Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “meter, test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Wind-tunnel measurements and comparison with flight of the boundary layer and heat transfer on a hollow cylinder at Mach 3

The wind tunnel tests were conducted both with and without boundary layer trips at Mach 3 and nominal free stream Reynolds numbers per meter ranging from 3.3 x 10 the 6th power. Instrumentation consisted of pressure orifices, thermocouples, a boundary layer pitot pressure rake, and a floating element skin friction balance. Measurements from both wind tunnel and flight were compared with existing engineering prediction methods.

Stallings, R. L., Jr.↗

Development of a high altitude Spin Parachute

A specially configured 16.6 foot (5.1 meter) Disc Gap Band (DGB) Spin Parachute has been designed, developed, integrated with a sounding rocket, and qualified by flight testing. Design requirements include (1) stable parachute should successfully deploy in the altitude region of 260,000 feet (80 kilometers) from a Super Arcas launch vehicle; (2) after deployment, parachute and payload spin rate should be greater than three rpm; (3) four electric field sensors should be mounted on parachute shroud lines and have provisions to be electrically connected to the suspended payload; and (4) time above 100,000 feet (30 kilometers) should exceed five minutes. The successful meeting of these requirements provided the first known high-altitude deployment of a Spin Parachute.

Silbert, M. N.↗

Flow improvements in the NASA Langley 4- by 7-meter tunnel circuit

The mean velocity profiles in both the horizontal and vertical planes of symmetry at specific locations throughout the tunnel circuit to identify the most promising means for improving the flow in the 4 by 7 meter wind tunnel were measured. In the base line tunnel flow surveys, the flow patterns near the end of the test section indicate a uniform mean velocity distribution. Downstream of the test section, unsymmetrical flow patterns result in low velocities along the inner walls and in flow separation along the inner wall of the diffuser upstream of the drive fan and along the outer wall of the large diffuser downstream of the drive fan. A set of trailing-edge flaps attached to the five flow-control vanes located just downstream of the first corner were installed. These flaps are successful in making the tunnel flow more symmetrical and in eliminating the regions of separation in the diffusers upstream and downstream of the drive fan. Previously announced in STAR as N84-15117

Applin, Z. T.↗

Resonant AC power system proof-of-concept test program

Proof-of-concept testing was performed on a 20-kHz, resonant power system breadboard from 1981 through 1985. The testing began with the evaluation of a single, 1.0-kW resonant inverter and progressed to the testing of breadboard systems with higher power levels and more capability. The final breadboard configuration tested was a 25.0-kW breadboard with six inverters providing power to three user-interface modules over a 50-meter, 20-kHz bus. The breadboard demonstrated the ability to synchronize multiple resonant inverters to power a common bus. Single-phase and three-phase 20-kHz power distribution was demonstrated. Simple conversion of 20-kHz to dc and variable-frequency ac was demonstrated as was bidirectional power flow between 20-kHz and dc. Steady state measurements of efficiency, power-factor tolerance, and conducted emissions and conducted susceptibility were made. In addition, transient responses were recorded for such conditions as start up, shut down, load changes. The results showed the 20-kHz resonant system to be a desirable technology for a spacecraft power management and distribution system with multiple users and a utility-type bus.

Wappes, Loran J.↗

Experimental Heat Transfer and Bulk Air Temperature Measurements for a Multipass Internal Cooling Model with Ribs and Bleed

An experimental study was made to obtain heat transfer and air temperature data for a simple 3-leg serpentine test section that simulates a turbine blade internal cooling passage with trip strips and bleed holes. The objectives were to investigate the interaction of ribs and various bleed conditions on internal cooling and to gain a better understanding of bulk air temperature in an internal passage. Steady state heat transfer measurements were obtained using a transient technique with thermochromic liquid crystals. Trip strips were attached to one wall of the test section and were located either between or near the bleed holes. The bleed holes, used for film cooling, were metered to simulate the effect of external pressure on the turbine blade. Heat transfer enhancement was found to be greater for ribs near bleed holes compared to ribs between holes, and both configurations were affected slightly by bleed rates upstream. Air temperature measurements were taken at discreet locations along one leg of the model. Average bulk air temperatures were found to remain fairly constant along one leg of the model.

