Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Waste management strategy for cost effective and environmentally friendly NPP decommissioning

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named ndcon to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNF-ST&DARDS Unified Database and the Automatic Document Generator

The U.S. Department of Energy, Office of Nuclear Energy is sponsoring development of a database to store information related to spent nuclear fuel (SNF) in support of its Spent Fuel and Waste Disposition efforts. This database, referred to as the Unified Database (UDB), is part of a larger engineering analysis tool, the Used Nuclear Fuel Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS). The UDB provides a comprehensive, controlled source of SNF information, including dry cask attributes, assembly data, economic attributes, transportation infrastructure attributes, potential future facility attributes, and federal government radioactive waste attributes. There are a number of existing and envisioned data reports that can be expected to use data stored within the UDB; however, previously, there was not a streamlined method to couple the database to such data reports. Therefore, to streamline the creation of these reports, two methods were developed to generate documents from information in the database automatically. The first method used Java and LaTeX for automatically generating the report, and the second method used the Python programming language along with Sphinx, a Python documentation generator. There are some advantages and disadvantages to both approaches, but both methods produced equally high-quality, automatically generated reports that were directly coupled to the database. Finally, this study describes data currently available in the UDB; explains the two different methods for automatically generating reports from these data; and shows examples of inline text, figures, and tables automatically generated using both approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DPC Direct Disposal R&D Independent Technical Review: Plan

Developing and evaluating approaches for direct geologic disposal of commercial spent nuclear fuel (SNF) in dual-purpose canisters (DPCs) is a cross-cutting multi-disciplinary activity that is directly tied to the implementation of DPCs by the nuclear industry. The ultimate goal of the DPC direct disposal R&D program is to facilitate and maximize safe, cost-effective, licensed direct disposal. Independent Technical Review (ITR) is needed to maximize the impact of the R&D program on future implementation. The review will involve a team of experts representing the nuclear industry, repository sciences, and licensing. The team will be charged to review a set of representative technical reports and other information, and answer a set of questions that focus on R&D steering.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mechanical Modeling of a WIPP Drum Under Pressure

Mechanical modeling was undertaken to support the Waste Isolation Pilot Plant (WIPP) technical assessment team (TAT) investigating the February 14th 2014 event where there was a radiological release at the WIPP. The initial goal of the modeling was to examine if a mechanical model could inform the team about the event. The intention was to have a model that could test scenarios with respect to the rate of pressurization. It was expected that the deformation and failure (inability of the drum to contain any pressure) would vary according to the pressurization rate. As the work progressed there was also interest in using the mechanical analysis of the drum to investigate what would happen if a drum pressurized when it was located under a standard waste package. Specifically, would the deformation be detectable from camera views within the room. A finite element model of a WIPP 55-gallon drum was developed that used all hex elements. Analyses were conducted using the explicit transient dynamics module of Sierra/SM to explore potential pressurization scenarios of the drum. Theses analysis show similar deformation patterns to documented pressurization tests of drums in the literature. The calculated failure pressures from previous tests documented in the literature vary from as little as 16 psi to 320 psi. In addition, previous testing documented in the literature shows drums bulging but not failing at pressures ranging from 69 to 138 psi. The analyses performed for this study found the drums failing at pressures ranging from 35 psi to 75 psi. When the drums are pressurized quickly (in 0.01 seconds) there is significant deformation to the lid. At lower pressurization rates the deformation of the lid is considerably less, yet the lids will still open from the pressure. The analyses demonstrate the influence of pressurization rate on deformation and opening pressure of the drums. Analyses conducted with a substantial mass on top of the closed drum demonstrate that the drums will still open provided the pressure is high enough. Investigation teams should look for displaced drum lids when searching for drums that have pressurized and failed. The mechanical modeling study for this program is summarized in the following memo. Following a brief introduction, there is a summary of a brief literature review of previous pressure testing of drums, an explanation of the model, presentation of the key results, some discussion, and concluding with a summary and key points.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Demolition of Historic Cape Canaveral Air Force Station Launch Facilities: Managing the Process to Maximize Recycle Value to Fund Demolition

