Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Grid Optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Scheduling Results for the THEMIS Observation Scheduling Tool

We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

Thermal Emission Imaging System (THEMIS)↗

The Atmospheric Grand Challenges in the Science of Wind Energy

Harvested by advanced technical systems honed over decades of research and development, wind energy has become a mainstream energy resource. However, continued innovation is needed to realize the potential of wind to serve the global demand for clean energy. Here, we outline three interdependent, cross-disciplinary grand challenges underpinning this research endeavor. The first is the need for a deeper understanding of the physics of atmospheric flow in the critical zone of plant operation. The second involves science and engineering of the largest dynamic, rotating machines in the world. The third encompasses optimization and control of fleets of wind plants working synergistically within the electricity grid. Addressing these challenges could enable wind power to provide as much as half of our global electricity needs and perhaps beyond.

17 WIND ENERGY↗

Distributed Coordination of Demand-side Flexible Resources in Microgrid with All-Time Feasibility

The prevalence of distributed renewable generators motivates microgrid operators to exploit demand-side flexible resources (DFRs). Due to their dispersed nature, distributed DFR coordination has been a vibrant research area, while there are several issues awaiting to be addressed. On one hand, DFR power is internally coupled through power flow, while DFR usually cannot access grid information. On the other hand, in time-restricted scenarios, solution feasibility cannot be guaranteed by conventional dual-based algorithms. To fill these gaps, we propose a distributed DFR coordination framework with all-time feasibility. The proposed framework accounts for the distinct access of microgrid entities to grid information. A distributed and all-time feasible algorithm is proposed for optimal DFR coordination, which allows DFRs to make local decisions without violating constraints throughout iterations. The effectiveness of the proposed algorithm is demonstrated through case studies. The impact of peer-to-peer communication links on algorithm convergence is also investigated, which emphasizes the balance between communication investment and algorithm performance.

Li, Hongyi [Iowa State Univ., Ames, IA (United Sta↗

Kokhanok Mini-grid Business Case

A business case analysis was performed for the Village of Kokhanok. The business case analysis evaluated the optimal case from the technical analysis performed by the National Renewable Energy. The optimal case provided for repairing the two Vestas 17 (90 kW) wind turbine controllers and added electric thermal stoves and a battery. The project cost 0.5 million. The direct cost of electricity would likely decline from 0.69/kWh to 0.39/kWh. The direct costs don’t include administrative and distribution costs. The repair of controller and the addition of electric stoves reduced fuel consumption by 63% or approximately 22,000 gallons. The reduction in cost provides an opportunity for the Kokhanok Village Council to obtain financing through grants and loans to install renewable energy and reduce diesel fuel consumption to the cooperative

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Shungnak Mini-grid Business Case

A business case analysis was performed for the Village of Shungnak. The business case analysis evaluated the optimal case from the technical analysis performed by the Sandia National Laboratory using Microgrid Design Toolkit (MDT). The optimal case adds a 500 kW wind plant, 100 kW of solar photovoltaics (PV), 100 kW diesel and 46 kW of electric thermal stoves. The project cost 4.3 million. The direct cost of electricity would likely decline from 0.63/kWh to 0.55/kWh. The direct costs don’t include administrative and distribution costs. The addition of the renewable resources reduced diesel fuel consumption by more than 74% or approximately 96,000 gallons. The reduction in cost provides an opportunity for Alaska Village Electric Cooperative to obtain financing through grants and loans to install renewable energy and reduce diesel fuel consumption to the cooperative.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chefornak Mini-grid Business Case

