Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Simulation of Particulate Transport for Delivery of Solid Amendments into the Subsurface: FY24 Status Report

For particulate-based amendments to be viable for field-scale remediation at the Hanford Site (e.g., 200 DV-1 Operable Unit), particles need to be delivered a sufficient radial distance from an injection well and retained at concentrations high enough for effective treatment. An accurate description of the particle radius of influence (ROI) is critical for developing an overall remediation strategy. However, field-scale particle simulations are currently limited due to insufficient simulation capabilities and a lack of experimental data to validate and parameterize particle transport models. To help build toward field-scale deployment, this fiscal year (FY) we have (1) developed a pre screening tool to estimate particle transport, (2) implemented particle transport models within PFLOTRAN, and (3) conducted preliminary estimations of particle ROI. While field-scale numerical simulations will ultimately be necessary before remedy design and field implementation, we have developed a pre-screening tool that offers valuable estimations of expected particle injectability and ROI in a 1-D system. The advantage of the tool is that it does not require extensive laboratory experiments and instead makes predictions based solely on routine laboratory measurements. This tool can assist in down-selection and decision-making by identifying which particle amendment systems are worth pursuing in future laboratory experiments, such as 1-D column tests and beyond. With any system, scaling up from the lab to the field presents challenges. Currently, there is no field data available for model calibration or validation. However, the theoretical particle models being developed herein are the best tools available to guide progress toward field deployment. To help bridge this gap and verify model predictions, larger-scale lab experiments are being proposed. To advance simulation capabilities, six particle transport models are being integrated into the reactive transport simulator PFLOTRAN. These include colloid filtration theory (CFT) and five additional particle transport models (M1-M5). Each model, from M1 to M5, progressively incorporates additional particle transport and retention processes. Ultimately, the simplest model capable of accurately describing 1-D column data will be selected and parameterized. During FY24, the CFT and M1 model have been fully implemented within PFLOTRAN. Using an existing 1 D column experiment, the two currently implemented particle transport models (CFT and M1), and associated parameters, were fit to this experiment. While simpler model formulations are helpful for estimations, these formulations could not fully describe particle transport and retention behavior in the previous 1-D column experiment. Thus, additional complexities will need to be considered, which will be accounted for in the M2-M5 model formulations. Additionally, because a viscous, shear thinning fluid was required to keep particles in suspension, considerations for flow will also need to also be accounted for. Therefore, a new immiscible two-phase flow mode is currently being implemented in PFLOTRAN. With some modifications, this new flow module could also support simulation of non-Newtonian liquid amendments, foams, and emulsions. We also estimated the expected ROI of solid amendments using 1-D simulations. The average predicted ROI was approximately 15 ft for micron-sized zero valent iron (mZVI) suspended in xanthan gum (XG). Using the pre screening tool and ROI estimates, additional amendment-delivery laboratory characterization and experiments are proposed. The results from additional experiments can be used to validate and parametrize particulate transport model formulations, which will ultimately provide predictive capabilities for field amendment-delivery systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

200-DV-1 Laboratory Treatability Study: Proof-of-Principle Results

This document presents the Phase 1 technical approach and results of laboratory-scale treatability testing of nine in situ remedial technologies for their consideration in a future Feasibility Study (FS) for the 200-DV-1 OU. The primary objective of this initial assessment was a proof-of-principle testing evaluation primarily via batch experiments to determine the potential reduction and sequestration of primary contaminants of interest with and without potential co-contaminants of interest. An effectiveness rate of 35% transformation to immobile or nontoxic end products, along with other experimental indicators, was used by the project team to determine the technologies that advanced to Phase 2 for further evaluations. For most technologies, the performance was evaluated based on a series of sequential extractions designed to evaluate the mobility of contaminants before and after treatment, with each subsequent extraction representing a relative decrease in mobility. The results of this study will be used to inform testing for Phase 2 of the treatability study for further evaluation of selected technologies. The final results from the treatability study, following the completion of remaining experimental phases, will be used to determine whether the technologies tested can be appropriately evaluated in a FS to expand on the limited number of viable DVZ remediation technologies. After completion of the laboratory treatability study and the 200-DV-1 OU Remedial Investigation (RI) and Resource Conservation and Recovery Act Facility Investigation (RFI) of the waste sites, results will be evaluated to determine whether field studies are needed to provide additional information on effectiveness, implementability, or costs for evaluating these technologies in the FS for their site-specific application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building 100 Groundwater Bioremediation at the Former DOE Pinellas Plant, Florida: Review of Progress and Opportunities

