Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “energy saving process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Removing Fluoride from Double Four-Membered Rings Yielding Defect-Free Zeolites under Mild Conditions Using Ozone

We have investigated ozone treatment of as-made LTA zeolites under mild temperature conditions (175 °C) using experiments and periodic DFT as a method of energy savings and engineering defects such as silanol nests in comparison with conventional calcination at 550 °C. We have studied ozone treatment on LTA samples synthesized with 1,2-dimethyl-3-(4-methylbenzyl) imidazolium (denoted as “BULKY”) as the primary organic structure-directing agent (OSDA) and with various amounts of tetramethylammonium (TMA) as a secondary OSDA. Ozone treatment of LTA-BULKY at 175 °C was found to give defect-free, pristine LTA materials as determined by 29 Si NMR, 13 C NMR, Raman spectra, and DFT to assign the spectra. This represents a significant and unexpected finding: that fluoride ions can be completely removed from double four-membered rings (D4Rs) under such mild conditions. Furthermore, ozone treatment of LTA-BULKY-TMA samples removed BULKY but left behind TMA/F, giving a new and more diverse structural landscape of Si environments in LTA. Ab initio MetaDynamics calculations provide pathways with relatively low barriers, explaining how fluoride ions can be removed from D4Rs, leaving behind defect-free LTA materials under mild conditions.

36 MATERIALS SCIENCE↗

EDF's used fuel management french policy - 15199

Regarding back-end fuel cycle, EDF's strategy, implemented from the very beginning of French nuclear production, consists in reprocessing of used fuel; decision to recycle plutonium in French PWR was taken from 1984. This reprocessing and recycling strategy, relying on existing industrial facilities (AREVA La Hague and Melox plants), has proven to be reliable and efficient. Treatment leads to a stabilization of used fuel total inventory in interim storage. Vitrification process ensures a safe packaging for high level and long-lived waste under a reduced volume. Recycling of fissile materials saves natural uranium requirements. Concentration of Pu in MOX used fuel leaves open the option to reuse it for starting next Generation IV systems beyond 2040. In 2008, EDF and AREVA, supported by French Government, agreed on commercial terms covering long term fuel reprocessing and recycling (up to 2040). Currently, EDF fuel management strategy relies on flow equilibrium in order to respect fuel cycle consistency and sustainability. The underlying principle is to strictly adjust separated plutonium production to recycling possibilities (i.e. licensed reactors and MOX fuel fabrication facilities). Given that fuel cycle policy, any trend in NPP core management that may impact the fuel cycle should be anticipated within times in order to avoid technical or administrative incompatibilities, and guarantee a high level of safety and robustness. In collaboration with industrial operators, EDF have to perform periodic 'Cycle Impact' analyses and report to the French Nuclear Safety Authority (ASN); next exercise is scheduled by the end of 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beam commissioning and measurements validating the beam model in a new TPS that converts helical tomotherapy plans to step-and-shoot IMRT plans

Purpose: A new type of treatment planning system called SHAREPLAN has been studied, which enables the transfer of treatment plans generated for helical tomotherapy delivery to plans that can be delivered on C-arm linacs. The purpose is to ensure continuous patient treatment during periods of unscheduled downtime for the TomoTherapy unit, particularly in clinics without a backup unit. The purpose of this work was to verify that the plans generated in this novel planning system are deliverable and accurate. The work consists primarily of beam commissioning, verification of the beam model, and measurements verifying that generated plans are deliverable with sufficient accuracy. Methods: The beam commissioning process involves input of general geometric properties of the modeled linac, profiles and depth dose curves for a specific photon nominal energy (6 MV), and the automated modeling of other beam properties. Some manual tuning of the beam model is required. To evaluate its accuracy, the confidence limit concept [J. Venselaar et al., ''Tolerances for the accuracy of photon beam dose calculations of treatment planning systems,'' Radiother. Oncol. 60, 191-201 (2001)] was used, which is a method supported by ESTRO. Measurements were conducted with a 2D diode array at the commissioned linac as a final check of the beam model and to evaluate whether the generated plans were deliverable and accurate. Results: The comparison and evaluation of calculated data points and measured data according to the method applied confirmed the accuracy of the beam model. The profiles had a confidence limit of 1.1% and the depth dose curves had a confidence limit of 1.7%, both of which were well below the tolerance limit of 2%. Plan specific QC measurements and evaluation verified that different plans generated in the TPS were deliverable with sufficient accuracy at the commissioned linac, as none of the 160 beams for the 20 different plans evaluated had a fraction of approved data points below 90%, the local clinical approval criterion for delivery QA measurements. Conclusions: This study is a validation of the new TPS as it verifies that the generated plans are deliverable at a commissioned linac with adequate accuracy. A thorough investigation of the treatment plan quality will require a separate study. The TPS is proving to be a useful and time-saving complement, especially for clinics having a single unit for helical delivery among its conventional linacs.