A business case analysis was performed for the Village of Chefornak. The business case analysis evaluated the optimal case from the technical analysis performed by the National Renewable Energy using HOMER. The optimal case adds an 800 kW wind plant with 650 kW of electric thermal stoves and a 300 kW battery. The project cost 5.8 million. The direct cost of electricity would likely decline from 0.41/kWh to 0.30/kWh. The direct costs don’t include administrative and distribution costs. The addition of the renewable resources and thermal electric stoves reduced total fuel consumption by more almost 80% or approximately 103,000 gallons. The reduction in cost provides an opportunity for Chefornak’s utility, the Naterkaq Light Plant, to obtain financing through grants and loans to install renewable energy and reduce overall fuel consumption to the community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Experimental Evidence on Latency in a Fleet of Controllable Water Heaters

Demand response is an important emerging part of smart grids with wide coverage in theoretical and modeling research. However, experimental evidence on the real-life behavior of controllable loads is still limited. We present observations regarding latency and communication aspects of the operation on a fleet of residential water heaters in a smart neighborhood in Atlanta, GA. Our analysis shows that latency in water heaters is not constant and does not follow a Gaussian distribution. We also find that there is a systematic relationship between latency and hour of the day. Latency was found to increase during morning and evening hours compared to the afternoon. These findings could help better plan deployment of control for demand response programs. Understanding delays associated with controlling smart devices is crucial for proper design and algorithm development for optimization, frequency of dispatch, and override detection.

communication delay↗

Battery and backup generator sizing for a resilient microgrid under stochastic extreme events

Owing to the recent power outages caused by extreme events, installing battery energy storage and backup generators is important to improve resiliency for a grid-tied microgrid. In the design stage, the event occurrence time and duration, which are highly uncertain and cannot be effectively predicted, may affect the needed battery and backup generator capacity but are usually assumed to be pre-determined in utility planning tools. This study investigates the optimal battery and backup generator sizing problem considering the stochastic event occurrence time and duration for the grid-tied microgrid under islanded operation. The reliability requirement is quantified by the mean value of the critical customer interruption time in each stochastic islanding time window (ITW), whose length is the duration and the centre is the occurrence time. The stochastic ITW constraint is then transformed to a probability-weighted expression to derive an equivalent Mixed Integer Linear Programming model. Numerical simulations on a realistic grid-tied PV-based microgrid demonstrate that the total cost is reduced by 11.5% considering the stochastic ITW, compared with the deterministic ITW under the same reliability requirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Emerging Technologies: Integrating with the Power Grid of Tomorrow

Traditional interactions between the built environment and the electric utility industry are changing rapidly. Rather than a one-way flow of electricity where utilities produce and transmit the electricity that buildings then consume, buildings are becoming efficient energy consumers that can dynamically adjust loads to ensure grid-provided energy is used effectively. Buildings are transitioning to now be at the intersection of forecasting loads and demand response, forecasting and control of output from distributed generation and renewable energy systems, and the optimal dispatch of energy storage. Because residential and commercial buildings consume 74.7% of the electricity generated in the United States, grid-integrated buildings represent an important solution to addressing challenges facing the power sector. In addition to the electric power grid, buildings will be increasingly interactive with water, transportation, and telecommunications networks, and will also more strongly affect surrounding buildings and other civic infrastructure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal A-Train Data Utilization: A Use Case of Aura OMI L2G and MERRA-2 Aerosol Products

Ozone Monitoring Instrument (OMI) aboard NASA's Aura mission measures ozone column and profile, aerosols, clouds, surface UV irradiance, and the trace gases including NO2, SO2, HCHO, BrO, and OClO using UltraViolet electromagnetic spectrum (280 - 400 nm) with a daily global coverage and a pixel spatial resolution of 13 km × 24 km at nadir, and it's been one of the key instruments to study the Earth's atmospheric composition and chemistry. The second Modern-Era Retrospective analysis for Research and Applications (MERRA-2) is NASA's atmospheric reanalysis using an upgraded version of Goddard Earth Observing System Model, version 5 (GEOS-5) data assimilation system. Compared to its predecessor MERRA, MERRA-2 is enhanced with more aspects of the Earth system among which is aerosol assimilation. When comparing between satellite pixel measurements and modeled grid data, how to properly handle counterpart pairing is critical considering their spatial and temporal variations. The comparison between satellite and model data by simply using Level 3 (L3) products may result biases due to lack of detailed temporal information. It has been preferred to inter-compare or implement satellite derived physical quantity (i.e., Level 2 (L2) Swath type) directly with/to model measurements with higher temporal and spatial resolution as possible. However, this has posed a challenge in the community to handle. Rather than directly handling the L2 or L3 data, there is a Level 2G (L2G) product conserving L2 pixel scientific data quality but in Grid type with the global coverage. In this presentation, we would like to demonstrate the optimal utilization of OMI L2G daily aerosol products by comparing with MERRA-2 hourly aerosol simulations matched well in both space and time.

