ISS) Space-to-Ground Antenna (SGANT) is used for ISS communication with earth through the Tracking and Data Relay Satellite (TDRSS). Due to the different speeds of travel between earth, ISS and TDRSS, a steerable SGANT was required on the ISS. The mechanical design of SGANT is an unbalanced mechanism with insufficient strength and driving torque to support and drive itself in a 1G environment. For ground testing, a specially designed offloading mechanism is required. Basically, the test mechanism must offload the SGANT in a two-axis operation, allowing the SGANT to move within a specific range, speed and acceleration; therefore the SGANT can move from elevation 0 to 90 deg and be tested at both the 0 and 90 deg positions. The load introduced by the test equipment should be less than 10.17 N-m (7.5 ft-lbf). The on-ground group level tracking test is quite challenging due to the unbalanced antenna mechanical design and tough specification requirements. This paper describes the detailed design, fabrication, and calibration of the test mechanism, and how the above requirements are met. The overall antenna is simplified to a mass model in order to facilitate the offloading mechanism design and analysis. An actual SGANT mass dummy was made to calibrate the system. This paper brings together the theoretical analysis and the industrial experience that were relied upon to meet the above-mentioned requirements for the ground test. The lessons learned during the calibration phase are extremely important for future double or multiple offloading system designs. The ISS SGANT QM and FM units passed their ground test and the SGANT/Boom fit check successfully, and the Flight Model (FM) was delivered to SSPF in April 1998. It is now installed on ISS and functioning well.

Zhang, Xi-Lin↗

The NACA Impact Basin and Water Landing Tests of a Float Model at Various Velocities and Weights

The first data obtained in the United States under the controlled testing conditions necessary for establishing relationships among the numerous parameters involved when a float having both horizontal and vertical velocity contacts a water surface are presented. The data were obtained at the NACA impact basin. The report is confined to a presentation of the relationship between resultant velocity and impact normal acceleration for various float weights when all other parameters are constant. Analysis of the experimental results indicated that the maximum impact normal acceleration was proportional to the square of the resultant velocity, that increases in float weight resulted in decreases in the maximum impact normal acceleration, and that an increase in the flight-path angle caused increased impact normal acceleration.

Batterson, Sidney A↗

Lunar Auger Dryer ISRU (LADI) Mechanical Testing and Supporting Models

In 2009, the Lunar Reconnaissance Orbiter (LRO) and Lunar Crater Observation and Sensing Satellite (LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR). Both the 2020 NASA Technology Taxonomy and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shad-owed Region (PSR) environmental conditions. A water processing plant operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of the primary sub-system for a Mars plant in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both physical flow and thermal models are required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Performance characteristics and statistics of a laser initiated microdetonator

The test results of 320 units of the laser initiated microdetonator are summarized. The commercially fabricated units used a lead styphnate/lead azide/HMX (1 mg/17.5 mg/13.5 mg) explosive train design contained in a miniature aluminum can and completed with a glass-metal seal window. The test parameters were the high and low laser energy, high and low temperature, laser pulse duration, laser wavelength and nuclear radiation (5 x 10 to the 6th rads of 1 MeV gamma ray). The performance parameters were the laser energy for ignition and the actuation response time. Included also is a description of the development of a flexible, continuously advanced train of explosive devices by using the units, miniature optics and fiber optics.

Yang, L. C.↗

The SuperCam Instrument Suite on the Mars 2020 Rover: Science Objectives and Mast-Unit Description

On the NASA 2020 rover mission to Jezero crater, the remote determination of the texture, mineralogy and chemistry of rocks is essential to quickly and thoroughly characterize an area and to optimize the selection of samples for return to Earth. As part of the Perseverance payload, SuperCam is a suite of five techniques that provide critical and complementary observations via Laser-Induced Breakdown Spectroscopy (LIBS), Time-Resolved Raman and Luminescence (TRR/L), visible and near-infrared spectroscopy (VISIR), high-resolution color imaging (RMI), and acoustic recording (MIC). SuperCam operates at remote distances, primarily 2–7 m, while providing data at sub-mm to mm scales. We report on SuperCam’s science objectives in the context of the Mars 2020 mission goals and ways the different techniques can address these questions. The instrument is made up of three separate subsystems: the Mast Unit is designed and built in France; the Body Unit is provided by the United States; the calibration target holder is contributed by Spain, and the targets themselves by the entire science team. This publication focuses on the design, development, and tests of the Mast Unit; companion papers describe the other units. The goal of this work is to provide an understanding of the technical choices made, the constraints that were imposed, and ultimately the validated performance of the flight model as it leaves Earth, and it will serve as the foundation for Mars operations and future processing of the data.