Thurman, Douglas↗

Experimental Heat Transfer and Bulk Air Temperature Measurements for a Multipass Internal Cooling Model with Ribs and Bleed

An experimental study was made to obtain heat transfer and air temperature data for a simple three-leg serpentine test section that simulates a turbine blade internal cooling passage with trip strips and bleed holes. The objectives were to investigate the interaction of ribs and various bleed conditions on internal cooling and to gain a better understanding of bulk air temperature in an internal passage. Steady-state heat transfer measurements were obtained using a transient technique with thermochromic liquid crystals. Trip strips were attached to one wall of the test section and were located either between or near the bleed holes. The bleed holes, used for film cooling, were metered to simulate the effect of external pressure on the turbine blade. Heat transfer enhancement was found to be greater for ribs near bleed holes compared to ribs between holes, and both configurations were affected slightly by bleed rates upstream. Air temperature measurements were taken at discrete locations along one leg of the model. Average bulk air temperatures were found to remain fairly constant along one leg of the model.

Thurman, Douglas↗

In Situ Measurement of Aerosol Extinction

Aerosols are important contributors to the radiative forcing in the atmosphere. Much of the uncertainty in our knowledge of climate forcing is due to uncertainties in the radiative forcing due to aerosols as illustrated in the IPCC reports of the last ten years. Improved measurement of aerosol optical properties, therefore, is critical to an improved understanding of atmospheric radiative forcing. Additionally, attempts to reconcile in situ and remote measurements of aerosol radiative properties have generally not been successful. This is due in part to the fact that it has been impossible to measure aerosol extinction in situ in the past. In this presentation we introduce a new instrument that employs the techniques used in cavity ringdown spectroscopy to measure the aerosol extinction and scattering coefficients in situ. A prototype instrument has been designed and tested in the lab and the field. It is capable of measuring aerosol extinction coefficient to 2x10(exp -6) per meter. This prototype instrument is described and results are presented.

Strawa, Anthony W.↗

The Swift Gamma Ray Burst Mission

Swift is an international mission managed by NASA as part of its MIDEX program. It is a multiwavelength transient observatory for GRB astronomy that will launch in 2004. The goals of the mission are to determine the origin of GRBs and their afterglows and use bursts to probe the early Universe. A wide field gamma-ray camera will detect more than a hundred GRBs per year to 2-5 times fainter than BATSE. Sensitive narrow-field X-ray, and UV/optical telescopes will be pointed at the burst location in 20 to 75 sec by an autonomously controlled 'swift' spacecraft. For each burst, arcsec positions will be determined and optical/UV/x-ray/gamma-ray spectrophotometry performed. Measurements of redshift will be made for many of the bursts. The instrumentation is a combination of superb existing flight-spare hardware and design from XMM and Spectrum-X/JET-X contributed by collaborators in the UK and Italy and development of a coded-aperture camera with a large-area (approx. 0.5 square meter) CdZnTe detector array. The instruments have now completed their fabrication phase and are integrated on the observatory for final testing. Key components of the mission are vigorous follow-up and outreach programs to engage the astronomical community and public in Swift. The talk will describe the mission and its status and give a summary of our plans for GRB operations.