Weapons research, development, and production operations at the former Pinellas Plant, which includes the Building 100 area, released chlorinated organic solvents into the subsurface, contaminating the underlying soil and groundwater. The site was sold to Pinellas County and is now home to a thriving industrial park known as the Young - Rainey Science, Technology, and Research (STAR) Center. The US Department of Energy (DOE) has applied bioremediation at the Building 100 Area as a key technology to clean up the chlorinated volatile organic compound (cVOC) contamination in soil and groundwater. The monitoring data indicate significant progress toward remedial objectives over the past two decades. Starting conditions in the 1980s-1990s included areas containing residual undissolved dense nonaqueous phase liquids (DNAPLs) and the associated presence of an extensive high concentration plume in the groundwater. The original parent cVOCs were primarily tetrachloroethene (PCE) and trichloroethene (TCE). After several informative pilot studies, bioremediation was implemented at the Building 100 Area of the site and relies on reductive biological pathways and the sequential removal of chlorine from the parent cVOCs forming dichloroethane (DCE) and chloroethene (vinyl chloride, VC). As bioremediation sites evolve toward cleanup, the trends in VC concentrations often serve as a critical indicator for progress and remediation timeframe because VC typically has a lower concentration target remedial objective (nominally 1 to 2 μg/L) compared to PCE and TCE (nominally 3 to 5 μg/L).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Site Environmental Report: 2006

This report provides information about environmental programs during the calendar year (CY) of 2006 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year; i.e., stormwater monitoring covering the winter season of 2006/2007 (October 2006 through May 2007), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC continued to follow the path to self-declare an environmental management system under DOE Order 450.1, 'Environmental Protection Program' and effectively applied environmental management in meeting the site's integrated safety and environmental management system goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that Worker safety and health are protected; The environment is protected; and Compliance is ensured. Throughout 2006, SLAC focused on these activities through the SLAC management systems. These systems were also the way SLAC approached implementing 'greening of the government' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. The SLAC Office of Assurance was created during 2006 in response to DOE Order 226.1. During 2006, there were no reportable releases to the environment from SLAC operations, and there were no Notice of Violations issued to SLAC from any of the regulatory agencies that oversee SLAC. In addition, many improvements in waste minimization, recycling, stormwater drain system, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2006 to better manage chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board, San Francisco Bay Region (RWQCB) for the investigation and remediation of impacted soil and groundwater at SLAC. The new board order lists specific tasks and deadlines for groundwater and soil remedial investigation. All 2006 submittals to the board were completed on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FRACTURE ENHANCED SOIL VAPOR EXTRACTION TECHNOLOGY DEMONSTRATION AT THE A-014 OUTFALL

