At least 1,333 records · Page 74

Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate

54 ENVIRONMENTAL SCIENCES↗

Geologic CO 2 Sequestration Potential of 42 California Power Plant Sites: A Status Report to WESTCARB

Forty-two California natural gas combined-cycle (NGCC) power plant sites were evaluated for geologic carbon dioxide (CO 2 ) sequestration potential. The following data were collected in order to gauge the sequestration potential of each power plant site: nearest potential CO 2 sink, proximity to oil or gas fi elds, subsurface geology, surface expression of nearby faults, and subsurface water. The data for each site were compiled into a one-page, standalone profi le to serve as a quick reference for future decision-makers. A subset of these data was compiled into a summary table for easy comparison of all 42 sites. Decision-makers will consider the geologic CO 2 sequestration potential of each power plant in concert with its CO 2 capture potential and will select the most suitable sites for a future carbon capture and storage project. Once the most promising sites are selected, Lawrence Livermore National Laboratory (LLNL) will conduct additional geologic research in order to construct a detailed 3D geologic model for those sites.

03 NATURAL GAS↗

Geospatial Optimization of Siting Large-Scale Solar Projects

Recent policy and economic conditions have encouraged a renewed interest in developing large-scale solar projects in the U.S. Southwest. However, siting large-scale solar projects is complex. In addition to the quality of the solar resource, solar developers must take into consideration many environmental, social, and economic factors when evaluating a potential site. This report describes a proof-of-concept, Web-based Geographical Information Systems (GIS) tool that evaluates multiple user-defined criteria in an optimization algorithm to inform discussions and decisions regarding the locations of utility-scale solar projects. Existing siting recommendations for large-scale solar projects from governmental and non-governmental organizations are not consistent with each other, are often not transparent in methods, and do not take into consideration the differing priorities of stakeholders. The siting assistance GIS tool we have developed improves upon the existing siting guidelines by being user-driven, transparent, interactive, capable of incorporating multiple criteria, and flexible. This work provides the foundation for a dynamic siting assistance tool that can greatly facilitate siting decisions among multiple stakeholders.

14 SOLAR ENERGY↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Remediation Radiological Dose Assessment, Linde Site, Tonawanda, New York

A post-remediation radiological dose assessment was conducted for the Formerly Utilized Sites Remedial Action Program (FUSRAP) Linde Site by using the measured residual concentrations of the radionuclides of concern following the completion of the soils remedial action. The site’s FUSRAP-related contaminants of concern (COCs) are radionuclides associated with uranium processing activities conducted by the Manhattan Engineer District (MED) in support of the Nation’s early atomic energy and weapons program and include radium-226 (Ra-226), thorium-230 (Th-230), and total uranium (Utotal). Remedial actions to address Linde Site soils and structures were conducted in accordance with the Record of Decision for the Linde Site, Tonawanda, New York (ROD) (USACE 2000a). In the ROD, the U.S. Army Corps of Engineers (USACE) determined that the cleanup standards found in Title 40, Part 192 of the Code of Federal Regulations (40 CFR Part 192), the standards for cleanup of uranium mill sites designated under the Uranium Mill Tailings Radiation Control Act (UMTRCA), and the Nuclear Regulatory Commission (NRC) standards for decommissioning of licensed uranium and thorium mills, found in 10 CFR Part 40, Appendix A, Criterion 6(6), are Applicable or Relevant and Appropriate Requirements (ARARs) for cleanup of MED-related contamination at the Linde Site. The major elements of this remedy will involve excavation of the soils with COCs above soil cleanup levels and placement of clean materials to meet the other criteria of 40 CFR Part 192.

61 RADIATION PROTECTION AND DOSIMETRY↗

Long-Term Surveillance and Maintenance Plan for the Gnome-Coach, New Mexico, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Long-Term Surveillance and Maintenance Plan (LTSMP) for the Gnome-Coach, New Mexico, Site (the Gnome site). The Gnome site is approximately 25 miles east of Carlsbad in Eddy County, New Mexico (Figure 1). The site was the location of a 3-kiloton-yield underground nuclear test and radioisotope groundwater tracer test. The tests resulted in residual contamination and post-detonation features that require long-term oversight. Long-term responsibility for the site was transferred from the DOE National Nuclear Security Administration Nevada Site Office to LM on October 1, 2006. Responsibilities include surveillance, monitoring, and maintenance of institutional controls (ICs) as part of the long-term stewardship of the site. Long-term stewardship is designed to ensure protection of human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Renewable Energy Zones for Balancing Siting Trade-offs in India