Gehrels, Neil↗

SOFIA: Flying the Telescope

The primary focus of this paper is how the flight test team for the Stratospheric Observatory For Infrared Astronomy (SOFIA) re-cast an extensive developmental test program to meet key milestones while simultaneously ensuring safe certification of the airframe and delivery of an operationally relevant platform, ultimately saving the overall program from financial demise. Following a brief introduction to the observatory and what it is designed to do, SOFIAs planned developmental test program is summarized, including analysis and design philosophy, envelope expansion, model validation and airframe certification. How NASA used lessons learned from other aircraft that employed open cavities in flight is explained as well as how and why the chosen design was selected. The approach to aerodynamic analysis, including bare airframe testing, wind tunnel testing, computational fluid dynamics and finite element modeling proved absolutely critical. Despite a solid analytical foundation, many unknowns remained. History provides several examples of disastrous effects on both systems and flight safety if cavity design is not approached properly. For these reasons, an extensive test plan was developed to ensure a safe and thorough build-up for envelope expansion, airframe certification and early science missions. Unfortunately, as is often the case, because of chronic delays in overall program execution, severe schedule and funding pressures were present. If critical milestones were not met, domestic as well as international funding was in serious jeopardy, and the demise of the entire program loomed large. Concentrating on rigorous model validation, the test team challenged certification requirements, increased test efficiency and streamlined engineering analysis. This resulted in the safe reduction of test point count by 72%, meeting all program milestones and a platform that soundly satisfied all operational science requirements. Results from early science missions are shown and a proof of concept mission for which SOFIA was opportunely positioned is showcased. Success on this time-critical mission to observe a rare astronomical event proved the usefulness of an airborne observatory and the value in waiting for the capability provided by SOFIA. Finally, lessons learned in the test program are presented with emphasis on how lessons from previous aircraft and successful test programs were applied to SOFIA. Effective application of these lessons was crucial to the success of the SOFIA flight test program. SOFIA is an international cooperative program between NASA and the German Space Agency, DLR. It is a 2.5 meter (100-inch) telescope mounted in a Boeing 747SP aircraft used for astronomical observations at altitudes above 35,000 feet. SOFIA will accommodate a host of scientific instruments from the international science community and has a planned operational lifespan of more than 20 years.

Asher, Troy A.↗

Test Results of 15 T Nb3Sn Quadrupole Magnet HQ01 with a 120 mm Bore for the LHC Luminosity Upgrade

In support of the luminosity upgrade of the Large Hadron Collider (LHC), the US LHC Accelerator Research Program (LARP) has been developing a 1-meter long, 120 mm bore Nb{sub 3}Sn IR quadrupole magnet (HQ). With a short sample gradient of 219 T/m at 1.9 K and a conductor peak field of 15 T, the magnet will operate under higher forces and stored-energy levels than that of any previous LARP magnet models. In addition, HQ has been designed to incorporate accelerator quality features such as precise coil alignment and adequate cooling. The first 6 coils (out of the 8 fabricated so far) have been assembled and used in two separate tests-HQ01a and HQ01b. This paper presents design parameters, summary of the assemblies, the mechanical behavior as well as the performance of HQ01a and HQ01b.

43 PARTICLE ACCELERATORS↗

Accuracy of automated measurement and verification (M&V) techniques for energy savings in commercial buildings

Trustworthy savings calculations are critical to convincing investors in energy efficiency projects of the benefit and cost-effectiveness of such investments and their ability to replace or defer supply-side capital investments. However, today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of efficiency projects. They also require time-consuming manual data acquisition and often do not deliver results until years after the program period has ended. The rising availability of “smart” meters, combined with new analytical approaches to quantifying savings, has opened the door to conducting M&V more quickly and at lower cost, with comparable or improved accuracy. These meter- and software-based approaches, increasingly referred to as “M&V 2.0”, are the subject of surging industry interest, particularly in the context of utility energy efficiency programs. Program administrators, evaluators, and regulators are asking how M&V 2.0 compares with more traditional methods, how proprietary software can be transparently performance tested, how these techniques can be integrated into the next generation of whole-building focused efficiency programs. This paper expands recent analyses of public-domain whole-building M&V methods, focusing on more novel M&V2.0 modeling approaches that are used in commercial technologies, as well as approaches that are documented in the literature, and/or developed by the academic building research community. We present a testing procedure and metrics to assess the performance of whole-building M&V methods. We then illustrate the test procedure by evaluating the accuracy of ten baseline energy use models, against measured data from a large dataset of 537 buildings. The results of this study show that the already available advanced interval data baseline models hold great promise for scaling the adoption of building measured savings calculations using Advanced Metering Infrastructure (AMI) data. Median coefficient of variation of the root mean squared error (CV(RMSE)) was less than 25% for every model tested when twelve months of training data were used. With even six months of training data, median CV(RMSE) for daily energy total was under 25% for all models tested. Finally, these findings can be used to build confidence in model robustness, and the readiness of these approaches for industry uptake and adoption

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Design, Prototyping, Fabrication and Test of the Mu2e AC-Dipole Magnet