Data collected during this study show that the performance of hydraulically fractured wells (with respect to mass removal rates) may tend to decrease with time following precipitation events. These effects are due to temporary increases in water saturation in the formation within the vicinity of the fractures, therefore, the wells should tend to rebound during subsequent dry periods. The data available for fractured well versus conventional well performance (with respect to flow rate versus vacuum pressure) are limited in this study. However, the data that we have to draw from suggest that, with the possible exception of a few extreme examples, hydraulically fractured wells tend to perform better than conventional wells during soil vapor extraction (SVE) operation at the A-14 Outfall. The pancake like geometry associated with hydraulic fractures also leads to a significant increase in zone of influence (ZOI), as compared to conventional wells. The increase in ZOI is due to the radially extending, horizontal, high-permeability conduit nature of the hydraulic fracture, however, air-flow into the fracture is predominately vertical (occurring at right angles to the fracture plane). Flow rates from above and below the fracture will tend to be equivalent when the formation is homogeneous, however, in the case of directionally fining depositional sequences flow rates will be greater from the direction of increasing permeability. The Upland Unit is a fining upward sequence, therefore flow rates (and contaminant mass flow rates) will tend to be higher below the fracture. This suggests that emplacing the fractures slightly above the source zone is an important strategy for accelerating contaminant removal at the A-014 Outfall site and in the Upland Unit at the SRS. However, due to the multitude of previous borings at the A-014 Outfall site, the shallower fractures failed. More than 2500 lbs of chlorinated volatile organic compounds (cVOCs) were removed during approximately 6 months of fractured well SVE operation at the A-014 field site. Plotting total mass removed over this time period shows a roughly linear relationship Figure 7. This occurs because the mass removal rate remains fairly constant with time. When mass removal comes predominately from cVOCs stored in the vapor phase there is a marked decline in mass removal rate over a short period of time due to the limiting nature of diffusion. Constant mass removal rates suggest that a source zone has been directly targeted and, therefore, is providing a constant supply of cVOC that partitions into the vapor phase and is removed through the well. Directly targeting and removing source zones is the most efficient approach to remediating contaminated sites. Results of this study show that utilization of hydraulic fractures during SVE is an effective approach for increasing remediation efficiency at the A-014 Outfall field site and in the Upland Unit at the SRS. Hydraulically fractured wells tend to produce greater flow rates and create larger ZOI's than do conventional wells. These attributes allow fractured wells to effectively treat larger volumes of formation. The unique sand-emplacement geometry associated with hydraulically fractured wells also allows direct targeting of multiple zones located at similar elevations within a fairly large radius of the well. The ability to directly target source zones significantly decreases diffusion pathways, therefore, significantly decreasing the time required to reach remediation goals.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report, 2007(ASER)

This report provides information about environmental programs during the calendar year (CY) of 2007 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2007/2008 (October 2007 through May 2008), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423 and DOE Order 450.1, 'Environmental Protection Program', SLAC effectively implemented and integrated the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2007, SLAC focused on development and implementation of SLAC management systems to ensure continual improvement. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13148. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC) and thirteen objectives and targets were established for 2007. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2007 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JV Task 104 - Risk Reduction Using Innovative Vacuum-Enhanced Plume Controls

The Energy & Environmental Research Center (EERC) conducted remediation of hydrocarbon-contaminated soils and groundwater at the Vining Oil site in Carrington, North Dakota. The primary technological synergies included (1) contaminant recovery using simultaneous operation of multiphase recovery and high-vacuum soil vapor extraction (SVE) and (2) vacuum-controlled air and ozone sparging on the periphery of an induced hydraulic and pneumatic depression. Final risk reduction steps included design and retrofit for the municipal well. The successful remediation effort resulted in the reduction of long-term health risks associated with rate-limited contaminant release within the capture zone for the municipal well and allowed for its reintegration into the water supply system. Contaminant recovery for the remediation period of September 2006 to June 2008 totaled over 12,653 lb (5,740 kg) of hydrocarbons, an equivalent to 2022 gallons (7653 l) of product. Integration of the air-sparging subsystem operated simultaneously with multiphase extraction and SVE systems resulted in accelerated volatile organic contaminant transport from the saturated zone and increased contaminants of concern recovery. Delivery of over 7.7 million ft{sup 3} of oxygen (219.8 thousand m{sup 3}) into the contaminated aquifer would translate into in situ biodegradation of 2007 kg (4424 lb) of benzene and provide for long term stimulation of the natural attenuation process.