43 PARTICLE ACCELERATORS↗

Office of the Chief Financial Officer Annual Report 2007

2007 was a year of progress and challenges for the Office of the Chief Financial Officer (OCFO). I believe that with the addition of a new Controller, the OCFO senior management team is stronger than ever. With the new Controller on board, the senior management team spent two intensive days updating our strategic plan for the next five years ending in 2012, while making sure that we continue to execute on our existing strategic initiatives. In 2007 the Budget Office, teaming with Human Resources, worked diligently with our colleagues on campus to reengineer the Multi-Location Appointment (MLA) process, making it easier for our Principal Investigators (PIs) to work simultaneously between the Laboratory and UC campuses. The hiring of a point-of-contact in Human Resources to administer the program will also make the process flow smoother. In order to increase our financial flexibility, the OCFO worked with the Department of Energy (DOE) to win approval to reduce the burden rates on research and development (R&D) subcontracts and Intra-University Transfers (IUT). The Budget Office also performed a 'return on investment' (ROI) analysis to secure UCRP funding for a much needed vocational rehabilitation counselor. This new counselor now works with employees who are on medical leave to ensure that they can return to work in a more timely fashion, or if not able to return, usher them through the various options available to them. Under the direction of the new Controller, PriceWaterhouse Coopers (PWC) performed their annual audit of the Laboratory's financial data and reported positive results. In partnership with the Financial Policy and Training Office, the Controller's Office also helped to launch self-assessments of some of our financial processes, including timekeeping and resource adjustments. These self assessments were conducted to promote efficiencies and mitigate risk. In some cases they provided assurance that our practices are sound, and in others highlighted opportunities to improve. A third, and most important assessment on funds control was also conducted that proved very useful in making sure that our financial processes are sound and of the highest ethical standards. In June of 2007 the Procurement Department was awarded the DOE's FY2006 Secretarial Small Business Award for the advancement of small business contracts at Lawrence Berkeley National Laboratory (LBNL). The award was presented in Washington, D.C. Procurement also distinguished itself by passing the tri-ennial Procurement Evaluation and Re-engineering Team (PERT) Review of its systems and processes. We continue to reduce costs through the Supply Chain Initiative saving the Laboratory {approx}$6M to date and have placed over 11,000 orders with over seven vendors using the eBuy system. Our wall-to-wall inventory, which was completed in March of 2007, reported a result of 99+% for item count and 99.51% by value. This was a remarkable achievement that required the hard work of every Division and the Property Department working together. Training continues to be a major initiative for the OCFO and in 2007 we rolled out financial training programs specifically tailored to meet the needs of the scientific divisions. FY2008 presents several opportunities to enhance and improve our service to the scientific community. With the awarding of the HELIOS and JBEI programs, we will be developing new financial paradigms to provide senior management flexibility in decision making. Last year we heard the Laboratory community loud and clear when they expressed their frustration with our current travel system. As we head into the new fiscal year, a cross-functional travel team has identified a new model for how we provide travel services. We will be implementing the Oracle PeopleSoft Travel Reimbursement system by July of 2008. The new system will be more user-friendly and provide better information to the divisions and travel operations. We will also continue to review the travel disbursements operation for further improvement. Also in FY2008, several key information systems implementation projects are under way which will strengthen the Laboratory's financial and business processes. These include Supply Chain Management, and the Budget and Planning System. Future planned systems development includes an electronic sponsored research administration system. Continuing to improve the procurement process at the Laboratory is another major priority for the OCFO. To that end, we will be working to re-engineer the 'procure-to-pay' process. The goal will be to correct process flow to maximize efficiency and effectiveness, while implementing sound business practices and incorporating strong internal controls. Along the same lines, we will also be working with the divisions to implement the Property Management Improvement Program that was identified in FY2007.

57↗

Lessons Learned from a Complex FUSRAP Site - Sylvania Corning FUSRAP Site - 12269

Since its addition to the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 2005, the Sylvania Corning FUSRAP Site (the Site) in Hicksville, New York, has provided challenges and opportunities from which to gain lessons learned for conducting investigation work at a complex multi-contaminant FUSRAP Site. The United States Army Corps of Engineers (USACE) and its contractors conducted a Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation (RI) and are currently in the Feasibility Study (FS) phase at the Site. This paper presents the planning, execution, and reporting lessons learned by USACE during the RI/FS. The Site, operated from 1952 to 1967 for the research, development, and fabrication of nuclear elements under the Atomic Energy Commission, and other government and commercial contracts. Previous investigations performed by the New York State Department of Environmental Conservation (NYSDEC) and the current property owner have identified uranium, thorium, nickel, and chlorinated solvents, as Site contaminants [1]. The property owner is currently under two separate voluntary agreements with NYSDEC to investigate and remediate the Site. USACE's work at the site has been independent of this voluntary agreement and has moved on a parallel path with any work the property owner has completed. The project at the Site is complex because of the radiological and chemical concerns in both soils and groundwater, high hydraulically conductive soils, lack of a shallow aquiclude/aquitard, and a principal water table aquifer underlying the site. Contaminants are migrating from the Site and may potentially impact local drinking water supplies (municipal wells). During the RI/FS process the project team has encountered many issues and has thus developed many resolutions. The issues are organized into three categories: Planning and Contracting, Execution, and Reporting. Planning and Contracting lessons learned include: how to incorporate an overwhelming volume of historical data; how to manage a complex team of three prime contractors innovatively, and how to implement a project under an Award Fee task order. Execution lessons learned include: characterization of investigation derived wastes, and proper approach to radiological scanning of direct-push borings and soil cores. Reporting lessons learned include: coordinating multiple phase (iterative) reporting, large dataset presentation, and the National Priorities List (NPL) designation. The goal of this paper is to provide a resource for other project delivery teams that encounter similar situations on their projects to optimize cost savings, realization of efficiency, shorten schedules, or simply ensure higher quality deliverables. Each FUSRAP project is unique but there are many lessons we can apply to each site to gain efficiency and work more effectively. The Sylvania Corning FUSRAP site is a complex site with both soils and groundwater contamination, contamination to depths of 182 meters, and a highly politically charged environment of PRP involvement. Many of the lessons the project team has learned during the life of the project to date are being shared with others as well as being applied back to this project for future work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Passive SCR Performance Under Pseudo-Transient Cycle: Challenges and Opportunities for Meeting Tier 3 Emissions