Fermilab Magnet Systems is building three High-frequency AC-Dipole Magnets for the Mu2e experiment at Fermilab. These magnets are composed of three single-loop one-meter-long ferrite loaded segments. The excitation consists of a copper tube, which is also used as a means for its cooling with the inherited challenges of Voltage and Frequency uncoupling. These magnets are designed to operate either at 300 kHz or 4.4 MHz via resonance tuning. Following the completion of the design, prototyping, and analysis phases, all ferrites and other components were procured, and the magnets were fabricated to meet vacuum compatibility requirements using strict procedures. Each magnet undergoes thorough baking and testing before being installed in the experiment. This paper discusses the magnets' role in proton background suppression as it represents a unique and essential device for the Mu2e experiment at Fermilab. We present the magnet design choices, modeling approach, and the challenges encountered during fabrication. Additionally, we outline the power supply driving mechanism, the testing that was performed, and our results.

Elementi, Luciano [Fermilab] (ORCID:00000002766372↗

A cycle timer for testing electric vehicles

A cycle timer was developed to assist the driver of an electric vehicle in more accurately following and repeating SAE driving schedules. These schedules require operating an electric vehicle in a selected stop-and-go driving cycle and repeating this cycle pattern until the vehicle ceases to meet the requirements of the cycle. The heart of the system is a programmable read-only memory (PROM) that has the required test profiles permanently recorded on plug-in cards, one card for each different driving schedule. The PROM generates a direct current analog signal that drives a speedometer displayed on one scale of a dual movement meter. The second scale of the dual movement meter displays the actual speed of the vehicle as recorded by the fifth wheel. The vehicle operator controls vehicle speed to match the desired profile speed. The PROM controls the recycle start time as well as the buzzer activation. The cycle programmer is powered by the test vehicle's 12-volt accessory battery, through a 5-volt regulator and a 12-volt dc-to-dc converter.

Soltis, R. F.↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter). All Fluid Management Plan requirements were met.

54 ENVIRONMENTAL SCIENCES↗

Completion Report for Well ER-2-2 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 1

Well ER-2-2 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled from January 17 to February 8, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nevada. The primary purpose of the well was to collect hydrogeologic data to evaluate uncertainty in the flow and transport conceptual model and its contamination boundary forecasts, and to detect radionuclides in groundwater from the CALABASH (U2av) underground test. Well ER-2-2 was not completed as planned due to borehole stability problems. As completed, the well includes a piezometer (p1) to 582 meters (m) (1,909 feet [ft]) below ground surface (bgs) installed in the Timber Mountain lower vitric-tuff aquifer (TMLVTA) and a 12.25-inch (in.) diameter open borehole to 836 m (2,743 ft) bgs in the Lower tuff confining unit (LTCU). A 13.375-in. diameter carbon-steel casing is installed from the surface to a depth of 607 m (1,990 ft) bgs. Data collected during borehole construction include composite drill cutting samples collected every 3.0 m (10 ft), geophysical logs to a depth of 672.4 m (2,206 ft) bgs, water-quality measurements (including tritium), water-level measurements, and slug test data. The well penetrated 384.05 m (1,260 ft) of Quaternary alluvium, 541.93 m (1,778 ft) of Tertiary Volcanics (Tv) rocks, and 127.71 m (419 ft) of Paleozoic carbonates. The stratigraphy and lithology were generally as expected. However, several of the stratigraphic units were significantly thicker then predicted—principally, the Tunnel formation (Tn), which had been predicted to be 30 m (100 ft) thick; the actual thickness of this unit was 268.22 m (880 ft). Fluid depths were measured in the borehole during drilling as follows: (1) in the piezometer (p1) at 552.15 m (1,811.53 ft) bgs and (2) in the main casing (m1) at 551.69 m (1,810.01 ft) bgs. As expected, field measurements for tritium were above the Safe Drinking Water Act limit (20,000 picocuries per liter) for a portion of the Tertiary volcanic section near the water table. Tritium concentrations were at or near the field detection limit in the Lower carbonate aquifer (LCA) while drilling. During drilling, a sample was collected while circulating in the LCA. The sample was submitted for off-site laboratory analysis. The sample results indicated low but measurable tritium concentrations. All Fluid Management Plan requirements were met during drilling activities.