54 ENVIRONMENTAL SCIENCES↗

Interfacial Reduction-Oxidation Mechanisms Governing Fate and Transport of Contaminants in the Vadose Zone

There are many soil contamination sites at the Department of Energy (DOE) installations that contain radionuclides and toxic metals such as uranium (U), technetium (Tc), and chromium (Cr). Since these contaminants are the main 'risk drivers' at the Hanford site (WA) and some of them also pose significant risk at other DOE facilities (e.g., Oak Ridge Reservation - TN; Rocky Flats - CO), development of technologies for cost effective site remediation is needed. Current assessment indicates that complete removal of these contaminants for ex-situ disposal is infeasible, thus in-situ stabilization through reduction to insoluble species is considered one of the most important approaches for site remediation. In Situ Gaseous Reduction (ISGR) is a technology developed by Pacific Northwest National Laboratory (PNNL) for vadose zone soil remediation. The ISGR approach uses hydrogen sulfide (H{sub 2}S) for reductive immobilization of contaminants that show substantially lower mobility in their reduced forms (e.g., Tc, U, and Cr). The technology can be applied in two ways: (i) to immobilize or stabilize pre-existing contaminants in the vadose zone soils by direct H{sub 2}S treatment, or (ii) to create a permeable reactive barrier (PRB) that prevents the migration of contaminants. Direct treatment involves reduction of the contaminants by H{sub 2}S to less mobile species. Formation of a PRB is accomplished through reduction of ferric iron species in the vadose zone soils by H{sub 2}S to iron sulfides (e.g., FeS), which provides a means for capturing the contaminants entering the treated zone. Potential future releases may occur during tank closure activities. Thus, the placement of a permeable reactive barrier by ISGR treatment can be part of the leak mitigation program. Deployment of these ISGR approaches, however, requires a better understanding of the immobilization kinetics and mechanisms, and a better assessment of the long-term effectiveness of treatment. The primary objective of this project was to understand the complex interactions among the contaminants (i.e., Cr, Tc, and U), H{sub 2}S, and various soil constituents. The reaction with iron sulfide is also the focus of the research, which could be formed from iron oxide reduction by hydrogen sulfide. Factors controlling the reductive immobilization of these contaminants were identified and quantified. The results and fundamental knowledge obtained from this project shall help better evaluate the potential of in situ gaseous treatment to immobilize toxic and radioactive metals examined.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2008 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during the calendar year of 2008 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2008/2009 (October 2008 through May 2009), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2008, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423 and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC), and twelve objectives and targets were established for 2008. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management and the DOE SLAC Site Office (SSO). During 2008, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2008: a composting program at SLAC's onsite cafeteria was initiated, greater than 800 cubic feet of legacy radioactive waste were packaged and shipped from SLAC, a chemical redistribution program was developed, SLAC reduced the number of General Services Administration leased vehicles from 221 to 164, recycling of municipal waste was increased by approximately 140 tons during 2008, and site-wide releases of sulfur hexafluoride were reduced by 50 percent. In 2008, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. Twenty eight generators were trained in 2008. As a best management practice, SLAC also reduced its tritium inventory by at least 95 percent by draining one of its accelerator cooling water systems; with the cooperation of the South Bayside System Authority, the West Bay Sanitary District and the DOE, SLAC discharged the cooling water to the sanitary sewer according to federal regulations and replenished the system with clean water. In 2008, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2008 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrogeology of the Hanford Site Central Plateau – A Status Report for the 200 West Area

The Remediation Decisions Support (RDS) function of the Soil and Groundwater Remediation Project (managed by CH2M HILL Plateau Remediation Company [CHPRC]) is responsible for facilitating the development of consistent data, parameters, and conceptual models to resolve technical issues and support efforts to estimate contaminant migration and impacts (i.e., the assessment process). In particular, the RDS function is working to update electronic data sources and conceptual models of the geologic framework and associated hydraulic and geochemical parameters to facilitate traceability, transparency, defensibility, and consistency in support of environmental assessments. This report summarizes the efforts conducted by Pacific Northwest National Laboratory (PNNL) scientists in fiscal year 2008 (FY08) that focused primarily on the 200 West Area, as well as a secondary effort initiated on the 200 East Area.

