Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NCSP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Advanced Variance Reduction for Global k-Eigenvalue Simulations in MCNP

The "criticality" or k-eigenvalue of a nuclear system determines whether the system is critical (k=1), or the extent to which it is subcritical (k<1) or supercritical (k>1). Calculations of k are frequently performed at nuclear facilities to determine the criticality of nuclear reactor cores, spent nuclear fuel storage casks, and other fissile systems. These calculations can be expensive, and current Monte Carlo methods have certain well-known deficiencies. In this project, we have developed and tested a new "functional Monte Carlo" (FMC) method that overcomes several of these deficiencies. The current state-of-the-art Monte Carlo k-eigenvalue method estimates the fission source for a sequence of fission generations (cycles), during each of which M particles per cycle are processed. After a series of "inactive" cycles during which the fission source "converges," a series of "active" cycles are performed. For each active cycle, the eigenvalue and eigenfunction are estimated; after N >> 1 active cycles are performed, the results are averaged to obtain estimates of the eigenvalue and eigenfunction and their standard deviations. This method has several disadvantages: (i) the estimate of k depends on the number M of particles per cycle, (iii) for optically thick systems, the eigenfunction estimate may not converge due to undersampling of the fission source, and (iii) since the fission source in any cycle depends on the estimated fission source from the previous cycle (the fission sources in different cycles are correlated), the estimated variance in k is smaller than the real variance. For an acceptably large number M of particles per cycle, the estimate of k is nearly independent of M; this essentially takes care of item (i). Item (ii) can be addressed by taking M sufficiently large, but for optically thick systems a sufficiently large M can easily be unrealistic. Item (iii) cannot be accounted for by taking M or N sufficiently large; it is an inherent deficiency due to the correlations between fission source estimates. In the new FMC method, the eigenvalue problem (expressed in terms of the Boltzmann equation) is integrated over the energy and direction variables. Then these equations are multiplied by J special "tent" functions in space and integrated over the spatial variable. This yields J equations that are exactly satisfied by the eigenvalue k and J space-angle-energy moments of the eigenfunction. Multiplying and dividing by suitable integrals of the eigenfunction, one obtains J algebraic equations for k and the space-angle-energy moments of the eigenfunction, which contain nonlinear functionals that depend weakly on the eigenfunction. In the FMC method, information from the standard Monte Carlo solution for each active cycle is used to estimate the functionals, and at the end of each cycle the J equations for k and the space-angle-energy moments of the eigenfunction are solved. Finally, these results are averaged over N active cycles to obtain estimated means and standard deviations for k and the space-angle-energy moments of the eigenfunction. Our limited testing shows that for large single fissile systems such as a commercial reactor core, (i) the FMC estimate of the eigenvalue is at least one order of magnitude more accurate than estimates obtained from the standard Monte Carlo approach, (ii) the FMC estimate of the eigenfunction converges and is several orders of magnitude more accurate than the standard estimate, and (iii) the FMC estimate of the standard deviation in k is at least one order of magnitude closer to the correct standard deviation than the standard estimate. These advances occur because: (i) the Monte Carlo estimates of the nonlinear functionals are much more accurate than the direct Monte Carlo estimates of the eigenfunction, (ii) the system of discrete equations that determines the FMC estimates of k is robust, and (iii) the functionals are only very weakly correlated between different fission generations. The FMC method was developed only late in the project and has to date received limited testing. Current work, which is taking place after the conclusion of this project, involves further development and testing for more complex and realistic problems. We expect that the FMC method will become a practical tool for Monte Carlo criticality simulations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reactor Physics and Criticality Benchmark Evaluations for Advanced Nuclear Fuel (Final Technical Report)

The nuclear industry interest in advanced fuel and reactor design often drives towards fuel with uranium enrichments greater than 5 wt% 235 U. Unfortunately, little data exists, in the form of reactor physics and criticality benchmarks, for uranium enrichments ranging between 5 and 10 wt% 235 U. The primary purpose of this project is to provide benchmarks for fuel similar to what may be required for advanced light water reactors (LWRs). These experiments will ultimately provide additional information for application to the criticality-safety bases for commercial fuel facilities handling greater than 5 wt% 235 U fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