This paper will present the history of the Atlas 36 and Titan 40 Space Launch Complexes (SLC), the facility assessment process, demolition planning, recycle methodology, and actual facility demolition that resulted in a 40% reduction in baseline cost. These two SLC launched hundreds of payloads into space from Cape Canaveral Air Force Station (AFS), Florida. The Atlas-Centaur family of rockets could lift small- to medium-size satellites designed for communications, weather, or military use, placing them with near pinpoint accuracy into their intended orbits. The larger Titan family was relied upon for heavier lifting needs, including launching military satellites as well as interplanetary probes. But despite their efficiency and cost-effectiveness, the Titan rockets, as well as earlier generation Atlas models, were retired in 2005. Concerns about potential environmental health hazards from PCBs and lead-based paint chipping off the facilities also contributed to the Air Force's decision in 2005 to dismantle and demolish the Atlas and Titan missile-launching systems. Lockheed Martin secured the complex following the final launch, removed equipment and turned over the site to the Air Force for decommissioning and demolition (D and D). AMEC was retained by the Air Force to perform demolition planning and facility D and D in 2004. AMEC began with a review of historical information, interviews with past operations personnel, and 100% facility assessment of over 100 structures. There where numerous support buildings that due to their age contained asbestos containing material (ACM), PCB-impacted material, and universal material that had to be identified and removed prior to demolition. Environmental testing had revealed that the 36B mobile support tower (MST) exceeded the TSCA standard for polychlorinated biphenyls (PCB) paint (<50 ppm), as did the high bay sections of the Titan Vertical Integration Building (VIB). Thus, while most of the steel structures could be completely recycled, about one-third of 36B MST and the affected areas of the VIB were to be consigned to an on-site regulated waste landfill. In all, it is estimated that approximately 10,000,000 kg (11,000 tons) of PCB-coated steel will be land-filled and 23,000,000 kg (25,000 tons) will be recycled. The recycling of the steel and other materials made it possible to do additional demolition by using these funds. Therefore, finding ways to maximize the recycle value of materials became a key factor in the pre-demolition characterization and implementation strategy. This paper will present the following: - Critical elements in demolition planning working at an active launch facility; - Characterization and strategy to maximize steel recycle; - Waste disposition strategy to maximize recycle/reuse and minimize disposal; - Recycle options available at DOD installations that allow for addition funds for demolition; - Innovation in demolition methodologies for large structures - explosive demolition and large-scale dismantlement; - H and S aspects of explosive demolition and large scale dismantlement. In conclusion: The Cape Canaveral AFS Demolition Program has been a great success due to the integration of multiple operations and contractors working together to determine the most cost-effective demolition methods. It is estimated that by extensive pre-planning and working with CCAFS representatives, as well as maximizing the recycle credits of various material, primarily steel, that the government will be able to complete what was base-lined to be a $30 M demolition program for < $20 M. Other factors included a competitive subcontractor environment where they were encouraged with incentives to maximize recycle/reuse of material and creative demolition solutions. Also, by overlapping multiple demolition tasks at multiple facilities allowed for a reduction in field oversight. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The New Generation of Uranium In Situ Recovery Facilities: Design Improvements Should Reduce Radiological Impacts Relative to First Generation Uranium Solution Mining Plants