54 ENVIRONMENTAL SCIENCES↗

TECHNICAL BASIS FOR EVALUATING SURFACE BARRIERS TO PROTECT GROUNDWATER FROM DEEP VADOSE ZONE CONTAMINATION

The U.S. DOE and its predecessors released nearly 2 trillion liters (450 billion gallons) of contaminated liquid into the vadose zone at the Hanford Site. Some of the contaminants currently reside in the deeper parts of the vadose zone where they are much less accessible to characterization, monitoring, and typical remediation activities. The DOE Richland Operations Office (DOE-RL) prepared a treatability test plan in 2008 to examine remediation options for addressing contaminants in the deep vadose zone; one of the technologies identified was surface barriers (also known as engineered barriers, covers, and caps). In the typical configuration, the contaminants are located relatively close to the surface, generally within 15 m, and thus they are close to the base of the surface barrier. The proximity of the surface barrier under these conditions yielded few concerns about the effectiveness of the barrier at depth, particularly for cases in which the contaminants were in a lined facility. At Hanford, however, some unlined sites have contaminants located well below depths of 15 m. The issue raised about these sites is the degree of effectiveness of a surface barrier in isolating contaminants in the deep vadose zone. Previous studies by Hanford Site and PNNL researchers suggest that surface barriers have the potential to provide a significant degree of isolation of deep vadose zone contaminants. The studies show that the actual degree of isolation is site-specific and depends on many factors, including recharge rates, barrier size, depth of contaminants, geohydrologic properties ofthe sediments, and the geochemical interactions between the contaminants and the sediments. After the DOE-RL treatability test plan was published, Pacific Northwest National Laboratory was contracted to review the information available to support surface barrier evaluation for the deep vadose zone, identify gaps in the information and outcomes necessary to fill the data gaps, and outline tasks to achieve those outcomes. Full understanding of contaminant behavior in the deep vadose zone is constrained by four key data gaps: limited access; limited data; limited time; and the lack of an accepted predictive capability for determining whether surface barriers can effectively isolate deep vadose zone contaminants. Activities designed to fill these data gaps need to have these outcomes: (1) common evaluation methodology that provides a clear, consistent, and defensible basis for evaluating groundwater impacts caused by placement of a surface barrier above deep vadose zone contamination; (2) deep vadose zone data that characterize the lithology, the spatial distribution of moisture and contaminants, the physical, chemical, and biological process that affect the mobility of each contaminant, and the impacts to the contaminants following placement of a surface barrier; (3) subsurface monitoring to provide subsurface characterization of initial conditions and changes that occur during and following remediation activities; and (4) field observations that span years to decades to validate the evaluation methodology. A set of six proposed tasks was identified to provide information needed to address the above outcomes. The proposed tasks are: (1) Evaluation Methodology - Develop common evaluation methodology that will provide a clear, consistent, and defensible basis for evaluating groundwater impacts caused by placement of a surface barrier above deep vadose zone contamination. (2) Case Studies - Conduct case studies to demonstrate the applicability ofthe common evaluation methodology and provide templates for subsequent use elsewhere. Three sites expected to have conditions that would yield valuable information and experience pertinent to deep vadose zone contamination were chosen to cover a range of conditions. The sites are BC Cribs and Trenches, U Plant Cribs, and the T Farm Interim Cover. (3) Subsurface Monitoring Technologies - Evaluate minimally invasive geophysical approaches for delineating subsurface plumes and monitoring their migration in the deep vadose zone. (4) Controlled Field Test at Sisson and Lu Site - Evaluate the ability ofthe model to predict long-term liquid, vapor, and chemical transport processes at a well-characterized site containing a plume of subsurface water and tracer remaining from injections in the early 1980s and 2000s. (5) Deep Vadose Zone Monitoring at T Farm - Demonstrate the ability of the geophysical sensors and the model to detect and predict long-term migration of liquid and vapor between the vadose zone beneath the infiltration area and the vadose zone protected by the interim cover. (6) Deep Vadose Zone Monitoring at the Prototype Hanford Barrier - Demonstrate the ability of geophysical sensors and the model to detect and predict the hydrologic conditions in the vadose zone beneath the Prototype Hanford Barrier 15 years after construction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

