Embedded Sensors and Controls to Improve Component Performance and Reliability -- Bench-scale Testbed Design Report

Embedded instrumentation and control systems that can operate in extreme environments are challenging due to restrictions on sensors and materials. As a part of the Department of Energy's Nuclear Energy Enabling Technology cross-cutting technology development programs Advanced Sensors and Instrumentation topic, this report details the design of a bench-scale embedded instrumentation and control testbed. The design goal of the bench-scale testbed is to build a re-configurable system that can rapidly deploy and test advanced control algorithms in a hardware in the loop setup. The bench-scale testbed will be designed as a fluid pump analog that uses active magnetic bearings to support the shaft. The testbed represents an application that would improve the efficiency and performance of high temperature (700 C) pumps for liquid salt reactors that operate in an extreme environment and provide many engineering challenges that can be overcome with embedded instrumentation and control. This report will give details of the mechanical design, electromagnetic design, geometry optimization, power electronics design, and initial control system design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A business case for nuclear plant control room modernization - 352

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing nuclear power plants (NPPs). The business case is based on advanced digital instrumentation and control (I and C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. Labor savings can be harvested in terms of reduced overtime and redistribution of work. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases. The technologies employed in CRM include large overview displays, task-based operator displays, computer-based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others. The CRM business case is founded on the following categories of cost savings: - Integrated Computer-Based Procedures for Operators; - Reduction in Corrective Action Program Work Due to Operator Error; - Reduction in Outage Critical Path Time; - Operation of Local Control Panels; - Reduction in Control Room Support; - Reduction in Plant Events Resulting in Generation Loss; - Paperless Control Room Processes. In addition to cost savings, these technologies also offer improvements to indirect ways that have impact on key performance indicators of the plant. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Heat transfer evaluation in a plasma core reactor

Numerical evaluations of heat transfer in a fissioning uranium plasma core reactor cavity, operating with seeded hydrogen propellant, was performed. A two-dimensional analysis is based on an assumed flow pattern and cavity wall heat exchange rate. Various iterative schemes were required by the nature of the radiative field and by the solid seed vaporization. Approximate formulations of the radiative heat flux are generally used, due to the complexity of the solution of a rigorously formulated problem. The present work analyzes the sensitivity of the results with respect to approximations of the radiative field, geometry, seed vaporization coefficients and flow pattern. The results present temperature, heat flux, density and optical depth distributions in the reactor cavity, acceptable simplifying assumptions, and iterative schemes. The present calculations, performed in cartesian and spherical coordinates, are applicable to any most general heat transfer problem.

Smith, D. E.↗

Transition Core Modeling for Extended Enrichment & Accident-Tolerant Fuels Using Polaris/PARCS

Commercial light water reactor (LWR) operators and fuel vendors are currently interested in increasing the low-enriched uranium (LEU) fuel enrichments from the current limit of 5.0 $^w/_o$ $^{235}U$ up to 10 $^ w/_o$ $^{235}U$ (referred to as "LEU+") in their current fleets; they are also interested in using accident-tolerant fuel (ATF) with both LEU and LEU+ fuel. This report aims to identify modeling challenges and accuracy concerns in transition core analysis using the SCALE Polaris lattice physics code and U.S. Nuclear Regulatory Commission core simulator PARCS. At the time this study was started, no publicly available LEU+ core designs existed for boiling water reactor (BWR) or pressurized water reactor (PWR) systems. Therefore, fuel lattices were shuffled within a multi-assembly model to mimic neutronically challenging lattice combinations seen in transition cores, such as a fresh LEU+ lattice next to depleted LEU lattices. In addition to multi-assembly models, whole-core BWR transition core calculations were performed for ATF and LEU+ fuel using an existing Hatch-1 Cycle 3 core model. A whole-core BWR model was chosen due to the more heterogeneous core designs compared to those for a PWR core. Since the original core is an old checkerboard core design and no core or fuel design optimization was performed for the modeled fuel types, these core calculations were intended only to provide: (1) Comparisons of core characteristics of interest, such as the pin power distributions and peaking factors, Doppler temperature coefficients (DTCs), and control blade worths (CBWs) under challenging core designs, (2) Identification of reactor physics challenges in modeling LEU+ and ATF cores, and (3) A stress test for the Polaris/PARCS two-step modeling approach, including characterization of the relative accuracy for predicting characteristics of interest such as pin power distributions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

