Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Radiation protection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

CSA, the French LILW Disposal Facility: Taking Stock of the 30 years' Operating Experience - 20009

French Andra's currently operational LILW repository, Aube disposal facility, is almost 30 years old. From the beginning, the repository has benefited from the lessons learned from the first disposal facility, the CSM. It has nevertheless continued to evolve, to improve and to adapt, seeking to gain in efficiency, safety and cost optimization. This is a look at what has changed at the CSA since 1992 - and the effect these changes had on its operating practices, construction principles and the entire management organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quest for Continuous Design and Safety Optimization: A Look at Cires, the French Very Low Level Waste Disposal - 20010

Cires, the French repository for very low-level waste (VLLW) managed by Andra, has a fifteen-year history of enhancing design and disposal operations, responding to producers' needs by optimizing existing facilities and providing new facilities as needed. Its flexibility allows the facility to adapt to changes in waste delivery flows, to dispose of larger waste volumes without using more space, to integrate new concepts and even envisage disposal capacity extension. The article traces the ever evolving history of technical and operational optimization of this unique disposal facility situated in Eastern France. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Start-up of Silo 130 Waste Retrieval at La Hague: first Step Towards Reducing Legacy Inventory - 20020

On June 25, 2019, the first grapple of waste and debris was lifted from Silo 130, one of the most challenging legacy waste storage silos at La Hague. This was the achievement of more than ten years of studies and efforts focused on solving some very unique technical and safety challenges, and on designing an innovative, efficient solution. The waste is from de-cladding materials from past Gas-Cooled Reactor fuel reprocessing operations. It is an unsorted mixture of magnesium cladding pieces, graphite debris, and various other metallic waste types. These materials can be chemically reactive and therefore need specific dispositions for handling and storing. The building is more than 40 years old and does not meet modern standards. French safety authorities have required the silo to be emptied. After about three years of operation, the bulk of this waste will be removed and placed in safe storage, pending the selection of a final conditioning solution. Removal of bottom debris will then be possible. When finished, this operation will bring a conclusion to a significant legacy-related hazard on the site. The silo will then be available for final cleaning and de-activation. This paper will describe the technical, safety, and economical challenges, and the various decisions and optimizations that led to the definition of the process and technology to be implemented. Several innovative features were developed and implemented, in all sections of the project: project organization, progressive approach for the waste disposition strategy, light building design, customized and robust retrieval technology, processing technologies involving the most modern robotic and sorting techniques, storage method... Several of these first-of-a-kind innovative features have been developed and qualified specifically for this application, using the detailed qualification procedure specified for all La Hague projects. The facility was built in less than five years, overcoming various difficulties along the line. Commissioning is now finished with the combined efforts of the project, engineering, start-up, and operating teams assisted by dedicated suppliers. The facility is now ramping-up. The paper will also report on the commissioning and start-up of the facility and describe the first operational results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geographic Information System Based Emergency Response Training Assessments for DOE Radioactive Materials Transport - 20027

Safety and security are priorities of U.S. Department of Energy (DOE) radioactive materials shipping campaigns. In the more than 70-year history of domestic transport of spent nuclear fuel (SNF), there has never been a transportation-related radiological injury. To support transportation planning, among the tools that DOE uses is the Stakeholder Tool for Assessing Radioactive Transportation (START). START contains geospatial data and transportation route analyses capabilities designed to support a range of DOE transportation planning initiatives. One of those functions is the capability to support emergency response planning and training for State and Tribal jurisdictions located on routes used for DOE shipments of radioactive materials. As part of the Department's commitment to public safety, DOE provides federally-funded radiological response training to emergency responders along DOE radioactive materials transportation corridors through its Transportation Emergency Preparedness Program (TEPP). START contains spatial data representing the locations and emergency-response capabilities of fire departments, police, hospitals, State emergency response centers, and where TEPP-trained personnel are based. The START tool supports State and Tribal users' ability to evaluate emergency-response coverage on active and potential DOE radioactive materials transport routes through their jurisdictions, provide expected response times to reach the scene of an incident, identify equipment available to support a response, and identify the number of response personnel and their respective training levels. In addition, START can be used to identify gaps in coverage along a transportation corridor where additional radiological emergency response training may be needed. This paper describes the data, features, and functionality DOE uses to provide a resource for emergency response training needs assessments for States and Tribes along active and potential routes for transporting radioactive materials, and illustrates its use. It also discusses future plans to integrate TEPP and Federal Emergency Management Agency (FEMA) radiological training data to provide a more comprehensive source of geospatial information on personnel who have received equivalent radiological response training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Simple, Revolutionary Approach to Waste Packaging Utilizing Proven Technology - 20201