100-N Area Strontium-90 Treatability Demonstration Project: Food Chain Transfer Studies for Phytoremediation Along the 100-N Columbia River Riparian Zone

Strontium-90 (90Sr) exceeds the U.S. Environmental Protection Agency’s drinking water standards for groundwater (8 picocuries/L) by as much as a factor of 1000 at several locations within the Hanford 100-N Area and along the 100-N Area Columbia River shoreline). Phytoextraction, a managed remediation technology in which plants or integrated plant/rhizosphere systems are employed to phytoextract and/or sequester 90Sr, is being considered as a potential remediation system along the riparian zone of the Columbia River as part of a treatment train that includes an apatite barrier to immobilize groundwater transport of 90Sr. Phytoextraction would employ coyote willow (Salix exigua) to extract 90Sr from the vadose zone soil and aquifer sediments (phytoextraction) and filter 90Sr (rhizofiltration) from the shallow groundwater along the riparian zone of the Columbia River. The stem and foliage of coyote willows accumulating 90Sr may present not only a mechanism to remove the contaminant but also can be viewed as a source of nutrition for natural herbivores, therefore becoming a potential pathway for the isotope to enter the riparian food chain. Engineered barriers such as large and small animal fencing constructed around the field plot will control the intrusion of deer, rodents, birds, and humans. These efforts, however, will have limited effect on mobile phytophagous insects. Therefore, this study was undertaken to determine the potential for food chain transfer by insects prior to placement of the remediation technology at 100-N. Insect types include direct consumers of the sap or liquid content of the plants vascular system (xylem and phloem) by aphids as well as those that would directly consume the plant foliage such as the larvae (caterpillars) of Lepidoptera species. Heavy infestations of aphids feeding on the stems and leaves of willows growing in 90Sr-contaminated soil can accumulate a small amount (~0.15 ± 0.06%) of the total label removed from the soil by the plant over a 17-day exposure period. The 90Sr in the exuded honeydew during this period amounted to 1.17 ± 0.28% of this total label. The honeydew would eventually be deposited into the soil at the base of the plant, but the activity would be so dispersed as to be undetectable. Moth larvae will consume 90Sr contaminated leaves but retain very little of the label (~0.02%) and only that contained in their digestive tracts. As the moths pupated and became adults, they contained no detectable amounts of 90Sr. Over the 10-day exposure period, ~4% of the phytoextracted 90Sr was lost from the plant as moth feces. However, like the honeydew, feces dispersed into the soil were undetectable. As the plant diminishes the content of 90Sr in the soil, the activity of the label in the leaves and new stems would also diminish. The results of these studies indicate that the risk for detectable transfer of 90Sr from willow trees growing in the contaminated soil along the 100-N shoreline through the food chain of herbivorous insects would be very slight to non-existent

54 ENVIRONMENTAL SCIENCES↗

A Long-Term Strategic Plan for Hanford Sediment Physical Property and Vadose Zone Hydraulic Parameter Databases

Physical property data and unsaturated hydraulic parameters are critical input for analytic and numerical models used to predict transport and fate of contaminants in variably saturated porous media and to assess and execute remediation alternatives. The Remediation Decision Support (RDS) project, managed by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE) and the CH2M Hill Plateau Remediation Company (CHPRC), has been compiling physical and hydraulic property data and parameters to support risk analyses and waste management decisions at Hanford. Efforts have been initiated to transfer sediment physical property data and vadose zone hydraulic parameters to CHPRC for inclusion in HEIS-Geo, a new instance of the Hanford Environmental Information System database that is being developed for borehole geologic data. This report describes these efforts and a strategic plan for continued updating and improvement of these datasets.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Interfacial-Area-Based Relative Permeability Function