OECD/NEA study on the economics of the long-term operation of nuclear power plants

The OECD Nuclear Energy Agency (NEA) established the Ad hoc expert group on the Economics of Long-term Operation (LTO) of Nuclear Power Plants. The primary aim of this group is to collect and analyse technical and economic data on the upgrade and lifetime extension experience in OECD countries, and to assess the likely applications for future extensions. This paper describes the key elements of the methodology of economic assessment of LTO and initial findings for selected NEA member countries. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Continuous measurement of boron concentration in nuclear power plants: why is it essential for safe and efficient operation? - 318

As a neutron-absorber, Boron 10 plays a significant role in nuclear power plants as it is used in order to control reactivity in the core, together with control rods. For that reason; it is a key parameter that has to be controlled. In a similar way, it is crucial to be able to detect a boron dilution in the primary circuit, as it would causes severe damages if not detected and controlled. Thus, it comes as evidence that a boron concentration monitoring system is a key for every nuclear power plant. Consequently, it becomes important to provide plant operators with a boron concentration measurement issued by a reliable, redundant, classified and qualified system, with high accuracy and short response time. In order to cover this need, Rolls-Royce has designed Boronline{sup R}, the latest generation of boron meter, which provides nuclear power plant operators with a permanent record of boron concentration of primary circuit by way of continuous sampling and real-time measurements. Boronline takes part of a new generation of Advanced Sensors and Measurements Technologies. In this paper, boron meter role, main functions and measuring principles will be detailed, as well as technical characteristics of the new generation of boron meter will be presented. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

International Low Level Waste Disposal Practices and Facilities

The safe management of nuclear waste arising from nuclear activities is an issue of great importance for the protection of human health and the environment now and in the future. The primary goal of this report is to identify the current situation and practices being utilized across the globe to manage and store low and intermediate level radioactive waste. The countries included in this report were selected based on their nuclear power capabilities and involvement in the nuclear fuel cycle. This report highlights the nuclear waste management laws and regulations, current disposal practices, and future plans for facilities of the selected international nuclear countries. For each country presented, background information and the history of nuclear facilities are also summarized to frame the country's nuclear activities and set stage for the management practices employed. The production of nuclear energy, including all the steps in the nuclear fuel cycle, results in the generation of radioactive waste. However, radioactive waste may also be generated by other activities such as medical, laboratory, research institution, or industrial use of radioisotopes and sealed radiation sources, defense and weapons programs, and processing (mostly large scale) of mineral ores or other materials containing naturally occurring radionuclides. Radioactive waste also arises from intervention activities, which are necessary after accidents or to remediate areas affected by past practices. The radioactive waste generated arises in a wide range of physical, chemical, and radiological forms. It may be solid, liquid, or gaseous. Levels of activity concentration can vary from extremely high, such as levels associated with spent fuel and residues from fuel reprocessing, to very low, for instance those associated with radioisotope applications. Equally broad is the spectrum of half-lives of the radionuclides contained in the waste. These differences result in an equally wide variety of options for the management of radioactive waste. There is a variety of alternatives for processing waste and for short term or long term storage prior to disposal. Likewise, there are various alternatives currently in use across the globe for the safe disposal of waste, ranging from near surface to geological disposal, depending on the specific classification of the waste. At present, there appears to be a clear and unequivocal understanding that each country is ethically and legally responsible for its own wastes, in accordance with the provisions of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. Therefore the default position is that all nuclear wastes will be disposed of in each of the 40 or so countries concerned with nuclear power generation or part of the fuel cycle. To illustrate the global distribution of radioactive waste now and in the near future, Table 1 provides the regional breakdown, based on the UN classification of the world in regions illustrated in Figure 1, of nuclear power reactors in operation and under construction worldwide. In summary, 31 countries operate 433 plants, with a total capacity of more than 365 gigawatts of electrical energy (GW[e]). A further 65 units, totaling nearly 63 GW(e), are under construction across 15 of these nations. In addition, 65 countries are expressing new interest in, considering, or actively planning for nuclear power to help address growing energy demands to fuel economic growth and development, climate change concerns, and volatile fossil fuel prices. Of these 65 new countries, 21 are in Asia and the Pacific region, 21 are from the Africa region, 12 are in Europe (mostly Eastern Europe), and 11 in Central and South America. However, 31 of these 65 are not currently planning to build reactors, and 17 of those 31 have grids of less than 5 GW, which is said to be too small to accommodate most of the reactor designs available. For the remaining 34 countries actively planning reactors, as of September 2010: 14 indicate a strong intention to precede with introduction of nuclear power; 7 are preparing but haven't made a final decision, 10 have made a decision and are preparing infrastructure, 2 have ordered a new nuclear power plant, and 1 has a plant under construction. In all countries interested in pursuing nuclear power, it is necessary for the governments to create an environment for investment and advancement of nuclear power, including development of a professional and independent regulatory framework and regime, knowledge and refinement of skills in nuclear safety and control, definition of policies on nuclear waste management and decommissioning, and participation in international non-proliferation measures. Specifically related to radioactive waste management, nuclear facilities and industries that utilize radioactive material work to well-established safety standards for the management of their waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Accident at Fukushima: What Happened?