India’s targets of 175 GW of renewable energy capacity by 2022, and 40% generation capacity from non-fossil fuel sources by 2030 will require a rapid and dramatic increase in solar and wind capacity deployment and overcoming its associated economic, siting, and power system challenges. The objective of this study was to spatially identify the amount and quality of wind and utility-scale solar resource potential in India, and the possible siting-related constraints and opportunities for development of renewable resources. Using the Multi-criteria Analysis for Planning Renewable Energy (MapRE) methodological framework, we estimated several criteria valuable for the selection of sites for development for each identified potential "zone", such as the levelized cost of electricity, distance to nearest substation, capacity value (or the temporal matching of renewable energy generation to demand), and the type of land cover. We find that high quality resources are spatially heterogeneous across India, with most wind and solar resources concentrated in the southern and western states, and the northern state of Rajasthan. Assuming India's Central Electricity Regulatory Commission's norms, we find that the range of levelized costs of generation of wind and solar PV resources overlap, but concentrated solar power (CSP) resources can be approximately twice as expensive. Further, the levelized costs of generation vary much more across wind zones than those across solar zones because of greater heterogeneity in the quality of wind resources compared to that of solar resources. When considering transmission accessibility, we find that about half of all wind zones (47%) and two-thirds of all solar PV zones (66%) are more than 25 km from existing 220 kV and above substations, suggesting potential constraints in access to high voltage transmission infrastructure and opportunities for preemptive transmission planning to scale up RE development. Additionally and importantly, we find that about 84% of all wind zones are on agricultural land, which provide opportunities for multiple-uses of land but may also impose constraints on land availability. We find that only 29% of suitable solar PV sites and 15% of CSP sites are within 10 km of a surface water body suggesting water availability as a significant siting constraint for solar plants. Availability of groundwater resources was not analyzed as part of this study. Lastly, given the possible economic benefits of transmission extensions or upgrades that serve both wind and solar generators, we quantified the co-location opportunities between the two technologies and find that about a quarter (28%) of all solar PV zones overlap with wind zones. Using the planning tools made available as part of this study, these multiple siting constraints and opportunities can be systematically compared and weighted to prioritize development that achieves a particular technology target. Our results are limited by the uncertainties associated with the input datasets, in particular the geospatial wind and solar resource, transmission, and land use land cover datasets. As input datasets get updated and improved, the methodology and tools developed through this study can be easily adapted and applied to these new datasets to improve upon the results presented in this study. India is on a path to significantly decarbonize its electricity grid through wind and solar development. A stakeholder-driven, systematic, and integrated planning approach using data and tools such as those highlighted in this study is essential to not only meet the country's RE targets, but to meet them in a cost-effective, and socially and environmentally sustainable way.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nonlinear Time Domain Seismic Soil-Structure Interaction (SSI) Deep Soil Site Methodology Development

