Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “eclipse”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Thermal Control System Architecture and Technology Challenges for a Lunar Surface Habitat

NASA’s current plans for exploration of the Lunar South Pole region include a Surface Habitat (SH) to provide up to 60-day habitability for a crew of four. The SH concept is comprised of several elements including an inflatable volume for the habitable space and a metallic airlock for access to a pressurized rover and other surface assets. A conceptual architecture for the SH Thermal Control System (TCS) is presented. A TCS dual loop design is utilized with a water/propylene glycol mix for the internal crew spaces and an external loop with low temperature coolant. The internal loop is partitioned into low and moderate temperature service with a sublimator available for operational scenarios prior to thermal radiator deployment (or redeployment). Waste heat is rejected through thermal radiators contained in the external loop. Optimization of the thermal radiator geometry/orientation as well as the TCS internal/external loop architecture is accomplished via analytical models of the system. Low mass, dust tolerant, deployable/retractable thermal radiators (in partial gravity) and thermal control surfaces, along with accommodating infrequent eclipse periods lasting up to 100 hours, present the major technology challenges. Mitigation strategies to reduce the energy needed to maintain the SH and associated systems above survival temperature limits during the eclipse period are considered in the paper. Options include retractable radiators, re-generable heat exchangers, temperature excursions, thermal energy storage and optimized inflatable optical properties. TCS sensitivity to potential SH Electrical Power System (EPS) growth is also a consideration for both operational and dormant mission phases.

Thermal Control System↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

BioSentinel: To the Moon or Beyond?

BioSentinel, an Artemis-1 secondary spacecraft, will carry a biology experiment into deep space for the first time in 50 years. A 6U CubeSat form factor was utilized for the spacecraft and included technologies newly developed or adapted for operations beyond Earth orbit. This is the maiden deep-space voyage for the radio, propulsion system, electrical power system, and BioSensor payload. The spacecraft carries onboard budding yeast, Saccharomyces cerevisiae, as an analog to human cells to test the biological response to deep space radiation. Flying a secondary payload beyond LEO comes with unique challenges with respect to trajectory uncertainty and mission operations planning. BioSentinel does not carry propulsion for trajectory maneuvers, so plans for Comms and Power need to be developed for all trajectories. The nominal plan is a lunar flyby followed by an insertion into Heliocentric orbit. However, some possible scenarios include lunar eclipses that could severely impact the power budget during that phase of the mission, while others could result in a “Retrograde” hyperbola at swingby resulting in the spacecraft traveling inward toward Earth or even towards a collision with the lunar surface. BioSentinel’s final trajectory will not be known until after launch and deployment so possible scenarios need to be planned for ahead of time. This paper discusses the operational scenarios that were planned for as well as the actual execution of the mission operations including: command pass scheduling with the Deep Space Network, selecting bandwidth limits, medium gain antenna versus low gain antenna usage, and conserving power prior to a lunar eclipse. Note: Artemis-1 is planned to launch in the Spring of 2022

BioSentinel↗

TOI-2109: An Ultrahot Gas Giant on a 16 hr Orbit

We report the discovery of an ultrahot Jupiter with an extremely short orbital period of 0.67247414 ± 0.00000028 days (∼16 hr). The 1.347 ± 0.047 RJup planet, initially identified by the Transiting Exoplanet Survey Satellite (TESS) mission, orbits TOI-2109 (TIC 392476080)—a T(eff) ∼ 6500 K F-type star with a mass of 1.447 ± 0.077 Mꙩ, a radius of 1.698 ± 0.060 Rꙩ, and a rotational velocity of v sin i =81.9 ± 1.7 km/s. The planetary nature of TOI-2109b was confirmed through radial-velocity measurements, which yielded a planet mass of 5.02 ± 0.75 M(Jup). Analysis of the Doppler shadow in spectroscopic transit observations indicates a well-aligned system, with a sky-projected obliquity of λ = 1.°7± 1.°7. From the TESS full-orbit light curve, we measured a secondary eclipse depth of 731 ± 46 ppm, as well as phase-curve variations from the planet's longitudinal brightness modulation and ellipsoidal distortion of the host star. Combining the TESS-band occultation measurement with a K(s)-band secondary eclipse depth (2012 ± 80 ppm) derived from ground-based observations, we find that the dayside emission of TOI-2109b is consistent with a brightness temperature of 3631 ± 69 K, making it the second hottest exoplanet hitherto discovered. By virtue of its extreme irradiation and strong planet–star gravitational interaction, TOI-2109b is an exceptionally promising target for intensive follow-up studies using current and near-future telescope facilities to probe for orbital decay, detect tidally driven atmospheric escape, and assess the impacts of H2 dissociation and recombination on the global heat transport.

