Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

SU-E-P-27: Efficient Process for AccuBoost Planning and Treatment Delivery to Minimize Patient Compression Time

Purpose: To implement an efficient and robust process for AccuBoost planning and treatment delivery that can be safely performed by a single Physicist while minimizing patient’s total session time. Methods: Following a thorough commissioning and validation process, templates were created in the brachytherapy planning system for each AccuBoost applicator. Tables of individual and total nominal dwell times for each applicator as a function of separation were generated to streamline planning while an Excel-based nomogram provided by the vendor functions as a secondary verification of the treatment parameters. Tables of surface dose as a function of separation and applicator, along with concise guidance documents for applicator selection, are readily available during the planning process. The entire process is described in a set of detailed Standard Operating Procedures which, in addition to the items described above, include a verbal time-out between the primary planner and the individual performing the secondary verification as well as direct visual confirmation of applicator placement using an articulated mirror. Prior to treatment initiation, a final time-out is conducted with the Radiation Oncologist. Chart documentation is finalized after the patient is released from compression following completion of the treatment. Results: With the aforementioned procedures, it has been possible to consistently limit the time required to prepare each treatment such that the patient is typically under compression for less than 10 minutes per orientation prior to the initiation of the treatment, which is particularly important for APBI cases. This process can be overseen by a single physicist assisted by a dosimetrist and has been optimized during the past 16 months, with 180 treatment sessions safely completed to date. Conclusion: This work demonstrates the implementation of an efficient and robust process for real-time-planned AccuBoost treatments that effectively minimizes the time that the patient is under compression.

60 APPLIED LIFE SCIENCES↗

Implementation of Bin Packing Model for Reed Switch Production Planning

This paper presents a form to resolve a real problem of efficient material election in reed switch manufacturing. The carrying out of the consumer demands depends on the stochastic results of the classification process where each lot of switches is distributed into bins according to an electric measure value. Various glass types are employed for the switch manufacturing. The effect caused by the glass type variation on the switch classification results was investigated. Based on real data statistic analysis, the problem is reduced to the lot number minimizing taking into consideration the glass type, and interpreted as a bin packing problem generalization. On difference to the classic bin packing problem, in the considered case, an item represents a set of pieces; a container is divided into a number of bins (sub-containers); the bin capacity is variable; there are the assignment restrictions between bins and sets of pieces; the items are allowed to be fragmented into bins and containers. The problem has a high complexity. A heuristic offline algorithm is proposed to find the quantity, types and packing sequence of containers, the item fragments associated with containers and bins. The bin capacities do not affect the algorithm.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

The foundations of reusability: Successful experience and important conclusions from planning and scheduling of space operations

NASA's Office of Space Communications is sponsoring a combined technical and management initiative to dramatically decrease the cost of preparing for and conducting space operations. The authors present their successful experience and important conclusions from producing generalized and readily reusable solutions and systems for planning and scheduling applications. While generality by itself should enable reuse, generality alone may not produce the desired cost savings. Generality achieved by accumulating numerous special cases within a software system often increases the complexity of the software to the extent that maintenance costs overtake development savings. Because of this phenomenon, the authors have insisted on simplicity, as well as generality, to achieve cost-effective operation reusability. Simplicity and generality can be accomplished simultaneously when the basic 'Building Blocks' for a problem domain, in this paper, planning and scheduling, are discovered and implemented with reuse in mind. The Building Blocks for planning and scheduling are described. The authors also present examples of how these Building Blocks have accommodated various scenarios that were previously treated as mission-peculiar. Two case histories are presented to demonstrate operational reusability and cost effectiveness.

Hornstein, Rhoda Shaller↗

Redefining Tactical Operations for MER Using Cloud Computing

The Mars Exploration Rover Mission (MER) includes the twin rovers, Spirit and Opportunity, which have been performing geological research and surface exploration since early 2004. The rovers' durability well beyond their original prime mission (90 sols or Martian days) has allowed them to be a valuable platform for scientific research for well over 2000 sols, but as a by-product it has produced new challenges in providing efficient and cost-effective tactical operational planning. An early stage process adaptation was the move to distributed operations as mission scientists returned to their places of work in the summer of 2004, but they would still came together via teleconference and connected software to plan rover activities a few times a week. This distributed model has worked well since, but it requires the purchase, operation, and maintenance of a dedicated infrastructure at the Jet Propulsion Laboratory. This server infrastructure is costly to operate and the periodic nature of its usage (typically heavy usage for 8 hours every 2 days) has made moving to a cloud based tactical infrastructure an extremely tempting proposition. In this paper we will review both past and current implementations of the tactical planning application focusing on remote plan saving and discuss the unique challenges present with long-latency, distributed operations. We then detail the motivations behind our move to cloud based computing services and as well as our system design and implementation. We will discuss security and reliability concerns and how they were addressed

Mars↗

Bridging Climate Change Resilience and Mitigation in the Electricity Sector Through Renewable Energy and Energy Efficiency: Emerging Climate Change and Development Topics for Energy Sector Transformation

Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growing electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.