Currently the Department of Energy (DOE) and the nuclear industry perform seismic soil-structure interaction (SSI) analysis using equivalent linear numerical analysis tools. For lower levels of ground motion, these tools should produce reasonable in-structure response values for evaluation of existing and new facilities. For larger levels of ground motion these tools likely overestimate the in-structure response (and therefore structural demand) since they do not consider geometric nonlinearities (such as gaping and sliding between the soil and structure) and are limited in the ability to model nonlinear soil behavior. The current equivalent linear SSI (SASSI) analysis approach either joins the soil and structure together in both tension and compression or releases the soil from the structure for both tension and compression. It also makes linear approximations for material nonlinearities and generalizes energy absorption with viscous damping. This produces the potential for inaccurately establishing where the structural concerns exist and/or inaccurately establishing the amplitude of the in-structure responses. Seismic hazard curves at nuclear facilities have continued to increase over the years as more information has been developed on seismic sources (i.e. faults), additional information gathered on seismic events, and additional research performed to determine local site effects. Seismic hazard curves are used to develop design basis earthquakes (DBE) that are used to evaluate nuclear facility response. As the seismic hazard curves increase, the input ground motions (DBE’s) used to numerically evaluation nuclear facility response increase causing larger in-structure response. As ground motions increase so does the importance of including nonlinear effects in numerical SSI models. To include material nonlinearity in the soil and geometric nonlinearity using contact (gaping and sliding) it is necessary to develop a nonlinear time domain methodology. This methodology will be known as, NonLinear Soil-Structure Interaction (NLSSI). In general NLSSI analysis should provide a more accurate representation of the seismic demands on nuclear facilities their systems and components. INL, in collaboration with a Nuclear Power Plant Vender (NPP-V), will develop a generic Nuclear Power Plant (NPP) structural design to be used in development of the methodology and for comparison with SASSI. This generic NPP design has been evaluated for the INL soil site because of the ease of access and quality of the site specific data. It is now being evaluated for a second site at Vogtle which is located approximately 15 miles East-Northeast of Waynesboro, Georgia and adjacent to Savanna River. The Vogtle site consists of many soil layers spanning down to a depth of 1058 feet. The reason that two soil sites are chosen is to demonstrate the methodology across multiple soil sites. The project will drive the models (soil and structure) using successively increasing acceleration time histories with amplitudes. The models will be run in time domain codes such as ABAQUS, LS-DYNA, and/or ESSI and compared with the same models run in SASSI. The project is focused on developing and documenting a method for performing time domain, non-linear seismic soil structure interaction (SSI) analysis. Development of this method will provide the Department of Energy (DOE) and industry with another tool to perform seismic SSI analysis.

58 GEOSCIENCES↗

Nevada National Security Site Environmental Report 2016

This Nevada National Security Site Environmental Report (NNSSER) was prepared to satisfy DOE Order DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to (1) report compliance status with environmental standards and requirements, (2) present results of environmental monitoring of radiological and nonradiological effluents, (3) report estimated radiological doses to the public from releases of radioactive material, (4) summarize environmental incidents of noncompliance and actions taken in response to them, (5) describe the National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Environmental Management System and characterize its performance, and (6) highlight significant environmental programs and efforts. This NNSSER summarizes data and compliance status for calendar year 2016 at the Nevada National Security Site (NNSS) and its two Nevada-based support facilities, the North Las Vegas Facility (NLVF) and the Remote Sensing Laboratory–Nellis (RSL-Nellis). It also addresses environmental restoration (ER) projects conducted at the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). NNSA/NFO directs the management and operation of the NNSS and six sites across the nation. In addition to the NNSA itself, the six sites include two in Nevada (NLVF and RSL-Nellis) and four in other states (RSL-Andrews in Maryland, Livermore Operations in California, Los Alamos Operations in New Mexico, and Special Technologies Laboratory in California). Los Alamos, Lawrence Livermore, and Sandia National Laboratories are the principal organizations that sponsor and implement the nuclear weapons programs at the NNSS. National Security Technologies, LLC (NSTec), is the current Management and Operating contractor accountable for the successful execution of work and ensuring that work is performed in compliance with environmental regulations. The six sites all provide support to enhance the NNSS as a location for its multiple missions. The three major NNSS missions include National Security/Defense, Environmental Management, and Nondefense. The major programs that support these missions are Stockpile Stewardship and Management, Nonproliferation and Counterterrorism, Nuclear Emergency Response, Strategic Partnership Projects, Environmental Restoration, Waste Management, Conservation and Renewable Energy, Other Research and Development, and Infrastructure. The major facilities that support the programs include the U1a Facility, Big Explosives Experimental Facility (BEEF), Device Assembly Facility, Dense Plasma Focus Facility, Joint Actinide Shock Physics Experimental Research Facility, Radiological/Nuclear Countermeasures Test and Evaluation Complex, Nonproliferation Test and Evaluation Complex (NPTEC), Radiological/Nuclear Weapons of Mass Destruction Incident Exercise Site, the Area 5 Radioactive Waste Management Complex (RWMC), and the Area 3 Radioactive Waste Management Site (RWMS).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Classification for Standard Modular Hydropower Development: Characterizing Stream Reaches by Module Need

