Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Operational Benefits of Meeting California's Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014 version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33% and 40% renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33% and 40% renewable scenarios. A storage device that can participate in energy and ancillary service markets provides the grid with the greatest benefit; the mandated storage requirement of 1,325 MW was estimated to reduce the total cost of production by about 78 million per year in the 33% scenario and 144 million per year in the 40% scenario. Much of this value is derived from the avoided start and stop costs of thermal generators and provision of ancillary services. A device on the 2024 California grid and participating in only ancillary service markets can provide the system with over 90% of the value as the energy and ancillary service device. The analysis points to the challenge of new storage providing regulation reserve, as the added storage could provide about 75% of the regulation up requirement for all of California, which would likely greatly reduce regulation prices and potential revenue. The addition of storage in California decreases renewable curtailment, particularly in the 40% RPS case. Following previous analysis, storage has a mixed impact on emissions, generally reducing emissions, but also creating additional incentives for increased emissions from out-of-state coal generations. Overall, storage shows significant system cost savings, but analysis also points to additional challenges associated with full valuation of energy storage, including capturing the operational benefits calculated here, but also recovering additional benefits associated avoided generation, transmission, and distribution capacity, and avoided losses.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Procurement of 100 kg of Enriched Xenon for the EXO Prototype and for its Installation at WIPP

This grant supported the enriched xenon procurement, detector construction and initial operation of the EXO-200 double beta decay experiment at the Waste Isolation Pilot Plant (WIPP). The period of performance was Aug 15, 2002 to Dec 31, 2014. The primary goal of the experiment is to search for the very rare (and to date not observed) neutrino-less double beta decay. Such decay, if observed, would shed the light of the quantum-mechanical structure of neutrinos, and the origins of elementary particle masses. Another goal of the detector is to serve as prototype of a larger neutrino-less double beta decay experiment, currently being considered by DOE-OS. EXO-200 has already been extremely successful in both areas and is, in fact, leading the way world-wide in this area of fundamental physics. In the initial part of the grant the EXO-200 collaboration acquired 200kg of xenon enriched to 80% in the isotope 136 that is a candidate for double beta decay. At the time this was the largest isotope separation program carried out for fundamental science. The enrichment was done in Russia, providing a rare and valuable opportunity for US scientists to work alongside Russian colleagues, in some cases from the former closed cities of their military complex. By now the EXO-200 collaboration include institutions from the US, Canada, South Korea, China, Germany, Switzerland and Russia. Many collaborating scientists from these countries have taken shifts at WIPP or at the various remote monitoring sites world-wide. EXO-200 detector construction was completed in early 2010, with the time projection chamber (TPC) installation in the cleanrooms already placed in NeXA. Detector commissioning at WIPP followed, with the last phase, the filling of the TPC with liquid Xenon, occurring in the spring 2011. EXO-200 is described in [1]. Low background data taking started on Jun 1, 2011 and within the first month of data the 2-neutrino double beta decay of 136Xe was discovered, as reported in [2]. More data provided the best half-life measurement of any 2-neutrino double-beta decay modes [3]. Until Feb 2014 the detector ran continuously producing some of the world leading results in the field and, in particular, two of the most sensitive searches for neutrinoless double beta decay [4,5]. These measurements show that the half life of this decay is longer than 1015 times the age of the universe. This is one of the leading results in this field world-wide and succeeded to put the DOE-funded research on the world stage in a very cost-effective way. Other results from EXO-200 include a search for exotic double-beta decay modes [6], a detailed report on the state of the art background levels achieved in the detector [7], the study of rare ion and neutral atom motion and neutralization rates in liquid Xenon [8], a study of the cosmogenic backgrounds in the detector at WIPP’s depth [9], a search for Lorentz and CPT symmetries violation [10] and a search for double-beta decay to excited states [11]. In Feb 2014 the EXO-200 detector was severely disrupted by the accidents in the WIPP underground (unrelated to EXO-200). The EXO-200 operations team was able to recover the unique stockpile of enriched Xenon to high pressure cylinders and warm-up the detector to room temperature without damaging the very delicate equipment. This was a very impressive achievement as no plan had been made to complete these operations entirely from remote. This validates the robustness of well-designed liquid xenon detectors for this and other measurements in particle and nuclear astrophysics. The operations team re-gained almost regular access to the WIPP underground and the EXO-200 detector in Jan 2015 and spent calendar 2015 cleaning up the soot from the WIPP fire, assessing the damage to the EXO-200 infrastructure, correcting such damage and restarting the detector. This process was successfully carried out and culminated in the re-filling of the detector with liquid xenon, in Jan 2016. As of late Jan 2016 EXO-200 is taking data again. The collaboration is in the process of upgrading the readout electronics and restarting a radon abatement system that had been commissioned just before the Feb 2014 events. The upgraded electronics will provide lower readout noise and, in turn, better signal to background discrimination. The radon abatement system will further reduce the radon in a small air-gap between the EXO-200 cryostat and the lead shielding. In a review in Jun 2015 DOE-OS approved EXO-200 for 2.5 more years of running at the end of which we expect to improve the sensitivity to the neutrino-less double-beta decay by a factor two or three. For the last 5 years the EXO-200 detector, located in the WIPP underground, has been at the center of the hunt for new physics beyond the Standard Model of particle physics!