We report that the passive ammonia (NH 3 ) selective catalytic reduction (SCR) system is a potential approach for controlling nitrogen oxide (NOx) emissions from lean-burn gasoline engines based on utilizing NH 3 generated by a three-way catalyst (TWC) during brief periods of fuel-rich engine operation. NH 3 generated by the TWC is stored and available to reduce NOx on a downstream SCR catalyst during subsequent periods of lean engine operation. Control of the overall passive SCR process can be more challenging than current urea-based approach because it depends explicitly on fuel-rich engine operation, which must be implemented in the context of transient engine operation. Under transient engine operation, significant variation in SCR temperatures is also to be expected. With NH 3 storage capacity highly dependent on exhaust temperatures, proper system architecture and engine operating strategy are needed for effective NH 3 utilization over the SCR catalyst. In this study, the performance of a passive SCR system was evaluated on a 2.0-l BMW lean-burn gasoline direct injection engine under 6-mode pseudo-transient cycle. The aim of this work is to understand how various engine operating strategies change the dynamics of NH 3 generation and utilization, and NOx reduction in the passive SCR system. A 5.9% fuel economy improvement relative to stoichiometric-only operation with 0.018 g/mi of NOx + NMHC emissions were demonstrated over 6-mode pseudo-transient cycle; however, CO emissions were twice the emission standard. In conclusion, the results of this work reveal challenges and opportunities for meeting Tier 3 emissions and improving fuel savings benefits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

INFORMATION: Management Alert on the Department's Monitoring of the Weatherization Assistance Program in the State of Illinois

Under the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Department of Energy's Weatherization Assistance Program received $5 billion to improve the energy efficiency of homes owned or occupied by low income persons, reduce their total residential expenditures, and improve their health and safety. Since the Recovery Act was enacted in February 2009, the Department has awarded weatherization grants to every state, the District of Columbia and five territories. Because of the unprecedented level of funding and the risks associated with spending vast amounts of money in a relatively short period of time, the Office of Inspector General (OIG) initiated a series of audits designed to evaluate the Program's internal control structures at both the Federal and state levels. As part of our work, we are in the process of reviewing Weatherization Program internal controls for the State of Illinois. We are also currently performing identical audits in the States of North Carolina, Pennsylvania and Virginia. Under the Recovery Act and the Department's Program, the State of Illinois received $242 million to weatherize 26,933 homes. The State of Illinois awarded these funds to 35 local agencies responsible for determining recipients' eligibility, contracting for the installation of the weatherization work, and conducting final inspections to ensure that work on homes was done in accordance with requirements. Inspectors working for the local agencies are required to evaluate the quality of mechanical and architectural improvements, such as furnace installations and window caulking, and certify that the work performed meets established standards. Under a Department approved plan in place at the time of our review, state officials were required to evaluate the sufficiency of local agency monitoring controls and to inspect the work performed on at least five percent of the units weatherized with Department funds during the program year for each local agency. We identified significant internal control deficiencies in the management of the Weatherization Program in Illinois which require immediate attention. Specifically, our audit testing revealed significant problems with on-site monitoring and inspection of the Illinois Home Weatherization Assistance Program (Illinois). We noted that the Department had not fulfilled its requirement to perform monitoring visits at the State level. In addition, Illinois officials had not complied with the Department's requirements for inspecting weatherization work conducted by local agencies. Finally, we found that a weatherization inspection for one of the local agencies failed to detect substandard installation of energy saving materials. This case involved a furnace gas leak that could have resulted in serious injury to the occupants and material damage to the structure. This is an interim report and our audit work remains in progress.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated High-Level Waste System Planning - Utilizing an Integrated Systems Planning Approach to Ensure End-State Definitions are Met and Executed - 13244

The Savannah River Site (SRS) is a Department of Energy site which has produced nuclear materials for national defense, research, space, and medical programs since the 1950's. As a by-product of this activity, approximately 37 million gallons of high-level liquid waste containing approximately 292 million curies of radioactivity is stored on an interim basis in 45 underground storage tanks. Originally, 51 tanks were constructed and utilized to support the mission. Four tanks have been closed and taken out of service and two are currently undergoing the closure process. The Liquid Waste System is a highly integrated operation involving safely storing liquid waste in underground storage tanks; removing, treating, and dispositioning the low-level waste fraction in grout; vitrifying the higher activity waste at the Defense Waste Processing Facility; and storing the vitrified waste in stainless steel canisters until permanent disposition. After waste removal and processing, the storage and processing facilities are decontaminated and closed. A Liquid Waste System Plan (hereinafter referred to as the Plan) was developed to integrate and document the activities required to disposition legacy and future High-Level Waste and to remove from service radioactive liquid waste tanks and facilities. It establishes and records a planning basis for waste processing in the liquid waste system through the end of the program mission. The integrated Plan which recognizes the challenges of constrained funding provides a path forward to complete the liquid waste mission within all regulatory and legal requirements. The overarching objective of the Plan is to meet all Federal Facility Agreement and Site Treatment Plan regulatory commitments on or ahead of schedule while preserving as much life cycle acceleration as possible through incorporation of numerous cost savings initiatives, elimination of non-essential scope, and deferral of other scope not on the critical path to compliance. There is currently a premium on processing and storage space in the radioactive liquid waste tank system. To enable continuation of risk reduction initiatives, the Plan establishes a processing strategy that provides tank space required to meet, or minimizes the impacts to meeting, programmatic objectives. The Plan also addresses perturbations in funding and schedule impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