BENCHMARKING ORTEC ISOTOPIC MEASUREMENTS AND CALCULATIONS

This report represents a description of compiled benchmark tests conducted to probe and to demonstrate the extensive utility of the Ortec ISOTOPIC {gamma}-ray analysis computer program. The ISOTOPIC program performs analyses of {gamma}-ray spectra applied to specific acquisition configurations in order to apply finite-geometry correction factors and sample-matrix-container photon absorption correction factors. The analysis program provides an extensive set of preset acquisition configurations to which the user can add relevant parameters in order to build the geometry and absorption correction factors that the program determines from calculus and from nuclear g-ray absorption and scatter data. The Analytical Development Section field nuclear measurement group of the Savannah River National Laboratory uses the Ortec ISOTOPIC analysis program extensively for analyses of solid waste and process holdup applied to passive {gamma}-ray acquisitions. Frequently the results of these {gamma}-ray acquisitions and analyses are to determine compliance with facility criticality safety guidelines. Another use of results is to designate 55-gallon drum solid waste as qualified TRU waste3 or as low-level waste. Other examples of the application of the ISOTOPIC analysis technique to passive {gamma}-ray acquisitions include analyses of standard waste box items and unique solid waste configurations. In many passive {gamma}-ray acquisition circumstances the container and sample have sufficient density that the calculated energy-dependent transmission correction factors have intrinsic uncertainties in the range 15%-100%. This is frequently the case when assaying 55-gallon drums of solid waste with masses of up to 400 kg and when assaying solid waste in extensive unique containers. Often an accurate assay of the transuranic content of these containers is not required, but rather a good defensible designation as >100 nCi/g (TRU waste) or <100 nCi/g (low level solid waste) is required. In these cases the ISOTOPIC analysis program is especially valuable because it allows a rapid, defensible, reproducible analysis of radioactive content without tedious and repetitive experimental measurement of {gamma}-ray transmission through the sample and container at multiple photon energies. The ISOTOPIC analysis technique is also especially valuable in facility holdup measurements where the acquisition configuration does not fit the accepted generalized geometries where detector efficiencies have been solved exactly with good calculus. Generally in facility passive {gamma}-ray holdup measurements the acquisition geometry is only approximately reproducible, and the sample (object) is an extensive glovebox or HEPA filter component. In these cases accuracy of analyses is rarely possible, however demonstrating fissile Pu and U content within criticality safety guidelines yields valuable operating information. Demonstrating such content can be performed with broad assumptions and within broad factors (e.g. 2-8) of conservatism. The ISOTOPIC analysis program yields rapid defensible analyses of content within acceptable uncertainty and within acceptable conservatism without extensive repetitive experimental measurements. In addition to transmission correction determinations based on the mass and composition of objects, the ISOTOPIC program performs finite geometry corrections based on object shape and dimensions. These geometry corrections are based upon finite element summation to approximate exact closed form calculus. In this report we provide several benchmark comparisons to the same technique provided by the Canberra In Situ Object Counting System (ISOCS) and to the finite thickness calculations described by Russo in reference 10. This report describes the benchmark comparisons we have performed to demonstrate and to document that the ISOTOPIC analysis program yields the results we claim to our customers.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Remaining Sites Verification Package for the 600-111, P-11 Critical Mass Laboratory Crib, and UPR-600-16, Fire and Contamination Spread Waste Sites, Waste Site Reclassification Form 2004-065

The 600-111, P-11 Critical Mass Laboratory Crib waste site, also referred to as the P-11 Facility, included the 120 Experimental Building, the 123 Control Building, and the P-11 Crib. The facility was constructed in 1949 and was used as a laboratory for plutonium criticality studies. In accordance with this evaluation, the confirmatory and verification sampling results support a reclassification of this site to Interim Closed Out. The results of confirmatory and verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remaining Sites Verification Package for the 600-111, P-11 Critical Mass Laboratory Crib, and UPR-600-16, Fire and Contamination Spread Waste Sites, Waste Site Reclassification Form 2008-045