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Laboratory Evaluation of Air Flow Measurement Methods for Residential HVAC Returns

This project improved the accuracy of air flow measurements used in commissioning California heating and air conditioning systems in Title 24 (Building and Appliance Efficiency Standards), thereby improving system performance and efficiency of California residences. The research team at Lawrence Berkeley National Laboratory addressed the issue that typical tools used by contractors in the field to test air flows may not be accurate enough to measure return flows used in Title 24 applications. The team developed guidance on performance of current diagnostics as well as a draft test method for use in future evaluations. The series of tests performed measured air flow using a range of techniques and devices. The measured air flows were compared to reference air flow measurements using inline air flow meters built into the test apparatus. The experimental results showed that some devices had reasonable results (typical errors of 5 percent or less) but others had much bigger errors (up to 25 percent). Because manufacturers’ accuracy estimates for their equipment do not include many of the sources of error found in actual field measurements (and replicated in the laboratory testing in this study) it is essential for a test method that could be used to determine the actual uncertainty in this specific application. The study team prepared a draft test method through ASTM International to determine the uncertainty of air flow measurements at residential heating ventilation and air conditioning returns and other terminals. This test method, when finalized, can be used by the Energy Commission and other entities to specify required accuracy of measurement devices used to show compliance with standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗

Systems Based Approaches for Thermochemical Conversion of Biomass to Bioenergy and Bioproducts

Auburn’s Center for Bioenergy and Bioproducts conducts research on production of synthesis gas for use in power generation and the production of liquid fuels. The overall goal of our gasification research is to identify optimal processes for producing clean syngas to use in production of fuels and chemicals from underutilized agricultural and forest biomass feedstocks. This project focused on construction and commissioning of a bubbling-bed fluidized-bed gasifier and subsequent shakedown of the gasification and gas cleanup system. The result of this project is a fully commissioned gasification laboratory that is conducting testing on agricultural and forest biomass. Initial tests on forest biomass have served as the foundation for follow-up studies on gasification under a more extensive range of temperatures, pressures, and oxidant conditions. The laboratory gasification system consists of a biomass storage tank capable of holding up to 6 tons of biomass; a biomass feeding system, with loss-in-weight metering system, capable of feeding biomass at pressures up to 650 psig; a bubbling-bed fluidized-bed gasification reactor capable of operating at pressures up to 650 psig and temperatures of 1500oF with biomass flowrates of 80 lb/hr and syngas production rates of 37 scfm; a warm-gas filtration system; fixed bed reactors for gas conditioning; and a final quench cooling system and activated carbon filtration system for gas conditioning prior to routing to Fischer-Tropsch reactors, or storage, or venting. This completed laboratory enables research to help develop economically feasible technologies for production of biomass-derived synthesis gases that will be used for clean, renewable power generation and for production of liquid transportation fuels. Moreover, this research program provides the infrastructure to educate the next generation of engineers and scientists needed to implement these technologies.