How good are learning-based control v.s. model-based control for load shifting? Investigations on a single zone building energy system

Both model predictive control (MPC) and deep reinforcement learning control (DRL) have been presented as a way to approximate the true optimality of a dynamic programming problem, and these two have shown significant operational cost saving potentials for building energy systems. Furthermore, there is still a lack of in-depth quantitative studies on their approximation levels to the true optimality, especially in the building energy domain. To fill in the gap, this paper provides a numerical framework that enables the evaluation of the optimality levels of different controllers for building energy systems. This framework is then used to comprehensively compare the optimal control performance of both MPC and DRL controllers with given computation budgets for a single zone fan coil unit system. Note the optimality is estimated based on a user-specific selection of trade-off weights among energy costs, thermal comfort and control slew rates. Compared with the best optimality we can find through expensive optimization simulations, the best DRL agent can maximally approximate the optimality by 96.54%, which outperforms the best MPC whose optimality level is 90.11%. However, due to the stochasticity, the DRL agent is only expected to approximate the optimality by 90.42%, which is almost equivalent to the best MPC. Except for Proximal Policy Optimization (PPO), all DRL agents can have a better approximation to the optimality than the best MPC, and are expected to have better approximation than the MPC with a prediction horizon of 32 steps (15 min per step). In terms of reducing energy cost and thermal discomfort, MPC can outperform the rule-based control (RBC) by 18.47%–25.44%. DRL can be expected to outperform RBC by 18.95%–25.65% ,and the best DRL control policy can outperform RBC by 20.29%–29.72%. Although the comparison of the optimality level is performed in a perfect setting, e.g., MPC assumes perfect models, and DRL assumes a perfect offline training process and online deployment process, this can shed insight on their capabilities of approximating to the original dynamic programming problem.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Saving Glass Lamination via Selective Radio Frequency Heating

This project focused on advancing radio-frequency (RF) lamination technology closer to commercial implementation, in order to reduce the energy intensity of glass lamination by up to 90%. Lamination comprises a wide range of products including autoglass, architectural safety and innovative design glass, transparent armor (e.g. bullet proof glass), smart glass, mirrors, and encapsulation of photovoltaics. Lamination is also the fastest growing segment of glass manufacturing, with photovoltaics, architectural needs, and an anticipated transition to laminated side windows in vehicles. The state-of-the-art for glass lamination is to use autoclaves, which apply heat and uniform gas pressure to bond the laminates over the course of 1 to 18 hours. Laminates consist of layers of glass or other materials bonded with vinyl or urethane interlayers. In autoclaving, significant heat energy is lost heating the chamber, pressurized air, glass racks, and the glass. In RF lamination, the heat is generated directly in the vinyl interlayer, causing it to heat and melt quickly, in just 1 to 10 minutes, without significantly heating the glass or the equipment. The main purpose of this project was to provide evidence that low energy, rapid RF lamination quality met the same standards as conventionally autoclaved windows. The development of concepts for laminating curved glass with RF lamination was a major goal. Other primary goals included developing a stronger understanding of the lamination product markets described above, and to refine the potential benefits of commercial implementation. The scope of the project was to complete implementation concept studies in preparation for continuation into advanced development, pilot studies, and commercial implementation. The project consisted of 6 main tasks. The first dealt with lamination with poly-vinyl butyral (PVB) interlayers, which prior work had shown difficulties in achieving good quality laminates, working with Pilkington North America. The second task dealt with a study of current lamination processes in the various laminate industries, and development of concepts for integrating RF lamination into new or existing processes. The third task explored the use of a non-destructive technique for analyzing laminate adhesion with the University of Illinois at Urbana-Champaign. The fourth task focused on developing concepts for curved glass lamination using RF lamination. The fifth and sixth tasks together comprised an analysis of laminate product markets, ranking for applicability and commercialization potential, and the development of commercialization strategies for those products. In addition, throughout the project as new experimental data and conventional process data were obtained, the benefits analysis of RF lamination was refined. The goals of the project described above were achieved, positioning RF lamination for the next stage growth envisioned in the original Industrial Grand Challenge proposal. Working with Pilkington North America, lamination of flat autoglass with PVB was achieved, meeting all 16 stringent industry tests. In particular, PVB laminates made with RF lamination passed environmental tests including the high temperature, 120 C bake test, without significant formation of bubbles (defects). The adhesion of PVB to glass was measured using the pummel method. Adhesion values ranging from 1 to 7 out of 10 were obtained. The significant process parameters affecting the environmental and adhesion performance were identified through a designed experiment. Pre-lamination process variables including PVB storage humidity and the de-airing process (vacuum or nip rolling) were significant, as well as the level of pressure applied to the laminate during the RF process. Analysis of manufacturing with RF lamination equipment, based on the processes developed indicated that 3 RF presses could replace a typical auto-industry autoclave to achieve equal or greater throughput with possibly less capital cost and smaller footprint. Concepts for curved lamination identifying castable molds for prototyping were developed, which allowed Ceralink to obtain commitment to begin curved tooling development. The project significantly helped to advance RF lamination past the feasibility and novelty stage and into the realm of commercial acceptance as a viable alternative to autoclaves. The demonstration of autoclave-quality autoglass produced in just 1 minute with RF lamination, with validation by Pilkington, has fueled industry motivation to seriously consider RF lamination. The industry and other contacts and outreach made in the study of laminate markets (including 3 technical publications and 5 conference presentations), has resulted in a recent surge in RF lamination activity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Saving Glass Lamination via Selective Radio Frequency Heating

