A multi-satellite orbit determination problem in a parallel processing environment

The Engineering Orbit Analysis Unit at GE Valley Forge used an Intel Hypercube Parallel Processor to investigate the performance and gain experience of parallel processors with a multi-satellite orbit determination problem. A general study was selected in which major blocks of computation for the multi-satellite orbit computations were used as units to be assigned to the various processors on the Hypercube. Problems encountered or successes achieved in addressing the orbit determination problem would be more likely to be transferable to other parallel processors. The prime objective was to study the algorithm to allow processing of observations later in time than those employed in the state update. Expertise in ephemeris determination was exploited in addressing these problems and the facility used to bring a realism to the study which would highlight the problems which may not otherwise be anticipated. Secondary objectives were to gain experience of a non-trivial problem in a parallel processor environment, to explore the necessary interplay of serial and parallel sections of the algorithm in terms of timing studies, to explore the granularity (coarse vs. fine grain) to discover the granularity limit above which there would be a risk of starvation where the majority of nodes would be idle or under the limit where the overhead associated with splitting the problem may require more work and communication time than is useful.

Deakyne, M. S.↗

FY 1991 safety program status report

In FY 1991, the NASA Safety Division continued efforts to enhance the quality and productivity of its safety oversight function. Recent initiatives set forth in areas such as training, risk management, safety assurance, operational safety, and safety information systems have matured into viable programs contributing to the safety and success of activities throughout the Agency. Efforts continued to develop a centralized intra-agency safety training program with establishment of the NASA Safety Training Center at the Johnson Space Center (JSC). The objective is to provide quality training for NASA employees and contractors on a broad range of safety-related topics. Courses developed by the Training Center will be presented at various NASA locations to minimize travel and reach the greatest number of people at the least cost. In FY 1991, as part of the ongoing efforts to enhance the total quality of NASA's safety work force, the Safety Training Center initiated development of a Certified Safety Professional review course. This course provides a comprehensive review of the skills and knowledge that well-rounded safety professionals must possess to qualify for professional certification. FY 1992 will see the course presented to NASA and contractor employees at all installations via the NASA Video Teleconference System.

Source record↗

Towards a Mars base - Critical steps for life support on the moon and beyond

In providing crew life support for future exploration missions, overall exploration objectives will drive the life support solutions selected. Crew size, mission tasking, and exploration strategy will determine the performance required from life support systems. Human performance requirements, for example, may be offset by the availability of robotic assistance. Once established, exploration requirements for life support will be weighed against the financial and technical risks of developing new technologies and systems. Other considerations will include the demands that a particular life support strategy will make on planetary surface site selection, and the availability of precursor mission data to support EVA and in situ resource recovery planning. As space exploration progresses, the diversity of life support solutions that are implemented is bound to increase.

Rummel, John D.↗

Systems Integration Processes for NASA's Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable low earth orbit. This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and non-propulsion elements within NASA's Crew Launch Vehicle (CLV). The objective of the CLV is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to Low Earth Orbit (LEO) in support of the lunar and Mars missions. The CLV must successfully provide the capability within cost and schedule with an acceptable risk approach. This paper will describe in detail the systems engineering management processes that will be applied to assure CLV Project success through complete and efficient technical integration. Discussion of specific processes for requirements development and verification, integrated design and analysis, integrated simulation and testing and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The CLV Project is broken logically into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these CLV elements and among the other Constellation projects. Launch vehicle stack integration (CLV to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage will also be discussed. The processes for decomposing requirements to the Elements and ensuring that requirements have been correctly validated, decomposed, allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements will be discussed.