The UPR-600-16, Fire and Contamination Spread waste site is an unplanned release that occurred on December 4, 1951, when plutonium contamination was spread by a fire that ignited inside the 120 Experimental Building. The 120 Experimental Building was a laboratory building that was constructed in 1949 and used for plutonium criticality studies as part of the P-11 Project. In November 1951, a criticality occurred in the 120 Experimental Building that resulted in extensive plutonium contamination inside the building. The confirmatory evaluation supports a reclassification of this site to Interim Closed Out. The current site conditions achieve the remedial action objectives and the corresponding remedial action goals established in the Remaining Sites ROD. The results of the extensive radiological survey of the surface soil and the confirmatory and verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

100-IU-6 Operable Unit↗

Design and Criticality Considerations for 9977 and 9978 Shipping Packages

Savannah River National Laboratory (SRNL) has developed two new, Type B, state-of-the-art, general purpose, fissile material Shipping Packages, designated 9977 and 9978, as replacements for the U.S. DOT specification 6M container, phased out in September 30, 2008 due to non-compliance with current requirements 10CFR71 regulation. The packages accommodate plutonium, uranium and other special nuclear materials in bulk quantities and in many forms with capabilities exceeding those of the 6M. These packages provide a high degree of single containment and comply with 10CFR71, Department of Energy (DOE) Order 460.1B, DOE Order 460.2, and 10CFR20 (As Low As Reasonably Achievable (ALARA)). Allowed package contents were determined accounting for nuclear criticality, radiation shielding, and decay heat rate. The Criticality Safety Index (CSI) for the package is 1.0. The package utilizes passive cooling to maintain internal temperatures within limits. Radiation shielding analyses have established the contents for which the packages can be shipped under non-exclusive use in the Safe-Secure Trailer or under exclusive use. The packages are designed to ship radioactive contents in several configurations; Radioisotope Thermoelectric Generators (RTGs), nested food-pack cans, site specific containers, and DOE-STD-3013 containers. Each shipping package includes a 35-gallon stainless steel outer drum, insulation, a drum liner, and a single containment vessel (CV). The 9977 includes a 6-inch ID CV while the 9978 includes a 5-inch ID CV. One inch of Fiberfrax{reg_sign} insulation is wrapped around and attached to the sides and bottom of the liner. The volume between the Fiberfrax{reg_sign} and the drum wall is filled with polyurethane foam. Top and bottom aluminum Load Distribution Fixtures (LDFs) within the drum liner cavity, above and below the CV, center the CV in the liner, stiffen the package radially, and distribute loads away from the CV. The 6CV fits directly into the LDFs while honeycomb spacers position the 5CV in the LDFs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

REMOVAL OF SOLIDS FROM HIGHLY ENRICHED URANIUM SOLUTIONS USING THE H-CANYON CENTRIFUGE

Prior to the dissolution of Pu-containing materials in HB-Line, highly enriched uranium (HEU) solutions stored in Tanks 11.1 and 12.2 of H-Canyon must be transferred to provide storage space. The proposed plan is to centrifuge the solutions to remove solids which may present downstream criticality concerns or cause operational problems with the 1st Cycle solvent extraction due to the formation of stable emulsions. An evaluation of the efficiency of the H-Canyon centrifuge concluded that a sufficient amount (> 90%) of the solids in the Tank 11.1 and 12.2 solutions will be removed to prevent any problems. We based this conclusion on the particle size distribution of the solids isolated from samples of the solutions and the calculation of particle settling times in the centrifuge. The particle size distributions were calculated from images generated by scanning electron microscopy (SEM). The mean particle diameters for the distributions were 1-3 {micro}m. A significant fraction (30-50%) of the particles had diameters which were < 1 {micro}m; however, the mass of these solids is insignificant (< 1% of the total solids mass) when compared to particles with larger diameters. It is also probable that the number of submicron particles was overestimated by the software used to generate the particle distribution due to the morphology of the filter paper used to isolate the solids. The settling times calculated for the H-Canyon centrifuge showed that particles with diameters less than 1 to 0.5 {micro}m will not have sufficient time to settle. For this reason, we recommend the use of a gelatin strike to coagulate the submicron particles and facilitate their removal from the solution; although we have no experimental basis to estimate the level of improvement. Incomplete removal of particles with diameters < 1 {micro}m should not cause problems during purification of the HEU in the 1st Cycle solvent extraction. Particles with diameters > 1 {micro}m account for > 99% of the solid mass and will be efficiently removed by the centrifuge; therefore, the formation of emulsions during solvent extraction operations is not an issue. Under the current processing plan, the solutions from Tanks 11.1 and 12.2 will be transferred to the enriched uranium storage (EUS) tank following centrifugation. The solution from Tanks 11.1 and 12.2 may remain in the EUS tank for an extended time prior to purification. The effects of extended storage on the solution were not evaluated as part of this study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ZPR-6 assembly 7 high {sup 240}Pu core experiments : a fast reactor core with mixed (Pu,U)-oxide fuel and a centeral high{sup 240}Pu zone.