The objective of site classification for Standard Modular Hydropower (SMH) development is to develop a framework for classifying potential SMH sites in terms useful for informing SMH development, such as module need and module design requirements. While the current vision for SMH has focused on applications for new stream-reach development, these site classifications are equally useful for other applications, such as modular development at non-powered dams and other hydropower co-development opportunities. We used K-means clustering to classify sites (i.e., stream reaches) into clusters (i.e., groups of sites with similar attributes) based on simultaneous consideration of physical and biological attributes of those sites. Stream reaches included were confined to those with mean annual flow > 50 cfs and < 25,000 cfs (~350,000 reaches). Site Classification was conducted separately for six modules: hydroelectric generation, water quality, sediment passage, fish passage, foundation support, and recreation. About 340,000 stream reaches across the contiguous US were classified into 10 groups for each of the 6 different module categories. For each module category, clusters are visualized on US maps and described based on the defining variables that differentiate clusters from each other.

13 HYDRO ENERGY↗

Blast-Wave Characteristics Near Site 300

We have developed a procedure for calculating the maximum high-explosive weight limit for use at Site 300 based on the analysis of the blast-wave propagation behavior in the atmosphere. Both analytical and experimental efforts have been involved in the present work, including a literature search, evaluation of other data, measurements of local weather conditions, and implementation of relevant computational programs. Major results of the present effort are • Comparison of the LLNL data with other data reveals discrepancies, suggesting that local effects, such as weather conditions in the downrange regions, may play a role in affecting the wave-propagation behavior. Our measurements of the local weather conditions indeed show that they differ from those at Site 300. • Analyses of other, newer models and data have resulted in the implementation of relevant computer codes, such as the BLASTO code, to be used at Site 300. • A new procedure for predicting the weight limit at Site 300 has been recommended. This new procedure consists of - Site 300 and local valley weather measurements. - The LAP code. - The BLASTO code. The LAP code is a modified SIPS code and computes the acoustic ray trajectories, including the focus ("caustic") locations, under varying local weather conditions. The BLASTO code calculates the peak overpressure vs distance relationship for a given charge weight and weather condition. Both the LAP code and the BLASTO code have been implemented and are operational at Site 300. Future plans include conducting selective tests to verify the validity of the predictive procedure recommended for Site 300.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Assessment of the Geomechanical Risks Associated with CO 2 Injection at the FutureGen 2.0 Site: Application of the State of Stress Assessment Tool (SOSAT)

This report presents the results of the application of the State of Stress Assessment Tool (SOSAT) on the FutureGen 2.0 data set. SOSAT was developed as part of the National Risk Assessment Partnership (NRAP) project and provides a unique integrated framework for estimating the state of stress probability distribution at a given depth in the subsurface and evaluating the risk of induced shear and tensile failure resulting from the injection of carbon dioxide (CO 2 ). The approach implemented by SOSAT is based on two deterministic and widely used methods of determining the state of stress (i.e., stress polygon and one-dimensional tectonic-elastic approach). These methods have been modified using a probabilistic approach to account for uncertainties in the input parameters. The methodology proposed in SOSAT was demonstrated using the data obtained for the FutureGen 2.0 project located in the Illinois Basin. Although the FutureGen 2.0 project was suspended by the U.S. Department of Energy prior to the start of injection operations, the extensive characterization efforts undertaken at the storage site have yielded a considerable amount of valuable data about this part of the sedimentary basin. The FutureGen 2.0 storage site was designed to accommodate the injection of 1.1 million metric tons of CO 2 per year over a 20-year period. The injection of CO 2 and the associated pressure buildup in the reservoir is expected to alter the state of stress over the course of the injection. These changes in the initial stress state may affect fault stability and potentially lead to the unintentional creation of hydraulic fractures, which could pose a leakage risk if not contained within the reservoir. Assessing these risks is critical to making informed decisions about the characterization, management of the injection operation, and monitoring of the storage site. The data required by SOSAT for the geomechanical assessment of the FutureGen 2.0 site were identified, and the methodology proposed in SOSAT was followed to evaluate the probability of reactivating critically oriented faults or potentially creating hydraulic fractures in the reservoir. The results of the geomechanical analysis performed using the SOSAT led to the following conclusions. 1. The probability distribution of the state of stress indicates significant uncertainties in the magnitude of the maximum horizontal stress S Hmax , while the minimum horizontal stress S hmin is well constrained by the stress measurements conducted during the characterization efforts at the storage site. This uncertainty in the magnitude of S Hmax is a common challenge and has significant implications for geomechanical risk at sites like FutureGen 2.0 where a strike-slip tectonic regime exists. 2. The probability that the Mount Simon reservoir was initially critically stressed is relatively high—25%. When the pore pressure increases to the maximum allowable pressure permitted under the Underground Injection Control Class VI regulation of the FutureGen 2.0 project, the risk of shear failure approaches a probability of 43%. These relatively high probabilities reflect the current state of information about the geomechanical conditions in this part of the Illinois Basin. For future operations in this basin this should be a high characterization priority because it could significantly lower the risk of operations. 3. Based on the maximum injection pressure allowed in the UIC Class VI, the risk of unintentional hydraulic fracturing is limited. The risk of shear failure as determined by SOSAT is based on a very conservative approach assuming that critically oriented faults exist in the subsurface. While no faults have been formally identified at the FutureGen 2.0 site, the results obtained with SOSAT using the FutureGen 2.0 data set highlight the importance of integrating uncertainties in critical parameters to quantify geomechanical risks in a defensible way. Should SOSAT have been available at the time the characterization activities were being planned, more characterization efforts would have been implemented to reduce the uncertainties on the magnitude of the maximum horizontal stress, and to dismiss with confidence the potential existence of a critically-oriented fault in the reservoir (e.g., 3D seismic survey).