This project focused on advancing radio-frequency (RF) lamination technology closer to commercial implementation, in order to reduce the energy intensity of glass lamination by up to 90%. Lamination comprises a wide range of products including autoglass, architectural safety and innovative design glass, transparent armor (e.g. bullet proof glass), smart glass, mirrors, and encapsulation of photovoltaics. Lamination is also the fastest growing segment of glass manufacturing, with photovoltaics, architectural needs, and an anticipated transition to laminated side windows in vehicles. The state-of-the-art for glass lamination is to use autoclaves, which apply heat and uniform gas pressure to bond the laminates over the course of 1 to 18 hours. Laminates consist of layers of glass or other materials bonded with vinyl or urethane interlayers. In autoclaving, significant heat energy is lost heating the chamber, pressurized air, glass racks, and the glass. In RF lamination, the heat is generated directly in the vinyl interlayer, causing it to heat and melt quickly, in just 1 to 10 minutes, without significantly heating the glass or the equipment. The main purpose of this project was to provide evidence that low energy, rapid RF lamination quality met the same standards as conventionally autoclaved windows. The development of concepts for laminating curved glass with RF lamination was a major goal. Other primary goals included developing a stronger understanding of the lamination product markets described above, and to refine the potential benefits of commercial implementation. The scope of the project was to complete implementation concept studies in preparation for continuation into advanced development, pilot studies, and commercial implementation. The project consisted of 6 main tasks. The first dealt with lamination with poly-vinyl butyral (PVB) interlayers, which prior work had shown difficulties in achieving good quality laminates, working with Pilkington North America. The second task dealt with a study of current lamination processes in the various laminate industries, and development of concepts for integrating RF lamination into new or existing processes. The third task explored the use of a non-destructive technique for analyzing laminate adhesion with the University of Illinois at Urbana-Champaign. The fourth task focused on developing concepts for curved glass lamination using RF lamination. The fifth and sixth tasks together comprised an analysis of laminate product markets, ranking for applicability and commercialization potential, and the development of commercialization strategies for those products. In addition, throughout the project as new experimental data and conventional process data were obtained, the benefits analysis of RF lamination was refined. The goals of the project described above were achieved, positioning RF lamination for the next stage growth envisioned in the original Industrial Grand Challenge proposal. Working with Pilkington North America, lamination of flat autoglass with PVB was achieved, meeting all 16 stringent industry tests. In particular, PVB laminates made with RF lamination passed environmental tests including the high temperature, 120°C bake test, without significant formation of bubbles (defects). The adhesion of PVB to glass was measured using the pummel method. Adhesion values ranging from 1 to 7 out of 10 were obtained. The significant process parameters affecting the environmental and adhesion performance were identified through a designed experiment. Pre-lamination process variables including PVB storage humidity and the de-airing process (vacuum or nip rolling) were significant, as well as the level of pressure applied to the laminate during the RF process. Analysis of manufacturing with RF lamination equipment, based on the processes developed indicated that 3 RF presses could replace a typical auto-industry autoclave to achieve equal or greater throughput with possibly less capital cost and smaller footprint. Concepts for curved lamination identifying castable molds for prototyping were developed, which allowed Ceralink to obtain commitment to begin curved tooling development. The project significantly helped to advance RF lamination past the feasibility and novelty stage and into the realm of commercial acceptance as a viable alternative to autoclaves. The demonstration of autoclave-quality autoglass produced in just 1 minute with RF lamination, with validation by Pilkington, has fueled industry motivation to seriously consider RF lamination. The industry and other contacts and outreach made in the study of laminate markets (including 3 technical publications and 5 conference presentations), has resulted in a recent surge in RF lamination activity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fusion for Space Propulsion and Plasma Liner Driven MTF

The need for fusion propulsion for interplanetary flights is discussed. For a propulsion system, there are three important system attributes: (1) The absolute amount of energy available, (2) the propellant exhaust velocity, and (3) the jet power per unit mass of the propulsion system (specific power). For human exploration and development of the solar system, propellant exhaust velocity in excess of 100 km/s and specific power in excess of 10 kW/kg are required. Chemical combustion cannot meet the requirement in propellant exhaust velocity. Nuclear fission processes typically result in producing energy in the form of heat that needs to be manipulated at temperatures limited by materials to about 2,800 K. Using the energy to heat a low atomic weight propellant cannot overcome the problem. Alternatively the energy can be converted into electricity which is then used to accelerate particles to high exhaust velocity. The necessary power conversion and conditioning equipment, however, increases the mass of the propulsion system for the same jet power by more than two orders of magnitude over chemical system, thus greatly limits the thrust-to-weight ratio attainable. If fusion can be developed, fusion appears to have the best of all worlds in terms of propulsion - it can provide the absolute amount, the propellant exhaust velocity, and the high specific jet power. An intermediate step towards pure fusion propulsion is a bimodal system in which a fission reactor is used to provide some of the energy to drive a fusion propulsion unit. The technical issues related to fusion for space propulsion are discussed. There are similarities as well as differences at the system level between applying fusion to propulsion and to terrestrial electrical power generation. The differences potentially provide a wider window of opportunities for applying fusion to propulsion. For example, pulsed approaches to fusion may be attractive for the propulsion application. This is particularly so in the light of significant development of the enabling pulsed power component technologies that have occurred in the last two decades because of defense and other energy requirements. The extreme states of matter required to produce fusion reactions may be more readily realizable in the pulsed states with less system mass than in steady states. Significant saving in system mass may result in pulsed fusion systems using plasmas in the appropriate density regimes. Magnetized target fusion, which attempts to combine the favorable attributes of magnetic confinement and inertial compression-containment into one single integrated fusion scheme, appears to have benefits that are worth exploring for propulsion application.

