Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Capacity Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Sustainable Hydropower in Lower Mekong Countries: Technical Assessment and Training Travel Report Thailand

The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supporting sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The mission of the ORNL Water Power Program is to develop technologies, decision-support tools, and methods of analysis that enable holistic management of water-dependent energy infrastructure and natural resources in support of the DOE Energy Efficiency and Renewable Energy Office (DOE-EERE), Federal hydropower agencies, Federal Energy Regulatory Commission (FERC), Nuclear Regulatory Commission (NRC), energy producers, and other entities. In support of SIM, ORNL completed technical assessments of two hydropower plants owned and operated by the Electricity Generating Authority of Thailand (EGAT): Vajiralongkorn (VRK), with an installed capacity of 300 MW, and Rajjaprabha (RPB), with an installed capacity of 240MW. Technical assessment is defined as the assessment of hydropower operation and performance, and the identification of potential opportunities for performance improvement through plant optimization. At each plant, the assessment included an initial analysis of hydropower operating and performance metrics, provided by dam owners. After this analysis, ORNL engaged with the plant management team in a skills exchange, where best practices, operational methods, and technical challenges were discussed. The technical assessment process was outlined to plant management followed by a presentation of preliminary results and analysis based on 50 days of operational data. EGAT has agreed to provide a full year of operational data so a complete and detailed assessment that captures seasonal variability can be completed. The results of these assessments and discussions will be used to develop a set of best practices, training, and procedure recommendations to improve the efficiency of the two assessed plants.

13 HYDRO ENERGY↗

Simple Retrofit High-Efficiency Natural Gas Water Heater Field Test

High-performance water heaters are typically more time consuming and costly to install in retrofit applications, making high performance water heaters difficult to justify economically. However, recent advancements in high performance water heaters have targeted the retrofit market, simplifying installations and reducing costs. Four high efficiency natural gas water heaters designed specifically for retrofit applications were installed in single-family homes along with detailed monitoring systems to characterize their savings potential, their installed efficiencies, and their ability to meet household demands. The water heaters tested for this project were designed to improve the cost-effectiveness and increase market penetration of high efficiency water heaters in the residential retrofit market. The retrofit high efficiency water heaters achieved their goal of reducing costs, maintaining savings potential and installed efficiency of other high efficiency water heaters, and meeting the necessary capacity in order to improve cost-effectiveness. However, the improvements were not sufficient to achieve simple paybacks of less than ten years for the incremental cost compared to a minimum efficiency heater. Significant changes would be necessary to reduce the simple payback to six years or less. Annual energy savings in the range of $200 would also reduce paybacks to less than six years. These energy savings would require either significantly higher fuel costs (greater than $1.50 per therm) or very high usage (around 120 gallons per day). For current incremental costs, the water heater efficiency would need to be similar to that of a heat pump water heater to deliver a six year payback.

03 NATURAL GAS↗

Contrasting advantages of learning with random weights and backpropagation in non-volatile memory neural networks

Recently, a Cambrian explosion of novel, non-volatile memory (NVM) devices known as memristive devices have inspired effort in building hardware neural networks that learn like the brain. Early experimental prototypes built simple perceptrons from nanosynapses, and recently, fully-connected multi-layer perceptron (MLP) learning systems have been realized. However, while backpropagating learning systems pair well with high-precision computer memories and achieve state-of-the-art performances, this typically comes with a massive energy budget. For future Internet of Things/peripheral use cases, system energy footprint will be a major constraint, and emerging NVM devices may fill the gap by sacrificing high bit precision for lower energy. In this work, we contrast the well known MLP approach with the Extreme Learning Machine (ELM) or NoProp approach, which uses a large layer of random weights to improve the separability of high-dimensional tasks, and is usually considered inferior in a software context. However, we find that when taking device non-linearity into account, NoProp manages to equal hardware MLP system in terms of accuracy. While also using a sign-based adaptation of the delta rule for energy-savings, we find that NoProp can learn effectively with four to six ’bits’ of device analog capacity, while MLP requires eight bit capacity with the same rule. This may allow the requirements for memristive devices to be relaxed in the context of online learning. By comparing the energy footprint of these systems for several candidate nanosynapses, as well as realistic peripherals, we confirm that memristive NoProp systems save energy compared to MLP systems. Lastly, we show that ELM/NoProp systems can achieve better generalization abilities than nanosynaptic MLP systems when paired with pre-processing layers (which do not require backpropagated error). Collectively, these advantages make such systems worthy of consideration in future accelerators or embedded hardware.