MERRA-2 reanalysis↗

The Hawaii Meteorology, Energy and Transmission (MET) Toolkit

Reliable long-term resource adequacy and grid planning in Hawaii require precise, multi-decadal meteorological records. This paper introduces the Hawaii Meteorology, Energy and Transmission (MET) Toolkit, a 26-year (2000-2025) high-fidelity atmospheric dataset developed by the National Laboratory of the Rockies (NLR). We present a validation study of the underlying WRF model configurations, comparing the legacy MYNN PBL scheme against an alternative YSU formulation. Using vertical lidar profiles and surface buoy data, our analysis identified a foundational geometric distortion in the legacy NOW-23 Hawaii dataset caused by an incorrect grid projection. When evaluated on a corrected, zero-distortion grid, the YSU scheme demonstrated superior performance in bias and cRMSE compared to the legacy setup. To address these findings, the MET Toolkit has been re-produced as a unified 26-year record using the optimized YSU setup and corrected geometry. This dataset offers the Hawaii power sector a robust, validated, and homogenous reference for future grid resilience and energy integration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Influence of Computational Drop Representation in LES of a Droplet-Laden Mixing Layer

Multiphase turbulent flows are encountered in many practical applications including turbine engines or natural phenomena involving particle dispersion. Numerical computations of multiphase turbulent flows are important because they provide a cheaper alternative to performing experiments during an engine design process or because they can provide predictions of pollutant dispersion, etc. Two-phase flows contain millions and sometimes billions of particles. For flows with volumetrically dilute particle loading, the most accurate method of numerically simulating the flow is based on direct numerical simulation (DNS) of the governing equations in which all scales of the flow including the small scales that are responsible for the overwhelming amount of dissipation are resolved. DNS, however, requires high computational cost and cannot be used in engineering design applications where iterations among several design conditions are necessary. Because of high computational cost, numerical simulations of such flows cannot track all these drops. The objective of this work is to quantify the influence of the number of computational drops and grid spacing on the accuracy of predicted flow statistics, and to possibly identify the minimum number, or, if not possible, the optimal number of computational drops that provide minimal error in flow prediction. For this purpose, several Large Eddy Simulation (LES) of a mixing layer with evaporating drops have been performed by using coarse, medium, and fine grid spacings and computational drops, rather than physical drops. To define computational drops, an integer NR is introduced that represents the ratio of the number of existing physical drops to the desired number of computational drops; for example, if NR=8, this means that a computational drop represents 8 physical drops in the flow field. The desired number of computational drops is determined by the available computational resources; the larger NR is, the less computationally intensive is the simulation. A set of first order and second order flow statistics, and of drop statistics are extracted from LES predictions and are compared to results obtained by filtering a DNS database. First order statistics such as Favre averaged stream-wise velocity, Favre averaged vapor mass fraction, and the drop stream-wise velocity, are predicted accurately independent of the number of computational drops and grid spacing. Second order flow statistics depend both on the number of computational drops and on grid spacing. The scalar variance and turbulent vapor flux are predicted accurately by the fine mesh LES only when NR is less than 32, and by the coarse mesh LES reasonably accurately for all NR values. This is attributed to the fact that when the grid spacing is coarsened, the number of drops in a computational cell must not be significantly lower than that in the DNS.