ZPR-6 Assembly 7 (ZPR-6/7) encompasses a series of experiments performed at the ZPR-6 facility at Argonne National Laboratory in 1970 and 1971 as part of the Demonstration Reactor Benchmark Program (Reference 1). Assembly 7 simulated a large sodium-cooled LMFBR with mixed oxide fuel, depleted uranium radial and axial blankets, and a core H/D near unity. ZPR-6/7 was designed to test fast reactor physics data and methods, so configurations in the Assembly 7 program were as simple as possible in terms of geometry and composition. ZPR-6/7 had a very uniform core assembled from small plates of depleted uranium, sodium, iron oxide, U{sub 3}O{sub 8} and Pu-U-Mo alloy loaded into stainless steel drawers. The steel drawers were placed in square stainless steel tubes in the two halves of a split table machine. ZPR-6/7 had a simple, symmetric core unit cell whose neutronic characteristics were dominated by plutonium and {sup 238}U. The core was surrounded by thick radial and axial regions of depleted uranium to simulate radial and axial blankets and to isolate the core from the surrounding room. The ZPR-6/7 program encompassed 139 separate core loadings which include the initial approach to critical and all subsequent core loading changes required to perform specific experiments and measurements. In this context a loading refers to a particular configuration of fueled drawers, radial blanket drawers and experimental equipment (if present) in the matrix of steel tubes. Two principal core configurations were established. The uniform core (Loadings 1-84) had a relatively uniform core composition. The high {sup 240}Pu core (Loadings 85-139) was a variant on the uniform core. The plutonium in the Pu-U-Mo fuel plates in the uniform core contains 11% {sup 240}Pu. In the high {sup 240}Pu core, all Pu-U-Mo plates in the inner core region (central 61 matrix locations per half of the split table machine) were replaced by Pu-U-Mo plates containing 27% {sup 240}Pu in the plutonium component to construct a central core zone with a composition closer to that in an LMFBR core with high burnup. The high {sup 240}Pu configuration was constructed for two reasons. First, the composition of the high {sup 240}Pu zone more closely matched the composition of LMFBR cores anticipated in design work in 1970. Second, comparison of measurements in the ZPR-6/7 uniform core with corresponding measurements in the high {sup 240}Pu zone provided an assessment of some of the effects of long-term {sup 240}Pu buildup in LMFBR cores. The uniform core version of ZPR-6/7 is evaluated in ZPR-LMFR-EXP-001. This document only addresses measurements in the high {sup 240}Pu core version of ZPR-6/7. Many types of measurements were performed as part of the ZPR-6/7 program. Measurements of criticality, sodium void worth, control rod worth and reaction rate distributions in the high {sup 240}Pu core configuration are evaluated here. For each category of measurements, the uncertainties are evaluated, and benchmark model data are provided.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technical Review Report for the Model 9978-96 Package Safety Analysis Report for Packaging (S-SARP-G-00002, Revision 1, March 2009)