97 MATHEMATICS AND COMPUTING↗

Development of the Mathematics of Learning Curve Models for Evaluating Small Modular Reactor Economics

The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well known based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs.

small modular reactors (SMRs)↗

Development of the Mathematics of Learning Curve Models for Evaluating Small Modular Reactor Economics

The cost of nuclear power is a straightforward yet complicated topic. It is straightforward in that the cost of nuclear power is a function of the cost to build the nuclear power plant, the cost to operate and maintain it, and the cost to provide fuel for it. It is complicated in that some of those costs are not necessarily known, introducing uncertainty into the analysis. For large light water reactor (LWR)-based nuclear power plants, the uncertainty is mainly contained within the cost of construction. The typical costs of operations and maintenance (O&M), as well as fuel, are well known based on the current fleet of LWRs. However, the last currently operating reactor to come online was Watts Bar 1 in May 1996; thus, the expected construction costs for gigawatt (GW)-class reactors in the United States are based on information nearly two decades old. Extrapolating construction, O&M, and fuel costs from GW-class LWRs to LWR-based small modular reactors (SMRs) introduces even more complication. The per-installed-kilowatt construction costs for SMRs are likely to be higher than those for the GW-class reactors based on the property of the economy of scale. Generally speaking, the economy of scale is the tendency for overall costs to increase slower than the overall production capacity. For power plants, this means that doubling the power production capacity would be expected to cost less than twice as much. Applying this property in the opposite direction, halving the power production capacity would be expected to cost more than half as much. This can potentially make the SMRs less competitive in the electricity market against the GW-class reactors, as well as against other power sources such as natural gas and subsidized renewables. One factor that can potentially aid the SMRs in achieving economic competitiveness is an economy of numbers, as opposed to the economy of scale, associated with learning curves. The basic concept of the learning curve is that the more a new process is repeated, the more efficient the process can be made. Assuming that efficiency directly relates to cost means that the more a new process is repeated successfully and efficiently, the less costly the process can be made. This factor ties directly into the factory fabrication and modularization aspect of the SMR paradigm—manufacturing serial, standardized, identical components for use in nuclear power plants can allow the SMR industry to use the learning curves to predict and optimize deployment costs. Thus, SMR deployment cost estimates can be modeled using learning curve theory to provide some insight into how and when SMRs would be competitive with both the GW-class reactors and other mutual competitors. However, assuming static learning curve behavior for all aspects of SMR construction is likely an invalid approach—not all components and systems in SMRs will be subject to learning, and those that are subject to learning may not learn at the same rate. A learning curvebased model must be capable of tracking these unique behaviors. At the same time, the behavior of the aggregated and integrated SMR deployment is a more useful metric for discussion and comparison—ultimately, the most useful learning curve information is that which describes power plant deployment as a whole. Therefore, the goal of SMR component and systems learning modeling includes a method to produce an overall power plant learning model. This report describes the mathematics of learning curves that can be used for estimating unit cost in future production for individual components and aggregated systems. All necessary assumptions are provided to support the derivations presented. Future work will demonstrate the implementation of this methodology and provide example calculations of SMR cost

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling Principles for Dual Participation by Energy Storage as a Transmission and Market Asset

Because the electric transmission system is sized to meet the highest levels of customer demand, much of its designed capacity goes unused during average operating conditions. As a uniquely flexible and scalable asset capable of providing multiple grid services, energy storage can be deployed to support the transmission system and then also provide services to energy markets when not needed for transmission. This paper reviews the technical barriers in transmission planning practices and energy market design that prevent the realization of dual-use energy storage projects that provide both regulated transmission and competitive market services. Current practices create barriers against the identification of energy storage in the transmission planning process and against the participation of a regulated transmission asset in competitive energy markets. A review of regional transmission plans identifies best practices for including energy storage in the planning process by directing planners to proactively identify such projects or by providing clear mechanisms for stakeholders to propose them. Creating a market participation model for dual-use energy storage assets requires establishing when an asset will be allowed to participate in the market, how it will participate in the market, and where it will recover its costs. In answering these questions, key principles must be satisfied, such as prioritizing reliability, incrementally building on existing market design, and balancing competing objectives. Several policy options exist for satisfying those principles, giving grid operators and stakeholders significant flexibility in developing a dual-use participation model in accordance with regional policies and conditions. By objectively framing the issue and identifying policy options, this paper may inform subsequent proceedings on dual-use energy storage and be a resource to regional market operators, utilities, developers, regulators, policymakers, and other stakeholders as they collectively work on this complex issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pathways for practical high-energy long-cycling lithium metal batteries