At 2:46 PM, on the coast of the Pacific Ocean in eastern Japan, people were spending an ordinary afternoon. The earthquake had a magnitude of 9.0, the fourth largest ever recorded in the world. Avery large number of aftershocks were felt after the initial earthquake. More than 100 of them had a magnitude of over 6.0. There were very few injured or dead at this point. The large earthquake caused by this enormous crustal deformation spawned a rare and enormous tsunami that crashed down 30-40 minutes later. It easily cleared the high levees, washing away cars and houses and swallowing buildings of up to three stories in height. The largest tsunami reading taken from all regions was 40 meters in height. This tsunami reached the West Coast of the United States and the Pacific coast of South America, with wave heights of over two meters. It was due to this tsunami that the disaster became one of a not imaginable scale, which saw the number of dead or missing reach about 20,000 persons. The enormous tsunami headed for 15 nuclear power plants on the Pacific coast, but 11 power plants withstood the tsunami and attained cold shutdown. The flood height of the tsunami that struck each power station ranged to a maximum of 15 meters. The Fukushima Daiichi Nuclear Power Plant Units experienced the largest and the cores of three reactors suffered meltdown. As a result, more than 160,000 residents were forced to evacuate, and are still living in temporary accommodation. The main focus of this presentation is on what happened at the Fukushima Daiichi, and how station personnel responded to the accident, with considerable international support. A year after the Fukushima Daiichi accident, Japan is in the process of leveraging the lessons learned from the accident to further improve the safety of nuclear power facilities and regain the trust of society. In this connection, not only international organizations, including IAEA, and WANO, but also governmental organizations and nuclear industry representatives from various countries, have been evaluating what happened at Fukushima Daiichi. Support from many countries has contributed to successfully stabilizing the Fukushima Daiichi Nuclear Power Station. International cooperation is required as Japan started along the long road to decommissioning the reactors. Such cooperation with the international community would achieve the decommissioning of the damaged reactors. Finally, recovery plans by the Japanese government to decontaminate surrounding regions have been started in order to get residents back to their homes as early as possible. Looking at the world's nuclear power industry, there are currently approximately 440 reactors in operation and 60 under construction. Despite the dramatic consequences of the Fukushima Daiichi catastrophe it is expected that the importance of nuclear power generation will not change in the years to come. Newly accumulated knowledge and capabilities must be passed on to the next generation. This is the duty put upon us and which is one that we must embrace.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Human factors and modeling methods in the development of control room modernization concepts - 315

Control room modernization is one of the most challenging and complex upgrade projects that a nuclear power plant can undertake. It can even have a bigger impact on operations than, for example, turbine replacement. The challenges of migrating an analog control system to a distributed control system are already well known and a number of nuclear utilities have embarked upon various levels of effort to upgrade some of the systems in the control room. When planning for control room upgrades, plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed human factors design and evaluation methods to be used in the development of an end-state control room concept and to manage the various phases of the upgrade life cycle. This included interactive sessions with operators in INL's Human System Simulation Laboratory, and three-dimensional modeling to visualize control board changes. To make the various upgrade phases as concrete and as visible as possible, the end-state concept includes a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach results in an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Overview of SNS accelerator shielding analyses

The Spallation Neutron Source is an accelerator driven neutron scattering facility for materials research. During all phases of SNS development, including design, construction, commissioning and operation, extensive neutronics work was performed in order to provide adequate shielding, to assure safe facility operation from radiation protection point of view, and to optimize performance of the accelerator and target facility. Presently, most of the shielding work is concentrated on the beam lines and instrument enclosures to prepare for commissioning, safe operation and adequate radiation background in the future. Although the accelerator is built and in operation mode, there is extensive demand for shielding and activation analyses. It includes redesigning some parts of the facility, facility upgrades, designing additional structures, storage and transport containers for accelerator structures taken out of service, and performing radiation protection analyses and studies on residual dose rates inside the accelerator. (authors)

