Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, th Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and grou handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, Jim↗

Flight and Integrated Vehicle Testing: Laying the Groundwork for the Next Generation of Space Exploration Launch Vehicles

Integrated vehicle testing will be critical to ensuring proper vehicle integration of the Ares I crew launch vehicle and Ares V cargo launch vehicle. The Ares Projects, based at Marshall Space Flight Center in Alabama, created the Flight and Integrated Test Office (FITO) as a separate team to ensure that testing is an integral part of the vehicle development process. As its name indicates, FITO is responsible for managing flight testing for the Ares vehicles. FITO personnel are well on the way toward assembling and flying the first flight test vehicle of Ares I, the Ares I-X. This suborbital development flight will evaluate the performance of Ares I from liftoff to first stage separation, testing flight control algorithms, vehicle roll control, separation and recovery systems, and ground operations. Ares I-X is now scheduled to fly in summer 2009. The follow-on flight, Ares I-Y, will test a full five-segment first stage booster and will include cryogenic propellants in the upper stage, an upper stage engine simulator, and an active launch abort system. The following flight, Orion 1, will be the first flight of an active upper stage and upper stage engine, as well as the first uncrewed flight of an Orion spacecraft into orbit. The Ares Projects are using an incremental buildup of flight capabilities prior to the first operational crewed flight of Ares I and the Orion crew exploration vehicle in 2015. In addition to flight testing, the FITO team will be responsible for conducting hardware, software, and ground vibration tests of the integrated launch vehicle. These efforts will include verifying hardware, software, and ground handling interfaces. Through flight and integrated testing, the Ares Projects will identify and mitigate risks early as the United States prepares to take its next giant leaps to the Moon and beyond.

Taylor, J. L.↗

Dynamic Radioisotope Power System (DRPS) Permanently Shadowed Region (PSR) Demonstrator Rover

This conceptual design study investigated trading several Dynamic Radioisotope Power Systems (DRPS) in development to supply power to a lunar science rover which operates for long periods (months) in permanently shadowed regions (PSR) over many years. The design was conducted by the Compass team and relied heavily on the planned VIPER rover design, which is limited to only a few hours of operations in PSRs and less than a month near the south pole. As such this conceptual design shows what a DRPS can do for a follow-on type VIPER rover. In addition to the long duration, go anywhere DRPS power system, the Compass team added a communications system that utilizes the Gateway spacecraft as a relay node for nearly 24/7 communications link to the DRPS rover in lunar craters not visible from the earth. The Compass design includes a notional conops, launch and delivery, subsystem designs of power, mobility, structures, science, command and data handling, communications, guidance and control, and thermal. The thermal design was especially important due the low temperatures in PSRs where the science environment needs to be shielded from the waste heat from the DRPS.

Dynamic Radioisotope Power Systems↗

Ground data system for Space Flyer Unit (SFU)

The Space Flyer Unit (SFU) is an unmanned, multi-purpose, retrievable and reusable space platform. The first mission of SFU (SFU-1) will be launched by NASDA's H-2 launch vehicle in early 1995 and retrieved by NASA's Space Shuttle after several months in orbit. Two Japanese ground stations, several ground stations belonging to NASA, and a ground station in Chile will be used for tracking of SFU-1. The control center of SFU-1 is the Sagamihara Operations Center (SOC) of ISAS located in Sagamihara, Japan. This paper describes the tracking and data acquisition network for SFU-1, the configuration and design policy of the SFU operations control system, and data processing schemes used for mission operations of SFU.

Yamada, Takahiro↗

Closed Loop Guidance Trade Study for Space Launch System Block-1B Vehicle

NASA is currently building the Space Launch System (SLS) Block-1 launch vehicle for the Exploration Mission 1 (EM-1) test flight. The design of the next evolution of SLS, Block-1B, is well underway. The Block-1B vehicle is more capable overall than Block-1; however, the relatively low thrust-to-weight ratio of the Exploration Upper Stage (EUS) presents a challenge to the Powered Explicit Guidance (PEG) algorithm used by Block-1. To handle the long burn durations (on the order of 1000 seconds) of EUS missions, two algorithms were examined. An alternative algorithm, OPGUID, was introduced, while modifications were made to PEG. A trade study was conducted to select the guidance algorithm for future SLS vehicles. The chosen algorithm needs to support a wide variety of mission operations: ascent burns to LEO, apogee raise burns, trans-lunar injection burns, hyperbolic Earth departure burns, and contingency disposal burns using the Reaction Control System (RCS). Additionally, the algorithm must be able to respond to a single engine failure scenario. Each algorithm was scored based on pre-selected criteria, including insertion accuracy, algorithmic complexity and robustness, extensibility for potential future missions, and flight heritage. Monte Carlo analysis was used to select the final algorithm. This paper covers the design criteria, approach, and results of this trade study, showing impacts and considerations when adapting launch vehicle guidance algorithms to a broader breadth of in-space operations.

