Apollo/Saturn V launch complex 39 capabilities
Apollo/Saturn 5 Kennedy Launch Complex 39 /LC-39/ physical characteristics emphasizing high launch rate capability, economy of operation and superior flexibility
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Apollo/Saturn 5 Kennedy Launch Complex 39 /LC-39/ physical characteristics emphasizing high launch rate capability, economy of operation and superior flexibility
Predicted launch vehicle operational trajectory and related data for Apollo 14 launch window
Acoustic data obtained during launch of ESRO 1-B satellite and GRS-A satellite by Scout launch vehicles
The sixth Atlas Centaur vehicle (AC-6) was successfully launched from the Eastern T e s t Range, Complex 36B, on August 11, 1965, at 0931:04.430 EST. A 2084-pound dynamic model of the Surveyor payload was placed in a simulated lunar transfer trajectory. Vehicle systems operated satisfactorily and all the flight objectives were accomplished. Lift-off within 4 seconds of the window opening demonstrated the launch-on-time capability of the vehicle were accurately compensated for by the Centaur guidance system. the Surveyor model into a near-perfect lunar transfer trajectory would have resulted in an impact of the moon without a midcourse correction. To hit the precise target area on the lunar surface, the required correction would have been 4.25 meters per second, which is well within the spacecraft capability. Normal thrust and impulse levels were obtained with both the A t l a s and Centaur propulsion systems. However, a sizeable thrust overshoot on startup of the Centaur engines has not been resolved. A propellant-utilization system used for the first time on the Centaur, accurately controlled the fuel and oxidant consumption. The turnaround and retrothrust maneuver were performed without incident. Relatively high longitudinal modal excitations and lateral payload excitations were obtained at lift-off; these high perturbations are believed t o be related t o the launcher holddown arms. Nominal temperatures were recorded for both the external vehicle skin and the payload compartment; however, abnormally low temperatures were measured in the forward equipment area, which may have resulted from leakage of cold helium purge gas. All vehicle electrical systems performed satisfactorily; the only difficulty with the RF systems was obtained with the C-band transponder. of the vehicle instrumentation yielded valid data. The AC-6 vehicle was constructed with several new lightweight designs including the forward bulkhead, thrust barrel, interstage adapter and tank skin thickness reduction from 0.016 t o 0.014 inch. No deficiencies were observed in any of these new structural elements.
The transonic phase of the 0.0088105-scale MSC orbiter booster separation test was conducted in the LTV 4-foot high speed wind tunnel, at Mach numbers of 0.6,0.9, 1.1, and 1.38. The purpose of this test was to define the effects of the orbiter/ booster proximity interference on the aerodynamic characteristics of the launch configuration during separation or abort maneuvers. Each model had both straight and delta wings available for variation of launch vehicle configuration concepts.
A description is given of the return of a manned Mars lander by a launch from the surface of Mars to some intermediate orbit, with subsequent maneuvers to rendezvous with a primary spacecraft (called the orbiter) in a Mars parking orbit. The type of Mars mission used to demonstrate the analytical technique includes a Venus swingby on the Mars-to-Earth portion of the trajectory in order to reduce the total mission velocity requirement. The total velocity requirement for the mission considered (if inplane launches are assumed) is approximately 17,500 ft/sec.
A suborbital abort guidance scheme is presented for returning the orbiter vehicle to the launch site in the event of a booster malfunction. The guidance scheme described, referred to as FBGUID, represents a simple closed-form technique to the flyback abort problem. In addition to returning to the launch site, objectives of the formulation are to preclude excessive structural and heating loads. A demonstration of the feasibility of this abort guidance concept is included for a 150-second abort time.
An investigation was made of the fin configuration and booster body configuration effects on a composite booster/040A orbiter launch configuration. Aerodynamic performance and stability characteristics in pitch and yaw were obtained. Configurations tested included two stepped cylindrical bodies of different lengths with a conical nose, four fin shapes of various sizes and aspect ratios mounted in different positions around the base of the bodies, two base flare angles and three 040A orbiter configurations. The orbiter variations included a tailless configuration and two tail sizes. A tailless booster launch configuration with deflected petals (expanded flare sectors) was also tested. The model scale was 0.003366. Data were converted to coefficient form in near real time, punched on cards, and tabulated. The cards used in conjunction with a Benson-Lehner plotter were used to provide plotted data. At the end of the test, tabulated input forms were completed for the SADSAC computer program to aid in publishing the final test data report.
Aerodynamic data obtained from a space shuttle abort stage separation wind tunnel test are presented. The .00556 scale models of the orbiter and booster configuration were tested in close proximity using dual balances during the time period of April 21 to April 27 1971. Data were obtained for both booster and orbiter over an angle of attack range from -10 to 10 deg for zero degree sideslip angle. The models were tested at several relative incidence angles and separation distances and power conditions. Plug nozzles utilizing air were used to simulate booster and orbiter plumes at various altitudes along a nominal ascent trajectory. Powered conditions were 100, 50, 25 and 0 percent of full power for the orbiter and 100, 50 and 0 percent of full power for the booster. Pitch control effectiveness data were obtained for both booster and orbiter with power on and off. In addition, launch vehicle data with and without booster power were obtained utilizing a single balance in the booster model. Data were also obtained with the booster canard off in close proximity and for the launch configuration.