Ian Wong↗

Bringing Planetary Science Mission Outreach to the Deaf and Blind Communities

Introduction: Technology for enhancing outreach, like 3D printing, and science communication products, such as videos and podcasts, can be utilized within the planetary science community, especially for the engagement and excitement of current or upcoming planetary exploration missions. However, these communication products can also be further enhanced for the benefit of the blind and deaf communities. While such products may already be readily available, such projects are not easily accessible to blind and/or deaf certified educators, which often rely on making their own resources or do not have the funds to provide such resources (e.g., cost of 3D printers or cost of braille books). The planetary science community can have better practices to reach these broader audiences. Best practices can include transcripts from podcasts, transcripts in videos, and large-font captions. Images on websites and social media accounts should also include alt-text descriptive captions. 3D printing can also enhance planetary science for the blind community, through tactile posters, maps, and pamphlets. Planetary data can also be augmented by providing different tactile geological maps (e.g., topography or various datasets), and audio-visual videos freely available for educators. Visual Engagement: Visual engagement consists of several avenues to consider, the three main themes includes: 1) swag; 2) videos; 3) interactive exploration. Swag can include the fun visual take-home materials, such as stickers, posters, bookmarks, etc. Videos can include educational-specific videos (available freely via YouTube or by other educational-specific streaming avenues, such as Nebula or Curiosity Stream), provided they have Closed Captioning (CC). The use of QR codes to such videos or websites can also benefit to being added on swag. Interactive exploration can also be sub-divided by different types of engagement. A popular and still fairly new technology for public engagement is the use of virtual reality (VR). While this has been mainly for martian and lunar surface exploration [1], the deaf communities can benefit from VR through a more extensive look at our solar system and beyond (for example, a VR experience of the flight path, or visual map of the heliosphere/dynamics of our Sun). Audio Engagement: Audio tools can also be a useful avenue of communication, especially for the blind communities. Audio archiving can certainly be transcripts from the video engagements, but also the use of podcasts can also be a benefit. Podcasting can take on two forms: 1) interview engagement; and 2) update engagement. For interviews, scientists can communicate with STEM-specific podcast platforms to make other listener-bases aware of what is going on with a specific mission. For update-type communication, missions may opt to have an archived podcast of news, updates, and the teams involved. The most important aspect of such podcasts would be for the need of complimentary transcripts (including descriptive transcripts if sounds are included), and the limited use of jargon. Research Engagement: There have been several examples of involving the blind and low-vision communities in citizen science, such as through the NASA Heliophysics division. Examples include the NASA PUNCH (Polarimeter to Unify the Corona and Heliosphere) mission led by the Southwest Research Institute [2], which include blind and visually-impaired citizens to assist in the Sun’s coronal rhythms.” Another example is the Eclipse Soundscapes: Citizen Science Project (ES:CSP), which documents observations of acoustical changes of nature and ecosystems during solar eclipse events [3]. Inclusivity: A major theme that is necessary for public engagement is inclusivity and the awareness of reaching broader audiences. Outreach to include hearing/seeing impaired communities are still lacking in the sciences. There are several opportunities that the planetary sciences could take. Other projects that have emerged from the space sciences include adding transcripts to visual engagement [4], and the use of 3D printing for the visually-impaired [5]. References: [1] Olgin, J. (2020) 51st LPSC, Abstract 2137. [2] https://scitechdaily.com/outreach-for-nasa-punch-mission-embraces-ancient-and-modern-sun-watching-theme/ [3] https://science.nasa.gov/science-activation-team/eclipse-soundscapes [4] NASA International Observe the Moon Night (Blind and Deaf Accessible), Youtube Video ( https://www.youtube.com/watch?v=neHCfg0S3-Q) [5] Richardson, J., et al. (2018) AGU Fall Meeting, Abstract ED23F-0963.