54 ENVIRONMENTAL SCIENCES↗

A cost-effective intelligent robotic system with dual-arm dexterous coordination and real-time vision

Dexterous coordination of manipulators based on the use of redundant degrees of freedom, multiple sensors, and built-in robot intelligence represents a critical breakthrough in development of advanced manufacturing technology. A cost-effective approach for achieving this new generation of robotics has been made possible by the unprecedented growth of the latest microcomputer and network systems. The resulting flexible automation offers the opportunity to improve the product quality, increase the reliability of the manufacturing process, and augment the production procedures for optimizing the utilization of the robotic system. Moreover, the Advanced Robotic System (ARS) is modular in design and can be upgraded by closely following technological advancements as they occur in various fields. This approach to manufacturing automation enhances the financial justification and ensures the long-term profitability and most efficient implementation of robotic technology. The new system also addresses a broad spectrum of manufacturing demand and has the potential to address both complex jobs as well as highly labor-intensive tasks. The ARS prototype employs the decomposed optimization technique in spatial planning. This technique is implemented to the framework of the sensor-actuator network to establish the general-purpose geometric reasoning system. The development computer system is a multiple microcomputer network system, which provides the architecture for executing the modular network computing algorithms. The knowledge-based approach used in both the robot vision subsystem and the manipulation control subsystems results in the real-time image processing vision-based capability. The vision-based task environment analysis capability and the responsive motion capability are under the command of the local intelligence centers. An array of ultrasonic, proximity, and optoelectronic sensors is used for path planning. The ARS currently has 18 degrees of freedom made up by two articulated arms, one movable robot head, and two charged coupled device (CCD) cameras for producing the stereoscopic views, and articulated cylindrical-type lower body, and an optional mobile base. A functional prototype is demonstrated.

Marzwell, Neville I.↗

Chromospheric Lyman-Alpha SpectroPolarimeter (CLASP)

Chromosphere, the transition layer of the sun is a region to switch to the magnetic pressure dominated from plasma pressure dominated, simultaneous observation of the detailed magnetic field measurement and plasma of dynamic phenomenon here is what is the frontier of the next solar physics. As This is a challenge that has just mentioned, even the next solar observation satellite plan SOLAR-C, in the experiments we had used a NASA sounding rocket for the first time in the SOLAR-C plan, will address the chromosphere-transition layer magnetic field measurement there. It is, is a Chromospheric Lyman-Alpha Spectro-Polarimeter (CLASP) plan, the linear polarization of Lyman 􀉲 emission lines chromosphere-transition layer shoots (121.6nm) were detected in 0.1 percent of high accuracy, a new technique called Hanre effect I get the magnetic field information of chromosphere-transition layer. In Japan, the US and Europe joint observation in November 2012 as a rocket experiment is adopted to NASA this plan that full-scale start-up, start from assembly work is 2014 spring flight observation device, currently, it is where the alignment of the optical elements have been implemented. After this, it is planned to continue with the performance evaluation towards the observation implementation of summer 2015. In addition to once again explain the contents of the plan In this presentation, we report an overview of the entire development and preparation current status.

CLASP↗

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

Johnson, Jill W.↗

Approach to rapid mission design and planning

Methods and techniques are described for implementation in automated computer systems to assess parametric data, capabilities, requirements and constraints for planning earth orbit missions. Mission planning and design procedures are defined using two types of typical missions as examples. These missions were the high energy Astronomical Observatory Satellite missions, and Small Applications Technology Satellite missions.