CH2M Hill Plateau Remediation Company (CHPRC) requested the services of the Pacific Northwest National Laboratory (PNNL) to provide technical support for the Remediation Decision Support (RDS) activity within the Soil & Groundwater Remediation Project. A portion of the support provided in FY2009, was to extend the soil unsaturated hydraulic conductivity using an alternative approach. This alternative approach incorporates the Brooks and Corey (1964), van Genuchten (1980), and a modified van Genuchten water-retention models into the interfacial-area-based relative permeability model presented by Embid (1997). The general performance of the incorporated models is shown using typical hydraulic parameters. The relative permeability models for the wetting phase were further examined using data from literature. Results indicate that the interfacial-area-based model can describe the relative permeability of the wetting phase reasonably well.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2009(ASER)

This report provides information about environmental programs during the calendar year of 2009 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2009/2010 (October 2009 through May 2010), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that Worker safety and health are protected, The environment is protected, and Compliance is ensured. Throughout 2009, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423, EO 13514, and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. SLAC's EMS was audited by a review team from the DOE Oak Ridge Office and the DOE SLAC Site Office (SSO) on March 31, 2009. The review team found the EMS to be in substantial conformance with the appropriate EMS requirements. Based on the audit results, SLAC and DOE were able to declare conformance with DOE Order 450.1A ahead of the June 30, 2009 mandated deadline. During 2009, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2009. Hazardous materials field verifications of 36 buildings identified a number of materials that could be removed from inventory due to lack of need or age of the material. In all, 124 chemical containers were removed from inventory. SLAC's chemical purchase approval process was reconfigured to allow for more effective control over purchase of highly toxic materials. One hundred percent of SLAC's purchased desktops, laptops, and monitors were either Silver or Gold level Electronic Product Environmental Assessment Tool (EPEAT) certified in fiscal year (FY) 2009. SLAC continues to make progress on achieving the sustainability goals of EOs 13423 and 13514, which include, but are not limited to reductions in the use of water, energy, and fuel, building to green standards and reductions in greenhouse gas (GHG) emissions. In 2009, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. During calendar year (CY) 2009, SLAC shipped 1324 cubic feet of low-level radioactive waste, legacy waste accounted for 40 percent of the volume, to appropriate treatment and disposal facilities for low-level radioactive waste. Moreover, SLAC continued its efforts in the inventory reduction of materials no longer needed for its mission: returned 28 sealed sources to the manufacturer, transferred additional 3 sources to Los Alamos National Laboratory, and disposed of 636 kilograms of depleted uranium tiles. In 2009, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region on October 19, 2009, for the investigation and remediation of impacted soil and groundwater at SLAC. Risk-based preliminary cleanup goals for impacted soil and groundwater have been established for SLAC, and the remedial efforts are being designed to meet these established goals.

Source record↗

Circular Perspective for Utilization of Industrial Wastewaters via Phytoremediation

Wastewater generated in municipal rendering facilities requires multi-step treatment, but it may also serve as a source of nutrients and water and thus may be valorized before or instead of the necessary wastewater treatment operations. In this work, wastewaters from a composting plant were utilized to support the growth of Miscanthus x giganteus, known as both a remediation plant and an energy biomass source. A pot experiment was established to compare the effects of different wastewater doses (0, 50, 100, and 200 mL per pot per week) on the miscanthus biomass yield, phytoextraction of heavy metals, biomass heat of combustion, and plant condition. The increase in the wastewater dose resulted in increases in both biomass yield (from about 44 to 139%) and biomass heat of combustion (from 7 to 17%) when compared to the control sample, with no adverse effects on plant physiological parameters. The highest concentrations of metals were found in miscanthus grown with the highest dose of wastewaters. It was found that higher wastewater dose correlates to both higher phytoextraction and phytorecovery of metals from plant substrate and wastewaters. The highest metal uptake was identified for Fe (431 mg·pot −1 ), followed by Al, Zn, Mn, Cu, Ni, Cr. The lowest metal uptake was noted for Pb, Co and Cd (0.88, 0.11, and 0.95 mg·pot −1 , respectively). The results indicate that miscanthus can be recommended for industrial wastewater treatment. In addition, due to high absorption efficiency of the substrate components, miscanthus can be used as a remediation tool, e.g., for the ecological stabilization of remediation of metal-polluted soils, especially in municipal facilities like rendering plants. This presents a circular perspective for the valorization of post-fermentation wastewaters with subsequent growth of energy crops, with other potential benefits for the environment, such as soil treatment, absorption of CO 2 , and air purification.

