Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Structural basis for recognition of hemi-methylated DNA by the SRA domain of human UHRF1.

Epigenetic inheritance in mammals is characterized by high-fidelity replication of CpG methylation patterns during development. UHRF1 (also known as ICBP90 in humans and Np95 in mouse) is an E3 ligase important for the maintenance of global and local DNA methylation in vivo. The preferential affinity of UHRF1 for hemi-methylated DNA over symmetrically methylated DNA by means of its SET and RING-associated (SRA) domain and its association with the maintenance DNA methyltransferase 1 (DNMT1) suggests a role in replication of the epigenetic code. Here we report the 1.7 {angstrom} crystal structure of the apo SRA domain of human UHRF1 and a 2.2 {angstrom} structure of its complex with hemi-methylated DNA, revealing a previously unknown reading mechanism for methylated CpG sites (mCpG). The SRA-DNA complex has several notable structural features including a binding pocket that accommodates the 5-methylcytosine that is flipped out of the duplex DNA. Two specialized loops reach through the resulting gap in the DNA from both the major and the minor grooves to read the other three bases of the CpG duplex. The major groove loop confers both specificity for the CpG dinucleotide and discrimination against methylation of deoxycytidine of the complementary strand. The structure, along with mutagenesis data, suggests how UHRF1 acts as a key factor for DNMT1 maintenance methylation through recognition of a fundamental unit of epigenetic inheritance, mCpG.

59 BASIC BIOLOGICAL SCIENCES↗

The SRA domain of UHRF1 flips 5-methylcytosine out of the DNA helix

Maintenance methylation of hemimethylated CpG dinucleotides at DNA replication forks is the key to faithful mitotic inheritance of genomic methylation patterns. UHRF1 (ubiquitin-like, containing PHD and RING finger domains 1) is required for maintenance methylation by interacting with DNA nucleotide methyltransferase 1 (DNMT1), the maintenance methyltransferase, and with hemimethylated CpG, the substrate for DNMT1 (refs 1 and 2). Here we present the crystal structure of the SET and RING-associated (SRA) domain of mouse UHRF1 in complex with DNA containing a hemimethylated CpG site. The DNA is contacted in both the major and minor grooves by two loops that penetrate into the middle of the DNA helix. The 5-methylcytosine has flipped completely out of the DNA helix and is positioned in a binding pocket with planar stacking contacts, Watson-Crick polar hydrogen bonds and van der Waals interactions specific for 5-methylcytosine. Hence, UHRF1 contains a previously unknown DNA-binding module and is the first example of a non-enzymatic, sequence-specific DNA-binding protein domain to use the base flipping mechanism to interact with DNA.

08 HYDROGEN↗

Energy management study: A proposed case of government building

Align with the current needs of the sustainable and green technology in Malaysian construction industry, this research is conducted to seek and identify opportunities to better manage energy use including the process of understand when, where, and how energy is used in a building. The purpose of this research is to provide a best practice guideline as a practical tool to assist construction industry in Malaysia to improve the energy efficiency of the office building during the post-production by reviewing the current practice of the building operation and maintenance in order to optimum the usage and reduce the amount of energy input into the building. Therefore, this paper will review the concept of maintenance management, current issue in energy management, and on how the research process will be conducted. There are several process involves and focuses on technical and management techniques such as energy metering, tracing, harvesting, and auditing based on the case study that will be accomplish soon. Accordingly, a case study is appropriate to be selected as a strategic research approach in which involves an empirical investigation of a particular contemporary phenomenon within its real life context using multiple sources of evidence for the data collection process. A Government office building will be selected as an appropriate case study for this research. In the end of this research, it will recommend a strategic approach or model in a specific guideline for enabling energy-efficient operation and maintenance in the office building.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Experience Detecting PV Underperformance in Real Time Using Existing Instrumentation

