Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GAIN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Tree Growth Enhancement Drives a Persistent Biomass Gain in Unmanaged Temperate Forests

While enhanced tree growth over the last decades has been reported in forests across the globe, it remains unclear whether it drives persistent biomass increases of forest stands, particularly in mature forests. Enhanced tree growth and stand-level biomass are often linked with a simultaneous increase in density-driven mortality and a reduction in tree longevity. Identifying empirical evidence regarding the balance between these processes is challenging due to the confounding effects of stand history, management, and environmental changes. Here, we investigate the link between growth and biomass via the negative relationship between average tree size and stand density (tree number per area). We find increasing stand density for a given mean tree size in unmanaged closed-canopy forests in Switzerland over the past six decades and a positive relationship between tree growth and stand density across forest plots—qualitatively consistent with our simulations using a mechanistic, cohort-resolving ecosystem model (BiomeE). Model simulations show that, in the absence of other disturbances, enhanced tree growth persistently increases biomass stocks despite simultaneous decreases in carbon residence time and tree longevity. However, the magnitude of simulated biomass changes for a given growth enhancement critically depends on the shape of the mortality functions. Our analyses reconcile reports of growth-induced reductions of tree longevity with model predictions of persistent biomass increases, and with our finding of trends toward denser forests in response to growth—also in mature stands.

biomass stocks↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez↗

Insights Gained from Ultrasonic Testing of Piping Welds Subjected to the Mechanical Stress Improvement Process

Pacific Northwest National Laboratory (PNNL) is assisting the United States Nuclear Regulatory Commission (NRC) in developing a position on the management of primary water stress corrosion cracking (PWSCC) in leak-before-break piping systems. Part of this involves determining whether inspections alone, or inspections plus mitigation, are needed. This work addresses the reliability of ultrasonic testing (UT) of cracks that have been mitigated by the mechanical stress improvement process (MSIP). The MSIP has been approved by the NRC (NUREG-0313) since 1986 and modifies residual stresses remaining after welding with compressive, or neutral, stresses near the inner diameter surface of the pipe. This compressive stress is thought to arrest existing cracks and inhibit new crack formation. To evaluate the effectiveness of the MSIP and the reliability of ultrasonic inspections, flaws were evaluated both before and after MSIP application. An initial investigation was based on data acquired from cracked areas in 325-mm-diameter piping at the Ignalina Nuclear Power Plant (INPP) in Lithuania. In a follow-on exercise, PNNL acquired and evaluated similar UT data from a dissimilar metal weld (DMW) specimen containing implanted thermal fatigue cracks. The DMW specimen is a carbon steel nozzle-to-safe end-to-stainless steel pipe section that simulates a pressurizer surge nozzle. The flaws were implanted in the nozzle-to-safe end Alloy 82/182 butter region. Results are presented on the effects of MSIP on specimen surfaces, and on UT flaw responses.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Insights Gained for Updating an Analog I&C System to a Digital System

Licensees at both Nuclear Power Plants (NPPs) and Non-Power Reactors (NPRs) are increasing their use of state-of-the-art digital technology in instrumentation and control (I&C) systems because digital systems offer improved reactor control, information processing, and information storage over analog. Digital I&C systems can range from experimental systems for reactor control research (at NPRs), to measurement and display systems, to complete reactor console replacements. Because of the increasing difficulty in finding spare parts for their original analog I&C systems, many licensees have begun or have plans to upgrade, refurbish, or replace their old analog I&C systems with digital systems. The perception is that upgrading to a digital I&C system will solve all of a facility s obsolescence problems. However, licensees need to be aware of several issues associated with upgrading to a digital system including obsolescence of the digital system (hardware and software) because of the short product life cycle and the associated cost to acquire, store, and maintain a long-term supply of spare parts. Configuration management and cyber security are also vitally important for any upgrade. Further, it must be recognized that the introduction of software and microprocessors could create new failure mechanisms, such as software errors and increased susceptibility to electromagnetic interference. In fact, experience has shown that these failure mechanisms may cause the reactor to malfunction in a way not previously considered. Thus, a conversion from analog to digital I&C systems solves some problems while potentially introducing others. Recognition of the additional risks coupled with good design, engineering, review, and testing can identify and minimize these risks.

Adams, A.↗