Lithium (Li)-ion batteries play a critical role in modern day technologies, but their specific energy (Wh kg-1) and energy density (Wh L-1) are approaching the maximum practically achievable values based on existing manufacturing processes with the conventional cathode and anode materials. Developing the next generation rechargeable batteries with a specific energy higher than 300 Wh kg-1, up to 500 Wh kg-1, is a significant challenge. This paper discusses the pathways to build the next generation 500 Wh kg-1 rechargeable Li battery based on Li metal anode and a high nickel-content lithium nickel-manganese-cobalt oxide (high-Ni NMC) cathode. The fundamental requirements and practical technical approaches will be explored to hopefully address this grand challenge. In particular, we discuss the detailed cell level requirements and parameters to achieve high energy density, as well as the significant scientific challenges and potential solutions, including but not limited to enable the direct utilization of Li metal anode with high efficiency and long-term cycling stability, dendrite-free Li metal deposition, high utilization of the cathode materials with high mass loading and reasonable electrode thickness along with minimum parasitic weight in the cathode side. The cell level understanding and validation of the materials properties for high performance and control of interfacial reactions across the whole cell will be explored. New concepts in emerging multifunctional materials and electrolytes/additives and their implications will also be discussed.

lithium metal anode, lithium nickel manganese coba↗

Rate capability and Ragone plots for phase change thermal energy storage

Phase change materials can improve the efficiency of energy systems by time shifting or reducing peak thermal loads. The value of a phase change material is defined by its energy and power density—the total available storage capacity and the speed at which it can be accessed. These are influenced by material properties but cannot be defined with these properties alone. In this work, we show the close link between energy and power density by developing thermal rate capability and Ragone plots, a framework widely used to describe the trade-off between energy and power in electrochemical storage systems (that is, batteries). Our results elucidate how material properties, geometry and operating conditions influence the performance of phase change thermal storage. This research sets a clear framework for comparing thermal storage materials and devices and can be used by researchers and designers to increase clean energy use with storage.

25 ENERGY STORAGE↗

Safety envelope for load tolerance of structural element design based on multi-stage testing

Structural elements, such as stiffened panels and lap joints, are basic components of aircraft structures. For aircraft structural design, designers select predesigned elements satisfying the design load requirement based on their load-carrying capabilities. Therefore, estimation of safety envelope of structural elements for load tolerances would be a good investment for design purpose. In this article, a method of estimating safety envelope is presented using probabilistic classification, which can estimate a specific level of failure probability under both aleatory and epistemic uncertainties. An important contribution of this article is that the calculation uncertainty is reflected in building a safety envelope using Gaussian process, and the effect of element test data on reducing the calculation uncertainty is incorporated by updating the Gaussian process model with the element test data. It is shown that even one element test can significantly reduce the calculation uncertainty due to lacking knowledge of actual physics, so that conservativeness in a safety envelope is significantly reduced. The proposed approach was demonstrated with a cantilever beam example, which represents a structural element. The example shows that calculation uncertainty provides about 93% conservativeness against the uncertainty due to a few element tests. As a result, it is shown that even a single element test can increase the load tolerance modeled with the safety envelope by 20%.