09 BIOMASS FUELS↗

A Qualitative Assessment of Current CCF Guidance Based on a Review of Safety System Digital Implementation Changes with Evolving Technology

The US Nuclear Regulatory Commission (NRC) is initiating a new rulemaking project to develop a digital system common-cause failure (CCF) rule. This rulemaking will review and modify or affirm the NRC's current digital system CCF policy as discussed in the Staff Requirements Memorandum to the Secretary of the Commission, Office of the NRC (SECY) 93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light Water Reactor (ALWR) Designs, and Branch Technical Position (BTP) 7-19, Guidance on Evaluation of Defense-in-Depth and Diversity in Digital Computer-Based Instrumentation and Control Systems, as well as Chapter 7, Instrumentation and Controls, in NRC Regulatory Guide (NUREG)-0800, Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants (ML033580677). The Oak Ridge National Laboratory (ORNL) is providing technical support to the NRC staff on the CCF rulemaking, and this report is one of several providing the technical basis to inform NRC staff members. For the task described in this report, ORNL examined instrumentation and controls (I&C) technology implementations in nuclear power plants in the light of current CCF guidance. The intent was to assess whether the current position on CCF is adequate given the evolutions in digital safety system implementations and, if gaps in the guidance were found, to provide recommendations as to how these gaps could be closed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Task 4 - EMI/RFI Issues Potentially Impacting Electromagnetic Compatibility of I&C Systems (NRCHQ6014D0015)

The U.S. Nuclear Regulatory Commission’s (NRC’s) regulations in Part 50, “Domestic Licensing of Production and Utilization Facilities,” of Title 10 of the Code of Federal Regulations (10 CFR Part 50) state that structures, systems, and components important to safety in a nuclear power plant are to be designed to accommodate the effects of environmental conditions (i.e., remain functional under all postulated service conditions) and that design control measures such as testing are to be used to check the adequacy of design. Regulatory Guide (RG) 1.180 was developed to provide guidance to licensees and applicants on methods acceptable to the NRC staff for complying with the NRC’s regulations on design, installation, and testing practices for addressing the effects of electromagnetic and radio-frequency interference (EMI/RFI) and power surges on safety-related instrumentation and control (I&C) systems. The first revision of RG 1.180 was issued in January 2000 and a second revision was issued in October 2003*. The second revision differed from the first revision in endorsing Military Standard (MIL-STD)-461E and the International Electrotechnical Commission (IEC) Standard (Std) 61000 series of EMI/RFI test methods, extending the guidance to cover signal line testing, incorporating frequency ranges where portable communications devices are experiencing increasing use, and relaxing the operating envelopes (test levels) when experience and confirmatory research warranted. It also offered exemptions from specific test criteria based on technical considerations such as plant conditions and the intended location of the safety-related I&C equipment. Since the last revision, new requirements have been identified, associated RGs have been created and updated, and additional industry guidance has been developed. Additionally, the operational environment has changed with the increase in wireless communication technology for both personal (smartphone) and industrial (remote I&C) purposes. Also, specific concerns and issues with testing methods and methodologies have been identified that must be addressed. Further, most of the standards that serve as the basis for the RG have been revised. Therefore, the NRC’s Office of Regulatory Research has contracted with Oak Ridge National Laboratory (ORNL) to incorporate new information and resolve the identified issues under NRC-HQ-60-14-D-0015, “Update to RG 1.180, Revision 2, Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems.” The ultimate goal of this project is to provide NRC the technical basis for developing and publishing a new revision of the RG. The focus of Task 4 was for ORNL to identify and address any new or additional EMI/RFI issues that could potentially impact the EMC of I&C systems. More specifically, ORNL was to evaluate the impact of any new issue on safety equipment in their local environments and then determine whether the issues should be included and discussed in the revision to RG 1.180 that is currently under way.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FutureGen 2.0 Oxy-combustion Large Scale Test – Final Report