54 ENVIRONMENTAL SCIENCES↗

Modular Optical PDV System

A modular optical photon Doppler velocimetry (PDV) detector system has been developed by using readily available optical components with a 20-GHz Miteq optical detector into eight channels of single-wide modules integrated into a 3U rack unit (1U = 1.75 inches) with a common power supply. Optical fibers were precisely trimmed, welded, and timed within each unit. This system has been used to collect dynamic velocity data on various physics experiments. An optical power meter displays the laser input power to the module and optical power at the detector. An adjustable micro-electromechanical system (MEMS) optical attenuator is used to adjust the amount of unshifted light entering the detector. Front panel LEDs show the presence of power to the module. A fully loaded chassis with eight channels consumes 45 watts of power. Each chassis requires 1U spacing above and below for heat management. Modules can be easily replaced.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Improvement of the predicted aural detection code ICHIN (I Can Hear It Now)

Acoustic tests were conducted to study the far-field sound pressure levels and aural detection ranges associated with a Sikorsky S-76A helicopter in straight and level flight at various advancing blade tip Mach numbers. The flight altitude was nominally 150 meters above ground level. This paper compares the normalized predicted aural detection distances, based on the measured far-field sound pressure levels, to the normalized measured aural detection distances obtained from sound jury response measurements obtained during the same test. Both unmodified and modified versions of the prediction code ICHIN-6 (I Can Hear It Now) were used to produce the results for this study.

Mueller, Arnold W.↗

Metrology of Large Parts

As discussed in the first chapter of this book, there are many different methods to measure a part using optical technology. Chapter 2 discussed the use of machine vision to measure macroscopic features such as length and position, which was extended to the use of interferometry as a linear measurement tool in chapter 3, and laser or other trackers to find the relation of key points on large parts in chapter 4. This chapter looks at measuring large parts to optical tolerances in the sub-micron range using interferometry, ranging, and optical tools discussed in the previous chapters. The purpose of this chapter is not to discuss specific metrology tools (such as interferometers or gauges), but to describe a systems engineering approach to testing large parts. Issues such as material warpage and temperature drifts that may be insignificant when measuring a part to micron levels under a microscope, as will be discussed in later chapters, can prove to be very important when making the same measurement over a larger part. In this chapter, we will define a set of guiding principles for successfully overcoming these challenges and illustrate the application of these principles with real world examples. While these examples are drawn from specific large optical testing applications, they inform the problems associated with testing any large part to optical tolerances. Manufacturing today relies on micrometer level part performance. Fields such as energy and transportation are demanding higher tolerances to provide increased efficiencies and fuel savings. By looking at how the optics industry approaches sub-micrometer metrology, one can gain a better understanding of the metrology challenges for any larger part specified to micrometer tolerances. Testing large parts, whether optical components or precision structures, to optical tolerances is just like testing small parts, only harder. Identical with what one does for small parts, a metrologist tests large parts and optics in particular to quantify their mechanical properties (such as dimensions, mass, etc); their optical prescription or design (i.e. radius of curvature, conic constant, vertex location, size); and their full part shape. And, just as with small parts, a metrologist accomplishes these tests using distance measuring instruments such as tape measures, inside micrometers, coordinate measuring machines, distance measuring interferometers; angle measuring instruments such as theodolites, autocollimators; and surface measuring instruments including interferometers, stylus profilers, interference microscopes, photogrammetric cameras, or other tools. However, while the methodology may be similar, it is more difficult to test a large object for the simple reason that most metrologists do not have the necessary intuition. The skills used to test small parts or optics in a laboratory do not extrapolate to testing large parts in an industrial setting any more than a backyard gardener might successfully operate a farm. But first, what is a large part? A simple definition might be the part's size or diameter. For optics and diffuse surface parts alike, the driving constraint is ability to illuminate the part's surface. For reflective convex mirrors, large is typically anything greater than 1 meter. But, for refractive optics, flats or convex mirrors, large is typically greater than 0.5 meter. While a size definition is simple, it may be less than universal. A more nuanced definition might be that a large part is any component which cannot be easily tested in a standard laboratory environment, on a standard vibration isolated table using standard laboratory infrastructure. A micro-switch or a precision lens might be easily measured to nanometer levels under a microscope in a lab, but a power turbine spline or a larger telescope mirror will not fit under that microscope and may not even fit on the table.

Stahl, H. Philip↗