Maintenance at large-scale photovoltaic plants employs a mix of preventative and corrective maintenance practices. Large outages, such as an inverter tripping offline, are often easy to detect. More subtle sub-inverter faults and failures can accumulate and go unnoticed for months or years. A software-based fault detection method has been developed to analyze commonly measured data from large-scale PV plants for more timely detection of subtle underperformance. The method has been demonstrated on eight datasets from large-scale plants with high accuracy of detection. Results are validated using aerial infrared scanning. String outages are detected with a true positive rate of 73 percent and tracker issues are detected with a true positive rate of 88 percent. The developed method can be uniformly applied to photovoltaic plants across a range of scales and configurations to assess performance, quickly detect underperformance, and determine the source and location of failures. The results inform and improve operations and maintenance at PV plants, ultimately aiding in improved affordability, reliability, availability, and resiliency of solar electricity.

14 SOLAR ENERGY↗

ENHANCED UNCERTAINTY ANALYSIS FOR SRS COMPOSITE ANALYSIS

The Composite Analysis (CA) performed for the Savannah River Site (SRS) in 2009 (SRS CA 2009) included a simplified uncertainty analysis. The uncertainty analysis in the CA (Smith et al. 2009b) was limited to considering at most five sources in a separate uncertainty calculation performed for each POA. To perform the uncertainty calculations in a reasonable amount of time, the analysis was limited to using 400 realizations, 2,000 years of simulated transport time, and the time steps used for the uncertainty analysis were increased from what was used in the CA base case analysis. As part of the CA maintenance plan, the Savannah River National Laboratory (SRNL) committed to improving the CA uncertainty/sensitivity analysis. The previous uncertainty analysis was constrained by the standard GoldSim licensing which limits the user to running at most four Monte Carlo uncertainty calculations (also called realizations) simultaneously. Some of the limitations on the number of realizations that could be practically run and the simulation time steps were removed by building a cluster of three HP Proliant windows servers with a total of 36 64-bit processors and by licensing the GoldSim DP-Plus distributed processing software. This allowed running as many as 35 realizations simultaneously (one processor is reserved as a master process that controls running the realizations). These enhancements to SRNL computing capabilities made uncertainty analysis: using 1000 realizations, using the time steps employed in the base case CA calculations, with more sources, and simulating radionuclide transport for 10,000 years feasible. In addition, an importance screening analysis was performed to identify the class of stochastic variables that have the most significant impact on model uncertainty. This analysis ran the uncertainty model separately testing the response to variations in the following five sets of model parameters: (a) K{sub d} values (72 parameters for the 36 CA elements in sand and clay), (b) Dose Parameters (34 parameters), (c) Material Properties (20 parameters), (d) Surface Water Flows (6 parameters), and (e) Vadose and Aquifer Flow (4 parameters). Results provided an assessment of which group of parameters is most significant in the dose uncertainty. It was found that K{sub d} and the vadose/aquifer flow parameters, both of which impact transport timing, had the greatest impact on dose uncertainty. Dose parameters had an intermediate level of impact while material properties and surface water flows had little impact on dose uncertainty. Results of the importance analysis are discussed further in Section 7 of this report. The objectives of this work were to address comments received during the CA review on the uncertainty analysis and to demonstrate an improved methodology for CA uncertainty calculations as part of CA maintenance. This report partially addresses the LFRG Review Team issue of producing an enhanced CA sensitivity and uncertainty analysis. This is described in Table 1-1 which provides specific responses to pertinent CA maintenance items extracted from Section 11 of the SRS CA (2009). As noted above, the original uncertainty analysis looked at each POA separately and only included the effects from at most five sources giving the highest peak doses at each POA. Only 17 of the 152 CA sources were used in the original uncertainty analysis and the simulation time was reduced from 10,000 to 2,000 years. A major constraint on the original uncertainty analysis was the limitation of only being able to use at most four distributed processes. This work expanded the analysis to 10,000 years using 39 of the CA sources, included cumulative dose effects at downstream POAs, with more realizations (1,000) and finer time steps. This was accomplished by using the GoldSim DP-Plus module and the 36 processors available on a new windows cluster. The last part of the work looked at the contribution to overall uncertainty from the main categories of uncertainty variables: K{sub d}s, dose parameters, flow parameters, and material properties. This was not intended to be a detailed sensitivity analysis but only to see in very general terms what broad category of parameters contributes most significantly to overall uncertainty in the CA dose. This analysis was not intended to be a final CA uncertainty calculation and there was no intent to revise the stochastic distributions as part of this work.

