Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, the Intuitive Machines IM-1 NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan Anzalone↗

Lunar Node – 1: Initial Flight Results and the Role of Surface Psuedolites in Lunar Navigation

On February 22, 2024, Intuitive Machines NOVA-C lander, nick-named Odysseus, landed on the lunar surface, carrying with it a cadre of NASA scientific and technology demonstration payloads. These payloads and missions marked the first delivery of NASA instruments to operate from the lunar surface since the Apollo landings. One of these payloads is Lunar Node -1 (LN-1), a navigation beacon demonstration mission. The payload was designed and built by NASA’s Marshall Space Flight Center. The payload’s main goal was to demonstrate and provide insight into the use of lunar surface-based radio navigation aids. As part of the mission, LN-1 successfully conducted multiple one-way transmissions from the NOVA-C vehicle to Deep Space Network ground receivers using its onboard S-band transmitter, while being disciplined by an onboard Space Chip Scale Atomic Clock. LN-1 transmitted to DSN on an almost daily basis during transit to the moon, including two surface passes. The payload was originally plan to conduct 7-10 days of surface operation as an always-on beacon. These passes focused on evaluating two main navigation approaches: performance and stability of ranging using time-based transfer techniques on a cubesat size and grade platform, as well as one-way psuedonoise ranging approaches. To assess performance, the measurements were compared to independent navigation solutions using multiple approaches including: one-way Doppler tracking, two-way Doppler Tracking, and visual verification of the landing location provided by visual observations from orbital platforms. While the mission only conducted limited surface operations, the data provides some initial insight to performance form the lunar surface. These results are compared with initial ground-based testing as well as continued evaluation of the flight-space platform using multiple grades of oscillators for maintaining clock and frequency stability. These focus on the timing stability of platform in a deep-space environment as well variations in state determination. Given these insights, this paper provides additional description and evaluation of how this approach can be utilized as part of a broader lunar navigation architecture, such as being developed and deployed across multiple international space agencies. Analysis is provided to develop overall timing requirements and assessment of operational scenarios, such as orbit and surface location determination. In addition, the results support discussion as to how surface pseudolites could best be used within existing standard signal definitions, such as defined in the LunaNet Interoperability Specifications. This will consider concerns such as the near-/far- problem as well as operational considerations, including whether a beacon is better suited as two- or one-way ranging platform. The use cases are focused on how these psuedolites can provide additional coverage to augment and support planned operational coverage. For example, this analysis provides analysis of mid-latitude surface missions, where there may be limited geometry and availability of orbital relays. The results will show how these navigation psuedolites can fit within the developing architecture to provide additional robustness, capability, and support multiple use cases. Lastly, the paper will discuss challenges and next steps to be addressed in the implementation and testing of a follow-on payload and a continued path towards demonstration and integration of this capability into Lunar PNT architectures.

Evan J Anzalone↗

Development And Initial Testing Of Off-Gas Recycle Liquid From The WTP Low Activity Waste Vitrification Process - 14333

The Waste Treatment and Immobilization Plant (WTP) process flow was designed to pre-treat feed from the Hanford tank farms, separate it into a High Level Waste (HLW) and Low Activity Waste (LAW) fraction and vitrify each fraction in separate facilities. Vitrification of the waste generates an aqueous condensate stream from the off-gas processes. This stream originates from two off-gas treatment unit operations, the Submerged Bed Scrubber (SBS) and the Wet Electrospray Precipitator (WESP). Currently, the baseline plan for disposition of the stream from the LAW melter is to recycle it to the Pretreatment facility where it gets evaporated and processed into the LAW melter again. If the Pretreatment facility is not available, the baseline disposition pathway is not viable. Additionally, some components in the stream are volatile at melter temperatures, thereby accumulating to high concentrations in the scrubbed stream. It would be highly beneficial to divert this stream to an alternate disposition path to alleviate the close-coupled operation of the LAW vitrification and Pretreatment facilities, and to improve long-term throughput and efficiency of the WTP system. In order to determine an alternate disposition path for the LAW SBS/WESP Recycle stream, a range of options are being studied. A simulant of the LAW Off-Gas Condensate was developed, based on the projected composition of this stream, and comparison with pilot-scale testing. The primary radionuclide that vaporizes and accumulates in the stream is Tc-99, but small amounts of several other radionuclides are also projected to be present in this stream. The processes being investigated for managing this stream includes evaporation and radionuclide removal via precipitation and adsorption. During evaporation, it is of interest to investigate the formation of insoluble solids to avoid scaling and plugging of equipment. Key parameters for radionuclide removal include identifying effective precipitation or ion adsorption chemicals, solid-liquid separation methods, and achievable decontamination factors. Results of the radionuclide removal testing indicate that the radionuclides, including Tc-99, can be removed with inorganic sorbents and precipitating agents. Evaporation test results indicate that the simulant can be evaporated to fairly high concentration prior to formation of appreciable solids, but corrosion has not yet been examined.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessing Government and Industry Roles to Accelerate Commercialization of Advanced Reactors and Supporting Fuel Cycles