This Technical Review Report (TRR) documents the review, performed by Lawrence Livermore National Laboratory (LLNL) Staff, at the request of the Department of Energy (DOE), on the 'Safety Analysis Report for Packaging (SARP), Model 9978 B(M)F-96', Revision 1, March 2009 (S-SARP-G-00002). The Model 9978 Package complies with 10 CFR 71, and with 'Regulations for the Safe Transport of Radioactive Material-1996 Edition (As Amended, 2000)-Safety Requirements', International Atomic Energy Agency (IAEA) Safety Standards Series No. TS-R-1. The Model 9978 Packaging is designed, analyzed, fabricated, and tested in accordance with Section III of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PVC). The review presented in this TRR was performed using the methods outlined in Revision 3 of the DOE's 'Packaging Review Guide (PRG) for Reviewing Safety Analysis Reports for Packages'. The format of the SARP follows that specified in Revision 2 of the Nuclear Regulatory Commission's Regulatory Guide 7.9, i.e., 'Standard Format and Content of Part 71 Applications for Approval of Packages for Radioactive Material'. Although the two documents are similar in their content, they are not identical. Formatting differences have been noted in this TRR, where appropriate. The Model 9978 Packaging is a single containment package, using a 5-inch containment vessel (5CV). It uses a nominal 35-gallon drum package design. In comparison, the Model 9977 Packaging uses a 6-inch containment vessel (6CV). The Model 9977 and Model 9978 Packagings were developed concurrently, and they were referred to as the General Purpose Fissile Material Package, Version 1 (GPFP). Both packagings use General Plastics FR-3716 polyurethane foam as insulation and as impact limiters. The 5CV is used as the Primary Containment Vessel (PCV) in the Model 9975-96 Packaging. The Model 9975-96 Packaging also has the 6CV as its Secondary Containment Vessel (SCV). In comparison, the Model 9975 Packagings use Celotex{trademark} for insulation and as impact limiters. To provide a historical perspective, it is noted that the Model 9975-96 Packaging is a 35-gallon drum package design that has evolved from a family of packages designed by DOE contractors at the Savannah River Site. Earlier package designs, i.e., the Model 9965, the Model 9966, the Model 9967, and the Model 9968 Packagings, were originally designed and certified in the early 1980s. In the 1990s, updated package designs that incorporated design features consistent with the then-newer safety requirements were proposed. The updated package designs at the time were the Model 9972, the Model 9973, the Model 9974, and the Model 9975 Packagings, respectively. The Model 9975 Package was certified by the Packaging Certification Program, under the Office of Safety Management and Operations. The Model 9978 Package has six Content Envelopes: C.1 ({sup 238}Pu Heat Sources), C.2 ( Pu/U Metals), C.3 (Pu/U Oxides, Reserved), C.4 (U Metal or Alloy), C.5 (U Compounds), and C.6 (Samples and Sources). Per 10 CFR 71.59 (Code of Federal Regulations), the value of N is 50 for the Model 9978 Package leading to a Criticality Safety Index (CSI) of 1.0. The Transport Index (TI), based on dose rate, is calculated to be a maximum of 4.1.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Update to the NARAC NNPP Non-Reactor Source Term Products

Recent updates to NARAC plots for NNPP requires a modification to your iClient database. The steps you need to take are described below. Implementation of the non-reactor source terms in February 2009 included four plots, the traditional three instantaneous plots (1-3) and a new Gamma Dose Rate: 1. Particulate Air Concentration 2. Total Ground Deposition 3. Whole Body Inhalation Dose Rate (CEDE Rate) 4. Gamma Dose Rate These plots were all initially implemented to be instantaneous output and generated 30 minutes after the release time. Recently, Bettis and NAVSEA have requested the Whole Body CEDE rate plot to be changed to an integrated dose valid at two hours. This is consistent with the change made to the Thyroid Dose rate plot conversion to a 2-hour Integrated Thyroid dose for the Reactor and Criticality accidents.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