Von der Porten, Paul↗

Space Shuttle Program description and status

The main reason for the development of the Space Shuttle is related to the aim to achieve a major reduction in the cost of placing a payload into space. Such a reduction is to be obtained by using a reusable in place of an expendable launch vehicle. Developments concerning launch vehicles show a steady reduction in launching expenses. From a cost of about $500,000 a pound in the late 1950's, launching expenses were reduced to $600 a pound for payloads on the Saturn V. With the Space Shuttle the cost will drop to approximately $150 a pound. The Space Shuttle Program is discussed, taking into account a system description, a typical mission profile, aspects of mission design, launch costs, and Space Shuttle characteristics. The Space Shuttle Program status is also examined, giving attention to orbital flight schedules, flight hardware tests, launch area facilities, the mission control center, and details of flight crew training.

Macleod, J. B.↗

EPS analysis of nominal STS-1 flight

The results of electrical power system (EPS) analysis of the planned Shuttle Transportation System Flight 1 mission are presented. The capability of the orbiter EPS to support the planned flight and to provide program tape information and supplementary data specifically requested by the flight operations directorate was assessed. The analysis was accomplished using the orbiter version of the spacecraft electrical power simulator program, operating from a modified version of orbiter electrical equipment utilization baseline revision four. The results indicate that the nominal flight, as analyzed, is within the capabilities of the orbiter power generation system, but that a brief, and minimal, current overload may exist between main distributor 1 and mid power controlled 1, and that inverter 9 may the overloaded for extended periods of time. A comparison of results with launch commit criteria also indicated that some of the presently existing launch redlines may be violated during the terminal countdown.

Wolfgram, D. F.↗

System test and flight results from infrared astronomical satellite external thermal subsystem

The Infrared Astronomical Satellite (IRAS) received its system level thermal testing in a solar simulator in September and October 1982 and was launched in January 1983. In order to reduce costs and meet a tight launch schedule, a system thermal test approach was employed which combined the goals of thermal design development tests, thermal balance tests, and thermal vacuum qualification tests. This approach relied heavily on the use of a computer-controlled automatic data handling and heater control system which reduced reliance on human monitoring of test data in comparison to past projects. The validity of this approach has been borne out by flight results. During the whole mission most temperatures were within the desired range and close to predictions. Included under the external thermal subsystem are room temperature electronics and radiatively cooled surfaces with temperatures below 100 and 200K.

Salazar, R. P.↗

Computer program for post-flight analysis of rigid body moments acting on a launch vehicle first stage

A FORTRAN coded computer program and method for evaluation of the rigid body disturbing moments for a launch vehicle first stage based on post-flight measurements is described. The technique is a straightforward deterministic approach. Residual moments are computed to satisfy the equations of motion. Residuals are expressed in terms of altered vehicle characteristics; the aerodynamic coefficients, thrust misalignment, and control effectiveness. This method was used on the Scout launch vehicle and uncovered several significant differences between flight data and wind tunnel data. The computer program is written in FORTRAN IV for a CDC CYBER 173 computer system.

Knauber, R. N.↗

Experiments of opportunity pay loads revisited

The design and operation of the Spartan program are discussed. The objective of the Spartan program is to utilize the Space Shuttle for conducting exoatmospheric science research. The Spartan 1 data storage and handling, attitude control, power, and thermal control systems and structure are described. The Spartan 1 was to study the structure of two prominent cosmic X-ray sources, the Perseus cluster of galaxies, and the center of the Milky Way. Spartan 1 was launched on June 17, 1985, deployed on June 20, and retrieved on June 22. The performance of the Spartan's system, and the collected data are analyzed; it was observed that the systems performed as planned. The methods used to minimize the Spartan program costs are considered.

Shrewsberry, D. J.↗

Mars Observer Mission Operations

Mars Observer, planned for launch in September 1992, will be the first deep space planetary mission to fully utilize a distributed operations concept for science instrument control. In addition, several of the other concepts proposed by the Mission Operations and Information Systems Subcommittee of the Solar System Exploration Committee have been adopted for the purpose of improving the efficiency and reducing the costs of Deep Space Mission Operations.

Mckinley, Edward L.↗

Isolation of crystallizing droplets by electrostatic levitation

The principles of electrostatic levitation where the positioning and stabilization of a sample are accomplished by applying appropriate electrostatic forces to a charged sample are outlined, and attention is focused on a feedback control algorithm, drop-launching method, and four-drop levitator. Drop levitation in 1-g is discussed, and crystal-growth experiments are presented. An experiment in which the protein concentration of a levitated drop is controlled by a feedback system is described. During levitation, the drop evaporation rate is controlled in a programmed way in order to acquire proper protein concentration levels for both nucleation and growth. The containerless approach of protein crystal growth when applied in the space environment is assessed.