54 ENVIRONMENTAL SCIENCES↗

Re-Assessing Green Building Performance: A Post Occupancy Evaluation of 22 GSA Buildings

2nd report on the performance of GSA's sustainably designed buildings. The purpose of this study was to provide an overview of measured whole building performance as it compares to GSA and industry baselines. The PNNL research team found the data analysis illuminated strengths and weaknesses of individual buildings as well as the portfolio of buildings. This section includes summary data, observations that cross multiple performance metrics, discussion of lessons learned from this research, and opportunities for future research. The summary of annual data for each of the performance metrics is provided in Table 25. The data represent 1 year of measurements and are not associated with any specific design features or strategies. Where available, multiple years of data were examined and there were minimal significant differences between the years. Individually focused post occupancy evaluation (POEs) would allow for more detailed analysis of the buildings. Examining building performance over multiple years could potentially offer a useful diagnostic tool for identifying building operations that are in need of operational changes. Investigating what the connection is between the building performance and the design intent would offer potential design guidance and possible insight into building operation strategies. The 'aggregate operating cost' metric used in this study represents the costs that were available for developing a comparative industry baseline for office buildings. The costs include water utilities, energy utilities, general maintenance, grounds maintenance, waste and recycling, and janitorial costs. Three of the buildings that cost more than the baseline in Figure 45 have higher maintenance costs than the baseline, and one has higher energy costs. Given the volume of data collected and analyzed for this study, the inevitable request is for a simple answer with respect to sustainably designed building performance. As previously stated, compiling the individual building values into single metrics is not statistically valid given the small number of buildings, but it has been done to provide a cursory view of this portfolio of sustainably designed buildings. For all metrics except recycling cost per rentable square foot and CBE survey response rate, the averaged building performance was better than the baseline for the GSA buildings in this study.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Year 2011

As a condition to the Disposal Authorization Statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year 2011 annual review for Area G. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 and formally approved in 2009. These analyses are expected to provide reasonable estimates of the long-term performance of Area G and, hence, the disposal facility's ability to comply with Department of Energy (DOE) performance objectives. Annual disposal receipt reviews indicate that smaller volumes of waste will require disposal in the pits and shafts at Area G relative to what was projected for the performance assessment and composite analysis. The future inventories are projected to decrease modestly for the pits but increase substantially for the shafts due to an increase in the amount of tritium that is projected to require disposal. Overall, however, changes in the projected future inventories of waste are not expected to compromise the ability of Area G to satisfy DOE performance objectives. The Area G composite analysis addresses potential impacts from all waste disposed of at the facility, as well as other sources of radioactive material that may interact with releases from Area G. The level of knowledge about the other sources included in the composite analysis has not changed sufficiently to call into question the validity of that analysis. Ongoing environmental surveillance activities are conducted at, and in the vicinity of, Area G. However, the information generated by many of these activities cannot be used to evaluate the validity of the performance assessment and composite analysis models because the monitoring data collected are specific to operational releases or address receptors that are outside the domain of the performance assessment and composite analysis. In general, applicable monitoring data are supportive of some aspects of the performance assessment and composite analysis. Several research and development (R and D) efforts have been initiated under the performance assessment and composite analysis maintenance program. These investigations are designed to improve the current understanding of the disposal facility and site, thereby reducing the uncertainty associated with the projections of the long-term performance of Area G. The status and results of R and D activities that were undertaken in fiscal year 2011 are discussed in this report. Special analyses have been conducted to determine the feasibility of disposing of specific waste streams, to address proposed changes in disposal operations, and to consider the impacts of changes to the models used to conduct the performance assessment and composite analysis. These analyses are described and the results of the evaluations are summarized in this report. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, all disposal operations at Area G have been confined to MDA G. Material Disposal Area G is scheduled to undergo final closure in 2015; disposal of waste in the pits and shafts is scheduled to end in 2013. In anticipation of the closure of MDA G, plans are being made to ship the majority of the waste generated at LANL to off-site locations for disposal. It is not clear at this time if waste that will be disposed of at LANL will be placed in Zone 4 or if disposal operations will move to a new location at the Laboratory. Separately, efforts to optimize the final cover used in the closure of MDA G are underway; a final cover design different than that adopted for the performance assessment and composite analysis will likely emerge from that investigation. All of these changes will require re-examination of the assumptions upon which the performance assessment and composite analysis are based and, in all likelihood, revision of those analyses.