In the last few years, there has been a significant increase in the demand for Uranium as historical inventories have been consumed and new reactor orders are being placed. Numerous mineralized properties around the world are being evaluated for Uranium recovery and new mining / milling projects are being evaluated and developed. Ore bodies which are considered uneconomical to mine by conventional methods such as tunneling or open pits, can be candidates for non-conventional recovery techniques, involving considerably less capital expenditure. Technologies such as Uranium In Situ Leaching / In Situ Recovery (ISL / ISR - also referred to as 'solution mining'), have enabled commercial scale mining and milling of relatively small ore pockets of lower grade, and are expected to make a significant contribution to overall world wide uranium supplies over the next ten years. Commercial size solution mining production facilities have operated in the US since the mid 1970's. However, current designs are expected to result in less radiological wastes and emissions relative to these 'first' generation plants (which were designed, constructed and operated through the 1980's). These early designs typically used alkaline leach chemistries in situ including use of ammonium carbonate which resulted in groundwater restoration challenges, open to air recovery vessels and high temperature calcining systems for final product drying vs the 'zero emissions' vacuum dryers as typically used today. Improved containment, automation and instrumentation control and use of vacuum dryers in the design of current generation plants are expected to reduce production of secondary waste byproduct material, reduce Radon emissions and reduce potential for employee exposure to uranium concentrate aerosols at the back end of the milling process. In Situ Recovery in the U.S. typically involves the circulation of groundwater, fortified with oxidizing (gaseous oxygen e.g) and complexing agents (carbon dioxide, e.g) into an ore body, solubilizing the uranium in situ, and then pumping the solutions to the surface where they are fed to a processing plant ( mill). Processing involves ion exchange and may also include precipitation, drying or calcining and packaging operations depending on facility specifics. This paper presents an overview of the ISR process and the health physics monitoring programs developed at a number of commercial scale ISL / ISR Uranium recovery and production facilities as a result of the radiological character of these processes. Although many radiological aspects of the process are similar to that of conventional mills, conventional-type tailings as such are not generated. However, liquid and solid byproduct materials may be generated and impounded. The quantity and radiological character of these by products are related to facility specifics. Some special monitoring considerations are presented which are required due to the manner in which radon gas is evolved in the process and the unique aspects of controlling solution flow patterns underground. The radiological character of these processes are described using empirical data collected from many operating facilities. Additionally, the major aspects of the health physics and radiation protection programs that were developed at these first generation facilities are discussed and contrasted to circumstances of the current generation and state of the art of uranium ISR technologies and facilities. In summary: This paper has presented an overview of in situ Uranium recovery processes and associated major radiological aspects and monitoring considerations. Admittedly, the purpose was to present an overview of those special health physics considerations dictated by the in situ Uranium recovery technology, to point out similarities and differences to conventional mill programs and to contrast these alkaline leach facilities to modern day ISR designs. As evidenced by the large number of ISR projects currently under development in the U.S. and worldwide, non conventional Uranium recovery techniques, such as ISL / ISR (solution mining), can play a significant role in complimenting Uranium supplies during the next decade. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of a Macro-Batch Qualification Strategy for the Hanford Tank Waste Treatment and Immobilization Plant