THE EFFECT OF INCREASING TEMPERATURE ON K-EFF FOR FISSILE MATERIAL OUTSIDE REACTORS

Nuclear Criticality Safety Evaluations typically employ room temperature cross sections, material densities, and dimensions. Processes that have been and are in development for conversion of legacy wastes in tanks, e.g., Waste Treatment Project (WTP) at the Hanford Remediation Site and Defense Waste Processing Facility (DWPF) at the Savannah River Site, utilize melters that operate at elevated temperatures, 1500 to 1900 C. The applicability of room temperature data to processes such as these has been questioned. Also questioned was the applicability of room temperature data for the analyses across the Savannah River Site (SRS) where the temperature may be elevated, such as in a postulated fire. This analysis was performed to examine the effect of temperature over the relatively small range encountered in normal and abnormal operations at SRS that does not include DWPF melters. This analysis documented herein is limited to fast systems of fissile metal and oxide cylinders on concrete at temperatures no greater than 640 C, the melting point of plutonium. Because thermal expansion data for various types of structural materials was not readily available, structural materials were not included in the analysis.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fifty-Five Gallon Drum Standard Study [Slides]

This presentation covers a Fifty-Five Gallon Drum Standard Study. This lecture finds that decontamination and decommissioning and legacy wastes is similar across most Sites. Additionally, Information on legacy wastes vary with site and original waste generation date. Finally, this presentation concludes with the discovery that different goals and modeling assumptions lead to a wide range in fissile mass limits for 55-Gallon waste drums.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Assessment of ATR-C Capabilities to Provide Integral Benchmark Data for Key Structural/Matrix Materials that May be Used for Nuclear Data Testing and Analytical Methods Validation

The purpose of this document is to identify some suggested types of experiments that can be performed in the Advanced Test Reactor Critical (ATR-C) facility. A fundamental computational investigation is provided to demonstrate possible integration of experimental activities in the ATR-C with the development of benchmark experiments. Criticality benchmarks performed in the ATR-C could provide integral data for key matrix and structural materials used in nuclear systems. Results would then be utilized in the improvement of nuclear data libraries and as a means for analytical methods validation. It is proposed that experiments consisting of well-characterized quantities of materials be placed in the Northwest flux trap position of the ATR-C. The reactivity worth of the material could be determined and computationally analyzed through comprehensive benchmark activities including uncertainty analyses. Experiments were modeled in the available benchmark model of the ATR using MCNP5 with the ENDF/B-VII.0 cross section library. A single bar (9.5 cm long, 0.5 cm wide, and 121.92 cm high) of each material could provide sufficient reactivity difference in the core geometry for computational modeling and analysis. However, to provide increased opportunity for the validation of computational models, additional bars of material placed in the flux trap would increase the effective reactivity up to a limit of 1$ insertion. For simplicity in assembly manufacture, approximately four bars of material could provide a means for additional experimental benchmark configurations, except in the case of strong neutron absorbers and many materials providing positive reactivity. Future tasks include the cost analysis and development of the experimental assemblies, including means for the characterization of the neutron flux and spectral indices. Oscillation techniques may also serve to provide additional means for experimentation and validation of computational methods and acquisition of integral data for improving neutron cross sections. Further assessment of oscillation techniques for implementation in the ATR-C may be of additional benefit. The establishment of benchmark experiment capabilities in the ATR-C would allow for the further development of techniques and facility enhancements involving neutronics experimentation in the ATR-C.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Over Batch Analysis for the LLNL DOE-STD-3013 Packaging System

This document addresses the concern raised in the Savannah River Site (SRS) Acceptance Criteria about receiving an item that is over batched by 1.0 kg of fissile materials. This document shows that the occurrence of this is incredible. Some of the Department of Energy Standard 3013 (DOE-STD-3013) requirements are described in Section 2.1. The SRS requirement is discussed in Section 2.2. Section 2.3 describes the way fissile materials are handled in the Lawrence Livermore National Laboratory (LLNL) Plutonium Facility (B332). Based on the material handling discussed in Section 2.3, there are only three errors that could result in a shipping container being over batched. These are: incorrect measurement of the item, selecting the wrong item to package, and packaging two items into a single shipping container. The analysis in Section 3 shows that the first two events are incredible because of the controls that exist at LLNL. The third event is physically impossible. Therefore, it is incredible for an item to be shipped to SRS that is more than 1.0 kg of fissile materials over batched.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Monte Carlo and deterministic simulations of activation ratio experiments for 238U(n,f), 238U(n,g) and 238U(n,2n) in the Big Ten benchmark critical assembly