Thio, Y.C. Francis↗

Hydroelectric Power and Hydrogen Production Integration

Hydropower-based hydrogen production could introduce opportunities for new revenue streams for hydropower plants, including from energy storage and regeneration as well as from sale of the hydrogen product to external markets. Hydrogen-based energy storage and regeneration could also help support Idaho Power’s decarbonization goals by decreasing dependence on fossil-based peaking power plants. Additionally, integration of hydrogen production with hydropower generation could help address the issue of low dissolved oxygen river water conditions that commonly accompany hydropower plant operations by utilizing the oxygen byproduct from an electrolytic hydrogen production process as a resource for mitigation of low dissolved oxygen water conditions. Comprehensive techno-economic analysis of the hybrid hydroelectric and hydrogen energy storage system has revealed critical insights into the pathways and considerations for optimizing the economic value and environmental benefits of such systems. Among the three identified pathways of natural gas blending, regeneration, and direct sale of hydrogen, the direct sale of hydrogen emerges as the most profitable, particularly given the current pricing dynamics of hydrogen and electricity. However, as we anticipate a future grid characterized by higher renewable energy penetration, the landscape may evolve, featuring lower average electricity prices, heightened fluctuations, and more significant seasonal variations. Consequently, the attractiveness of electricity regeneration through hydrogen and the benefits of long-duration hydrogen storage are expected to increase substantially in such a dynamic energy scenario. The careful selection of component sizes within the hybrid system proves to be paramount for ensuring cost-effectiveness. Notably, the size of the hydrogen market has emerged as a critical determinant for the optimal size of the electrolyzer. Hydrogen storage should be sized to meet energy shifting requirements. The appropriate size of the fuel cell/microturbine generator hinges on the shape of electricity prices and the available revenue streams derived from participating in grid services. Striking the right balance among these components is essential for maximizing the overall efficiency and profitability of the hydrogen facility. Furthermore, the by-product of electrolysis, namely oxygen, introduces an additional dimension to the system's functionality. The oxygen generated can be effectively utilized for dissolved oxygen (DO) mitigation, particularly with larger electrolyzer sizes capable of satisfying the complete oxygen demand for this purpose. While the economic benefits derived from saved oxygen purchase costs may be relatively modest compared to other revenue streams, the environmental advantages of repurposing oxygen for DO mitigation could help Idaho Power meet their environmental obligations. In addition to the identified factors shaping the viability of hybrid hydrogen production and hydroelectric generation, it is noteworthy that the integration of hydrogen energy storage offers a unique advantage during unusually wet years. In such periods of increased water inflow, the hydrogen storage capacity serves as a valuable supplement to the reservoir. By utilizing hydrogen energy storage as a complementary reservoir, the system gains flexibility in reservoir management when dealing with fluctuations in water availability.

08 HYDROGEN↗

ROOT: A C++ framework for petabyte data storage, statistical analysis and visualization

ROOT is an object-oriented C++ framework conceived in the high-energy physics (HEP) community, designed for storing and analyzing petabytes of data in an efficient way. Any instance of a C++ class can be stored into a ROOT file in a machine-independent compressed binary format. In ROOT the TTree object container is optimized for statistical data analysis over very large data sets by using vertical data storage techniques. These containers can span a large number of files on local disks, the web or a number of different shared file systems. In order to analyze this data, the user can chose out of a wide set of mathematical and statistical functions, including linear algebra classes, numerical algorithms such as integration and minimization, and various methods for performing regression analysis (fitting). In particular, the RooFit package allows the user to perform complex data modeling and fitting while the RooStats library provides abstractions and implementations for advanced statistical tools. Multivariate classification methods based on machine learning techniques are available via the TMVA package. A central piece in these analysis tools are the histogram classes which provide binning of one- and multi-dimensional data. Results can be saved in high-quality graphical formats like Postscript and PDF or in bitmap formats like JPG or GIF. The result can also be stored into ROOT macros that allow a full recreation and rework of the graphics. Users typically create their analysis macros step by step, making use of the interactive C++ interpreter CINT, while running over small data samples. Once the development is finished, they can run these macros at full compiled speed over large data sets, using on-the-fly compilation, or by creating a stand-alone batch program. Finally, if processing farms are available, the user can reduce the execution time of intrinsically parallel tasks - e.g. data mining in HEP - by using PROOF, which will take care of optimally distributing the work over the available resources in a transparent way.