Bellan, Josette↗

Chefornak Energy Configuration Options: Energy Infrastructure Optimization to Reduce Fuel Cost and Dependence in Chefornak, Alaska

The U.S. Department of Energy is funding, through the Grid Modernization Program, the Alaska Microgrid Partnership (AMP), a multi-stakeholder collaborative comprised of national labs and Alaska based partners. The over-arching goal of AMP is to reduce the use of total imported fuel into communities to secure all energy services by at least 50% in Alaska's remote microgrids without increasing system lifecycle costs, while improving overall system reliability, security, and resilience. One goal of AMP is to investigate if a combination of Energy Efficiency (EE) and high contribution (from Renewable Energy (RE)) power systems can reduce total imported energy usage by 50% while lowering Life Cycle Costs (LCC) and improving reliability and resiliency. A techno-economic analysis was conducted for the community of Chefornak to investigate system architectures that could meet the goal of reducing imported fuel consumption by 50% or more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A two-phase investment model for optimal allocation of phasor measurement units considering transmission switching

Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUs are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.

Phasor measurement unit↗

Biweekly Maps of Wind Stress for the North Pacific from the ERS-1 Scatterometer

The European Remote-sensing Satellite (ERS-1) was launched in July 1991 and contained several instruments for observing the Earth's ocean including a wind scatterometer. The scatterometer measurements were processed by the European Space Agency (ESA) and the Jet Propulsion Laboratory (JPL). JPL reprocessed (Freilich and Dunbar, 1992) the ERS-1 backscatter measurements to produced a 'value added' data set that contained the ESA wind vector as well as a set of up to four ambiguities. These ambiguities were further processed using a maximum-likelihood estimation (MLE) and a median filter to produce a 'selected vector.' This report describes a technique developed to produce time-averaged wind field estimates with their expected errors using only scatterometer wind vectors. The processing described in this report involved extracting regions of interest from the data tapes, checking the quality and creating the wind field estimate. This analysis also includes the derivation of biweekly average wind vectors over the North Pacific Ocean at a resolution of 0.50 x 0.50. This was done with an optimal average algorithm temporally and an over-determined biharmonic spline spatially. There have been other attempts at creating gridded wind files from ERS-1 winds, e.g., kriging techniques (Bentamy et al., 1996) and successive corrections schemes (Tang and Liu, 1996). There are several inherent problems with the ERS-1 scatterometer. Since this is a multidisciplinary mission, the satellite is flown in different orbits optimized for each phase of the mission. The scatterometer also shares several sub-systems with the Synthetic Aperture Radar (SAR) and cannot be operated while the SAR is in operation. The scatterometer is also a single-sided instrument and only measures backscatter along the right side of the satellite. The processing described here generates biweekly wind maps during the wktwo years analysis period regardless of the satellite orbit or missing data.

SYNTHETIC APERTURE RADAR↗

Enabling Resiliency Operations across Multiple Microgrids with Grid Friendly Appliance Controllers

Changes in economic, technological, and environmental policies are resulting in a re-evaluation of the dependence on large central generation facilities and their associated transmission networks. Emerging concepts of smart communities/cities are examining the potential to leverage cleaner sources of generation, as well as integrating electricity generation with other municipal functions. When grid connected, these generation assets can supplement the existing interconnections with the bulk transmission system, and in the event of an extreme event, they can provide power via a collection of microgrids. To achieve the highest level of resiliency, it may be necessary to conduct switching operations to interconnect individual microgrids. While the interconnection of multiple microgrids can increase the resiliency of the system, the associated switching operations can cause large transients in low inertia microgrids. The combination of low system inertia and IEEE 1547 and 1547a-compliant inverters can prevent multiple microgrids from being interconnected during extreme weather events. This study will present a method of using end-use loads equipped with Grid Friendly™ Appliance controllers to facilitate the switching operations between multiple microgrids; operations that are necessary for optimal operations when islanded for resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