Historically, removing hazardous waste from gloveboxes involves the use of bags as the primary containment method. This method can prove tedious, repetitive, and time consuming to ensure the process follows all safeguards required to contain the waste and mitigate any breach of containment. Layers of bags, yards of tape, and multiple filters are added to the waste stream in order to transfer the hazardous waste from the glovebox safely into the drum package. Then, finally, it can be shipped and disposed of. The process to cut, tie, and tape each bag for disposal involves manual effort by multiple operators. Following Administrative Safety Controls, good operators are able to safely perform those tasks; but, since the bag is the only confinement layer, incidents can occur. Operators, in some cases, are also at close proximity to this waste which may increase the risk of radiation exposure. Once the waste is transferred out through these bags, it is nearly impossible to remove packaged waste that may contain higher dosage levels, thus increasing drum disposal costs incurred by the facility. Exceeding the allowable radiation levels, and drums not fully filled, both contribute significantly to excess disposal costs. Central Research Laboratories (CRL), based in Red Wing Minnesota, has developed the Waste Drum Transfer System (WDTS) building upon the proven technology and containment of the Rapid Transfer Port (RTP) as an alternate, more efficient method of waste transfer. This solution consists of an RTP Alpha port mounted inside a glovebox and Beta assembly unit composed of a drum liner fitted inside a standard 55 gallon drum. The use of the Beta drum liner bypasses the typical use of bags, sleeves or tape to provide leak tight containment. The process to connect and disconnect a drum from the glovebox is achieved by the self-docking and rotating system controls of the RTP Alpha, all done with only one operator standing in an upright ergonomic position. This system also allows for greater flexibility in available Beta connection options, expanding the overall functionality of the system. This system can be disconnected and reconnected multiple times to maximize volume containment. This will minimize drum disposal costs and reduce the overall volume of waste output by more efficiently filling the drums. Radiation levels inside each drum can be monitored and adjusted more efficiently by operators utilizing the reconnect option. Minimal As Low As Reasonably Achievable (ALARA) levels are also achievable with this system. This paper will show how highly efficient packaging and disposal of hazardous waste can be accomplished in a cost-effective manner utilizing the proven RTP technology. Maximized operator productivity and safety, as well as minimized radiation dose exposure, are all attainable through the system's engineered controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Regulatory Strategy for Post Operational Clean Out Activities at Sellafield Limited Nuclear Licensed Site - 20273