The Savannah River National Laboratory (SRNL) has evaluated the existing waste feed qualification strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) based on experience from the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) waste qualification program. The current waste qualification programs for each of the sites are discussed in the report to provide a baseline for comparison. Recommendations on strategies are then provided that could be implemented at Hanford based on the successful Macrobatch qualification strategy utilized at SRS to reduce the risk of processing upsets or the production of a staged waste campaign that does not meet the processing requirements of the WTP. Considerations included the baseline WTP process, as well as options involving Direct High Level Waste (HLW) and Low Activity Waste (LAW) processing, and the potential use of a Tank Waste Characterization and Staging Facility (TWCSF). The main objectives of the Hanford waste feed qualification program are to demonstrate compliance with the Waste Acceptance Criteria (WAC), determine waste processability, and demonstrate unit operations at a laboratory scale. Risks to acceptability and successful implementation of this program, as compared to the DWPF Macro-Batch qualification strategy, include: Limitations of mixing/blending capability of the Hanford Tank Farm; The complexity of unit operations (i.e., multiple chemical and mechanical separations processes) involved in the WTP pretreatment qualification process; The need to account for effects of blending of LAW and HLW streams, as well as a recycle stream, within the PT unit operations; and The reliance on only a single set of unit operations demonstrations with the radioactive qualification sample. This later limitation is further complicated because of the 180-day completion requirement for all of the necessary waste feed qualification steps. The primary recommendations/changes include the following: Collection and characterization of samples for relevant process analytes from the tanks to be blended during the staging process; Initiation of qualification activities earlier in the staging process to optimize the campaign composition through evaluation from both a processing and glass composition perspective; Definition of the parameters that are important for processing in the WTP facilities (unit operations) across the anticipated range of wastes and as they relate to qualification-scale equipment; Performance of limited testing with simulants ahead of the waste feed qualification sample demonstration as needed to determine the available processing window for that campaign; and Demonstration of sufficient mixing in the staging tank to show that the waste qualification sample chemical and physical properties are representative of the transfers to be made to WTP. Potential flowcharts for derivatives of the Hanford waste feed qualification process are also provided in this report. While these recommendations are an extension of the existing WTP waste qualification program, they are more in line with the processes currently performed for SRS. The implementation of these processes at SRS has been shown to offer flexibility for processing, having identified potential processing issues ahead of the qualification or facility processing, and having provided opportunity to optimize waste loading and throughput in the DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Safety [Vol. 32, No. 4, October-December 1991]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 477 Report on the International Symposium on the Use of Probabilistic Safety Assessment for Operational Safety—PSA '91, S. Chakraborty and M. Khatib-Rahbar; 488 Good Relationships Are Pivotal in Nuclear Data Bases, A. S. Heger and B. V. Koen; 494 Technical Note: The Interagency Nuclear Safety Review Panel's Evaluation of the Ulysses Space Mission, J. A. Sholtis, Jr., D. A. Huff, L. B. Gray, N. P. Klug, and R. O. Winchester; ACCIDENT ANALYSIS: 502 The Severe Accident Analysis Program for the Savannah River Nuclear Production Reactors, M. L. Hyder; CONTROL AND INSTRUMENTATION: 511 A Framework for Selecting Suitable Control Technologies for Nuclear Power Plant