Recent growth in private sector interest and investment in advanced reactor designs signals a new period in the greater than six decade pursuit of commercial nuclear technology. This nuclear entrepreneurship is primarily centered in the North America; meanwhile, national programs in China, France, India, Russia, and South Korea also feature active efforts to design, construct, operate and export advanced reactors .The business case for most private ventures calls for an aggressive commercialization timeline-tied to expectations for returns on investment. Finally, strategic energy portfolio projections and utility resource planning point to the 2030 - 2050 window as the period of greatest need for dispatchable, energy intensive, low-carbon generation options to address retirement of baseload capacity, increased penetration of renewables and economy-scale decarbonization. However, lead times for commercialization range from 30 to 50 years based on more traditional government-centric timelines. Fuel development and fuel cycle infrastructure deployment represent parallel timelines that directly influence the timeline for commercialization of many advanced reactor concepts. While multi-decade development periods appear to be commonplace for new nuclear projects, such timelines were not always the norm-three separate countries set out to develop civilian commercial power from fundamental nuclear principles, in just over a decade, on average. The US led light-water reactor (LWR) development in the 1950's, the UK pioneered a gas-cooled reactor (GCR) concept in the same time period, and Canada forged the path to commercializing the heavy-water reactor (HWR) starting in the mid-1950's and into the mid-1960's. The necessary fuel cycle facilities to support the commercial reactor design also did not appear suddenly, but were a collaborative effort between government and private partners. In this paper, the efforts of these three governments and their private industry partnerships in reactor and fuel cycle development are explored, and a select sample of representative milestones for each is presented, with the roles that each group played. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Helium Energetic Neutral Atoms from the Heliosphere: Perspectives for Future Observations

Observations of energetic neutral atoms (ENAs) allow for remote sensing of plasma properties in distant regions of the heliosphere. So far, most of the observations have concerned only hydrogen atoms. In this paper, we present perspectives for observations of helium energetic neutral atoms (He ENAs). We calculated the expected intensities of He ENAs created by the neutralization of helium ions in the inner heliosheath and through the secondary ENA mechanism in the outer heliosheath. We found that the dominant source region for He ENAs is the inner heliosheath. The obtained magnitudes of intensity spectra suggest that He ENAs can be observed with future ENA detectors, as those planned on Interstellar Mapping and Acceleration Probe . Observing He ENAs is most likely for energies from a few to a few tens of keV/nuc. Estimates of the expected count rates show that the ratio of helium to hydrogen atoms registered in the detectors can be as low as 1:10{sup 4}. Consequently, the detectors need to be equipped with an appropriate mass spectrometer capability, allowing for recognition of chemical elements. Due to the long mean free paths of helium ions in the inner heliosheath, He ENAs are produced also in the distant heliospheric tail. This implies that observations of He ENAs can resolve its structure, which seems challenging from observations of hydrogen ENAs since energetic protons are neutralized before they progress deeper in the heliospheric tail.

79 ASTRONOMY AND ASTROPHYSICS↗

Planning air transport network in Appalachia

Main issues to be considered in designing an air transport system are discussed, and a model for the selection of an optimal air network for a region is presented. It was desired to have the ability to consider a dense network of nodes and air routes and variations in schedules on routes, which in combination would represent virtually all conceivable alternatives. Linear and integer programming were chosen as the most promising analysis methodologies. Integer programming was found to be intractable, while linear programming provided efficient solutions. The model was applied to studying the feasibility of a STOL network in West Virginia. Based on allowable paths, an examination of intercity demands, and established growth points, desired levels of service expressed as minimum flights were determined for certain city pairs.