42 ENGINEERING↗

Design of a Commercial Scale Accelerator Driven Subcritical Aqueous Assembly

SHINE Medical Technologies is working towards producing a reliable, domestic supply of medical isotopes, including molybdenum-99 (Mo-99), xenon-133, and iodine 131, without using highly enriched uranium. Approximately 88% of Mo-99 decays to technetium-99m, which is the most widely used medical isotope in the world, accounting for approximately 80% of all nuclear medicine procedures. A novel aqueous, subcritical nuclear assembly has been designed by SHINE Medical Technologies. The assembly can produce medical radioisotopes in significant quantities for U.S. and foreign needs. The assembly produces isotopes without using a reactor, instead using a fusion-based neutron source coupled to a fission-based aqueous assembly. The subcritical nature of the aqueous assembly has safety and licensing benefits, including the elimination of the reactor control system and elimination of high level waste. SHINE plans to construct eight subcritical assemblies with a plant capacity of greater than 3000 6-day Curies, which is more than one-quarter of the world's Mo-99 requirements. From a nuclear design standpoint, the aqueous subcritical assembly needs to be able to generate sufficient fission power to meet the production capacity requirements while remaining subcritical at all times with an acceptable margin. To address these conflicting design goals, a simple nuclear design and reactivity control philosophy has been developed that allows for high power operation with a high degree of safety. A fusion-driven subcritical fission assembly has been designed by SHINE Medical Technologies to provide a reliable, domestic supply of medical isotopes. Nuclear models have been created and show that the assembly can be started up, operated, and shutdown in a safe manner without active reactivity control systems. A unique reactivity control strategy allows SHINE to operate the aqueous subcritical assembly at much higher power levels than would otherwise be practical, while still retaining the benefits of subcritical operation and avoiding the need for complex subcritical measurement techniques. Based on the current design, the subcritical target is capable of generating significant fission power (on the order of 100 kW) when being driven by a simple, low-cost deuterium-tritium accelerator, enabling the SHINE facility to supply over one-fourth of the worldwide demand of Mo- 99. SHINE has recently been issued a construction permit by the U.S. Nuclear Regulatory Commission to build the commercial facility in Janesville, WI, with eight subcritical assemblies and the associated production equipment. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of combined hydrogen, heat, and power as a bridge to a hydrogen transition.

Combined hydrogen, heat, and power (CHHP) technology is envisioned as a means to providing heat and electricity, generated on-site, to large end users, such as hospitals, hotels, and distribution centers, while simultaneously producing hydrogen as a by-product. The hydrogen can be stored for later conversion to electricity, used on-site (e.g., in forklifts), or dispensed to hydrogen-powered vehicles. Argonne has developed a complex-adaptive-system model, H2CAS, to simulate how vehicles and infrastructure can evolve in a transition to hydrogen. This study applies the H2CAS model to examine how CHHP technology can be used to aid the transition to hydrogen. It does not attempt to predict the future or provide one forecast of system development. Rather, the purpose of the model is to understand how the system works. The model uses a 50- by 100-mile rectangular grid of 1-square-mile cells centered on the Los Angeles metropolitan area. The major expressways are incorporated into the model, and local streets are considered to be ubiquitous, except where there are natural barriers. The model has two types of agents. Driver agents are characterized by a number of parameters: home and job locations, income, various types of 'personalities' reflective of marketing distinctions (e.g., innovators, early adopters), willingness to spend extra money on 'green' vehicles, etc. At the beginning of the simulations, almost all driver agents own conventional vehicles. They drive around the metropolitan area, commuting to and from work and traveling to various other destinations. As they do so, they observe the presence or absence of facilities selling hydrogen. If they find such facilities conveniently located along their routes, they are motivated to purchase a hydrogen-powered vehicle when it becomes time to replace their present vehicle. Conversely, if they find that they would be inconvenienced by having to purchase hydrogen earlier than necessary or if they become worried that they would run out of fuel before encountering a facility, their motivation to purchase a hydrogen-powered vehicle decreases. At vehicle purchase time, they weigh this experience, as well as other factors such as social influence by their peers, fuel cost, and capital cost of a hydrogen vehicle. Investor agents build full-service hydrogen fueling stations (HFSs) at different locations along the highway network. They base their decision to build or not build a station on their (imperfect) estimates of the sales the station would immediately generate (based on hydrogen-powered vehicle traffic past the location and other factors), as well as the growth in hydrogen sales they could expect throughout their investment horizon. The interaction between driver and investor agents provides the basis for growth in both the number of hydrogen vehicles and number of hydrogen stations. For the present report, we have added to this mix smaller, 'bare-bones' hydrogen dispensing facilities (HDFs) of the type that owners of CHHP facilities could provide to the public. The locations of these stations were chosen to match existing facilities that might reasonably incorporate CHHP plants in the future. Unlike the larger commercial stations, these facilities are built according to exogenously supplied timetables, and no attempt has been made to model the financial basis for the facilities. Rather, our objective is to understand how the presence of these additional stations might facilitate the petroleum-to-hydrogen transition. We discuss a base case in which the HDFs are not present, and then investigate the effects of introducing HDFs in various numbers; according to different timetables; with various production capacities; and with hydrogen selling at prices above, equal to, and below the commercial stations selling price. We conclude that HDFs can indeed be helpful in accelerating a petroleum-to-hydrogen transition. Placed in areas where investors might not be willing to install large for-profit HFSs, HDFs can serve as a bridge until demand for hydrogen increases to the point where larger stations are viable. For drivers to use them, however, HDFs must sell hydrogen at a price competitive with that of the larger HFSs. Because the marginal cost of producing hydrogen is expected to be higher for small capacities, HDFs may be uncompetitive without (possibly substantial) subsidies or other means to allow them to sell hydrogen at a price below the actual cost to produce and distribute it. Fortunately, HDFs do not need to be subsidized for very long. In our model, installing HDFs only as the demand for hydrogen increased was effective; then closing down all HDFs after five years into the transition made virtually no difference to the resultant accelerated outcome. Even installing much smaller numbers of HDFs only in the second and third years of the simulation and then closing them at the end of the fifth year was helpful.