Systems, R. A. Kisner; DESIGN FEATURES: 521 Containments for Gas-Cooled Power Reactors History and Status, P.W. Williams; ENVIRONMENTAL EFFECTS: 537 Indoor Radon: A Natural Risk, N. H. Harley and J.H. Harley; On the Importance of the Atmospheric Parameters in the Fission Products Distribution of a Severe Reactor Accident, M. C. Barla and A. R. Bayulken; Book Review: Health Effects of Exposure to Low Levels of Ionizing Radiation BEIR V, C. R. Richmond; WASTE AND SPENT FUEL MANAGEMENT: 555 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver OPERATING EXPERIENCES: 567 Effects of Component Aging on the Westhinghouse Control Rod Drive System, K. Sullivan and W. Gunther; 577 Reactor Shutdown Experience, Compiled by J. W. Cletcher, 580 Selected Safety-Related Events, Compiled by G. A. Murphy; 582 Operating U 8 Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver, RECENT DEVELOPMENTS: 596 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 610 Reports, Standards, and Safety Guides, D. S. Queener; 614 Proposed Rule Changes as of June 30, 1991; ANNOUNCEMENTS: 520 Workshop on PC PRAISE: A Probabilistic Fracture Mechanics Personal Computer Code for Nuclear Power Plant Piping Reliability Assessment; 536 Fifth Workshop on Nuclear Power Plant Containment Integrity; 624 New OECD "International Information System on Occupational Exposure (ISOE)"; 625 Harvard School of Public Health Announces Short Courses; 625 Eighth Power Plant Dynamics, Control and Testing Symposium; 626 Second Training Course on Off-Site Emergency Planning and Response for Nuclear Accidents; 618 The Authors; 622 Reviewers of Nuclear Safety, Vol 32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Safety [Vol. 32, No. 4, October-December 1991]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 477 Report on the International Symposium on the Use of Probabilistic Safety Assessment for Operational Safety—PSA '91, S. Chakraborty and M. Khatib-Rahbar; 488 Good Relationships Are Pivotal in Nuclear Data Bases, A. S. Heger and B. V. Koen; 494 Technical Note: The Interagency Nuclear Safety Review Panel's Evaluation of the Ulysses Space Mission, J. A. Sholtis, Jr., D. A. Huff, L. B. Gray, N. P. Klug, and R. O. Winchester; ACCIDENT ANALYSIS: 502 The Severe Accident Analysis Program for the Savannah River Nuclear Production Reactors, M. L. Hyder; CONTROL AND INSTRUMENTATION: 511 A Framework for Selecting Suitable Control Technologies for Nuclear Power Plant Systems, R. A. Kisner; DESIGN FEATURES: 521 Containments for Gas-Cooled Power Reactors History and Status, P.W. Williams; ENVIRONMENTAL EFFECTS: 537 Indoor Radon: A Natural Risk, N. H. Harley and J.H. Harley; On the Importance of the Atmospheric Parameters in the Fission Products Distribution of a Severe Reactor Accident, M. C. Barla and A. R. Bayulken; Book Review: Health Effects of Exposure to Low Levels of Ionizing Radiation BEIR V, C. R. Richmond; WASTE AND SPENT FUEL MANAGEMENT: 555 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver OPERATING EXPERIENCES: 567 Effects of Component Aging on the Westhinghouse Control Rod Drive System, K. Sullivan and W. Gunther; 577 Reactor Shutdown Experience, Compiled by J. W. Cletcher, 580 Selected Safety-Related Events, Compiled by G. A. Murphy; 582 Operating U 8 Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver, RECENT DEVELOPMENTS: 596 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 610 Reports, Standards, and Safety Guides, D. S. Queener; 614 Proposed Rule Changes as of June 30, 1991; ANNOUNCEMENTS: 520 Workshop on PC PRAISE: A Probabilistic Fracture Mechanics Personal Computer Code for Nuclear Power Plant Piping Reliability Assessment; 536 Fifth Workshop on Nuclear Power Plant Containment Integrity; 624 New OECD "International Information System on Occupational Exposure (ISOE)"; 625 Harvard School of Public Health Announces Short Courses; 625 Eighth Power Plant Dynamics, Control and Testing Symposium; 626 Second Training Course on Off-Site Emergency Planning and Response for Nuclear Accidents; 618 The Authors; 622 Reviewers of Nuclear Safety, Vol 32.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SAFETY IMPROVES DRAMATICALLY IN FLUOR HANFORD SOIL AND GROUNDWATER REMEDIATION PROJECT