Carter, E. C.↗

Impact of Probabilistic Weather on Flight Routing Decisions

Flight delays in the United States have been found to increase year after year, along with the increase in air traffic. During the four-month period from May through August of 2005, weather related delays accounted for roughly 70% of all reported delays, The current weather prediction in tactical (within 2 hours) timeframe is at manageable levels, however, the state of forecasting weather for strategic (2-6 hours) timeframe is still not dependable for long-term planning. In the absence of reliable severe weather forecasts, the decision-making for flights longer than two hours is challenging. This paper deals with an approach of using probabilistic weather prediction for Traffic Flow Management use, and a general method using this prediction for estimating expected values of flight length and delays in the National Airspace System (NAS). The current state-of-the-art convective weather forecasting is employed to aid the decision makers in arriving at decisions for traffic flow and flight planing. The six-agency effort working on the Next Generation Air Transportation System (NGATS) have considered weather-assimilated decision-making as one of the principal foci out of a list of eight. The weather Integrated Product Team has considered integrated weather information and improved aviation weather forecasts as two of the main efforts (Ref. 1, 2). Recently, research has focused on the concept of operations for strategic traffic flow management (Ref. 3) and how weather data can be integrated for improved decision-making for efficient traffic management initiatives (Ref. 4, 5). An overview of the weather data needs and benefits of various participants in the air traffic system along with available products can be found in Ref. 6. Previous work related to use of weather data in identifying and categorizing pilot intrusions into severe weather regions (Ref. 7, 8) has demonstrated a need for better forecasting in the strategic planning timeframes and moving towards a probabilistic description of weather (Ref. 9). This paper focuses on. specified probability in a local region for flight intrusion/deviation decision-making. The process uses a probabilistic weather description, implements that in a air traffic assessment system to study trajectories of aircraft crossing a cut-off probability contour. This value would be useful for meteorologists in creating optimum distribution profiles for severe weather, Once available, the expected values of flight path and aggregate delays are calculated for efficient operations. The current research, however, does not deal with the issue of multiple cell encounters, as well as echo tops, and will be a topic of future work.

Sheth, Kapil↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Materials: Reconsidering Wastes and Assets - 13193

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable ('assets') to worthless ('wastes'). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or - in the case of high level waste - awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site's (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as 'waste' include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River nuclear solutions criticality safety training and qualification program and professional development/retention - 14507

Many years ago, at the Savannah River Site, the need for technically competent and qualified criticality safety (CS) staff was identified. Over the intervening years an extensive training and qualification (T and Q) program was developed. In 2008 Savannah River Nuclear Solutions (SRNS), the current site M and O contractor, inherited the T and Q program developed by the prior site contractors. Since then SRNS has initiated changes to the T and Q program to better fit the current regulatory environment, ensuring compliance with ANSI/ANS-8.26 [1], and implementing the idea of continuous improvement. Currently, a significant fraction of the SRNS CS staff either will be or are eligible for retirement. Therefore, SRNS is pursuing recent Nuclear Engineering college graduates and/or experienced criticality engineers. The challenges associated with hiring and maintaining criticality staff include, but are not limited to, increased workforce mobility and increased competition for fewer criticality resources. For example, the recent trend in company benefits is to eliminate longer term benefits such as pensions to make the benefits more transportable in terms of 401 Ks and Health Savings Accounts. In addition, there have been reductions in DOE funding for professional development through participation in ANS committees or attendance at Criticality related conferences. SRNS has investigated a number of possibilities on how to retain CS staff, but in the current environment has not identified any 'golden eggs'. Regardless, SRNS is exploring additional paths to incentivize the engineers to stay long term. SRNS is working to improve/maintain its workforce by creating a CS engineer pipeline. SRNS provides a training budget for new engineers and offers a formalized and mentored training program. For experienced criticality engineers, the SRNS T and Q program is flexible enough to allow 'credit' for previous accomplishments at other sites. SRNS is also striving to be proactive in supporting professional development by identifying specific monies in the planning phases of the annual budget requests. The current posture of SRNS is to maintain 'open' requisitions for both experienced staff looking for other opportunities, and for recent college graduates. As opportunities arise, either from within or without, SRNS evaluates the potential candidates and advances offers of employment. Until the longer term need is met SRNS intends to hire at least two staff members per year. Those staff members then enter the T and Q program and when appropriate, based on their experience and/or training accomplishments, begin assisting the current staff with program/facility CS support. (authors)

42 ENGINEERING↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitivity of natural gas deployment in the US power sector to future carbon policy expectations

One option for reducing carbon emissions in the power sector is replacement of coal-fired generation with less carbon-intensive natural gas combined cycle (NGCC) generation. In the United States, where there is abundant, low-cost natural gas supply, increased NGCC deployment could be a cost-effective emissions abatement opportunity at relatively modest carbon prices. However, under scenarios in which carbon prices rise and deeper emissions reductions are achieved, other technologies may be more cost-effective than NGCC in the future. In this analysis, using a US energy system model with foresight (a version of the National Energy Modeling System or “NEMS” model), we find that varying expectations about carbon prices after 2030 does not materially affect NGCC deployment prior to 2030, all else equal. An important implication of this result is that, under the set of natural gas and carbon price trajectories explored here, myopic behavior or other imperfect expectations about potential future carbon policy do not change the natural gas deployment path or lead to stranded natural gas generation infrastructure. Lastly, we explain these results in terms of the underlying economic competition between available generation technologies and discuss the broader relevance to US climate change mitigation policy.