99 GENERAL AND MISCELLANEOUS↗

Aggregate residential demand flexibility behavior: A novel assessment framework

Residential demand flexibility (DF) could save the U.S. electric grid up to 10 GW of peak demand while supporting increased amounts of renewable generation. However, less than 40% of the estimated DF peak reduction capacity is currently realized, and less than 8% of American households are enrolled. These low participation rates are combined with high rates of "overriding" a DF event and eventual opt-outs among enrolled customers. There is still not a comprehensive understanding of the drivers of DF participation and occupant interaction with DF program signals. We, therefore, present a novel survey processing framework to assess occupant DF-relevant behavior from the American Time Use Survey (ATUS). Using the framework, we summarize both the extensive and intensive behavior of more than 200,000 ATUS respondents (2003-2018 data) and provide insights on the DF-relevant behavior of residential occupants, which is generally overlooked in the literature. Here we use the framework to identify the activity priorities of residential occupants in the United States during different DF-relevant periods (critical peak, peak, and off-peak). These preferred activities capture overlooked routine behaviors that could be barriers to DF participation, if ignored, and might explain the high levels of overrides often exhibited by participants of demand response.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enabling Staged Pressurized Oxy-Combustion: Improving Flexibility and Performance at Reduced Cost

Introduction: The staged pressurized oxy-combustion (SPOC) process, developed by Washington University in St. Louis (WUSTL), is an oxy-combustion carbon capture technology that employs a steam power cycle to generate electricity. As with atmospheric-pressure oxy-combustion processes, carbon dioxide (CO 2 ) capture rates of 90% or higher can be achieved. The staged-combustion approach of the SPOC process, when operated at elevated gas pressure, allows for near elimination of flue gas recycle (FGR) and leads to significant improvements in efficiency and reduced costs. The primary goal of this project was to investigate the potential for SPOC for flexible operation beyond the capabilities of conventional coal-fired power plants, particularly those employing carbon capture and storage (CCS). Oxy-combustion differs from conventional coal combustion in that the combustion of coal is carried out using oxygen as opposed to air. The resultant flue gas is a mixture of primarily CO 2 and water, greatly simplifying CO 2 capture. As SPOC does the oxy-combustion process under pressure, it is higher efficiency and lower cost than atmospheric oxy-combustion. The project was led by the Electric Power Research Institute, Inc., with the assistance of WUSTL, Doosan Babcock (DBL – boiler plant original equipment manufacturer), and Air Liquide (AL – air separation experts). The specific objectives of the project were to: (1) Evaluate the SPOC concept and develop a risk-based approach to the heating surface layout ensuring that performance (gas and steam side), manufacturing, transportation, and plant erection considerations were fully accounted for in the system design. (2) Improve the technology to ensure its performance and cost potential are substantially better than today’s baseline pulverized coal power plant with post-combustion capture (PCC) or atmospheric oxy-combustion, and show progress toward performance commensurate with projected commercial operation, including 90% or more CO 2 capture. (3) Address critical technology gaps and improving overall system performance for the technology. (4) Perform combustion tests at scale under commensurate pressure to the commercial operating system validate combustor and advance the SPOC combustion modeling tools that will facilitate full-scale design. Combustion Testing: Testing was initially carried out at atmospheric pressure with methane to ensure that all systems were correctly operating. Following this, the testing then proceeded to moderate pressure operation at 4 bara, where different stoichiometric conditions were used across an extended heat input range, showing that a stable flame could be maintained. Testing then proceeded at 10 and 15 bara where it was shown that the ignition system needed to be replaced at these operating conditions. When testing recommenced, a similar stable flame shape was achieved, without any methane support, and the full 100 kWth coal oxy-combustion was demonstrated. Heat flux measurements showed 400 kW/m 2 (0.126 MMBtu/hr-ft 2 ) from the flame, within the 450 kW/m 2 (0.142 MMBtu/hr-ft 2 ) preferred limit defined by DBL for the full-scale design case. Carbon monoxide and carbon-in-ash measurements showed that complete combustion was possible with ultra-low excess oxygen at 1 vol % in the product flue gas. This allowed the full-scale models to be calculated based on this level of excess oxygen, improving the performance of the system as lower feed oxygen is produced in the air separation unit (ASU), saving auxiliary power. Full-Scale Design: The full-scale design is sized to deliver 550 MWe net electrical power output to allow direct comparison with the National Energy Technology Laboratory (NETL) baseline cases using the same Montana Powder River Basin (PRB) fuel. The cases used for direct comparison are: Case S12A (supercritical [SC] coal without CO 2 capture), Case S12B (SC coal with PCC at 90% CO 2 capture, and Case S12F (atmospheric oxy-combustion SC coal with 90% CO 2 capture). The SPOC stages were configured to be identical arrangements, allowing for a more straightforward design, construction, and control strategy. Each stage consists of two PVs, the first being the combustor PV module and the second being the convective PV module. The combustor module is the tallest vessel, with local coal feeding equipment and the burner FGR and oxygen plenums at the top and ash management at the bottom. The combustor module is effectively an open cross section with membrane tubes around the circumference – this unobstructed slender profile ensures that the relatively slower burnout mechanism needed for the low-speed turbulent mixing burner can proceed unimpeded and that molten ash will not attach to any surfaces at an angle to the predominant flue gas flow. The steam turbine used in the SPOC design is essentially the same unit utilized in the atmospheric oxy-combustion case except the degree of heat recovery possible allows the low-pressure (LP) feedwater heater train to be eliminated. This is a result of being able to capture the latent heat of evaporation of the moisture produced in the combustion (normally lost to the stack). The SPOC system outperforms the NETL atmospheric oxy-combustion baseline case by 3.3% points and the PCC case by 7.5% points. This performance increase is mainly a result of the improved heat recovery possible from the product flue gas and from the reduced auxiliary power consumption from the ASU and the CO 2 compression and purification unit over the atmospheric equivalent. The combined improvement in boiler efficiency and reduction in the steam turbine heat rate resulted in a net improvement in the overall plant efficiency by 0.61%, to 35.6% on a HHV basis. This relatively