This paper describes dramatic improvements in the safety record of the Soil and Groundwater Remediation Project (SGRP) at the Hanford Site in southeast Washington state over the past four years. During a period of enormous growth in project work and scope, contractor Fluor Hanford reduced injuries, accidents, and other safety-related incidents and enhanced a safety culture that earned the SGRP Star Status in the Department of Energy's (DOE's) Voluntary Protection Program (VPP) in 2007. This paper outlines the complex and multi-faceted work of Fluor Hanford's SGRP and details the steps taken by the project's Field Operations and Safety organizations to improve safety. Holding field safety meetings and walkdowns, broadening safety inspections, organizing employee safety councils, intensively flowing down safety requirements to subcontractors, and adopting other methods to achieve remarkable improvement in safety are discussed. The roles of management, labor and subcontractors are detailed. Finally, SGRP's safety improvements are discussed within the context of overall safety enhancements made by Fluor Hanford in the company's 11 years of managing nuclear waste cleanup at the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste processing cost recovery at Los Alamos National Laboratory--analysis and recommendations

Los Alamos National Laboratory is implementing full cost recovery for waste processing in fiscal year 2009 (FY2009), after a transition year in FY2008. Waste processing cost recovery has been implemented in various forms across the nuclear weapons complex and in corporate America. The fundamental reasoning of sending accurate price signals to waste generators is economically sound, and leads to waste minimization and reduced waste expense over time. However, Los Alamos faces significant implementation challenges because of its status as a government-owned, contractor-operated national scientific institution with a diverse suite of experimental and environmental cleanup activities, and the fact that this represents a fundamental change in how waste processing is viewed by the institution. This paper describes the issues involved during the transition to cost recovery and the ultimate selection of the business model. Of the six alternative cost recovery models evaluated, the business model chosen to be implemented in FY2009 is Recharge Plus Generators Pay Distributed Direct. Under this model, all generators who produce waste must pay a distributed direct share associated with their specific waste type to use a waste processing capability. This cost share is calculated using the distributed direct method on the fixed cost only, i.e., the fixed cost share is based on each program's forecast proportion of the total Los Alamos volume forecast of each waste type. (Fixed activities are those required to establish the waste processing capability, i.e., to make the process ready, permitted, certified, and prepared to handle the first unit ofwaste. Therefore, the fixed cost ends at the point just before waste begins 'to be processed. The activities to actually process the waste are considered variable.) The volume of waste actually sent for processing is charged a unit cost based solely on the variable cost of disposing of that waste. The total cost recovered each year is the total distributed direct shares from generators plus the unit cost times actual volumes processed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydrologic Data for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada, Revision 1

This hydrologic data document (HDD) has been prepared for Corrective Action Units (CAUs) 101 and 102, Central and Western Pahute Mesa, in order to support the development of a groundwater flow and contaminant transport model. Central and Western Pahute Mesa are two of the five CAUs on the Nevada National Security Site (NNSS) (formerly the Nevada Test Site [NTS]) used for underground nuclear testing (Figure 1-1). The nuclear tests resulted in groundwater contamination in the vicinity of the underground test areas. As a result, the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program is currently conducting a corrective action investigation (CAI) of the Pahute Mesa underground test areas. This work is a part of the Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The CAU groundwater flow and transport model is composed of two pieces, a flow model and a transport model, that together provide the contaminant boundary forecasts required by the FFACO. The hydrologic data necessary for the flow model portion of the CAU model are presented in this report. The transport data necessary for the transport model portion of the CAU model will be provided in a separate report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Workforce for the Nuclear Industry - 16513

The US Department of Energy's Office of Environmental Management (DOE-EM) oversees one of the largest environmental restoration projects in the world. DOEEM's labor statistics show that 91% of EM employees are 40 years old or older and only 1% of its workforce is under 30 years old. In addition, it is estimated that within the next three years, DOE-EM will lose as much as 30-35% of its technical workforce due to retirement. DOE-EM is responding to the aging workforce problem by proactively partnering with universities to train and develop the new generation for the environmental restoration workforce. In 2007, DOE-EM and Florida International University's Applied Research Center (ARC) established the DOE-FIU Science and Technology Workforce Development Program. This is an innovative program designed to train and mentor FIU students in STEM (science, technology, engineering, and math) disciplines and provides them with career paths in environmental restoration and the nuclear industry. The selected students (called DOE Fellows) perform hands-on environmental remediation research and participate in internships at DOE Headquarters, DOE sites, national laboratories, and DOE contractors. Upon graduation and completion of the DOE fellowship, DOE Fellows pursue employment opportunities with DOE and its contractors. In addition, DOE-EM has also established a Minority Serving Institution STEM program targeting STEM students at Historically Black Colleges and Universities (HBCUs). Both programs have the purpose of enhancing educational and training opportunities to minority students. DOE Fellows support DOE-EM research at FIU's ARC. The Fellows work side by side with ARC's scientists and engineers in the research of technologies and methodologies in the areas of high level waste/waste disposal and treatment, soil and groundwater remediation and modeling, deactivation and decommissioning (D and D) technology test and evaluation, and engage in the development of information technology systems in support of the DOE-EM environmental remediation mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Residential Properties Contaminated with LLRW as Part of the Port Hope Area Initiative - 17456