43 PARTICLE ACCELERATORS↗

Radioxenon spiked air

Four of the radioactive xenon isotopes ( 131m Xe, 133m Xe, 133 Xe and 135 Xe) with half-lives ranging from 9 h to 12 days are produced from nuclear fission and can be detected from days to weeks following their production and release. Being inert gases, they are readily transported through the atmosphere. Sources for release of radioactive xenon isotopes include operating nuclear reactors via leaks in fuel rods, medical isotope production facilities, and nuclear weapons' detonations. They are not normally released from fuel reprocessing due to the short half-lives. The Comprehensive Nuclear-Test-Ban Treaty has led to creation of the International Monitoring System. The International Monitoring System, when fully implemented, will consist of one component with 40 stations monitoring radioactive xenon around the globe. Monitoring these radioactive xenon isotopes is important to the Comprehensive Nuclear-Test-Ban Treaty in determining whether a seismically detected event is or is not a nuclear detonation. A variety of radioactive xenon quality control check standards, quantitatively spiked into various gas matrices, could be used to demonstrate that these stations are operating on the same basis in order to bolster defensibility of data across the International Monitoring System. This study focuses on Idaho National Laboratory's capability to produce three of the xenon isotopes in pure form and the use of the four xenon isotopes in various combinations to produce radioactive xenon spiked air samples that could be subsequently distributed to participating facilities.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Training and certification of human organizational factors designers in nuclear plant engineering - 344

Performing an increasing number of small and large-scope nuclear Human Factors Programs, AREVA NP is facing the challenging situation that (1) well-trained experts in Human Factors or Usability Engineering are currently hard to find and (2) newly hired ones need at least two years 'on the job' to become familiar with the nuclear field and the complexity of engineering Human Factors in this field. To innovatively meet this challenge we focus instead on company-internal engineers. Demonstrated nuclear engineering knowledge and skills and pronounced interest to extend both renders them optimal applicants to the AREVA NP two years Human Organizational Factors Training and Certification program. The AREVA NP training shall convey Human Factors knowledge and skills within the limited time of two years. We also stress the need to change participants' mindset from a technically-biased to a human-centered approach, committed to involve end-users throughout design. Next to psychology principles, user testing, user-centered design, plant operation principles, and the acquisition and documentation of users' requirements, design constraints, and inherent tradeoffs, participants will be trained to apply learned methods in a real environment and meet the challenges of real projects. The following sections provide insights in the training conception and preparation phase, the identification of appropriate candidates, the development of course syllabuses, and the schedule of lectures and tests. The promising experiences made thus far are reported as well. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multimodal ultrafine particles from pulverized coal combustion in a laboratory scale reactor

Particle size distribution functions have been measured in a ethanol fueled flame reactor fed with a low amount of pulverized coal particles. The reactor is operated in low (5.0 vol.%) and high (76.5 vol.%) oxygen concentrations using two high volatile bituminous Colombian and Indonesian coals. A carbon black powder is also oxidized in the same conditions. Generated particles are sampled using rapid-dilution probes and the size distribution functions are measured on-line by a high resolution Differential Mobility Analyzer. Results clearly show that ultrafine particles, those with sizes lower than 100 nm, have a multimodal size distribution function. These particles have huge number concentrations in both investigated conditions whereas their formation is enhanced in the oxygen enriched condition. Ultrafine particles are almost totally dominated in number by the fraction having sizes below 30 nm. Nanoparticles also account for a significant fraction of total particle mass and slowly coagulate in the reactor. The shape of the size distribution functions is not affected by the coal type, at least for the two investigated coals. Results suggest that ultrafine particles form through the vaporization-nucleation-growth pathway involving inorganic ashes. Moreover the contribution of carbonaceous particles seems particularly important for size smaller than 5 nm. (author)

01 COAL, LIGNITE, AND PEAT↗

Innovative applications of technology for nuclear power plant productivity improvements