Green, W. G.↗

Modeling, Simulation, and Forecasting of Subseasonal Variability

A planning workshop on "Modeling, Simulation and Forecasting of Subseasonal Variability" was held in June 2003. This workshop was the first of a number of meetings planned to follow the NASA-sponsored workshop entitled "Prospects For Improved Forecasts Of Weather And Short-Term Climate Variability On Sub-Seasonal Time Scales" that was held April 2002. The 2002 workshop highlighted a number of key sources of unrealized predictability on subseasonal time scales including tropical heating, soil wetness, the Madden Julian Oscillation (MJO) [a.k.a Intraseasonal Oscillation (ISO)], the Arctic Oscillation (AO) and the Pacific/North American (PNA) pattern. The overarching objective of the 2003 follow-up workshop was to proceed with a number of recommendations made from the 2002 workshop, as well as to set an agenda and collate efforts in the areas of modeling, simulation and forecasting intraseasonal and short-term climate variability. More specifically, the aims of the 2003 workshop were to: 1) develop a baseline of the "state of the art" in subseasonal prediction capabilities, 2) implement a program to carry out experimental subseasonal forecasts, and 3) develop strategies for tapping the above sources of predictability by focusing research, model development, and the development/acquisition of new observations on the subseasonal problem. The workshop was held over two days and was attended by over 80 scientists, modelers, forecasters and agency personnel. The agenda of the workshop focused on issues related to the MJO and tropicalextratropical interactions as they relate to the subseasonal simulation and prediction problem. This included the development of plans for a coordinated set of GCM hindcast experiments to assess current model subseasonal prediction capabilities and shortcomings, an emphasis on developing a strategy to rectify shortcomings associated with tropical intraseasonal variability, namely diabatic processes, and continuing the implementation of an experimental forecast and model development program that focuses on one of the key sources of untapped predictability, namely the MJO. The tangible outcomes of the meeting included: 1) the development of a recommended framework for a set of multi-year ensembles of 45-day hindcasts to be carried out by a number of GCMs so that they can be analyzed in regards to their representations of subseasonal variability, predictability and forecast skill, 2) an assessment of the present status of GCM representations of the MJO and recommendations for future steps to take in order to remedy the remaining shortcomings in these representations, and 3) a final implementation plan for a multi-institute/multi-nation Experimental MJO Prediction Program.

Waliser, Duane↗

Development of functional requirements specification for digital instrumentation and control systems upgrades used at nuclear power plants (NPPs) - 396

Recent market conditions have driven the nuclear industry to become more innovative at reducing cost in order to remain competitive. Instrumentation and Control (I and C) systems used by many NPPs are based on outdated 1960's and 70's technology. Many of the components used in these digital systems are no longer supported by Original Equipment Manufacturers (OEMs) and are rapidly becoming obsolete. Coping with the high cost of replacing I and C equipment due to obsolescence adds to this economic challenge. While other industries have migrated from analog to modern digital I and C technology, implementation of digital I and C controls within the nuclear industry has been very slow. This is primarily due to the high capital cost related to implementation of digital I and C upgrades, which is compounded by regulatory uncertainties that present significant licensing risks. The Nuclear Regulatory Commission (NRC), Nuclear Energy Institute (NEI) and the industry's Digital I and C Working Group are working to address many of the regulatory barriers that adversely impacts implementation of digital upgrades at NPPs. The NRC has developed an 'Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure' (ML16097A182), Reference 1. Once fully implemented, this plan is expected to help reduce regulatory uncertainties that affects project cost. Excluding regulatory uncertainty, most OEM's will concur that one of the most important factors in reducing project cost is assuring that all requirements are well defined and complete prior to starting the project. A detailed and high quality Functional Requirements Specification (FRS) is critical in documenting these requirements. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Radiation Oncology Medical Student Clerkship: Implementation and Evaluation of a Bi-institutional Pilot Curriculum

Purpose: To develop and evaluate a structured didactic curriculum to complement clinical experiences during radiation oncology clerkships at 2 academic medical centers. Methods and Materials: A structured didactic curriculum was developed to teach fundamentals of radiation oncology and improve confidence in clinical competence. Curriculum lectures included: (1) an overview of radiation oncology (history, types of treatments, and basic clinic flow); (2) fundamentals of radiation biology and physics; and (3) practical aspects of radiation treatment simulation and planning. In addition, a hands-on dosimetry session taught students fundamentals of treatment planning. The curriculum was implemented at 2 academic departments in 2012. Students completed anonymous evaluations using a Likert scale to rate the usefulness of curriculum components (1 = not at all, 5 = extremely). Likert scores are reported as (median [interquartile range]). Results: Eighteen students completed the curriculum during their 4-week rotation (University of Chicago n=13, Harvard Longwood Campus n=5). All curriculum components were rated as extremely useful: introduction to radiation oncology (5 [4-5]); radiation biology and physics (5 [5-5]); practical aspects of radiation oncology (5 [4-5]); and the treatment planning session (5 [5-5]). Students rated the curriculum as “quite useful” to “extremely useful” (1) to help students understand radiation oncology as a specialty; (2) to increase student comfort with their specialty decision; and (3) to help students with their future transition to a radiation oncology residency. Conclusions: A standardized curriculum for medical students completing a 4-week radiation oncology clerkship was successfully implemented at 2 institutions. The curriculum was favorably reviewed. As a result of completing the curriculum, medical students felt more comfortable with their specialty decision and better prepared to begin radiation oncology residency.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-E-J-127: Implementation of An Online Replanning Tool for VMAT Using Flattening Filter-Free Beams