54 ENVIRONMENTAL SCIENCES↗

Analytics-at-scale of Sensor Data for Digital Monitoring in Nuclear Plants: 2nd Annual Report

For economic reasons, the nuclear industry is witnessing premature closure of nuclear power plants, despite excellent safety records. Operations and Maintenance (O&M) activities are some of the largest costs in operating legacy light-water plants. By reducing O&M costs, nuclear energy can become more economically competitive with other energy sources. This can be achieved by leveraging machine-learning and artificial intelligence technologies to develop data-driven algorithms to better diagnose potential faults within the system. Improved accuracy of the models can lead to a reduction in unnecessary maintenance, thus reducing costs associated with parts, labor, and unnecessary planned, forced, or extended outages. To address these challenges, the goal of this project is to perform research and development in the area of digital monitoring, i.e., the application of advanced sensor technologies (particularly wireless sensor technologies) and data science based analytic capabilities, to advance online monitoring and predictive maintenance in nuclear plants and improve plant performance (efficiency gain and economic competitiveness). This report summarizes the fiscal year 2020 research progress encompassing (1) different wireless vibration sensor and data indicators used to assess the health of a plant asset; (2) development of diagnostic models for fault detection; and (3) development of prognostic models for estimating the health of the system up to 7 days ahead.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technical Review Report for the Model 9977 Safety Analysis Report for Packaging Addendum 1 Justification for DNDO Contents

The Model 9977 Package is currently certified for Content Envelope C.1, {sup 238}Pu Heat Sources, either in Radioisotope Thermoelectric Generator (RTG), or in Food-Pack Can configurations, under Certificate of Compliance (CoC) Certificate Number 9977 and Package Identification Number USA/9977/B(M)F-96 (DOE). Addendum 1, Justification for DNDO Contents,--the Submittal--supplements Revision 2 of the Safety Analysis Report for Packaging for the Model 9977 Package. The Submittal adds five new contents to the Model 9977 Package, Content Envelopes, AC.1 through AC.5. The Content Envelopes are neptunium metal, the beryllium-reflected plutonium ball (BeRP Ball), plutonium/uranium metal, plutonium/uranium metal with enhanced wt% {sup 240}Pu (to 50 wt%), and uranium metal. The last three Content Envelopes are stabilized to DOE-STD-3013. These Content Envelopes will be shipped to the Device Assembly Facility (DAF) at the Nevada Test Site (NTS), where they will reside, and, hence, to off-site locations in support of the Department of Homeland Security (DHS) Domestic Nuclear Detection Office (DNDO). The new certificate will apply to a limited number of Model 9977 Packages. At the same time, the Submittal requests an extension of the periodic maintenance requirements from one (1) year to up to five (5) years using Radio-Frequency Identification (RFID) temperature-monitoring systems to measure the ambient storage temperature in order to ensure that the temperature of the Viton{reg_sign} O-rings for the 6-inch Containment Vessel (6CV) remain less than 200 F. The RFIDs have been developed by Argonne National Laboratory. An on-going surveillance program at the K-Area Materials Storage (KAMS) facility at the Savannah River Site, and an on-going examination of Viton{reg_sign} O-rings from mock Primary Containment Vessels (PCVs) at Savannah River National Laboratory (SRNL) provide the technical justification for the extension of the periodic maintenance interval. Where extended periodic maintenance is desired, the decay heat rate for the Model 9977 Package is limited to 15 watts.