The Thermal Oxide Reprocessing Plant (THORP) at the Sellafield nuclear licensed site carried out its final commercial shear of spent nuclear fuel in November 2018, since when the facility has undergone rundown prior to cessation of operations. The Magnox Reprocessing Facility (MRF) is also due to cease operating, around the end of 2020. Following the cessation of spent fuel reprocessing, the facilities and supporting infrastructure will transition into Post Operational Clean Out (POCO), which will become an increasingly significant portion of Sellafield Limited's (SL) activities. POCO is defined as the set of activities undertaken directly after a nuclear facility comes to the end of its operational life, in order to place the plant in a suitable state for the subsequent decommissioning steps. The decommissioning strategy at SL is for deferred dismantling of these facilities, which will be subject to a period of Surveillance and Maintenance (S and M) following completion of POCO. This paper outlines the development and implementation of a regulatory strategy for POCO activities at the Sellafield site by the Office for Nuclear Regulation (ONR), the independent nuclear safety, transport and security regulator in the United Kingdom. The paper also describes how this regulatory strategy is applied to nuclear installations undergoing transition into POCO and subsequent decommissioning. ONR works jointly with the Environment Agency, as the environmental regulators in England, to ensure that matters relevant to them have been duly considered. In developing a regulatory strategy, ONR has taken a site-wide approach, moving away from regulation on a facility-by-facility basis, to promote consistency, as well as maximising efficiency and effectiveness. The aim of this integrated approach was to prevent complications during future decommissioning and dismantling that have been experienced previously at similar facilities in France. The strategy recognised that once reprocessing operations are concluded, the hazard present will be reduced significantly, which provides the opportunity for ONR to consider how best to deliver a proportionate approach to regulatory interventions. Once POCO has been completed and the facility has transitioned into a period of S and M, the scale and frequency of ONR's interventions will reduce, commensurate with the safety case covering the remaining hazard and activities associated with maintaining the facility prior to final decommissioning. This approach allows ONR to consider risks holistically, considering the full life cycle of the facility and by taking due account of the interdependencies between facilities across the site. The strategy also aligns with existing regulation of high hazard and risk reduction activities, which remain ONR's top priority. As SL progresses with POCO activities in THORP and across the rest of the site, ONR will review its regulatory strategy to ensure that the intended safety benefits are realised. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Irradiation Assessment of a Lightweight Industrial Robot - Towards Faster, Safer and Sooner Waste Decommissioning - 20317

Robotic systems have been successfully applied in the nuclear industry for several decades as a safe approach to minimize the exposure dose of human operators. As nuclear waste management and decommissioning gathers pace, there is an emerging interest integrating modern off-the-shelf industrial robots in nuclear robotic systems which make use of complex electronics and software to improve functionality over traditional machines. The use of the industrial robots will significantly increase the pace of development of automated waste management systems at a reduced cost, and although these off-the-shelf robots are proven robust in typical industrial environments, performance in radioactive environments is less clear. This paper investigates the performance degradation of a lightweight industrial robot (KUKA iiwa 7 LBR 800) in a controlled radiation field, aiming to simulate conditions in highly radioactive nuclear waste handling facilities. The degradation of the industrial robot's performance is identified while measuring the air kerma dose-tolerance of sensitive components, via a systematic experimental methodology. The experience from this experiment has demonstrated the significant capabilities of industrial robots, which tolerated a large gamma dose of 164 Gy before a system failure. Future tests are planned, aiming to enable faster, safer and sooner waste management and decommissioning using complex robotic systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Development of a Robotic Exoskeleton Device for use in Glove Boxes - 20374

Glovebox operators in nuclear facilities often operate under radioactive environment and typically perform monotonous, dull and repetitive work. This can result in muscle fatigue leading to increased levels of accidents. Current research work aims in assisting the glovebox operators by designing a novel upper limb exoskeleton device to reduce injuries and increase worker efficiency. Almost none of the commercially available hand and upper body exoskeletons are directly suitable for use in gloveboxes. This explains the novelty of the present work in developing a wearable powered robotic exoskeleton device. The device consists of electronics, motors and spring systems mounted on adjustable plates and is supported by a stationary frame behind the worker. The device is intended to be portable and adjustable according to the operator height. The elbow has a flexion movement assisted with motor control by way of a Bowden cable system. The system is floated on a spring and pulley combination that allows for extra safety and smoothness of operation. The end points are fixed near the pivot points to help minimize unwanted movement/torque. The extension movement of the upper and lower arm are assisted by gravity and a counter spring. The shoulder and upper arm movement are held in a neutral position with a spring system for counter balance allowing small movements within the glovebox. This initial concept considers only the vertical movement of the arm. The abduction and adduction movement will not be assisted or impeded by the over shoulder plate or at the forearm plate allowing for full range of motion. Several glovebox aspects such as the level of task assistance, ergonomic design, minimum hindrance in dexterity/operator movements and tear resistance for hazardous safety reasons will be considered in the design of the exoskeleton. Computer models will be simulated to test the load levels and stress conditions on the exoskeleton to enhance the designs. The exoskeleton focusses on major muscular involvement reduction through weight offset and active assistance with minimal parts and hence the device is derived with several joint links and contains both passive and active joints. The paper details the various stages in the design development and prototype testing of the exoskeleton device. Upon successful prototype device development, human testing will be conducted in a replica of the SRS-235F hot cell facility constructed at FIU-ARC. The final stage of the project will be potential testing/deployment of the exoskeleton device in one of the glovebox facilities in Savannah River Nuclear Waste site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Nuclear Facility Mission Completion Through an Improved Chemical Hazard Control Strategy - 20460