C J Ahrens↗

Thermal Control System Architecture and Technology Challenges for a Lunar Surface Habitat

NASA’s current plans for exploration of the Lunar South Pole region include a Surface Habitat (SH) to provide up to 60-day habitability for a crew of four. The SH concept is comprised of several elements including an inflatable volume for the habitable space and a metallic airlock for access to a pressurized rover and other surface assets. A conceptual architecture for the SH Thermal Control System (TCS) is presented. A TCS dual loop design is utilized with a water/propylene glycol mix for the internal crew spaces and an external loop with low temperature coolant. The internal loop is partitioned into low and moderate temperature service with a sublimator available for operational scenarios prior to thermal radiator deployment (or redeployment). Waste heat is rejected through thermal radiators contained in the external loop. Optimization of the thermal radiator geometry/orientation as well as the TCS internal/external loop architecture is accomplished via analytical models of the system. Low mass, dust tolerant, deployable/retractable thermal radiators (in partial gravity) and thermal control surfaces, along with accommodating infrequent eclipse periods lasting up to 100 hours, present the major technology challenges. Mitigation strategies to reduce the energy needed to maintain the SH and associated systems above survival temperature limits during the eclipse period are considered in the paper. Options include retractable radiators, re-generable heat exchangers, temperature excursions, thermal energy storage and optimized inflatable optical properties. TCS sensitivity to potential SH Electrical Power System (EPS) growth is also a consideration for both operational and dormant mission phases.

Thermal Control System↗

Soil Moisture Active/Passive (SMAP) L-Band Microwave Radiometer Post-Launch Calibration Revisit: Approach and Performance

The soil moisture active passive (SMAP) microwave radiometer is a fully-polarimetric L -band radiometer flown on the SMAP satellite in a 6 AM /6 PM sun-synchronous orbit at 685-km altitude. After the SMAP L1B_TB data product version 4 was released in 2018, the radiometer has undergone further calibration and validation. The goal is to reduce the difference between antenna temperature of ascending and descending orbits during the eclipse, and to reduce the dips in the calibration drift over the cold sky (CS) during the eclipse seasons in 2017 and 2018. The postlaunch calibration algorithm has been revisited by retrieving all of the calibration parameters simultaneously with two different options for the hot calibration source (the global ocean, or the radiometer internal reference load). The performance of the two options are compared here. The option with the radiometer internal reference load has been chosen by the SMAP science team for data release version 5. In addition, a correction offset is applied to the input signal to account for offsets during the early-mission stages with the SMAP synthetic aperture radar transmitter operating alongside the radiometer.

calibration↗

Supervisory On-line Optimal Control of an Electric Power Microgrid Design for Lunar Habitation

The following article describes an optimal control algorithm for the operation and study of an electric microgrid designed to power a lunar habitat. A photovoltaic (PV) generator powers the habitat and the presence of predictable lunar eclipses necessitates a system to prioritize and control loads within the microgrid. The algorithm consists of a reduced order model (ROM) that describes the microgrid, a discretization of the equations that result from the ROM, and an optimization formulation that controls the microgrid’s behavior. In order to validate this approach, the paper presents results from simulation based on lunar eclipse information and a schedule of intended loads.

Joseph Young↗

BioSentinel Deep Space CubeSat Mission

The BioSentinel mission was recently launched aboard the SLS launch vehicle (LV) as part of the Artemis-1 campaign. This 6U CubeSat carries yeast cells to analyze the effects of radiation at large distances from Earth, becoming the first biological payload in Deep Space. Prelaunch activities included mission design updates, orbit determination rehearsals and the development of a tracking schedule in coordination with the Artemis-1 payload office and the Deep Space Network (DSN). An important influence on the trajectories of Artemis I secondaries was the uncertainty associated with deployment from the Interim Cryogenic Propulsion System (ICPS), the upper stage of the SLS LV. The ICPS was rotating at a rate of 1 rpm; there was also uncertainty in the spin axis attitude, which translated into an unknown clock angle of deployment. The variability in this angle and magnitude of deployment implied the existence of a non-negligible risk of a lunar impact, which was evaluated for various potential launch dates. On November 16 th 2022 BioSentinel successfully deployed from ICPS and the navigation team started to receive tracking data from the DSN and ESA antennas. Soon after deployment, the spacecraft was tumbling and entered safe mode. The mission team recovered the spacecraft and after four tracking passes, we solved for a first ephemeris that was sent to the DSN for better tracking of the spacecraft. After propagating this first ephemeris solution, we determined that we avoided impact with a margin of a few hundred km from the lunar surface. More tracking data over the next few days allowed for a more refined orbit solution predicting a periselene altitude of 406 km and a lunar eclipse lasting 36.5 minutes. Therefore, BioSentinel operators avoided any correction maneuvers on the trajectory and successfully tracked and guide the spacecraft. The spacecraft performed a nominal lunar flyby which provided the pertinent energy to achieve a final Earth-trailing heliocentric orbit. Over the course of two weeks, the mission operators corroborated that the subsystems were functioning as expected after the lunar eclipse and the large ΔV incurred. Science operations started once the mission achieved the nominal orbit in Deep Space. This paper discusses in detail the BioSentinel flight performance, as well as the challenges and lessons learned prior to and during this CubeSat mission.