The Port Hope Area Initiative (PHAI) is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. The Eldorado refinery, on the shores of Lake Ontario, began refining Ra-226 from pitchblende ore, later transitioning to the refining of uranium ore. Within the community of Town of Port Hope, surveys are being conducted at approximately 5000 individual properties to identify the presence of LLRW resulting from fugitive emissions from the refinery and/or the use of refinery residue as construction backfill within the community. Of the 5000 properties being surveyed, it is expected that approximately 10% will contain some degree of LLRW requiring physical remediation. The design phase for remediation of the first group of 44 residential properties to be included in the small scale sites program and the various challenges associated with working in a well-established community are presented. In developing the design packages for individual properties it is important to understand that this remedial phase represent the final and most intrusive aspect of the PHAI for those homeowners affected. As such, the success of the program is dependent on how well the needs and desires of the community and individual property owners are incorporated into the remedial designs and how well those designs are implemented to remove LLRW and restore properties to their original (or better) condition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research and Technology Development Activities to Address the DOE-EM Environmental Mercury Challenge - 17497

Human activities have altered trace metal distributions globally. This is especially true for the trace metal mercury (Hg), a pervasive global pollutant that can be methylated to form highly toxic methylmercury (MeHg), which bio-accumulates in aquatic food webs, endangering humans and other biota. Currently there are more than 3,000 mercury-contaminated sites identified worldwide and the United Nations Environment Programme has recently highlighted the risk of this contamination to human health. The Oak Ridge Reservation (ORR) represents an example of one of these mercury-contaminated sites. Unlike other contaminants-metals, radionuclides, and organic solvents-that impact the Department of Energy Office of Environmental Management (DOE-EM) cleanup program at the ORR and other DOE sites, mercury has several unique characteristics that make environmental remediation of the Y-12 National Security Complex one of the most formidable challenges ever encountered. These distinctive physicochemical properties for mercury include the following: it is a liquid at ambient temperature and pressure; it is the only metal that bio-magnifies; and it is the only contaminant transported as a cation, as a dissolved or gaseous elemental metal (similar to an organic solvent), or as both a cation and a dissolved or gaseous elemental metal under environmental conditions. Because of these complexities, implementing cost effective and sustainable solutions that reduce mercury flux from various primary and secondary contamination sources will require linking basic science understanding and applied research advancements into Oak Ridge Office of Environmental Management's (OREM) cleanup process. Currently, DOE is investing in mercury-related research through a variety of programs, including the Office of Science-sponsored Critical Interfaces Science Focus Area, EM headquarters-sponsored Applied Field Research Initiative, OREM-sponsored Lower East Fork Poplar Creek (LEFPC) Mercury Technology Development Program, Small Business Innovative Research (SBIR), and EM's Minority Serving Institutions Partnership Program. Collectively, these multi-institutional and multidisciplinary programs are generating new tools, knowledge, and remediation approaches that will enable efficient cleanup of mercury contaminated systems locally and globally. In this talk we will highlight the progress made to date in addressing key knowledge gaps required to solve this watershed-scale conundrum. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Temperature Oxidation of Plutonium Surrogate Metals and Alloys

The Plutonium Management and Disposition Agreement (PMDA) is a nuclear non-proliferation agreement designed to remove 34 tons of weapons-grade plutonium from Russia and the United States. While several removal options have been proposed since the agreement was first signed in 2000, processing the weapons-grade plutonium to mixed-oxide (MOX) fuel has remained the leading candidate for achieving the goals of the PMDA. However, the MOX program has received its share of criticisms, which causes its future to be uncertain. One alternative pathway for plutonium disposition would involve oxidizing the metal followed by impurity down blending and burial in the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. This pathway was investigated by use of a hybrid microwave and a muffle furnace with Fe and Al as surrogate materials. Oxidation occurred similarly in the microwave and muffle furnace; however, the microwave process time was significantly faster.

36 MATERIALS SCIENCE↗