08 HYDROGEN↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

Developing a roadmap for carbon capture, and storage in Oklahoma by assessing the viability of stacked storage

Abstract The Intergovernmental Panel on Climate Change concludes that CO 2 capture and storage (CCS) is critical for climate‐stabilizing energy transitions. In CCS, captured CO 2 is sequestered in saline aquifers within sedimentary basins. The CO 2 storage capacity and the rate of injection are functions of the geology of the saline aquifer, which is uncertain. To minimize impacts of this uncertainty, CCS projects could include backup plans, such as co‐locating geologic CO 2 storage (GCS) sites with or near existing CO 2 ‐enhanced oil recovery (CO 2 ‐EOR) operations. These “stacked storage” projects could hedge against uncertainty in the saline formation performance because captured CO 2 could be injected into either location in the event of unexpected events (e.g., the injectivity decreases). Here, we investigate the possibility and ramifications of developing CCS networks in Oklahoma that are amendable to stacked storage. We find that stacked storage is possible in Oklahoma but the counties with the lowest‐cost saline storage resources do not have existing CO 2 ‐EOR operations. At the systems level, we find it is slightly more expensive (e.g., $1/tCO 2 to $5/tCO 2 ) to site GCS in counties with CO 2 ‐EOR projects. This increased expense is largely due to increased CO 2 transportation costs because hundreds of km of additional pipeline is required to capture CO 2 from the lowest‐cost sources. Overall, our results suggest that it is optimal to build more pipelines and avoid injecting CO 2 in some of the lowest‐cost saline storage resources, to enable capturing CO 2 from the least‐cost sources. © 2023 Society of Chemical Industry and John Wiley & Sons, Ltd.