The authors have compared calculations of critical assembly activation ratios using 3 different Monte Carlo codes and one deterministic code. There is excellent agreement. Discrepancies between the different Monte Carlo codes are the 1-2% level. Notably, the deterministic calculations with 87 groups are also in good agreement with the continuous energy Monte Carlo results. The three codes underestimate the {sup 238}U(n,f) reaction, suggesting that there is room for improvement in the evaluation, or in the evaluations of other reactions influencing the spectrum in BigTen. Until statistical uncertainties are implemented in Mercury, they strongly advise long runs to guarantee sufficient convergence of the flux at high energies, and they strongly encourage comparing Mercury results to a well-developed and documented code such as MCNP5 and/or COG. It may be that ENDL2008 will be available for use in COG within a year. Finally, it may be worthwhile to add a 'standard' reaction rate tally similar to those implemented in COG and MCNP5, if the goal is to expand the central fission and activation ratios simulations to include isotopes that are not part of the specifications for the assembly material composition.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

MCNP5 Criticality Validation and Bias for Intermediate Enriched Uranium Systems

The purpose of this analysis is to validate the Monte Carlo N-Particle 5 (MCNP5) code Version 1.40 (LA-UR-03-1987, 2005) and its cross-section database for k-code calculations of intermediate enriched uranium systems on INTEL ® processor based PC's running any version of the WINDOWS operating system. Configurations with intermediate enriched uranium were modeled with the moderator range of 39≤HlFissile≤1438. See Table 2-1 for brief descriptions of selected cases and Table 3-1 for the range of applicability for this validation. A total of 167 input cases were evaluated including bare and reflected systems in a single body or arrays. The 167 cases were taken directly from the previous (Version 4C [Lan 2005]) validation database. Section 2.0 list data used to calculate k-effective (k eff ) for the 167 experimental criticality benchmark cases using the MCNP5 code v1.40 and its cross-section database. Appendix B lists the MCNP cross-section database entries validated for use in evaluating the intermediate enriched uranium systems for criticality safety. The dimensions and atom densities for the intermediate enriched uranium experiments were taken from NEA/NSC/DOC(95)03, September 2005, which will be referred to as the benchmark handbook throughout the report. For these input values, the experimental benchmark k eff is approximately 1.0. The MCNP validation computer runs ran to an accuracy of approximately ±0.001. For the cases where the reported benchmark k eff was not equal to 1.0000 the MCNP calculational results were normalized. The difference between the MCNP validation computer runs and the experimentally measured k eff is the MCNP5 v1.40 bias. The USLSTATS code (ORNL 1998) was utilized to perform the statistical analysis and generate an acceptable maximum k eff limit for calculations of the intermediate enriched uranium type systems.