Andres Dono Perez↗

Thermal Emission from the Earth-sized Exoplanet TRAPPIST-1 b using JWST

The TRAPPIST-1 system is remarkable for its seven planets that are similar in size, mass, density, and stellar heating to the rocky planets Venus, Earth, and Mars in our own Solar System [1]. All TRAPPIST-1 planets have been observed with the transmission spectroscopy technique using the Hubble or Spitzer Space Telescopes, but no atmospheric features have been detected or strongly constrained [2–5]. TRAPPIST-1 b is the closest planet to the system’s M dwarf star, and it receives 4 times as much irradiation as Earth receives from the Sun. This relatively large amount of stellar heating suggests that its thermal emission may be measurable. Here we present photometric secondary eclipse observations of the Earth-sized TRAPPIST1 b exoplanet using the F1500W filter of the MIRI instrument on JWST. We detect the secondary eclipse in each of five separate observations with 8.7-sigma confidence when all data are combined. These measurements are most consistent with re-radiation of the TRAPPIST-1 star’s incident flux from only the dayside hemisphere of the planet. The most straightforward interpretation is that there is little or no planetary atmosphere redistributing radiation from the host star and also no detectable atmospheric absorption from carbon dioxide (CO 2 ) or other species.

Thermal Emission↗

Introducing Triquetrum, A Possible Future for Kepler and Ptolemy II

Triquetrum is an open platform for managing and executing scientific workflows that is under development as an Eclipse project. Both Triquetrum and Kepler use Ptolemy II as their execution engine. Triquetrum presents opportunities and risks for the Kepler community. The opportunities include a possibly larger community for interaction and a path for Kepler to move from Kepler's one-off ant-based build environment towards a more common OSGi-based environment and a way to maintain a stable Ptolemy II core. The risks include the fact that Triquetrum is a fork of Ptolemy II that would result in package name changes and other possible changes. In addition, Triquetrum is licensed under the Eclipse Public License v1.0, which includes a patent clause that could conflict with the University of California patent clause. This paper describes these opportunities and risks.

Brooks, Christopher↗

A retrospective planning analysis comparing intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) using two optimization algorithms for the treatment of early-stage prostate cancer

The primary aim of this study is to compare intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) for the radical treatment of prostate cancer using version 10.0 (v10.0) of Varian Medical Systems, RapidArc radiation oncology system. Particular focus was placed on plan quality and the implications on departmental resources. The secondary objective was to compare the results in v10.0 to the preceding version 8.6 (v8.6). Twenty prostate cancer cases were retrospectively planned using v10.0 of Varian's Eclipse and RapidArc software. Three planning techniques were performed: a 5-field IMRT, VMAT using one arc (VMAT-1A), and VMAT with two arcs (VMAT-2A). Plan quality was assessed by examining homogeneity, conformity, the number of monitor units (MUs) utilized, and dose to the organs at risk (OAR). Resource implications were assessed by examining planning and treatment times. The results obtained using v10.0 were also compared to those previously reported by our group for v8.6. In v10.0, each technique was able to produce a dose distribution that achieved the departmental planning guidelines. The IMRT plans were produced faster than VMAT plans and displayed improved homogeneity. The VMAT plans provided better conformity to the target volume, improved dose to the OAR, and required fewer MUs. Treatments using VMAT-1A were significantly faster than both IMRT and VMAT-2A. Comparison between versions 8.6 and 10.0 revealed that in the newer version, VMAT planning was significantly faster and the quality of the VMAT dose distributions produced were of a better quality. VMAT (v10.0) using one or two arcs provides an acceptable alternative to IMRT for the treatment of prostate cancer. VMAT-1A has the greatest impact on reducing treatment time.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Understanding collective human movement dynamics during large-scale events using big geosocial data analytics