47 OTHER INSTRUMENTATION↗

GTTC Future of Ground Testing Meta-Analysis of 20 Documents

National research, development, test, and evaluation ground testing capabilities in the United States are at risk. There is a lack of vision and consensus on what is and will be needed, contributing to a significant threat that ground test capabilities may not be able to meet the national security and industrial needs of the future. To support future decisions, the AIAA Ground Testing Technical Committee’s (GTTC) “Future of Ground Test” (FoGT) Working Group selected and reviewed 20 “seminal” documents related to the application and direction of ground testing. Each document was reviewed, with the content main points collected and organized into sections in the form of a gap analysis – current state, future state, major challenges/gaps, and recommendations. This paper includes key findings and selected commentary by an editing team.

Dunn, Steven C.↗

Lunar Auger Dryer ISRU (LADI) Breadboard Testing and Model Validation

In 2009, the Lunar Reconnaissance Orbiter (LRO)and Lunar Crater Observation and Sensing Satellite(LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)[1]. Both the 2020 NASA Technology Taxonomy[2] and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region(PSR) environmental conditions. A screw conveyor dryer system operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of a similar sub-system for Mars operation in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study[3] in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both a physical flow and thermal model is required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Lunar Auger Dryer ISRU (LADI) Breadboard Testing and Model Validation

In 2009, the Lunar Reconnaissance Orbiter (LRO)and Lunar Crater Observation and Sensing Satellite(LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)[1]. Both the 2020 NASA Technology Taxonomy[2] and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region(PSR) environmental conditions. A screw conveyor dryer system operating from inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) began development of a similar sub-system for Mars operation in 2017 and fabricated a unique breadboard test stand for validating the feasibility of this concept. This testing was postponed with the redirection of NASA’s mission from Mars to Moon. A JSC led trade study[3] in FY20 formulated a plan to leverage existing hardware to test concept feasibility, developed a lunar auger dryer sizing tool, and identified that both a physical flow and thermal model is required to develop an Engineering Development Unit (EDU) for environmental testing. Beginning in FY21, the Game Changing Development Program (GCDP) funded a three-year technology development project to increase the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) subsystem to TRL 5.

Lunar↗

Light-emitting device test systems

Light-emitting devices, such as LEDs, are tested using a photometric unit. The photometric unit, which may be an integrating sphere, can measure flux, color, or other properties of the devices. The photometric unit may have a single port or both an inlet and outlet. Light loss through the port, inlet, or outlet can be reduced or calibrated for. These testing systems can provide increased reliability, improved throughput, and/or improved measurement accuracy.

36 MATERIALS SCIENCE↗

Phase I Flow and Transport Model Document for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nye County, Nevada, Revision 1 with ROTCs 1 and 2

The Underground Test Area (UGTA) Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, in the northeast part of the Nevada National Security Site (NNSS) requires environmental corrective action activities to assess contamination resulting from underground nuclear testing. These activities are necessary to comply with the UGTA corrective action strategy (referred to as the UGTA strategy). The corrective action investigation phase of the UGTA strategy requires the development of groundwater flow and contaminant transport models whose purpose is to identify the lateral and vertical extent of contaminant migration over the next 1,000 years. In particular, the goal is to calculate the contaminant boundary, which is defined as a probabilistic model-forecast perimeter and a lower hydrostratigraphic unit (HSU) boundary that delineate the possible extent of radionuclide-contaminated groundwater from underground nuclear testing. Because of structural uncertainty in the contaminant boundary, a range of potential contaminant boundaries was forecast, resulting in an ensemble of contaminant boundaries. The contaminant boundary extent is determined by the volume of groundwater that has at least a 5 percent chance of exceeding the radiological standards of the Safe Drinking Water Act (SDWA) (CFR, 2012).

54 ENVIRONMENTAL SCIENCES↗

Extraction, Scrub, and Strip Test Results from The Interim Salt Disposition Program Macrobatch 11 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP). The Salt Batch 11 characterization results were previously reported. An Extraction, Scrub, and Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the Next Generation Solvent (NGS) Blend solvent currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 117. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This cesium removal efficiency is better than the predicted value of 50.8 from a recently created D (Cs) model.

Peters, T.↗

CARETS: A prototype regional environmental information system. Volume 9: Shore zone land use and land cover; Central Atlantic Regional Ecological Test Site

Anderson's 1972 United States Geological Survey classification in modified form was applied to the barrier-island coastline within the CARETS region. High-altitude, color-infrared photography of December, 1972, and January, 1973, served as the primary data base in this study. The CARETS shore zone studied was divided into six distinct geographical regions; area percentages for each class in the modified Anderson classification are presented. Similarities and differences between regions are discussed within the framework of man's modification of these landscapes. The results of this study are presented as a series of 19 maps of land-use categories. Recommendations are made for a remote-sensing system for monitoring the CARETS shore zone within the context of the dynamics of the landscapes studied.

Coastal ecosystems↗