42 ENGINEERING↗

Hanford External Dosimetry Technical Basis Manual PNL-MA-842

The Hanford External Dosimetry Technical Basis Manual PNL-MA-842 documents the design and implementation of the external dosimetry system used at Hanford. The manual describes the dosimeter design, processing protocols, dose calculation methodology, radiation fields encountered, dosimeter response characteristics, limitations of dosimeter design under field conditions, and makes recommendations for effective use of the dosimeters in the field. The manual describes the technical basis for the dosimetry system in a manner intended to help ensure defensibility of the dose of record at Hanford and to demonstrate compliance with 10 CFR 835, DOELAP, DOE-RL, ORP, PNSO, and Hanford contractor requirements. The dosimetry system is operated by PNNL’s Hanford External Dosimetry Program (HEDP) which provides dosimetry services to all Hanford contractors. The primary users of this manual are DOE and DOE contractors at Hanford using the dosimetry services of PNNL. Development and maintenance of this manual is funded directly by DOE and DOE contractors. Its contents have been reviewed and approved by DOE and DOE contractors at Hanford through the Hanford Personnel Dosimetry Advisory Committee (HPDAC) which is chartered and chaired by DOE-RL and serves as means of coordinating dosimetry practices across contractors at Hanford. This manual was established in 1996. Since its inception, it has been revised many times and maintained by PNNL as a controlled document with controlled distribution. The first revision to be released through PNNL’s Electronic Records & Information Capture Architecture (ERICA) database was designated Revision 0. Revision numbers that are whole numbers reflect major revisions typically involving significant changes to all chapters in the document. Revision numbers that include a decimal fraction reflect minor revisions, usually restricted to selected chapters or selected pages in the document. Maintenance and distribution of controlled hard copies of the manual by PNNL was discontinued beginning with Revision 0.2. Revision Log: Rev. 0 (2/25/2005) Major revision and expansion. Rev. 0.1 (3/12/2007) Updated Chapters 5, 6 and 9 to reflect change in default ring calibration factor used in HEDP dose calculation software. Factor changed from 1.5 to 2.0 beginning January 1, 2007. Pages on which changes were made are as follows: 5.23, 5.69, 5.78, 5.80, 5.82, 6.3, 6.5, 6.29, and 9.2. Rev 0.2 (8/28/2009) Updated Chapters 3, 5, 6, 8 and 9. Chapters 6 and 8 were significantly expanded. References in the Preface and Chapters 1, 2, 4, and 7 were updated to reflect updates to DOE documents. Approved by HPDAC on 6/2/2009. Rev 1.0 (1/1/2010) Major revision. Updated all chapters to reflect the Hanford site wide implementation on January 1, 2010 of new DOE requirements for occupational radiation protection. The new requirements are given in the June 8, 2007 amendment to 10 CFR 835 Occupational Radiation Protection (Federal Register, June 8, 2007. Title 10 Part 835. U.S., Code of Federal Regulations, Vol. 72, No. 110, 31904-31941). Revision 1.0 to the manual replaces ICRP 26 dosimetry concepts and terminology with ICRP 60 dosimetry concepts and terminology and replaces external dose conversion factors from ICRP 51 with those from ICRP 74 for use in measurement of operational quantities with dosimeters. Descriptions of dose algorithms and dosimeter response characteristics, and field performance were updated to reflect changes in the neutron quality factors used in the measurement of operational quantities.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

DESTRUCTIVE EXAMINATION OF SHIPPING PACKAGE 9975-02028

Destructive and non-destructive examinations have been performed on specified components of shipping package 9975-02028. For those attributes that were also measured during the field surveillance, no significant changes were observed. Four conditions were identified that do not meet inspection criteria. These conditions are subject to additional investigation and disposition by the Surveillance Program Authority. The conditions include: (1) The lead shield was covered with a white corrosion layer; (2) The lead shield height exceeds drawing requirements; (3) Mold was observed on the lower fiberboard subassembly; and (4) Fiberboard thermal conductivity in the axial direction exceeded the specified range. The Surveillance Program Authority was notified of these conditions and will document the disposition by surveillance report. All other observations and test results met identified criteria, or were collected for information and trending purposes. The Savannah River Site (SRS) stores packages containing plutonium (Pu) materials in the K-Area Complex (KAC). The Pu materials are packaged per the DOE 3013 Standard and stored within Model 9975 shipping packages in KAC. The KAC facility DSA (Document Safety Analysis) credits the Model 9975 package to perform several safety functions, including criticality prevention, impact resistance, containment, and fire resistance to ensure the plutonium materials remain in a safe configuration during normal and accident conditions. The Model 9975 package is expected to perform its safety function for at least 12 years from initial packaging. The DSA recognizes the degradation potential for the materials of package construction over time in the KAC storage environment and requires an assessment of materials performance to validate the assumptions of the analysis and ultimately predict service life. As part of the comprehensive Model 9975 package surveillance program, destructive examination of package 9975-02028 was performed following field surveillance in accordance with Reference. Field surveillance of the Model 9975 package in KAC included nondestructive examination of the drum, fiberboard, lead shield and containment vessels. Results of the field surveillance are provided in Attachment 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