Conductive EMI - Responsibility and control.
Electromagnetic interference /EMI/ created by noise coupling through conductive paths, discussing responsibility for control within systems management
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Electromagnetic interference /EMI/ created by noise coupling through conductive paths, discussing responsibility for control within systems management
Technical summaries of objectives and plans of NASA research and technology programs used for management review and control
The NASA Research and Technology program for FY 1972 is presented. It is a compilation of the summary portions of each of the RTOPs (Research and Technology Operating Plan) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities.
Numerous candidate APU concepts are considered, each meeting the space shuttle APU problem statement. Evaluation of these concepts indicates that the optimum concept is a hydrogen-oxygen APU incorporating a recuperator to utilize the exhaust energy and using the cycle hydrogen flow as a means of cooling the component heat loads. A preliminary design of the selected APU concept is presented, placing primary emphasis on the cycle thermal management and the controls. Results for both steady state and transient APU performance are also included, based on digital computer programs developed during the study. The selected APU provides up to 400 hp out of the gearbox, has a fixed weight of about 277 lb, and requires about 2 lb/shp-hr of propellants.
The Seventh Annual NASA/AF/University Conference on Manual Control was held at the University of Southern California from June 2-4, 1971. Some eighty specialists, including colleagues from Canada, Netherlands and West Germany, attended the Conference, which was organized by the authors of this Summary. Generally at this conference there was less emphasis on theory and more on applications than at some previous meetings. In addition to the well-established areas of human operator modeling and display systems, this conference devoted considerable time to the extensions of manual control theory to such diverse areas as automobile driving, air traffic control and industrial management. This interest in meaningful applications of the existing theoretical knowledge in man-machine systems is encouraging and timely.
Abstracts are presented of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA. This RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The summary is arranged in five sections consisting of citations and abstracts of the RTOPs and subject, technical monitor, responsible NASA organization, and RTOP number indexes.
This paper describes how the design of the Unified S-band Ground System evolved from the technology available in the NASA's Deep Space Network and Scientific Satellite Network as well as the Manned Space Flight Network to fulfill the requirements of the Apollo program. The project organization established for this program proved to be an effective management technique for controlling the widely dispersed activities and maintaining the necessary liaison with other organizations involved in the overall program. The Manned Space Flight Network includes systems at three locations employing 26 meter antennas to support the lunar phases of the mission and a number of systems at other locations employing 9 meter antennas for support of the near earth phases of the mission. The tradeoffs of mission requirements and technical capability established the equipment parameters and the network configuration. An extensive checkout program which included the use of aircraft and spacecraft provided a thorough evaluation of the system prior to its commitment to operational support of the missions.
The purpose of the shuttle system is to permit us to do more useful and necessary things in space at minimum cost. The flight operation subsystem must be consistent with these goals. This review of the predicted payload and mission types reveals a ground facility functionally similar to the Skylab Control Center is needed to provide trajectory control and system management services for the spacecraft and payloads and to provide rapid, effective payload data acquisition and distribution to the user. An automated mission management system must be added to translate user requirements into specific missions, directives, schedules, and plans.
A compilation is presented of the summary portions of RTOPs used for management review and control of research. Citations and abstracts of RTOPs are included. A list is presented of RTOPs which have been changed, completed, or terminated since the last summary. Indexes presented include: subject, technical monitor, responsible NASA organization, and RTOP number.
This report presents a summarization and categorization of the pertinent literature associated with low-g fluid behavior technology. Initially a literature search was conducted to obtain pertinent documents for review. Reports determined to be of primary significance are summarized in detail. Each summary, where applicable, consists of; (1) report identification, (2) objective(s) of the work, (3) description of pertinent work performed, (4) major results, and (5) comments of the reviewer (GD/C). Pertinent figures are presented on a single facing page separate from the text. Specific areas covered are; interface configuration, interface stability, natural frequency and damping, liquid reorientation, bubbles and droplets, fluid inflow, fluid outflow, convection, boiling and condensation heat transfer, venting effects, and fluid properties. Reports which were reviewed and not summarized, along with reasons for not summarizing, are also listed. Cryogenic thermal control and fluid management systems technology are presented.
The Centaur propellant management and thermal control techniques required for zero gravity coasting were successfully demonstrated during an extended mission following spacecraft separation on the TC-2 flight. As part of the demonstration, two successful engine starts were accomplished. The first engine start followed a one-hour zero gravity coast, and the second engine start followed a three-hour zero gravity coast. All of the Centaur systems performed satisfactorily, the design parameters for zero gravity coasting were verified, and no significant problems were encountered. The flight results showed that the propellant location and behavior, propellant heating, and tank pressure rise rates observed during the zero-gravity coasts were less severe than expected. Consequently, the majority of the propellants remained at the tank bottom, the propellant collection times were very short, and more than 7 hours of coast could have been achieved before a tank venting was required. The tank pressurization prior to the engine starts provided boost pump Net Positive Suction Head values well in excess of the values required. The LO2 tank pressurization was accomplished by a new bubbler method that greatly reduced the helium usage.
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA was presented. The document is arranged in five sections. The first one contains citations and abstracts of the RTOP. This is followed by four indexes: subject, technical monitor, responsible NASA organization, and RTOP number.
Papers concerning the development of the Space Telescope which were presented at the Twenty-first Annual Meeting of the American Astronautical Society in August, 1975 are included. Mission planning, telescope performance, optical detectors, mirror construction, pointing and control systems, data management, and maintenance of the telescope are discussed.
Higher order software (HOS) is concerned only with computable functions and relationships. The HOS methodology can be used for the definition of software for multiprogrammed, multiprocessor, or multicomputer systems. A description of HOS methodology is presented, giving attention to questions of formulation, interface correctness, specification language principles, and HOS analyzers. Aspects of system design are considered, and details of software management are discussed. Attention is given to modularity as defined by HOS, frozen module management, the assembly control supervisor, and aspects of reliability and efficiency.
The present status of NASA's remote sensing program and its future plans are reviewed, and some investigations into the possible uses of remotely sensed data are briefly summarized. Landsat-1 photographs are presented to demonstrate how such data can be employed for monitoring and forecasting of agricultural production, for watershed management and flood control, and for mineral exploration. The performance of Landsat-2 and expectations for Landsat-C are evaluated. High-priority problems which should be the driving forces for designing space observation systems for the 1980's are outlined, including the problem of world food supply and the relationship between land use and climatic changes. The design of the modular Landsat-D spacecraft, which will fly a thematic mapper for agricultural observations, is described.
A compilation of the summary portion of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented along with citations and abstracts of the RTOPs. Four indexes are included: (1) subject; (2) technical monitor; (3) responsible NASA organization; and (4) RTOP number.
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented along with citations and abstracts of the RTOPs. Indexes include: subject; technical monitor; responsible NASA organization; and RTOP number.
The development and future requirements of life support systems are considered, and the choice of equipment for long-duration missions is examined. The need for programmatic flexibility, capability growth, and integration of life support systems is discussed. Water supply, CO2 control, oxygen supply, trace contaminant control, and waste management are surveyed, and evolution forecast is presented.