Reuter, James L.↗

Systems Integration Processes for NASA Ares I Crew Launch Vehicle

NASA's Exploration Initiative will require development of many new elements to constitute a robust system of systems. New launch vehicles are needed to place cargo and crew in stable Low Earth Orbit (LEO). This paper examines the systems integration processes NASA is utilizing to ensure integration and control of propulsion and nonpropulsion elements within NASA's Crew Launch Vehicle (CLV), now known as the Ares I. The objective of the Ares I is to provide the transportation capabilities to meet the Constellation Program requirements for delivering a Crew Exploration Vehicle (CEV) or other payload to LEO in support of the lunar and Mars missions. The Ares I must successfully provide this capability within cost and schedule, and with an acceptable risk approach. This paper will describe the systems engineering management processes that will be applied to assure Ares I Project success through complete and efficient technical integration. Discussion of technical review and management processes for requirements development and verification, integrated design and analysis, integrated simulation and testing, and the integration of reliability, maintainability and supportability (RMS) into the design will also be included. The Ares I Project is logically divided into elements by the major hardware groupings, and associated management, system engineering, and integration functions. The processes to be described herein are designed to integrate within these Ares I elements and among the other Constellation projects. Also discussed is launch vehicle stack integration (Ares I to CEV, and Ground and Flight Operations integration) throughout the life cycle, including integrated vehicle performance through orbital insertion, recovery of the first stage, and reentry of the upper stage. The processes for decomposing requirements to the elements and ensuring that requirements have been correctly validated, decomposed, and allocated, and that the verification requirements are properly defined to ensure that the system design meets requirements, will be discussed.

Taylor, James L.↗

Environmentally-Preferable Launch Coatings

The Ground Systems Development and Operations (GSDO) Program at NASA Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion protecting coatings for launch facilities and ground support equipment (GSE). The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. The project compares coating performance of the selected alternatives to existing coating systems or standards.

ground support equipment↗

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

Exploration Blueprint: Data Book

The material contained in this report was compiled to capture the work performed by the National Aeronautics and Space Administration's (NASA's) Exploration study team in the late 2002 timeframe. The "Exploration Blueprint Data Book" documents the analyses and findings of the 90-day Agency-wide study conducted from September - November 2002. During the summer of 2002, the NASA Deputy Administrator requested that a study be performed with the following objectives: - Develop the rationale for exploration beyond low-Earth orbit - Develop roadmaps for how to accomplish the first steps through humans to Mars - Develop design reference missions as a basis for the roadmaps - Make recommendations on what can be done now to effect this future This planning team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond LEO through the human exploration of Mars. The previous NASA Exploration Team activities laid the foundation and framework for development of NASA's Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the "Stepping Stone" approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low-Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars.

Bret G Drake↗

Process Optimization and Modeling for Minerals Sustainability (PrOMMiS) v1.0.0

The U.S. Department of Energy's ("DOE") Process Optimization and Modeling for Minerals Sustainability project ("PrOMMiS Project") was initiated in 2023 to transform the national Critical Minerals and Rare Earth Elements (CM & REE) landscape, thereby supporting DOE's three enduring strategic objectives: security, economic competitiveness, and environmental responsibility. To address this initiative, the PrOMMiS Project will develop, demonstrate, and deploy an open-source, advanced system modeling, optimization, and analysis application ("PrOMMiS Software Application") that will support industry decision-makers by accelerating the scale-up of novel CM & REE technologies by de-risking the development and deployment of commercial scale processes and maximizing learning throughout the development cycle.

Beattie, KeithS [Lawrence Berkeley National Labora↗

Noble Metals Testing on the DM1200 Pilot Melter System with AZ-101 HLW Simulants, VSL-03R3740-2, Rev. 0

This report documents the results obtained with respect to the behavior of noble metals in tests on the DM1200 HLW Pilot Melter during processing of simulated HLW AZ-101 feed. The principal objective of these tests was to collect data to determine the extent of retention of noble metals in the melter since that is an important uncertainty in determining the expected life of the WTP HLW melter. The present results constitute one part of an integrated testing strategy that has been developed to address this risk.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Probabilistic load simulation: Code development status

The objective of the Composite Load Spectra (CLS) project is to develop generic load models to simulate the composite load spectra that are included in space propulsion system components. The probabilistic loads thus generated are part of the probabilistic design analysis (PDA) of a space propulsion system that also includes probabilistic structural analyses, reliability, and risk evaluations. Probabilistic load simulation for space propulsion systems demands sophisticated probabilistic methodology and requires large amounts of load information and engineering data. The CLS approach is to implement a knowledge based system coupled with a probabilistic load simulation module. The knowledge base manages and furnishes load information and expertise and sets up the simulation runs. The load simulation module performs the numerical computation to generate the probabilistic loads with load information supplied from the CLS knowledge base.