The primary objectives of the FutureGen 2.0 CO 2 Oxy-Combustion Large Scale Test Project were to site, permit, design, construct, and commission, an oxy-combustion boiler, gas quality control system, air separation unit, and CO 2 compression and purification unit, together with the necessary supporting and interconnection utilities. The project was to demonstrate at commercial scale (168MWe gross) the capability to cleanly produce electricity through coal combustion at a retrofitted, existing coal-fired power plant; thereby, resulting in near-zeroemissions of all commonly regulated air emissions, as well as 90% CO 2 capture in steady-state operations. The project was to be fully integrated in terms of project management, capacity, capabilities, technical scope, cost, and schedule with the companion FutureGen 2.0 CO 2 Pipeline and Storage Project, a separate but complementary project whose objective was to safely transport, permanently store and monitor the CO 2 captured by the Oxy-combustion Power Plant Project. The FutureGen 2.0 Oxy-Combustion Large Scale Test Project successfully achieved all technical objectives inclusive of front-end-engineering and design, and advanced design required to accurately estimate and contract for the construction, commissioning, and start-up of a commercial-scale "ready to build" power plant using oxy-combustion technology, including full integration with the companion CO 2 Pipeline and Storage project. Ultimately the project did not proceed to construction due to insufficient time to complete necessary EPC contract negotiations and commercial financing prior to expiration of federal co-funding, which triggered a DOE decision to closeout its participation in the project. Through the work that was completed, valuable technical, commercial, and programmatic lessons were learned. This project has significantly advanced the development of near-zero emission technology and will be helpful to plotting the course of, and successfully executing future large demonstration projects. This Final Scientific and Technical Report describes the technology and engineering basis of the project, inclusive of process systems, performance, effluents and emissions, and controls. Further, the project cost estimate, schedule, and permitting requirements are presented, along with a project risk and opportunity assessment. Lessons-learned related to these elements are summarized in this report. Companion reports Oxy-combustion further document the accomplishments and learnings of the project, including: A.01 Project Management Report which describes what was done to coordinate the various participants, and to track their performance with regard to schedule and budget B.02 Lessons Learned - Technology Integration, Value Improvements, and Program Management, which describes the innovations and conclusions that we arrived upon during the development of the project, and makes recommendations for improvement of future projects of a similar nature . B.03 Project Economics, which details the capital and operation costs and their basis, and also illustrates the cost of power produced by the plant with certain sensitivities. B.04 Power Plant, Pipeline, and Injection Site Interfaces, which details the interfaces between the two FutureGen projects B.05 Contractual Mechanisms for Design, Construction, and Operation, which describes the major EPC, and Operations Contracts required to execute the project.

54 ENVIRONMENTAL SCIENCES↗

Surrogate Measurements of Actinide (n,2n) Cross Sections with NeutronSTARS

Directly measuring (n,2n) cross sections on short-lived actinides presents a number of experimental challenges. The surrogate reaction technique is an experimental method for measuring cross sections on short-­lived isotopes, and it provides a unique solution for measuring (n,2n) cross sections. This technique involves measuring a charged-­particle reaction cross section, where the reaction populates the same compound nucleus as the reaction of interest. To perform these surrogate (n,2n) cross section measurements, a silicon telescope array has been placed along a beam line at the Texas A&M University Cyclotron Institute, which is surrounded by a large tank of gadolinium-doped liquid scintillator, which acts as a neutron detector. The combination of the charge-particle and neutron-detector arrays is referred to as NeutronSTARS. In the analysis procedure for calculating the (n,2n) cross section, the neutron detection efficiency and time structure plays an important role. Due to the lack of availability of isotropic, mono-energetic neutron sources, modeling is an important component in establishing this efficiency and time structure. This report describes the NeutronSTARS array, which was designed and commissioned during this project. It also describes the surrogate reaction technique, specifically referencing a 235 U(n,2n) commissioning measurement that was fielded during the past year. Advanced multiplicity analysis techniques have been developed for this work, which should allow for efficient analysis of 241 Pu(n,2n) and 239 Pu(n,2n) cross section measurements