small improvement in plant efficiency between sub-bituminous and bituminous coals shows the value of useful moisture latent heat recovery offered by the SPOC system when using low rank fuels. Flexibility and Turndown: The SPOC system has inherent high turndown capabilities because of a demonstrated high range of combustion stability and the ability to bypass stages, thereby reducing steam generation rates proportionally without altering firing rates in operating stages. ASU units do not generally offer significant turndown opportunities as they are limited by the performance of the compression plant. The baseline SPOC design has a 2-train ASU configuration, needed to be able to meet the 10,500 tonnes per day duty, that can deliver efficient turndown points between 85–100% load with both trains operating, and at 45–50% load with a single train operating. Outside these operating points, the flexibility and efficiency are limited and may be uncompetitive at loads below 45% as the ASU systems are unable to turndown beyond 85% for the base case and 70% for the flexible case. The ASU cold box for the flexible case was designed to operate at loads between 40-100%, below this operating range the purity of the produced oxygen cannot be guaranteed, resulting in additional load for the CPU equipment. The additional power consumption of these cases yields an uneconomic operating condition with poor efficiency when operating at low loads such as 25% and 12%. To address this flexibility constraint, AL evaluated how the ASU configuration could be altered to deliver efficient oxygen supply over the load range. This involved integrating the compressor duties across both ASU trains into a shared duty arrangement with multiple compressors, strategically sized to deliver the duty required across all load ranges between 40–100% by enabling different combinations of the main air compressors and the booster air compressors. The oxygen purity cannot be guaranteed below 40% load for each train – the power consumption at 25% and 12% loads were estimated based on the multi-compressor configuration at maximum turndown as these load cases were not considered in the flexible ASU design. With a different cold box configuration, i.e. number of trains, the entire load range could be delivered within oxygen purity specifications. Although there is a small efficiency reduction at full load, there are significant improvements in overall plant performance during low-load operation. The exact ASU configuration needed will therefore be dependent on the expected operating profile of the unit. Economic Analysis: Cost estimates for the baseline and the flexible cases were developed using NETL baseline case data for common BOP items and an Association for the Advancement of Cost Engineering International Class 5 (conceptual/screening study) assessment of key components unique to the SPOC system. The capital, operating, and maintenance costs were assessed along with the first-year power cost, levelized cost of electricity, and CO 2 captured and avoided cost for the SPOC cases were compared against the relevant NETL baseline cases in January 2019 dollars. Both SPOC cases achieve a lower cost that the alternative NETL baseline cases (with the flexible SPOC case being slightly higher than the baseline SPOC case due to the compounded impact of higher capital costs and lower efficiency at full load). The SPOC cases deliver a lower cost of CO 2 avoided than the NETL baseline cases due to greater efficiency in generating low-carbon power. However, the cost of CO 2 captured is higher because the higher efficiency of the SPOC process generates less CO 2 , hence less needs to be captured, resulting in a high capital cost being shared over a reduced CO 2 quantity. The flexible ASU adds 1.6% overall to the plant cost in comparison to the baseline case, but the efficiency improvements at loads below 50% are significant. Subsequently, depending on the plant load-profile expectation, the flexible ASU would be beneficial if the plant spends a significant portion of its operating life below 50% load. This kind of operating profile is likely to be required for all fossil plants when more renewable electricity generators are installed on the local grid, particularly solar power that can be predicted ahead of time, allowing for appropriate pricing signals to be incorporated into the diurnal cycle. R&D Recommendations: SPOC, while a promising technology, is a relatively recent concept and, as such, operability issues of combustor design and steam-side integration for such systems at a scale relevant to commercial deployment have not been evaluated. WUSTL has conducted extensive small pilot-scale (100 kWth) research to understand and advance pressurized oxy-combustion processes, including investigation of combustion and flame characteristics, radiative heat flux, burner operability, turn down, char burnout, ash characteristics, water-wash column operation, etc. for pressurized oxy-combustion systems. Nonetheless, at this stage in the development of the SPOC process, what is needed is a large-scale pilot plant that can serve to study pressurized oxy-combustion systems and components at a scale commensurate with the maturity of the technology. A scale of 10 MWth, which includes steam-side integration and two stages would yield essential information with respect to heat transfer characteristics both in the radiative and convective sections of the pressure vessels, and the ability to operate the fuel staging process. In addition, while modeling results indicate that combustion and flame characteristics improve with scale, direct studies of the combustor at this scale will ensure that the models can be relied upon for scale up to commercial scale. Furthermore, a detailed analysis must be performed to understand the scaling aspects of key components and systems.

20 FOSSIL-FUELED POWER PLANTS↗

Maintaining department of energy (DOE) waste disposition pathways in today's uncertain budgetary environment - 15129

For many years the Department of Energy (DOE) and its prime contractors have worked collaboratively with commercial waste transportation, treatment, and disposal providers to develop and implement outlets for the efficient management and disposition of radioactive wastes, particularly 'no-path-forward' or 'difficult-to-treat' wastes. Both the DOE and commercial providers have made substantial investments to develop capabilities and infrastructure to address these wastes and both have benefited from this collaboration. For example, DOE realized significant cost savings and avoidances when a commercial facility became available that allowed closure of the TSCA incinerator in Oak Ridge or when commercial capabilities were expanded that precluded the need to build a new Hanford M-91 waste treatment facility, estimated at $540 million for design, permitting, and construction. In addition, expanded capabilities developed at commercial facilities ensured a known, if not guaranteed, source for managing waste and improving efficiencies for wastes which previously had no viable disposition outlet or that required extended schedules and cost for completion. Such wastes include sodium- and mercury-bearing wastes, classified shapes, or many forms of suspect transuranic (TRU) wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