Newell, J. F.↗

Further Developments in Modeling Creep Effects Within Structural SiC/SiC Components

Anticipating the implementation of advanced SiC/SiC composites into turbine section components of future aero-propulsion engines, the primary objective of this on-going study is to develop physics-based analytical and finite-element modeling tools to predict the effects of constituent creep on SiC/SiC component service life. A second objective is to understand how to possibly manipulate constituent materials and processes in order to minimize these effects. Focusing on SiC/SiC components experiencing through-thickness stress gradients (e.g., airfoil leading edge), prior NASA creep modeling studies showed that detrimental residual stress effects can develop globally within the component walls which can increase the risk of matrix cracking. These studies assumed that the SiC/SiC composites behaved as isotropic viscoelastic continuum materials with creep behavior that was linear and symmetric with stress and that the creep parameters could be obtained from creep data as experimentally measured in-plane in the fiber direction of advanced thin-walled 2D SiC/SiC panels. The present study expands on those prior efforts by including constituent behavior with non-linear stress dependencies in order to predict such key creep-related SiC/SiC properties as time-dependent matrix stress, constituent creep and content effects on composite creep rates and rupture times, and stresses on fiber and matrix during and after creep.

Lang, Jerry↗

A Review of the MLAS Parachute Systems

The NASA Engineering and Safety Center (NESC) is developing the Max Launch Abort System (MLAS) as a risk-mitigation design should problems arise with the baseline Orion spacecraft launch abort design. The Max in MLAS is dedicated to Max Faget, the renowned NASA spacecraft designer. The MLAS flight test vehicle consists of boost skirt, coast skirt and the MLAS fairing which houses a full scale boilerplate Orion Crew Module (CM). The objective of the flight test is to prove that the CM can be released from the MLAS fairing during pad abort conditions without detrimental recontact between the CM and fairing, achieving performance similar to the Orion launch abort system. The boost and coast skirts provide the necessary thrust and stability to achieve the flight test conditions and are released prior to the test -- much like the Little Joe booster was used in the Apollo Launch Escape System tests. To achieve the test objective, two parachutes are deployed from the fairing to reorient the CM/fairing to a heatshield first orientation. The parachutes then provide the force necessary to reduce the total angle of attack and body angular rates required for safe release of the CM from the fairing. A secondary test objective after CM release from the fairing is to investigate the removal of the CM forward bay cover (FBC) with CM drogue parachutes for the purpose of attempting to synchronously deploying a set of CM main parachutes. Although multiple parachute deployments are used in the MLAS flight test vehicle to complete its objective, there are only two parachute types employed in the flight test. Five of the nine parachutes used for MLAS are 27.6 ft D(sub 0) ribbon parachutes, and the remaining four are standard G-12 cargo parachutes. This paper presents an overview of the 27.6 ft D(sub 0) ribbon parachute system employed on the MLAS flight test vehicle for coast skirt separation, fairing reorientation, and as drogue parachutes for the CM after separation from the fairing. Discussion will include: the process used to select this design, previously proven as a spin/stall recovery parachute; descriptions of all components of the parachute system; the minor modifications necessary to adapt the parachute to the MLAS program; the techniques used to analyze the parachute for the multiple roles it performs; a discussion of the rigging techniques used to interface the parachute system to the vehicle; and a brief description of how the evolution of the program affected parachute usage and analysis. An overview of the Objective system, rationale for the MLAS approach and the future of the program will also be presented. We hope to have flight test results to report at the time of the Conference Presentation.

Taylor, Anthony P.↗

A Primary Care Approach to the Diagnosis and Management of Peripheral Arterial Disease

The objectives of this work are: (1) Be able to recognize characteristic symptoms of intermittent claudication (2) Diagnose PAD on the basis of history, physical exam, and simple limb blood pressure measurements (3) Recognize the significance of peripheral artery disease as a marker for coronary or cerebrovascular atherosclerosis (4) Provide appropriate medical management of atherosclerosis risk factors-- including use of antiplatelet therapy to reduce risk of myocardial infarction, stroke and death (5) Manage symptoms of intermittent claudication with program of smoking cessation, exercise, and medication The diagnosis of intermittent claudication secondary to peripheral artery disease (PAD) can often be made on the basis of history and physical examination. Additional evaluation of PAD is multi-modal and the techniques used will vary depending on the nature and severity of the patient's presenting problem. Most patients can be appropriately managed without referral for specialized diagnostic services or interventions.