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Considerations for State Regulators and Policymakers in a Post-FERC Order 745 World

By vacating the Federal Energy Commission's (FERC) Order 745 in Electric Power Supply Association vs. FERC (EPSA, 2014) the U.S. Court of Appeals for the D.C Circuit injected uncertainty into the future of demand response (DR) resources in U.S. wholesale markets. Many possible future scenarios in which DR continues to be available to provide capacity for resource adequacy would need to rely on a potential checkerboard of policies promulgated by state utility commissions. However, the states that will be most directly impacted by the potential implications from the EPSA ruling are precisely those that have the fewest policies currently in place to promote retail program development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ER@CEBAF: A test of 5-pass energy recovery at CEBAF

Jefferson Lab personnel have broad expertise in the design, commissioning, and operation of multiple energy recovery linacs (ERLs): the CEBAF Front-End Test (early 1990s), CEBAF-ER (2003), the IR Free Electron Laser (FEL) Demo, the IR FEL Upgrade, and the UV FEL Driver (1997-2014). Continued development of this core competency has led to this collaborative proposal to explore the forefronts of ERL technology at high energy in a unique expansion of CEBAF capability to a 5-pass ERL with negligible switchover time and programmatic impact to the CEBAF physics program. Such a capability would enable world-class studies of open issues in high-energy ERL beam dynamics that are relevant to future facilities such as electron-ion colliders (EICs). This proposal requests support from the CEBAF Program Advisory Committee to seek funding for hardware installation, and a prospective 12 days of beam time circa Fall 2018 for commissioning this high-energy multi-pass ERL experiment in CEBAF.

43 PARTICLE ACCELERATORS↗

CEBAF Upgrade Bunch Length Measurements

Many accelerators use short electron bunches and measuring the bunch length is important for efficient operations. CEBAF needs a suitable bunch length because bunches that are too long will result in beam interruption to the halls due to excessive energy spread and beam loss. In this work, bunch length is measured by invasive and non-invasive techniques at different beam energies. Two new measurement techniques have been commissioned; a harmonic cavity showed good results compared to expectations from simulation, and a real time interferometer is commissioned and first checkouts were performed. Three other techniques were used for measurements and comparison purposes without modifying the old procedures. Two of them can be used when the beam is not compressed longitudinally while the other one, the synchrotron light monitor, can be used with compressed or uncompressed beam.

43 PARTICLE ACCELERATORS↗

California Energy Systems for the 21st Century 2016 Annual Report

The California Energy Systems for the 21st Century (CES-21) Program is a public-private collaborative research and development program between the California Joint Utilities1 and Lawrence Livermore National Laboratory (LLNL). The purpose of this annual report is to provide the California Public Utilities Commission (CPUC or Commission) with a summary of the 2016 progress of the CES-21 Program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage System Safety: Plan Review and Inspection Checklist

Codes, standards, and regulations (CSR) governing the design, construction, installation, commissioning, and operation of the built environment are intended to protect the public health, safety, and welfare. While these documents change over time to address new technology and new safety challenges, there is generally some lag time between the introduction of a technology into the market and the time it is specifically covered in model codes and standards developed in the voluntary sector. After their development, there is also a timeframe of at least a year or two until the codes and standards are adopted. Until existing model codes and standards are updated or new ones are developed and then adopted, one seeking to deploy energy storage technologies or needing to verify the safety of an installation may be challenged in trying to apply currently implemented CSRs to an energy storage system (ESS). The Energy Storage System Guide for Compliance with Safety Codes and Standards1 (CG), developed in June 2016, is intended to help address the acceptability of the design and construction of stationary ESSs, their component parts, and the siting, installation, commissioning, operations, maintenance, and repair/renovation of ESS within the built environment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Review of Residential Comfort Control Products and Opportunities