54 ENVIRONMENTAL SCIENCES↗

TR acking A erosol C onvection Interations E xpe R iment ( TRACER ): Site Selection for the ARM TRACER Campaign

Three AMF Sites are needed: Main Site for the AMF1 Observatory, an 'ancillary site' to the SW of the city for measurement of air before crossing Houston. A radar site for the CSAPR between the main and ancillary sites, ideally no more than 50km from either site. We are making preliminary evaluations of sites for tethered balloon system (TBS) activities.

54 ENVIRONMENTAL SCIENCES↗

Composite Analysis Solid Waste Release Data Reduction of Activity Flux from Waste Sites to the Vadose Zone for Baseline Assessment

This environmental calculation file (ECF) describes the data reduction methodology for the solid waste release datasets generated by the Composite Analysis Solid Waste Release (CASWR) model (CP-62766, Model Package Report: Composite Analysis Solid Waste Release Model [CASWR Model]) and documents the resulting reduced datasets for the updated Composite Analysis (CA) baseline assessment. This ECF is in support of the updated Hanford Site CA. The purpose of the updated Hanford Site CA is to provide an estimate of the cumulative radiological impacts from active and planned low-level radioactive waste disposals and other potentially interacting radioactive waste disposal sources that will remain following Hanford Site closure. The vadose zone modeling activities associated with the CA includes solid waste forms as contaminant sources. To support the modeling of solid waste transport from the vadose zone to the groundwater at the Hanford Site, the CASWR model was designed to generate deterministic radionuclide release rates for the Hanford Site Central Plateau solid waste disposal sites. The complete CASWR model-generated dataset for the CA Baseline Assessment consists of 2,378,831 sets of time and release rates (1,073,869 sets for the 200 East Area and 1,304,962 sets for the 200 West Area), representing a course of the simulation from year 1953 to year 12,069, 16 radiological contaminants of potential concern (COPCs), and 237 solid waste sources as documented in ECFHANFORD- 19-0112, Solid Waste Release Calculations for the Composite Analysis Baseline Assessment. For several of the STOMP vadose zone models, the number of release rate data pairs required for release at all waste sites would exceed the limitations imposed by the STOMP modelling software package used to simulate contaminant transport through the vadose zone. As a result, a data reduction of the CASWR dataset is required prior to its use as a source input for the CA vadose zone modeling activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Containment and Geomechanical Risks at Integrated Mid-Content Stacked Carbon Storage Hub Sites