Dawson, David L.↗

High Current ESD Test of Advanced Triple Junction Solar Array Coupon

Testing was conducted on an Advanced Triple Junction (ATJ) coupon that was part of a risk reduction effort in the development of a high-powered solar array design by Space Systems Loral, LLC (SSL). The ATJ coupon was a small, 4-cell, two-string configuration of flight-type design that has served as the basic test coupon design used in previous SSL environmental aging campaigns. The objective of the present test was to evaluate the performance of the coupon after being subjected to induced electrostatic discharge (ESD) testing at two string voltages (100 V, 150 V) and four string currents (1.65 A, 2.0 A, 2.475 A, and 3.3 A). An ESD test circuit, unique to SSL solar array design, was built that simulates the effect of missing cells and strings in a full solar panel with special primary arc flashover circuitry. A total of 73 primary arcs were obtained that included 7 temporary sustained arcs (TSA) events. The durations of the TSAs ranged from 50 micro-seconds to 2.75 milli-seconds. All TSAs occurred at a string voltage of 150 V. Post-ESD functional testing showed that no degradation occurred due to the TSA events. These test results point to a robust design for application to a high-current, high-power mission.

Wright, Kenneth H., Jr.↗

EVA Health and Human Performance Benchmarking Study

Multiple HRP Risks and Gaps require detailed characterization of human health and performance during exploration extravehicular activity (EVA) tasks; however, a rigorous and comprehensive methodology for characterizing and comparing the health and human performance implications of current and future EVA spacesuit designs does not exist. This study will identify and implement functional tasks and metrics, both objective and subjective, that are relevant to health and human performance, such as metabolic expenditure, suit fit, discomfort, suited postural stability, cognitive performance, and potentially biochemical responses for humans working inside different EVA suits doing functional tasks under the appropriate simulated reduced gravity environments. This study will provide health and human performance benchmark data for humans working in current EVA suits (EMU, Mark III, and Z2) as well as shirtsleeves using a standard set of tasks and metrics with quantified reliability. Results and methodologies developed during this test will provide benchmark data against which future EVA suits, and different suit configurations (eg, varied pressure, mass, CG) may be reliably compared in subsequent tests. Results will also inform fitness for duty standards as well as design requirements and operations concepts for future EVA suits and other exploration systems.