42 ENGINEERING↗

High-Burnup BWR LOCA Burst Analysis Using High-Fidelity Multiphysics Simulations

The US nuclear industry is looking to improve on the operating economics of the current fleet of light-water reactors (LWRs). One way of achieving this is by operating fuel to higher burnup. In pressurized water reactors (PWRs), relaxing the current burnup limit will allow for cycle length extensions and power uprates; in boiling water reactors (BWRs) it may allow for improved fuel utilization and reduced feed assemblies, as well as more efficient power uprates and increased capacity factors that will support the Administration’s Executive Order to facilitate 5 GW of power uprates at existing nuclear facilities. However, one of the key limitations to operating fuel to higher burnup is the risk of fuel fragmentation, relocation, and dispersal (FFRD). Recognizing the high interest in extending burnup limits, the US Nuclear Regulatory Commission (NRC) has issued Draft Regulatory Guide DG-1434, which defines an approach that would be acceptable to the NRC for addressing FFRD risk. The approach defined will require better understanding of the phenomena leading to FFRD as well as best-estimate simulation methods to understand FFRD risk in high-burnup cores. The Nuclear Energy Advanced Modeling and Simulation program is supporting the FFRD industry challenge problem through development of state-of-the-art, high-fidelity modeling and simulation LWR analysis capabilities; namely, the BISON fuel performance code and the VERA core simulator software. These tools, along with the US NRC TRACE system analysis code, have been utilized for analysis of FFRD risk in both PWR and BWR cores in recent years. The work documented in this report addresses the lack of high-fidelity research for BWRs and builds on a previous activity where the framework has been applied to Cycles 16 through 18 of Limerick Unit 1, a BWR/4, with introduction of 8 high-burnup lead use assemblies (HBLUAs) that were representative of the 8 HBLUAs loaded into Limerick Unit 2 in 2021. VERA was used in this previous activity to model rod-by-rod depletion in these cycles, and its solution was used to initialize a TRACE simulation of a large-break loss-of-coolant accident (LBLOCA) at the end of Cycle 18. In the work documented in this report, the TRACE model was improved by refining the core mesh and utilizing a new feature that allows for capturing the full 3D VERA power distribution in the model. This allows for a more detailed solution for setting BISON boundary conditions. Furthermore, the solutions from VERA and TRACE were used to set up and perform BISON simulations of about 1,000 rods sampled from the core, including all burnup levels. Utilizing two cladding burst models, it was shown that no fuel rods were predicted to burst during the postulated LBLOCA transient. Additionally, a sensitivity study was performed by artificially increasing linear heat rate during the postulated LBLOCA to identify parameters that correlate with rod burst susceptibility. Burnup, fission gas release, and hoop strain were all found to be positively correlated with rod burst susceptibility. Small-break loss-of-coolant accident (SBLOCA) analyses were also performed; these analyses predicted cladding temperature increases that were bounded by the LBLOCA cladding temperatures for all small break sizes studied for this plant. However, future refinements to the plant response assumptions during the SBLOCA could impact the predicted cladding response. Finally, a benchmark study was performed between CTF and TRACE for LOCA conditions to better qualify CTF for BWR LOCA modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling CCS via Low-temperature Geothermal Energy Integration for Fossil-fired Power Generation

Here, among the key barriers to commercial scale deployment is the cost associated with CO 2 capture. This is particularly true for existing large, fossil-fired assets that account for a large fraction of the electricity generation fleet in developed nations, including the U.S. Fitting conventional combustion technologies with CO 2 capture systems can carry an energy penalty of thirty percent or more, resulting in an increased price of power to the grid, as well as an overall decrease in net plant output. Taken together with the positive growth in demand for electricity, this implies a need for accelerated capital build-out in the power generation markets to accommodate both demand growth and decreased output at retrofitted plants. In this paper, the authors present the results of a study to assess the potential to use geothermal energy to provide boiler feedwater preheating, capturing efficiency improvements designed to offset the losses associated with CO 2 capture. Based on NETL benchmark cases and subsequent analysis of the application using site-specific data from the North Valmy power plant, several cases for CO 2 capture were evaluated. These included geothermally assisted MEA capture, CO2BOLs capture, and stand-alone hybrid power generation, compared with a baseline, no-geothermal case. Based on Case 10, and assuming 2.7 MMlb/h of geothermally sourced 150 ºC water, the parasitic power load associated with MEA capture could be offset by roughly seven percent, resulting in a small (~1 percent) overall loss to net power generation, but at levelized costs of electricity similar to the no-geothermal CCS case. For the CO 2 BOLs case, the availability of 150°C geothermal fluid could allow the facility to not only offset the net power decrease associated with CO 2 BOLs capture alone, but could increase nameplate capacity by two percent. The geothermally coupled CO 2 BOLs case also decreases LCOE by 0.75 ¢/kWh relative to the non-hybrid CO 2 BOLs case, with the improved performance over the MEA case driven by the lower regeneration temperature and associated duty for CO 2 BOLs relative to MEA.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MCM-41 support for ultrasmall γ-Fe 2 O 3 nanoparticles for H 2 S removal