This paper begins by discussing the interaction of each major component in advanced sensor and control applications related to HVAC equipment. The paper also looks at the applications of these components to commissioning, maintenance and operations of the HVAC equipment in residential buildings. A summary of state-of-the-art product features is also provided. These products are categorized through their primary application type (commissioning/maintenance or operation) and the features are categorized by component type (sensors, data storage, human-in-the-loop, communication, and controls). A common theme that emerges from this study is the importance of the ability for various product categories to be connected to each other. There are many manufacturers of sensors and many manufacturers of controls, but the power to automate any commissioning, maintenance or operation application, requires connectivity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Small-scale pilot plant for gasification of coal and coal/biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch synthesis

This report describes the second phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction, commissioning and operating of the downstream process units for water-gas-shift, Fischer-Tropsch synthesis and balance of plant [BOP]. The deliverables from the operation of this pilot plant is firstly the liquid F-T products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. Going forward the facility will produce research quantities of F-T liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by -F-T Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels will be a primary research objective. The results of this second phase study include the FEED study and detailed engineering design of the downstream processing units and BOP, the selection of a range of technologies and technology vendors, the as-built plant - its equipment and capabilities, and the results of two trial production runs, one with coal only and one with a coal/biomass blend. These are described in detail in this report.

01 COAL, LIGNITE, AND PEAT↗

NREL and Clemson University Drivetrain Test Facility Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-13-509

The National Renewable Energy Laboratory (NREL) and Clemson University have a mutual interest in collaborating in the development of wind turbine drivetrain testing facilities and grid simulators. NREL and Clemson University will work together to share resources and experiences in the development of future wind energy test facilities and capabilities. The CRADA includes sharing of facility topologies and capabilities, modeling efforts, commissioning plans, test protocols, infrastructure cost data, test plans, pro forma contracting instruments, and safe operating strategies. Further, NREL and Clemson University will exchange staff for training and development purposes, including collaborative participation in commissioning and customer testing. DOE has provided NREL with over 10 years of support in developing custom facilities and capabilities to enable testing of full-scale integrated wind turbine drivetrain systems in accordance with the needs of the US wind industry. NREL currently operates a 2.5MW dynamometer and is in the processes of building a 5MW dynamometer and a grid simulator (referred to as a 'Controllable Grid Interface' or CGI). Clemson University is currently building a drivetrain testing facility with two dynamometers, 7.5 MW and 15 MW, and 15 MW Hardware in the loop grid simulator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Causal Analysis Report for NA-SS-SNL-8000-2018-0002 Electrical shock: Wind Turbine Nacelle Lubbock TX

A Sandia National Laboratories Member of the Workforce (MOW) experienced contact with electrical energy while performing work on an oil filter pump electrical system in the al wind turbine nacelle at Sandia National Laboratories Scaled Wind Turbine Facility (SWiFT). The Department of Energy (DOE) Sandia National Laboratories (SNL) Scaled Wind Farm Technology (SWiFT) facility does research and development (R&D) work in collaboration with Texas Tech University. The SWiFT facility includes three turbines for performing wind plant and turbine technology research in support of DOE's Wind Energy Technology Office. The current work ongoing at the site is primarily related to commissioning the three turbines to support ongoing DOE customer needs and requests. It was during the performance of commissioning tests of the hydraulic systems in the a1 turbine that a Sandia MOW experienced contact with electrical energy. There were multiple root and contributing causes that ultimately resulted in the electrical energy contact. These causes are summarized and aligned to their corrective actions in the corrective action plan table provided in Section 7(c). The purpose of this narrative section is to provide additional information and context

17 WIND ENERGY↗