99 GENERAL AND MISCELLANEOUS↗

Duck Valley Reservoirs Fish Stocking and O&M, Annual Progress Report 2007-2008.

The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance Project (DV Fisheries) is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the federal hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View (MVR), Lake Billy Shaw (LBS), and Sheep Creek Reservoirs (SCR), the program is also designed to: maintain healthy aquatic conditions for fish growth and survival, provide superior facilities with wilderness qualities to attract non-Tribal angler use, and offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period fall into three categories: operations and maintenance, monitoring and evaluation, and public outreach. Operation and maintenance of the three reservoirs include maintaining fences, roads, dams and all reservoir structures, feeder canals, water troughs, stock ponds, educational signs, vehicles, equipment, and restroom facilities. Monitoring and evaluation activities include creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, and control of encroaching exotic vegetation. Public outreach activities include providing environmental education to school children, providing fishing reports to local newspapers and vendors, updating the website, hosting community environmental events, and fielding numerous phone calls from anglers. The reservoir monitoring program focuses on water quality and fishery success. Sheep Creek Reservoir and Lake Billy Shaw had less than productive trout growth due to water quality issues including dissolved oxygen and/or turbidity. Regardless, angler fishing experience was the highest at Lake Billy Shaw. Trout in Mountain View Reservoir were in the best condition of the three reservoirs and anglers reported very good fishing there. Water quality (specifically dissolved oxygen and temperature) remain the main limiting factors in the fisheries, particularly in late August to early September.

13 HYDRO ENERGY↗

Project Plan 7930 Cell G PaR Remote Handling System Replacement

For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulators and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully functioning and reliable Par manipulator arm is necessary for uninterrupted {sup 252}Cf operations; a fully-functioning bridge is needed for the system to function as intended.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cluster man/system design requirements and verification

Discussion of the procedures employed for determining the man/system requirements that guided Skylab design, and review of the techniques used for implementing the man/system design verification. The foremost lesson learned from the design need anticipation and design verification experience is the necessity to allow for human capabilities of in-flight maintenance and repair. It is now known that the entire program was salvaged by a series of unplanned maintenance and repair events which were implemented in spite of poor design provisions for maintenance.

Orbital workers↗

Progress Toward Attractive Stellarators

The quasi-axisymmetric stellarator (QAS) concept offers a promising path to a more compact stellarator reactor, closer in linear dimensions to tokamak reactors than previous stellarator designs. Concept improvements are needed, however, to make it more maintainable and more compatible with high plant availability. Using the ARIES-CS design as a starting point, compact stellarator designs with improved maintenance characteristics have been developed. While the ARIES-CS features a through-the-port maintenance scheme, we have investigated configuration changes to enable a sector-maintenance approach, as envisioned for example in ARIES AT. Three approaches are reported. The first is to make tradeoffs within the QAS design space, giving greater emphasis to maintainability criteria. The second approach is to improve the optimization tools to more accurately and efficiently target the physics properties of importance. The third is to employ a hybrid coil topology, so that the plasma shaping functions of the main coils are shared more optimally, either with passive conductors made of high-temperature superconductor or with local compensation coils, allowing the main coils to become simpler. Optimization tools are being improved to test these approaches.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recent advances in automatic alignment system for the National Iginition Facility