In this paper, MCM-41 is proposed to build mesostructured Fe 2 O 3 -based sorbents as an alternative to other silica or alumina supports for mid-temperature H 2 S removal. MCM-41 was synthesized as micrometric (MCM41_M) and nanometric (MCM41_N) particles and impregnated through an efficient two-solvent (hexane–water) procedure to obtain the corresponding γ-Fe 2 O 3 @MCM-41 composites. The active phase is homogeneously dispersed within the 2 nm channels in the form of ultrasmall maghemite nanoparticles assuring a high active phase reactivity. The final micrometric (Fe_MCM41_M) and nanometric (Fe_MCM41_N) composites were tested as sorbents for hydrogen sulphide removal at 300 °C and the results were compared with a reference sorbent (commercial unsupported ZnO) and an analogous silica-based sorbent (Fe_SBA15). MCM-41 based sorbents, having the highest surface areas, showed superior performances that were retained after the first sulphidation cycle. Specifically, the micrometric sorbent (Fe_MCM41_M) showed a higher SRC value than the nanometric one (Fe_MCM41_N), due to the low stability of the nanosized particles over time caused by their high reactivity. Finally and furthermore, the low regeneration temperature (300–350 °C), besides the high removal capacity, renders MCM41-based systems an alternative class of regenerable sorbents for thermally efficient cleaning up processes in Integrated Gasification Combined Cycles (IGCC) systems.

36 MATERIALS SCIENCE↗

The involvement of SCK-CEN in decommissioning projects

SCK-CEN is the Belgian Nuclear Research Centre. Founded in the mid-fifties, it has accumulated experience and know-how in all fields of the nuclear power production: in the neutronics calculation, radiation protection, waste management, fuel performance and analysis, nuclear measurements, radiochemistry, reactor technology, etc. Since 1989, SCK-CEN has launched Decommissioning activities to deal with the Technical Liabilities created by 40 years of operation. The main projects started were: - the dismantling of the BR3 PWR reactor; - the dismantling of active laboratories and the decontamination of buildings for unrestricted reuse; - the management of the waste arising from the refurbishment activities of the BR2, especially the management of the high active beryllium matrix. In 1989, the BR3 reactor, a Pressurized Water Reactor, was selected by the European Commission as one of the four pilot dismantling projects in the framework of the EC five year RTD program on dismantling nuclear installations. Through this project, SCK-CEN has built up a broad know-how in dismantling and decommissioning operations. This know how concerns the decontamination for dose rate reduction and/or free release of materials, tele-operated techniques for cutting highly activated components of a reactor, concrete decontamination techniques, characterization techniques of radioactive waste or for free release of components and development of decommissioning management and record-keeping of material streams and of nuclear material accountancy. SCK-CEN is now actively involved in other decommissioning projects in Belgium and in expertise abroad. After giving an overview of the main achievements and the perspectives of the decommissioning of the BR3 reactor, the paper intends to present the involvement of SCK-CEN in the other decommissioning projects and to give an overview of our activities and capacities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Passivating Shells on the Chemistry and Electrode Properties of LiMn 2 O 4 Nanocrystal Heterostructures

Building a stable chemical environment at the cathode/electrolyte interface is directly linked to the durability of Li-ion batteries with high energy density. Recently, colloidal chemistry methods have enabled the design of core–shell nanocrystals of Li 1+x Mn 2–x O 4 , an important battery cathode, with passivating shells rich in Al 3+ through a colloidal synthetic route. These heterostructures combine the presence of redox-inactive ions on the surface to minimize undesired reactions, with the coverage of each individual particle in an epitaxial manner. Although they improve electrode performance, the exact chemistry and structure of the shell as well as the precise effect of the ratio between the shell and the active core remain to be elucidated. Correlation of these parameters to electrode properties would serve to tailor the heterostructure design toward complete shutdown of undesired reactions. These knowledge gaps are the target here. Li 1+x Mn 2–x O 4 nanocrystals with Al 3+ -rich shells of different thicknesses were synthesized. Multimodal characterization comprehensively revealed the elemental distribution, electronic state, and crystallinity in the heterostructures, which confirmed the potential of this approach to finely tune passivating layers. All of the modified nanocrystals improved the capacity retention while retaining charge storage compared to the bare counterpart, even under harsh conditions.

25 ENERGY STORAGE↗