Code of Federal Regulation (CFR) 10 CFR 830, Nuclear Safety Management [1], explicitly identifies hazardous materials in addition to radioactive materials when establishing the scope of materials that must be evaluated in Hazard Category (HC) 1, 2, and 3 nuclear facilities. This inclusion has led to a near decade-long progression of more and more rigorous application of chemical hazard controls in these facilities. The progressive addition of more rigorous chemical hazard controls has occurred across the Department of Energy (DOE) Complex, having been driven by contractors and regulators alike. However, chemical hazards in other DOE facilities have been, and continue to be, controlled using traditional industrial safety centered strategies. Thus, identical chemical hazards are controlled using dramatically different approaches based solely on the facility type. Not only are the controls different, the analysis and derivation rigor and requirements are also significantly different. In particular, chemical control derivation and application in non-nuclear facilities are much less onerous than the comprehensive hazard analysis process used in nuclear facilities, even in circumstances in which chemicals are not initiators to, or do not exacerbate a nuclear event. While the derivation and control approaches used in these two types of facilities are disparate, the safety results are similarly effective based on a review of reported chemical events from 2014 through 2018. While both approaches achieve comparable safety outcomes, the approach used in nuclear facilities results in significantly greater preparation costs and implementation costs. Furthermore, the problem with the differing approach is not relegated to the control preparation and implementation burden. The operational impact of potentially unnecessary controls slows mission completion without a corresponding increase in safety, not to mention the dilution of the importance of Technical Safety Requirements. The proposed solution must first include a critical and thorough examination of DOE Complex and top-tier chemical industry chemical hazard control practices, coupled with a similar examination of the driving facility regulatory requirements. Results from the examination can then be used to fuel a bold departure from current chemical control practices in Hazard Category 1, 2, and 3 nuclear facilities. Development of an improved and consistent chemical hazard control process would follow, one that continues to ensure safety while accelerating mission completion and significantly reducing the burden associated with chemical hazard control development and implementation. The improved process must establish a hierarchy where radiological hazards are addressed using safety class and safety significant controls and chemical hazards are addressed using overarching safety management programs (with limited unique exceptions). The improved Hazard Category 1,2, and 3 nuclear facility chemical hazard control strategy, while compliant with 10 CFR 830 [1], would be founded on the requirements in 10 CFR 851, Worker Safety and Health Program [2], and the complementary DOE O 151.1D, Comprehensive Emergency Management System [3]. In this way, the Hazard Category 1, 2, and 3 nuclear facility chemical hazard control strategy would, wherever appropriate, be the same process used at other DOE Complex facilities. Ultimately, the improved process will maintain safety and significantly reduce costs and life cycle risk through faster mission completion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implications of End Points on Remediation - 20476