The nuclear power industry in several countries is concerned about the ability to maintain high plant performance levels due to aging and obsolescence, knowledge drain, fewer plant staff, and new requirements and commitments. Current plant operations are labor-intensive due to the vast number of operational and support activities required by commonly used technology in most plants. These concerns increase as plants extend their operating life. In addition, there is the goal to further improve performance while reducing human errors and increasingly focus on reducing operations and maintenance costs. New plants are expected to perform more productively than current plants. In order to achieve and increase high productivity, it is necessary to look at innovative applications of modern technologies and new concepts of operation. The Electric Power Research Inst. is exploring and demonstrating modern technologies that enable cost-effectively maintaining current performance levels and shifts to even higher performance levels, as well as provide tools for high performance in new plants. Several modern technologies being explored can provide multiple benefits for a wide range of applications. Examples of these technologies include simulation, visualization, automation, human cognitive engineering, and information and communications technologies. Some applications using modern technologies are described. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The problem analysis of data processing performance in nuclear power plant computerized information and control system - 288

This paper is based on the data processing performance problems of operating command delay and system display not updating real-time for nuclear power plant computerized information and control system. The plant computerized information and control system is responsible for monitoring and controlling the plant operation, and it is a key part in the plant DCS system. Its data processing performance will affect the operation stability of nuclear power plant. The architecture, hardware configuration and data communication for plant computerized information and control system among the different levels in DCS are described. The main reasons affecting data processing performance in different signal channels are analyzed according to the plant load test results. The CPU load curves for real time server and central processing server are displayed, although the detailed cause for operating command delay and system display not updating realtime are not found, central processing server load is heavier than real time server which remind us to analyze the data processing of software resource scheduling deeply. So the resource distribution problem of software execution task is also analyzed according to CPU load test results. This paper provides the optimization analysis for data processing performance, and it is available and effective according to the latest test results. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Spherical Torus Nuclear Fusion Reactor Space Propulsion Vehicle Concept for Fast Interplanetary Travel

A conceptual vehicle design enabling fast outer solar system travel was produced predicated on a small aspect ratio spherical torus nuclear fusion reactor. Initial requirements were for a human mission to Saturn with a greater than 5% payload mass fraction and a one way trip time of less than one year. Analysis revealed that the vehicle could deliver a 108 mt crew habitat payload to Saturn rendezvous in 235 days, with an initial mass in low Earth orbit of 2,941 mt. Engineering conceptual design, analysis, and assessment was performed on all ma or systems including payload, central truss, nuclear reactor (including divertor and fuel injector), power conversion (including turbine, compressor, alternator, radiator, recuperator, and conditioning), magnetic nozzle, neutral beam injector, tankage, start/re-start reactor and battery, refrigeration, communications, reaction control, and in-space operations. Detailed assessment was done on reactor operations, including plasma characteristics, power balance, power utilization, and component design.

Williams, Craig H.↗

Pre-Irradiation Comparison of W-Based Alloys for the PHENIX Campaign: Microstructure, Composition, and Mechanical Properties

Tungsten is the material of choice as the plasma-facing material in future plasma-burning fusion reactors. During operation, plasma-facing materials will be simultaneously exposed to 14-MeV neutrons, low-energy D/He particles, and high heat loads. Neutron irradiation of tungsten results in bulk material damage, including knock-on damage causing loops and voids, and transmutation reactions leading to the transmutation of tungsten to rhenium and osmium. Under irradiation to high dose, Re and Os atoms can amalgamate into precipitates that drastically alter the material properties, noticeably increasing the hardness. However, the early-stage development of Re and Os precipitates under a fast neutron spectrum has not been investigated.In this work, the microstructure and hardening behavior of W-Re alloys containing 0 to 2.2 wt% Re, TiC-doped W, and powder-injection-molded W are investigated prior to neutron irradiation at 500ºC and 800ºC to ~0.1 displacement per atom in the High Flux Isotope Reactor (HFIR) to establish a baseline understanding of the starting microstructures.Transmission electron microscopy analysis indicates a dislocation-heavy microstructure, and scanning transmission electron microscopy–energy dispersive spectroscopy shows no spatial segregation of Re and W. Similarly, surface compositional studies performed with electron backscatter diffraction and X-ray photoelectron spectroscopy showed no presence of Re, indicating the Re did not segregate or form new phases during fabrication. Here, the alloys in their as-fabricated state showed no Re segregation or second-phase development, with no significant differences between their microstructures and Vickers hardness values.

36 MATERIALS SCIENCE↗