Conventional approaches for modeling human mobility pattern often focus on human activity and movement dynamics in their regular daily lives and cannot capture changes in human movement dynamics in response to large-scale events. With the rapid advancement of information and communication technologies, many researchers have adopted alternative data sources (e.g., cell phone records, GPS trajectory data) from private data vendors to study human movement dynamics in response to large-scale natural or societal events. Big geosocial data such as georeferenced tweets are publicly available and dynamically evolving as real-world events are happening, making it more likely to capture the real-time sentiments and responses of populations. However, precisely-geolocated geosocial data is scarce and biased toward urban population centers. In this research, we developed a big geosocial data analytical framework for extracting human movement dynamics in response to large-scale events from publicly available georeferenced tweets. The framework includes a two-stage data collection module that collects data in a more targeted fashion in order to mitigate the data scarcity issue of georeferenced tweets; in addition, a variable bandwidth kernel density estimation(VB-KDE) approach was adopted to fuse georeference information at different spatial scales, further augmenting the signals of human movement dynamics contained in georeferenced tweets. To correct for the sampling bias of georeferenced tweets, we adjusted the number of tweets for different spatial units (e.g., county, state) by population. To demonstrate the performance of the proposed analytic framework, we chose an astronomical event that occurred nationwide across the United States, i.e., the 2017 Great American Eclipse, as an example event and studied the human movement dynamics in response to this event. Finally, this analytic framework can easily be applied to other types of large-scale events such as hurricanes or earthquakes.

54 ENVIRONMENTAL SCIENCES↗

VARIABLE STARS IN THE GLOBULAR CLUSTER NGC 2808

The first calibrated broadband BVI time-series photometry is presented for the variable stars in NGC 2808, with observations spanning a range of 28 years. We have also redetermined the variability types and periods for the variable stars identified previously by Corwin et al., revising the number of probable fundamental-mode RR Lyrae variables (RR0) to 11 and the number of first-overtone variables (RR1) to five. Our observations were insufficient to discern the nature of the previously identified RR1 star, V24, and the tentatively identified RR1 star, V13. These two variables are {approx}0.8 mag brighter than the RR Lyrae variables, appear to have somewhat erratic period and/or luminosity changes, and lie inside the RR Lyrae instability strip. Curiously, all but one of the RR Lyrae stars studied in this relatively metal-rich cluster exhibit the Blazhko phenomenon, an effect thought to occur with higher frequency in metal-poor environments. The mean periods of the RR0 and RR1 variables are (P){sub RR0} = 0.56 {+-} 0.01 d and {sub RR1} = 0.30 {+-} 0.02 d, respectively, supporting an Oosterhoff I classification of the cluster. On the other hand, the number ratio of RR1-to-RR0-type variables is high, though not unprecedented, for an Oosterhoff I cluster. The RR Lyrae variables have no period shifts at a given amplitude compared to the M3 variables, making it unlikely that these variables are He enhanced. Using the recent recalibration of the RR Lyrae luminosity scale by Catelan and Cortes, a mean distance modulus of (m - M){sub V} = 15.57 {+-} 0.13 mag for NGC 2808 is obtained, in good agreement with that determined here from its type II Cepheid and SX Phoenicis population. Our data have also allowed the discovery of two new candidate SX Phoenicis stars and an eclipsing binary in the blue straggler region of the NGC 2808 color-magnitude diagram.

79 ASTRONOMY AND ASTROPHYSICS↗

THE LOW-MASS INTERACTING BINARY SYSTEM OO Aql REVISITED: A NEW QUADRUPLE SYSTEM

In this study we present photometric and spectroscopic variation analysis and an orbital period study of a low-mass interacting system OO Aql. Simultaneous solution of the light and radial velocity curves provides us with the determination of a new set of stellar physical parameters for the primary and the secondary companion, M{sub 1} = 1.05(2) M{sub Sun }, M{sub 2} = 0.89(2) M{sub Sun }, R{sub 1} = 1.38(2) R{sub Sun }, R{sub 2} = 1.28(2) R{sub Sun }, log (L{sub 1}/L{sub Sun }) = 0.258, and log (L{sub 2}/L{sub Sun }) = 0.117, and the separation of the components was determined to be a = 3.333(16) R{sub Sun }. Newly obtained parameters yield the distance of the system as 136(8) pc. Analyses of the mid-eclipse times indicate a period increase of (P/ P-dot )=4 Multiplication-Sign 10{sup 7} yr that can be interpreted in terms of the mass transfer (dM/dt) = 5 Multiplication-Sign 10{sup -8} M{sub Sun} yr{sup -1} from the less massive component to the more massive component. Our new solution confirmed that OO Aql is a multiple system in the form of AB + C + D. We found initial astrophysical parameters for the component of the system and its current age to be 8.6 Gyr using a non-conservative stellar evolution model (EV-TWIN code).