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI compliantly, on time and within budget is CNL's number one priority. The PHAI is being implemented as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste. The Port Hope Project includes a unique and important component - the remediation of approximately 1,200 private residences and businesses to include both interior and exterior verification of soil and surface-contaminated objects. Planning and consultation for the PHAI clean-up criteria and remediation verification standard operating procedures (RVSOP) were initiated in the early 2000's. The criteria were developed through a cooperative effort involving the PHAI, scientific specialists, federal and provincial government agencies, peer reviewers, the municipalities and members of the public. Subsequent verification procedures which detail the unique systematic methods to verify compliance with the clean-up criteria were developed by CNL in consultation with federal regulators and relevant stakeholders. Now, specifically with the Port Hope Small-Scale Sites project having been underway for a year and approximately 38 properties in some stage of remediation, it has become increasingly evident that the practical application of the clean-up criteria and RVSOP methodology is posing unique challenges that are having direct impact on project execution. The current RVSOP approach is based on discrete sample verification not allowing failure of any one sample. When implemented in the field, particularly at the Small-Scale Sites, it leads to a much more extensive excavation than what was accounted for in the original design, the implications of which are substantial delays in project progress and much more significant impact on the individual properties than originally anticipated. This paper will examine the evolution of PHAI clean-up criteria, subsequent RVSOP methodology and its impact on current project execution and the justification for exploring potential revisions to methods of remediation verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing Flexibility into the Authorized Radioactive Contents of the 9982 Shipping Package

The 9982 radioactive material shipping package, or the 9982, differs from the others by allowing a multitude of radionuclides instead of a single defined set. While allowing flexibility, this requires more justification on why these contents would be worthwhile and why they would not cause various safety hazards when shipped together. The latter was covered through mass limit calculations, and the potential uses for the package are shown through comparison with historical shipments. Here, the mass limits were already calculated[1] and used to show three example shipments are suitable for the 9982 as well. Plutonium stored in 3013 containers[2], training sources shipped in 9977 packages[3], and americium standards shipped in 9978 packages[4] were all analyzed. The mass of each radionuclide and the corresponding mass limit were used to first determine if the listed content could be shipped. If so, the maximum allowed mass of such contents is also calculated in order to see if the 200-gram fissile limit for the 9982 would be violated if additional material was packed. The sum-of-the-fractions method produces contents that do not violate the mass limits or exceed the 200-gram fissile limit. These sets also serve as realistic examples of what may be shipped in the 9982. Well-founded example contents will help the approval of the package by showing its compatibility with previously shipped material. Unfounded hypothetical contents would not show the usefulness of having a wide variety of allowed radionuclides. More contents may be developed in order to incorporate other radionuclides that were not present in these three examples. The light elements will also need to be evaluated due to their exclusion currently preventing some materials from being allowed in the 9982.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097A - Panel: Accomplishments and Update of the East Tennessee Technology Park in Oak Ridge, TN (1/4) (R1.16a)

This panel was deferred until 2021. The session was designed to highlight and celebrate the accomplishment of Vision 2020 at US DoE's East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Vision 2020 is the overarching strategy and guidance that have formed the foundation of success in closing one of the largest cleanup site in the DOE Complex. The session was supposed to feature representatives from the DOE Oak Ridge Office of Environmental Management (OREM) and its contractor, UCOR, in exploring the partnerships and performance excellence that have made the difference in achieving success. OREM's Vision 2020 is a collaboration with entities that have made a difference in its success: economic developers, workforce developers, the University of Tennessee, and community partners. The vigorous Oak Ridge small business contracting community has also been instrumental in helping achieve success. This session plans to celebrate the entire process, its numerous players, and the spirit of accomplishment as the Oak Ridge community comes to realize the promise of 30 years of continuous cleanup excellence. This session integrated with panel sessions 97B, 97C and 97D. Panelists with presentations: Beyond Cleanup: Achieving Risk Reduction through Partnerships and Performance Excellence (Kenneth Rueter); Strategic Approach to Achieve End States at the East Tennessee Technology Park (Jay Mullis)

61 RADIATION PROTECTION AND DOSIMETRY↗

Using FLAC{sup R} Modeling Software to Analyze the Stability of a LLRW Disposal Facility - 20031

Waste Control Specialists (WCS) wished to amend its existing LLRW disposal license such that it might use gravel aggregate instead of concrete as backfill around large component (LC) parts from decommissioned nuclear reactors. A classical mechanics evaluation of the strength of the LCs was presented to the Texas Commission on Environmental Quality (TCEQ), demonstrating that the LCs had adequate capacity to withstand the loads within the facilities, and that concrete was unnecessary for structural support. TCEQ requested that additional analyses of the LCs within the facilities be performed using FLAC{sup R} finite difference modeling software. Because FLAC{sup R} has the capability of modeling the support provided by the lateral earth pressures, the factors of safety against failure for the LCs increased. TCEQ found the FLAC{sup R} analyses presented in this report to be satisfactory, and granted WCS' license amendment request. This work demonstrates that FLAC{sup R} may be used advantageously to more accurately represent the complexities of the physical situation being modeled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Approach to Sampling and Survey for Radiological Contaminants to Release Overburden Soil for Reuse - 20120