Purpose: This is to report the implementation of an online replanning tool based on segment aperture morphing (SAM) for VMAT with flattening filter free (FFF) beams. Methods: Previously reported SAM algorithm modified to accommodate VMAT with FFF beams was implemented in a tool that was interfaced with a treatment planning system (Monaco, Elekta). The tool allows (1) to output the beam parameters of the original VMAT plan from Monaco, and (2) to input the apertures generated from the SAM algorithm into Monaco for the dose calculation on daily CT/CBCT/MRI in the following steps:(1) Quickly generating target contour based on the image of the day, using an auto-segmentation tool (ADMIRE, Elekta) with manual editing if necessary; (2) Morphing apertures based on the SAM in the original VMAT plan to account for the interfractional change of the target from the planning to the daily images; (3) Calculating dose distribution for new apertures with the same numbers of MU as in the original plan; (4) Transferring the new plan into a record & verify system (MOSAIQ, Elekta); (5) Performing a pre-delivery QA based on software; (6) Delivering the adaptive plan for the fraction.This workflow was implemented on a 16-CPU (2.6 GHz dual-core) hardware with GPU and was tested for sample cases of prostate, pancreas and lung tumors. Results: The online replanning process can be completed within 10 minutes. The adaptive plans generally have improved the plan quality when compared to the IGRT repositioning plans. The adaptive plans with FFF beams have better normal tissue sparing as compared with those of FF beams. Conclusion: The online replanning tool based on SAM can quickly generate adaptive VMAT plans using FFF beams with improved plan quality than those from the IGRT repositioning plans based on daily CT/CBCT/MRI and can be used clinically. This research was supported by Elekta Inc. (Crawley, UK)

60 APPLIED LIFE SCIENCES↗

Alternative Approaches to Mission Control Automation at NASA's Goddard Space Flight Center

To meet its objective of reducing operations costs without incurring a corresponding increase in risk, NASA is seeking new methods to automate mission operations. This paper examines the state of the art in automating ground operations for space missions. A summary of available technologies and methods for automating mission operations is provided. Responses from interviews with several space mission FOTs (Flight Operations Teams) to assess the degree and success of those technologies and methods implemented are presented. Mission operators that were interviewed approached automation using different tools and methods resulting in varying degrees of success - from nearly completely automated to nearly completely manual. Two key criteria for successful automation are the active participation of the FOT in the planning, designing, testing, and implementation of the system and the relative degree of complexity of the mission.

Rackley, Michael↗

Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

99 GENERAL AND MISCELLANEOUS↗

CCS Business Development Case Study for CarbonSAFE Illinois - Macon County (Task 4.1)

This report presents components of a commercialize strategy to develop CCS operations in the region of the CarbonSAFE Macon County project. The report describes regional business considerations for specific business plans necessary for successful implementation at commercial scale. This report also provides a brief summary of the regional business climate for CCS in the study region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Deep Space Network in the Common Platform Era: A Prototype Implementation at DSS-13

To enhance NASA's Deep Space Network (DSN), an effort is underway to improve network performance and simplify its operation and maintenance. This endeavor, known as the "Common Platform," has both short- and long-term objectives. The long-term work has not begun yet; however, the activity to realize the short-term goals has started. There are three goals for the long-term objective: 1. Convert the DSN into a digital network where signals are digitized at the output of the down converters at the antennas and are distributed via a digital IF switch to the processing platforms. 2. Employ a set of common hardware for signal processing applications, e.g., telemetry, tracking, radio science and Very Long Baseline Interferometry (VLBI). 3. Minimize in-house developments in favor of purchasing commercial off-the-shelf (COTS) equipment. The short-term goal is to develop a prototype of the above at NASA's experimental station known as DSS-13. This station consists of a 34m beam waveguide antenna with cryogenically cooled amplifiers capable of handling deep space research frequencies at S-, X-, and Ka-bands. Without the effort at DSS-13, the implementation of the long-term goal can potentially be risky because embarking on the modification of an operational network without prior preparations can, among other things, result in unwanted service interruptions. Not only are there technical challenges to address, full network implementation of the Common Platform concept includes significant cost uncertainties. Therefore, a limited implementation at DSS-13 will contribute to risk reduction. The benefits of employing common platforms for the DSN are lower cost and improved operations resulting from ease of maintenance and reduced number of spare parts. Increased flexibility for the user is another potential benefit. This paper will present the plans for DSS-13 implementation. It will discuss key issues such as the Common Platform architecture, choice of COTS equipment, and the standard for radio frequency (RF) to digital interface.

Space Communications and Navigation (SCaN)↗