The U.S. Department of Energy is leading the development of CCS through collaborative projects and programs to not only develop and demonstrate the technology but to also quantify the risks and provide tools that site operators can use to develop a site-specific understanding of their risk to enable successful project operations. This report summarizes results and findings from the application of risk-assessment tools to an industrial-scale Geologic Carbon Storage (GCS) project. Specifically, we applied the National Risk Assessment Partnership’s (NRAP) Open Integrated Assessment Model (NRAP-Open-IAM) and State of Stress Assessment Tool (SOSAT) to two candidate sites being considered for storage by the Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-Hub) project team. These sites, Sleepy Hollow Field in Nebraska and Patterson Field in Kansas, have historical oil and gas production and thus are attractive candidates to store the 50 million metric tons (Mt), which is the CarbonSAFE objective. Because these sites have historical operations, they have a significant number of existing wells that pose a risk for well leakage. Additionally, the storage formations will undergo significant pore pressure perturbation (i.e., increase due to CO 2 injection). Hence, we have selected the two NRAP tools best suited to study the risks associated with well leakage and geomechanical risks. The objective of the study was not only to assess the risk at the site, but to also improve the NRAP tools through application using real site data on an ongoing project.

54 ENVIRONMENTAL SCIENCES↗

Valley Elderberry Longhorn Beetle Surveys at the Lawrence Livermore National Laboratory - Site 300

This report describes the results of a visual survey conducted in 2020 to determine the potential presence of the federally listed Threatened Valley elderberry longhorn beetle (VELB; Desmocerus californicus dimorphus) and the quantity and quality of its host plant, blue elderberry (Sambucus nigra ssp. caerulea) on the Lawrence Livermore National Laboratory's (LLNL) Experimental Test Site, known as Site 300. In addition, an area located immediately southeast of Site 300, which is owned and managed by the California Department of Fish and Wildlife (CDFW), but secured by LLNL, was also included in this survey. This report will refer to the survey areas as the LLNL-Site 300 and the CDFW site. The 2020 survey included mapping the locations of elderberry plants that were observed using a global positioning system (GPS) to obtain positional coordinates for every elderberry plant at Site 300 and the CDFW site. In addition, observations of VELB emergence holes on elderberry plants were also mapped using GPS.

54 ENVIRONMENTAL SCIENCES↗

Small Mammal Trapping Survey for the Lawrence Livermore National Laboratory Site 300 and Corral Hollow Ecological Reserve

ECORP Consulting, Inc. conducted a nocturnal small mammal trapping survey within Lawrence Livermore National Laboratory’s (LLNL) Site 300 and the adjacent California Department of Fish and Wildlife (CDFW) Corral Hollow Ecological Reserve. Both sites are located east of the City of Livermore and southwest of the City of Tracy, Alameda and San Joaquin Counties, California (Figure 1-1). A small mammal trapping survey of the project site was conducted in 2002 in preparation for the 2005 LLNL Site-Wide Environmental Impact Statement (SWEIS; Jones & Stokes 2003). The San Joaquin pocket mouse (Perognathus inornatus) was the only special-status species (federal species of concern) captured on Site 300 during the study (West and Woollett 2003). However, since then P. inornatus was taxonomically split into separate subspecies and the pocket mouse species identified on Site 300 in 2002 is no longer considered a special-status species. The 2002 survey also captured woodrats, but identification of the subspecies was not possible. Further investigation was necessary to determine if the woodrat species on the project site was the federally listed (endangered) riparian (San Joaquin Valley) woodrat (Neotoma macrotis riparia [Formerly described as Neotoma fuscipes riparia]), the common Diablo Range woodrat (N. f. perplexa), or another form.

54 ENVIRONMENTAL SCIENCES↗

2021 Idaho National Laboratory Site Environmental Report

The INL Site’s operations, as well as the ongoing cleanup, necessarily involve a commitment to environmental stewardship and full compliance with environmental protection laws. As part of this commitment, the INL Site Environmental Report is prepared annually to inform the public, regulators, stakeholders, and other interested parties of the INL Site’s environmental performance during the year. This report is published for the DOE-ID in compliance with DOE O 231.1B, “Environment, Safety and Health Reporting.” Its purpose is to: • Present the INL Site, mission, and programs • Report compliance status with applicable federal, state, and local regulations • Describe the INL Site environmental programs and activities • Summarize results of environmental monitoring • Discuss potential radiation doses to the public residing in the vicinity of the INL Site • Report on ecological monitoring and research conducted by contractors and affiliated agencies and by independent researchers through the Idaho National Environmental Research Park • Describe quality assurance methods used to ensure confidence in monitoring data • Provide supplemental technical data and reports that support the INL Site Environmental Report (https://idahoeser.inl.gov/publications.html).

99 GENERAL AND MISCELLANEOUS↗