Various methods may be utilized to determine if overburden soil meets approved release criteria to allow for reuse of overburden soil as backfill material: soil scanning and sorting equipment, survey and sampling of excavated soil, in-situ sampling, and utilization of box or truck counters are common approaches. This paper focuses on a modified approach using elements of in-situ sampling and after excavation survey for a large volume of overburden soil that was expected to meet soil release criteria. This approach was utilized for the U.S. Army Corps of Engineers (USACE) St. Louis District at a North St. Louis County property. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combined Effort to De-Inventory the New Brunswick Laboratory of Plutonium Certified Reference Materials - 20504

To de-inventory plutonium Certified Reference Materials standards (CRMs) from the New Brunswick National Laboratory (NBL), the Argonne National Laboratory (ANL) and Savannah River National Laboratory (SRNL) formed a unique team. This teaming arrangement leveraged the different capabilities and expertise of both laboratories, helping to ensure the effort would be performed both safely and cost-effectively. With the NBL then physically housed on the ANL site, ANL served as the host-site, providing the necessary facilities and support services (e.g., supplying everything from hoods, loading equipment, and scales to Health Physics supports). From a packaging perspective, ANL's responsibilities focused mainly on characterizing and preparing the contents for shipment, followed by performing the Shipper of Record activities. With SRNL being the Package Design Authority of the 9978, the Type B packaging used for this effort, SRNL's scope included developing a Safety Analysis Report in Packaging (SARP) Letter Amendment to add the CRMs as authorized contents to the 9978. Recognizing competency, ANL prodigiously tasked SRNL to perform the actual loading of the CRMs into the 9978s, while physically on the ANL site. This paper details five different aspects of this effort. They are: 1. Characterization/validation of the CRM contents. 2. Development of the 9978 SARP Letter Amendment for the content change. 3. Development of the nitrogen inerting method to address SARP identified potential flammability concerns. 4. Renewal of the SRNL 9978 loading procedure. 5. Performance of the actual work execution activities. In 2017, the first nine packages were successfully loaded and shipped from NBL, while in 2019, the last ten were successfully loaded and planned for shipment. Without ANL leveraging SRNL's strengths, the de-inventorying of NBL of its plutonium CRMs would have likely taken many years longer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The German Site Selection Process - Implementation and Challenges - 20528

Federal Company for Radioactive Waste Disposal (Bundesgesellschaft fuer Endlagerung mbH; hereinafter referred to as BGE) is a state-owned company established in September 2016 following the 'Act on the Organisational Restructuring in the Field of Radioactive Waste Storage'. 'Repository Site Selection Act' (hereinafter referred to as StandAG) defines the site selection procedure, aiming to ensure the best possible safety for storing high-level radioactive waste in Germany for the duration of one million years. The selection procedure is a participatory, transparent, learning and self-questioning process based on scientific expertise. Possible repository sites are sought all over Germany, without excluding or predetermining any potential site at the beginning. The procedure consists of three phases. After each phase, the legislative decides on the regions for further consideration in the next phase of the site selection procedure. The current first phase (Phase I) is divided into two steps. Objective of Step 1 is to determine subareas of favorable geological conditions based on available data. Step 2 of Phase I will lead to identification of specific regions that are considered for further surface-based geoscientific and geophysical exploration. Potential host rocks are rock salt, clay rock and crystalline rock. As part of the site selection procedure, an overview of the status of the planning and implementation of R and D activities is given. Topics of particular interest are, for example, the adaptation of the maximum temperature of 100 deg. C at the container surface, the impact of long-term climate variations as well as minimally invasive exploration methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