Abercromby, A. F.↗

Sustaining Thermal Protection Systems Needed for Uranus Probes

Summary: Achieving Uranus in-situ science objectives through deploying probes in the atmosphere requires thermal protection systems capable of withstanding extreme entry environments. NASA’s 3-D Woven based thermal protection systems (TPS), developed specifically to meet this challenge, are mature, efficient, and capable of withstanding such entry. These science-enabling capabilities need to be sustained, otherwise mission implementation risk may increase to the point that the mission is untenable. The heatshield technology has been developed in concert with industry, and manufacturing processes have been technology transferred. Current technology readiness does not guarantee future availability. Sustainment requires maintaining expertise within NASA as well as ensuring that proven industrial expertise and capabilities will be readily available in the future. A constant awareness and risk assessment followed by risk mitigation are required. The scientific community needs to be aware of these challenges. It needs to engage NASA to ensure these capabilities will be available when needed. As was the case with the atrophy of heritage carbon phenolic that led to developing the 3-D Woven capabilities, our vigilance is again needed to sustain these enabling TPS capabilities for Uranus and for other missions. Background: NASA invested in and developed Heatshield for Extreme Entry Environment Technology (HEEET) TPS that was matured to TRL 6 in 2019 as a tiled system with seams and gap-fillers. Manufacturing readiness included development of specialized looms, molding, and infusion processes using commercial partners. In support of the Mars Sample Return mission, a single-layer, seamless, single-piece variant referred to as 3MDCP (3-D woven Mid-Density Carbon-Phenolic) was developed and is limited to a 1.3m maximum diameter scale due to weaving width limitations of 80”. Molding techniques developed to transform a flat, 2”-thick 3-D woven preform into a sphere-cone shape prior to phenolic resin infusion has been demonstrated. A team at NASA Ames is currently working with industry to demonstrate infusion at full-scale. By 2026, 3MDCP will be at a high level of maturity in technical, manufacturing, and integration readiness as well as material characterization. HEEET and 3MDCP for Uranus Entry: Several system studies have evaluated and baselined 3-D Woven TPS for Uranus entry, both HEEET as well as 3MDCP. If the aeroshell carrying the descent probe is 1.3m or less, then 3MDCP is a very capable and the most mass-efficient choice. If the aeroshell is bigger than 1.3m diameter, then HEEET can meet the mission need as it allows for an aeroshell of any diameter. HEEET and 3MDCP are capable of Saturn in-situ science missions prioritized in the New Frontiers-5 draft Announcement of Opportunity (AO) and if Saturn is the mission of choice, there is a pathway for sustaining the capability. Capability Sustainment: Given NASA’s current budgetary constraints, the postponement of the next New Frontiers AO to no earlier than 2026 and the unknown delay in starting the UOP flagship effort point to potential gap years for the HEEET and 3MDCP capabilities. The first step in capability sustainment is to understand the risks as they emerge, assess those risks, and develop plans to mitigate them. Keeping the science community, who are interested in UOP as well as the larger Giant Planet missions, informed of the emerging challenges requires continuous risk assessment/mitigation. Without these steps, atrophy is more likely within the industrial partners with which NASA has partnered. This presentation will provide more details as well as steps NASA can take to minimize the impact to the UOP mission.

Ethiraj Venkatapathy↗

An Approach to Dynamic Human Reliability Analysis and Its Data Collection Framework

Human reliability analysis (HRA) is a method for evaluating human errors in a variety of complex systems such as nuclear power plants, military systems, aircraft, and chemical plants. Most HRA methods currently used by regulatory institutes or utilities are called static HRA and are carried out by simple worksheets or simple calculators. To date, there are many unsolved or intrinsic challenges in static HRA. For example, existing static HRA does not realistically model and evaluate human actions as they would be performed at actual systems. There is no method with HRA to objectively estimate the time required for human actions despite being essential to HRA processes. In addition, many HRA methods still rely on a dataset generated prior to the 1980s, from unrelated industry experience or simply from expert judgment. Accordingly, this study attempted to research how to overcome the challenges of existing HRA via dynamic risk assessment (a.k.a., simulation-based or computation-based risk assessment) techniques. First, this study developed a dynamic HRA method, named as PRocedure-based Investigation Method of EMRALD Risk Assessment – HRA (PRIMERA-HRA). The PRIMERA-HRA mainly concentrates on providing HRA analysts with specific guidelines on how to reasonably model human actions, assign human reliability data and evaluate output of simulation within a dynamic probabilistic risk assessment tool, called as Event Modeling Risk Assessment using Linked Diagrams (EMRALD). Second, this study also developed a module for performance shaping factors (i.e., the key concept in HRA quantification) applicable to dynamic HRA, then implemented it based on PRIMERA-HRA within the EMRALD tool. Third, this study developed an HRA data collection framework to support dynamic HRA, called as Simplified Human Error Experimental Program (SHEEP). Originally, the SHEEP study aimed to support static HRA and its data collection, but recently extended the scope to the new technologies such as dynamic HRA or HRA for advanced reactors. SHEEP focuses on the use of data collected from simplified simulators to complement—but not replace—data collection studies using full-scope simulators and actual operators. To date, many experiments were conducted under the SHEEP framework. Multiple analyses, such as human performance analysis, human error analysis, task complexity analysis, learning effect analysis and time distribution analysis, were also carried out using the collected data. Then, based on the major insights, an approach to inferring full-scope data based on simplified simulator data was proposed. The PRIMERA-HRA and SHEEP research are expected to evaluate human actions more realistically than existing static HRA, provide an opportunity to collect more HRA data with reasonable cost and labor, then contribute to enhance the quality of HRA.