03 NATURAL GAS↗

TEM specimen preparation of semiconductor-PMMA-metal interfaces

Transmission electron microscopy (TEM) cross-section specimens of PMMA in contact with gold and Si were prepared by focused ion beam (FIB) and compared with plan-view PMMA specimens prepared by a dip-coating technique. The specimens were characterized by TEM and electron energy loss spectroscopy (EELS). In the cross-section specimens, the thin films of PMMA were located in a Si-PMMA-Au multilayer. Different thicknesses of PMMA films were spin-coated on the Si substrates. The thickness of the TEM specimens prepared by FIB was estimated using EELS to be 0.65 of the plasmon mean-free-path. Along the PMMA-Au interface, Au particle diffusion into the PMMA was observed, and the size of the Au particles was in the range of 2-4 nm. Dip-coating of PMMA directly on Cu TEM grids resulted in thin specimens with a granular morphology, with a thickness of 0.58 of the plasmon mean-free-path. The dip-coated specimens were free from ion milling induced artifacts, and thus serve as control specimens for comparison with the cross-sectioned specimens prepared by FIB.

36 MATERIALS SCIENCE↗

Design outline for a new multiman ATC simulation facility at NASA-Ames Research Center

A new and unique facility for studying human factors aspects in aeronautics is being planned for use in the Man-Vehicle Systems Research Division at the NASA-Ames Research Center. This facility will replace the existing three cockpit-single ground controller station and be expandable to include approximately seven cockpits and two ground controller stations. Unlike the previous system, each cockpit will be mini-computer centered and linked to a main CPU to effect a distributed computation facility. Each simulator will compute its own flight dynamic and flight path predictor. Mechanical flight instruments in each cockpit will be locally supported and CRT cockpit displays of (e.g.) traffic and or RNAV information will be centrally computed and distributed as a means of extending the existing computational and graphical resources. An outline of the total design is presented which addresses the technical design options and research possibilities of this unique man-machine facility and which may also serve as a model for other real time distributed simulation facilities.

Kreifeldt, J. G.↗

Participation of Bell Telephone Laboratories in Project Echo and Experimental Results

On August 12, 1960, Echo I, a 100-foot-diameter spherical balloon, was placed in orbit around the earth by the National Aeronautics and Space Administration. The objective was to demonstrate the feasibility of long-distance communication by microwave reflection from a satellite. A two-way coast-to-coast voice circuit was to be established between the Jet Propulsion Laboratory (JPL) facility in California and a station provided by Bell Telephone Laboratories (STL) in New Jersey. Similar tests were also planned with the Naval Research Laboratory and other stations. This paper describes the general organization and operation of the Holmdel, New Jersey, station, and discusses the results of the experiments performed between the balloon launching and March 1, 1961. Successful voice communication was achieved through a variety of modulation methods including frequency modulation with feedback, amplitude modulation, single-sideband modulation, and narrow-band phase modulation. Careful measurements were also made of the loss in the transmission path.

Jakes, William C., Jr.↗

High Temperature Materials Needs in NASA's Advanced Space Propulsion Programs

In recent years, NASA has embarked on several new and exciting efforts in the exploration and use of space. The successful accomplishment of many planned missions and projects is dependent upon the development and deployment of previously unproven propulsion systems. Key to many of the propulsion systems is the use of emergent materials systems, particularly high temperature structural composites. A review of the general missions and benefits of utilizing high temperature materials will be presented. The design parameters and operating conditions will be presented for both specific missions/vehicles and classes of components. Key technical challenges and opportunities are identified along with suggested paths for addressing them.

Eckel, Andrew J.↗

The Ensemble Canon

Ensemble is an open architecture for the development, integration, and deployment of mission operations software. Fundamentally, it is an adaptation of the Eclipse Rich Client Platform (RCP), a widespread, stable, and supported framework for component-based application development. By capitalizing on the maturity and availability of the Eclipse RCP, Ensemble offers a low-risk, politically neutral path towards a tighter integration of operations tools. The Ensemble project is a highly successful, ongoing collaboration among NASA Centers. Since 2004, the Ensemble project has supported the development of mission operations software for NASA's Exploration Systems, Science, and Space Operations Directorates.

applications programs (computers),↗