79 ASTRONOMY AND ASTROPHYSICS↗

ADAPTIVE OPTICS IMAGES. II. 12 KEPLER OBJECTS OF INTEREST AND 15 CONFIRMED TRANSITING PLANETS

All transiting planet observations are at risk of contamination from nearby, unresolved stars. Blends dilute the transit signal, causing the planet to appear smaller than it really is, or producing a false positive detection when the target star is blended with an eclipsing binary. High spatial resolution adaptive optics images are an effective way of resolving most blends. Here we present visual companions and detection limits for 12 Kepler planet candidate host stars, of which 4 have companions within 4''. One system (KOI 1537) consists of two similar-magnitude stars separated by 0.''1, while KOI 174 has a companion at 0.''5. In addition, observations were made of 15 transiting planets that were previously discovered by other surveys. The only companion found within 1'' of a known planet is the previously identified companion to WASP-2b. An additional four systems have companions between 1'' and 4'': HAT-P-30b (3.''7, {Delta}Ks = 2.9), HAT-P-32b (2.''9, {Delta}Ks = 3.4), TrES-1b (2.''3, {Delta}Ks = 7.7), and WASP-P-33b (1.''9, {Delta}Ks = 5.5), some of which have not been reported previously. Depending on the spatial resolution of the transit photometry for these systems, these companion stars may require a reassessment of the planetary parameters derived from transit light curves. For all systems observed, we report the limiting magnitudes beyond which additional fainter objects located 0.''1-4'' from the target may still exist.

79 ASTRONOMY AND ASTROPHYSICS↗

DEEP, LOW MASS RATIO OVERCONTACT BINARY SYSTEMS. XIII. DZ PISCIUM WITH INTRINSIC LIGHT VARIABILITY

New multi-color photometry for the eclipsing binary DZ Psc was performed in 2011 and 2012 using the 85 cm telescope at the Xinglong Station of the National Astronomical Observatories of China. Using the updated Wilson-Devinney (W-D) code, we deduced two sets of photometric solutions. The overcontact degree is f = 89.7({+-} 1.0)%, identifying DZ Psc as a deep, low mass ratio overcontact binary. The asymmetric light curves (i.e., LC{sub 2} in 2012) were modeled by a hot spot on the primary star. Based on all of the available light minimum times, we discovered that the orbital period of DZ Psc may be undergoing a secular period increase with a cyclic variation. The modulated period and semi-amplitude of this oscillation are P{sub mod} = 11.89({+-} 0.19) yr and A = 0.0064({+-} 0.0006) days, which may be possibly attributed to either cyclic magnetic activity or light-time effect due to the third body. The long-term period increases at a rate of dP/dt=+7.43({+-}0.17) Multiplication-Sign 10{sup -7} days yr{sup -1}, which may be interpreted as conserved mass transfer from the less massive component to the more massive one. With mass transferring, DZ Psc will finally merge into a rapid-rotation single star when J{sub spin}/J{sub orb} > 1/3.

79 ASTRONOMY AND ASTROPHYSICS↗

WIYN OPEN CLUSTER STUDY. LV. ASTROMETRY AND MEMBERSHIP IN NGC 6819

We present proper motions and astrometric membership analysis for 15,750 stars around the intermediate-age open cluster NGC 6819. The accuracy of relative proper motions for well-measured stars ranges from {approx}0.2 mas yr{sup -1} within 10' of the cluster center to 1.1 mas yr{sup -1} outside this radius. In the proper motion vector-point diagram, the separation between the cluster members and field stars is convincing down to V {approx} 18 and within 10' from the cluster center. The formal sum of membership probabilities indicates a total of {approx}2500 cluster members down to V {approx} 22. We confirm the cluster membership of several variable stars, including some eclipsing binaries. The estimated absolute proper motion of NGC 6819 is {mu}{sub x}{sup abs}=-2.6{+-}0.5 and {mu}{sub y}{sup abs}=-4.2{+-}0.5 mas yr{sup -1}. A cross-identification between the proper motion catalog and a list of X-ray sources in the field of NGC 6819 resulted in a number of new likely optical counterparts, including a candidate CV. For the first time we show that there is significant differential reddening toward NGC 6819.

79 ASTRONOMY AND ASTROPHYSICS↗