Rhim, Won-Kyu↗

The Submillimeter Wave Astronomy Satellite (SWAS) solar array system

The SWAS (Submillimeter Wave Astronomy Satellite) solar array system is described. It is an innovative approach to meet the missions requirements. The SWAS satellite provides a three axis stabilized platform to survey a variety of galactic cloud structures. This system includes highly reliable, lightweight launch latch, deployment, and lock mechanisms, and solar array panels that provide the maximum solar cell area. The design of the solar arrays are the result of system trades that included instrument and spacecraft thermal constraints, attitude control system maneuvering rates and pointing accuracies, the power system, and the spacecraft structure.

Sneiderman, Gary↗

Technology Development for a Stirling Radioisotope Power System

NASA Glenn Research Center and the Department of Energy are developing a Stirling convertor for an advanced radioisotope power system to provide spacecraft on-board electric power for NASA deep space missions. NASA Glenn is addressing key technology issues through the use of two NASA Phase II SBIRs with Stirling Technology Company (STC) of Kennewick, WA. Under the first SBIR, STC demonstrated a synchronous connection of two thermodynamically independent free-piston Stirling convertors and a 40 to 50 fold reduction in vibrations compared to an unbalanced convertor. The second SBIR is for the development of an Adaptive Vibration Reduction System (AVRS) that will essentially eliminate vibrations over the mission lifetime, even in the unlikely event of a failed convertor. This paper presents the status and results for these two SBIR projects and also discusses a new NASA Glenn in-house project to provide supporting technology for the overall Stirling radioisotope power system development. Tasks for this new effort include convertor performance verification, controls development, heater head structural life assessment, magnet characterization and thermal aging tests, FEA analysis for a lightweight alternator concept, and demonstration of convertor operation under launch and orbit transfer load conditions.

Thieme, Lanny G.↗

Preventing Spacecraft Failures Due to Tribological Problems

Many mechanical failures that occur on spacecraft are caused by tribological problems. This publication presents a study that was conducted by the author on various preventatives, analyses, controls and tests (PACTs) that could be used to prevent spacecraft mechanical system failure. A matrix is presented in the paper that plots tribology failure modes versus various PACTs that should be performed before a spacecraft is launched in order to insure success. A strawman matrix was constructed by the author and then was sent out to industry and government spacecraft designers, scientists and builders of spacecraft for their input. The final matrix is the result of their input. In addition to the matrix, this publication describes the various PACTs that can be performed and some fundamental knowledge on the correct usage of lubricants for spacecraft applications. Even though the work was done specifically to prevent spacecraft failures the basic methodology can be applied to other mechanical system areas.

Fusaro, Robert L.↗

A Flight Dynamics Perspective of the Orion Pad Abort One Flight Test

The Orion Crew Exploration Vehicle is America s next generation of human rated spacecraft. The Orion Launch Abort System will take the astronauts away from the exploration vehicle in the event of an aborted launch. The pad abort mode of the Launch Abort System will be flight-tested in 2009 from the White Sands Missile Range in New Mexico. This paper examines some of the efforts currently underway at the NASA Dryden Flight Research Center by the Controls & Dynamics group in preparation for the flight test. The concept of operation for the pad abort flight is presented along with an overview of the guidance, control and navigation systems. Preparations for the flight test, such as hardware testing and development of the real-time displays, are examined. The results from the validation and verification efforts for the aerodynamic and atmospheric models are shown along with Monte Carlo analysis results.

Idicula, Jinu↗

Mode Selection Techniques in Variable Mass Flexible Body Modeling

In developing a flexible body spacecraft simulation for the Launch Abort System of the Orion vehicle, when a rapid mass depletion takes place, the dynamics problem with time varying eigenmodes had to be addressed. Three different techniques were implemented, with different trade-offs made between performance and fidelity. A number of technical issues had to be solved in the process. This paper covers the background of the variable mass flexibility problem, the three approaches to simulating it, and the technical issues that were solved in formulating and implementing them.

Launch Abort System↗

Software for Collaborative Engineering of Launch Rockets

The Rocket Evaluation and Cost Integration for Propulsion and Engineering software enables collaborative computing with automated exchange of information in the design and analysis of launch rockets and other complex systems. RECIPE can interact with and incorporate a variety of programs, including legacy codes, that model aspects of a system from the perspectives of different technological disciplines (e.g., aerodynamics, structures, propulsion, trajectory, aeroheating, controls, and operations) and that are used by different engineers on different computers running different operating systems. RECIPE consists mainly of (1) ISCRM a file-transfer subprogram that makes it possible for legacy codes executed in their original operating systems on their original computers to exchange data and (2) CONES an easy-to-use filewrapper subprogram that enables the integration of legacy codes. RECIPE provides a tightly integrated conceptual framework that emphasizes connectivity among the programs used by the collaborators, linking these programs in a manner that provides some configuration control while facilitating collaborative engineering tradeoff studies, including design to cost studies. In comparison with prior collaborative-engineering schemes, one based on the use of RECIPE enables fewer engineers to do more in less time.

Stanley, Thomas Troy↗