The automatic alignment system for the National Ignition Facility (NIF) is a large-scale parallel system that directs all 192 laser beams along the 300-m optical path to a 50-micron focus at target chamber in less than 50 minutes. The system automatically commands 9,000 stepping motors to adjust mirrors and other optics based upon images acquired from high-resolution digital cameras viewing beams at various locations. Forty-five control loops per beamline request image processing services running on a LINUX cluster to analyze these images of the beams and references, and automaticallys teer the beams toward the target. This paper discusses the upgrades to the NIF automatic alignment system to handle new alignment needs and evolving requirements as related to various types of experiments performed. As NIF becomes a continuously-operated system and more experiments are performed, performance monitoring is increasingly important for maintenance and commissioning work. Data, collected during operations, is analyzed for tuning of the laser and targeting maintenance work. handling evolving alignment and maintenance needs is expected for the planned 30-year operational life of NIF.

42 ENGINEERING↗

The levelized cost of energy for distributed PV : a parametric study.

The maturation of distributed solar PV as an energy source requires that the technology no longer compete on module efficiency and manufacturing cost ($/Wp) alone. Solar PV must yield sufficient energy (kWh) at a competitive cost (c/kWh) to justify its system investment and ongoing maintenance costs. These metrics vary as a function of system design and interactions between parameters, such as efficiency and area-related installation costs. The calculation of levelized cost of energy includes energy production and costs throughout the life of the system. The life of the system and its components, the rate at which performance degrades, and operation and maintenance requirements all affect the cost of energy. Cost of energy is also affected by project financing and incentives. In this paper, the impact of changes in parameters such as efficiency and in assumptions about operating and maintenance costs, degradation rate and system life, system design, and financing will be examined in the context of levelized cost of energy.

14 SOLAR ENERGY↗

RCM and application at Sandia National Labs.

Reliability-Centered Maintenance (RCM) is a process used to determine what must be done to ensure that any physical asset continues to do whatever its users want it to do in its present operating context. There are 7 basic questions of RCM: (1) what are the functions of the asset; (2) in hwat ways does it fail to fulfill its functions; (3) what causes each functional failure; (4) what happens when each failure occurs; (5) in what way does each failure matter; (6) what can be done to predict or prevent each failure; and (7) what should be done if a suitable proactive task cannot be found. SNL's RCM experiences: (1) acid exhaust system - (a) reduced risk of system failure (safety and operational consequences), (b) reduced annual correctiv maintenance hours from 138 in FY06 to zero in FY07, FY08, FY09, FY10 and FY11 so far, (c) identified single point of failure, mitigated risk, and recommended a permanent solution; (2) fire alarm system - (a) reduced false alarms, which cause costly evacuations, (b) precented 1- to 2-day evacuation by identifying and obtaining a critical spare for a network card; (3) heating water system - (a) reduced PM hours on fire-tube boilers by 60%, (b) developed operator tasks and PM plan for modular boilers, which can be applied to many installations; and (4) GIF source elevator system - (a) reduced frequency of PM tasks from 6 months to 1 year, (b) established predictive maintenance task that identified overheating cabinet and prevented potential electrical failure or fire.

99 GENERAL AND MISCELLANEOUS↗

ESTIMATED SIL LEVELS AND RISK COMPARISONS FOR RELIEF VALVES AS A FUNCTION OF TIME-IN-SERVICE

Risk-based inspection methods enable estimation of the probability of spring-operated relief valves failing on demand at the United States Department of Energy's Savannah River Site (SRS) in Aiken, South Carolina. The paper illustrates an approach based on application of the Frechet and Weibull distributions to SRS and Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD) proof test results. The methodology enables the estimation of ANSI/ISA-84.00.01 Safety Integrity Levels (SILs) as well as the potential change in SIL level due to modification of the maintenance schedule. Current SRS practices are reviewed and recommendations are made for extending inspection intervals. The paper compares risk-based inspection with specific SILs as maintenance intervals are adjusted. Groups of valves are identified in which maintenance times can be extended as well as different groups in which an increased safety margin may be needed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