Miscanthus x giganteus↗

Generation of 3-D surface maps in waste storage silos using a structured light source

Surface contours inside the large waste storage tanks typical of the Department of Energy (DOE) complex are, in general, highly irregular. In addition to pipes and other pieces of equipment in the tanks, the surfaces may have features such as mounds, fissures, crystalline structures, and mixed solid and liquid forms. Prior to remediation activities, it will be necessary to characterize the waste to determine the most effective remediation approaches. Surface contour data will be required both prior to and during remediation. The use is described of a structured light source to generate 3-D surface contour maps of the interior of waste storage silos at the Feed Materials Production Center at Fernald, OH. The landscape inside these large waste storage tanks bears a strong resemblance to some of the landscapes that might be encountered during lunar or planetary exploration. Hence, these terrestrial 3-D mapping techniques may be directly applicable to extraterrestrial exploration. In further development, it will be demonstrated that these 3-D data can be used for robotic task planning just as 3-D surface contour data of a satellite could be used to plan maintenance tasks for a space-based servicing robot.

Burks, B. L.↗

Spacecraft Cabin Air Quality Control and Its Application to Tight Buildings

Air quality is an important consideration not only for the external environment, but also for the indoor environment. Most people spend a majority of their lives indoors and the air that they breathe is important to their physical and emotional well being. Since most modern building designs have focused on energy efficiency, less fresh air is brought from the outside. As a result, pollutants from building materials, furniture, cleaning, and cooking have no place to go. To make matters worse, most ventilation systems do not include any means for removing pollutants from the recycled air. Unfortunately, pollution at even a small level can result in eye, throat, and lung irritation in addition to chronic headaches, nausea, and fatigue. A spacecraft cabin, which represents the worst case in tight building design, requires special consideration of air quality since any effects pollutants may have on a crewmember can potentially place a mission or other crewmembers at risk. A detailed approach has been developed by the National Aeronautics and Space Administration (NASA) to minimize cabin atmosphere pollution and provide the crew with an environment which is as free of pollutants as possible. This approach is a combination of passive and active contamination control concepts involving the evaluation and selection of materials to be used onboard the spacecraft, the establishment of air quality standards to ensure crew health, and the use of active control means onboard the spacecraft to further ensure an acceptable atmosphere. This approach has allowed NASA to prevent illness by providing crewmembers with a cabin atmosphere which contains pollutant concentrations up to 100 times lower than those specified for terrestrial indoor environments. Standard building construction, however, does not take into account the potentially harmful effects of materials used in the construction process on the health of future occupants and relies primarily on remedial rather than preventive techniques when addressing contamination. This approach results in a building that theoretically has low operating costs, but may actually have high costs associated with lost work days, increased medical claims, decreased productivity, and problem remediation. A similar approach to NASA's may be adopted by the building construction community which can tap the extensive database of material offgassing properties that has been collected to support the space program. Many materials used by NASA are commercially available and are frequently used in building construction. In addition, computer models which have been developed for assessing various methods of active contamination control can be applied to building ventilation system design and the analysis of their economics. Through using NASA' s experience, the expense associated with the current remedial approach can be avoided.

Perry, J. L.↗