An investigation is reported to determine the static aerodynamic characteristics of a space shuttle parametric launch configuration. The orbiter control surfaces were deflected to obtain the control effectiveness for use in launch vehicle control studies. Experimental data were obtained for Mach number from 0.6 to 4.96, angles of attack from minus 10 to plus 10 degrees and angles of sideslip from minus six to six degrees at zero degrees angle of attack.
An atmospheric electrical field experiment was conducted during Apollo 14 launch to measure the electrical perturbations produced by the space vehicle. The measurements showed the presence of a much stronger electrical field than was expected, and that the disturbance might be caused by a buildup of electrostatic charges in the launch vehicle engine exhaust clouds, charge buildup of the vehicle itself, or a combination of both. Efforts were also made to establish the origin and carriers of the charge.
The announcement is presented of the launch of NASA's Small Astronomy Satellite B (SAS-B) on 2 Nov. 1972, to study gamma rays. The launch is to be from the Italian-operated San Marco Equatorial Range in the Indian Ocean for ease in acquiring an equatorial orbit. The spacecraft systems described include: stabilization and control, communication, and spark chamber gamma ray telescope. The results of Uhuru (Explorer 42) are also presented.
Discussion of the tradeoffs and EC/LS definition for a low cost shuttle launched space station to be launched in the late 1970s for use as a long-term manned scientific laboratory. The space station consists of 14-ft-diam modules, clustered together to support a six-man crew at the initial space station (ISS) level and a 12-man crew at the growth space station (GSS) level. Key design guidelines specify low initial cost and low total program cost and require two separate pressurized habitable compartments with independent lift support capability. The methodology used to select the EC/LS design consisted of systematically reducing quantitative parameters to a common denominator of cost. This approach eliminates many of the inconsistencies that can occur in such decision making. The EC/LS system selected is a partially closed system which recovers urine, condensate, and wash water and concentrates crew expired CO2 for use in a low thrust resistojet propulsion system.
Experimental aerodynamic investigations were conducted in the NASA/MSFC 14-inch Trisonic Wind Tunnel on a 0.004-scale model of the NR ATP baseline Shuttle launch configuration. The test model consisted of the NR ATP baseline orbiter, external tank, and SRB's with nozzles. Six component aerodynamic force and moment data were recorded over an angle of attack range from minus 10 deg to 10 deg at zero degrees sideslip and angle of sideslip range of minus 10 deg to 10 deg at zero angle of attack for a Mach range of 0.6 to 4.96. Rudder flare was constant at 10 deg during the entire test. The purpose of the test was to define the performance, stability, and control characteristics of the launch configuration as well as to investigate the buildup effect of two geometrical parameters.
Wavelike disturbances were observed in the ionosphere following several nuclear explosions in early 1960's. Supersonic shock waves within the atmosphere generated by large rockets can cause ionospheric electron density perturbations. A CW phase path Doppler array in the New York area was operated during the Saturn-Apollo 12 and 13 launches and recorded Doppler frequency fluctuations due to rocket launchings. Cross correlation and power spectral analyses of the phase path-path Doppler frequency variation records showed that the phase velocities of the signal arrivals were from south of the array with 700 - 800 m/sec corresponding to periods in the range of 2 to 4 minutes. Ionograms taken every 60 seconds from Wallops Islands showed clearly ionospheric disturbances due to rockets. The group velocities were estimated to be of the order of 450 m/sec 1 obtained from the earliest visible disturbances seen on CW phase path Doppler records and ionograms together with the rocket trajectory data.
The results of analytical and experimental parametric studies of space shuttle booster, orbiter and launch vehicle aerodynamics are described. During this study over 1700 hours of experimental wind tunnel tests were conducted on several versions of the shuttle booster, orbiter and launch vehicle. Fifteen separate tests were conducted in three different test facilities. Due to the number of test programs conducted and the time required for test preparation, analysis of the test data has been limited to that required to drive the experimental program. A brief description of each of the experimental tests conducted including the test purpose and approach is included. Several test models were designed and fabricated in support of the experimental program. These models are described.
The pertinent events concerned with the launch, float, and flight of balloon launched decelerator test vehicle AV-2 are discussed. The performance of the decelerator system is analyzed. Data on the flight trajectory and decelerator test points at the time of decelerator deployment are provided. A description of the time history of vehicle events and anomalies encounters during the mission is included.
The pertinent events concerned with the launch, float, and flight of balloon launched decelerator test vehicle AV-3 are discussed. The performance of the decelerator system is analyzed. Data on the flight trajectory and decelerator test points at the time of decelerator deployment are provided. A description of the time history of vehicle events and anaomalies encounters during the mission is included.