Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CERTIFICATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

High Performance Builder Spotlight: Cobblestone Homes

Cobblestone Homes of Freeland,MI quest to understand building science led to construction in 2010 of the "Vision Zero Project," a demonstration home that has earned a DOE Builders Challenge certification and achieved a HERS index of -4 with photovoltaics and 37 without PV.

builders challenge↗

Freescale Semiconductor Successfully Implements an Energy Management System

Through the Superior Energy Performance (SEP) plant certification program, Freescale Semiconductor implemented projects at the company's Oak Hill Fab plant that reduced annual energy consumption by 28 million kilowatt hours (kWh) of electricity and 26,000 million British thermal units (Btu) of natural gas between 2006 and 2009, saving more than $2 million each year. The plant is now certified at the SEP silver level, and has a management system in place to proactively manage the facility's energy resources in the future.

Case Study↗

Keeping Energy Savings in the LOOP: Mesa Lane Partners Case Study

Mesa Lane Partners (MLP) partnered with the U.S. Department of Energy (DOE) to develop and implement solutions to a build a new, low-energy mixed-use building that consumes at least 50% less energy than requirements set by Energy Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of America (IESNA), as part of DOE’s Commercial Building Partnerships (CBP) Program. Lawrence Berkeley National Laboratory (LBNL) provided technical expertise in support of this DOE program. The privately developed 46,000-square-foot LOOP project, which is intended to provide affordable off-campus student housing in an underserved community next to University of California at Santa Barbara, will contain more than 7,000 square feet of retail space, a roof deck, an event space, a gym, and 48 apartments. The project developer, MLP, is aiming to exceed CBP requirement, targeting energy consumption that is at least 65% less than that required by the standard. If the LOOP meets this goal, it is expected to achieve Leadership in Energy and Environmental Design (LEED) Gold certification.

CBP↗

New Whole-House Solutions Case Study: EcoVillage: A Net Zero Energy Ready Community, Ithaca, New York

The Consortium for Advanced Residential Buildings is working with the EcoVillage co-housing community and builder AquaZephyr in Ithaca, New York, on their third neighborhood called the Third Residential EcoVillage Experience (TREE). This community-scale project consists of 40 housing units—15 apartments, and 25 single family residences that range in size from 1,250 ft2–1,664 ft2 and cost from $80,000 to $235,000. The community is pursing DOE Zero Energy Ready Home (ZERH), US Green Building Council Leadership in Energy and Environmental Design (LEED) Gold, and ENERGY STAR certifications for the entire project.

BUILDING AMERICA↗

DOE Zero Energy Ready Home Case Study: Amaris Custom Homes, St. Paul, Minnesota

For this project, Amaris worked with U.S. Department of Energy (DOE) team, NorthernSTAR Building America Partnership, to develop the first Zero Energy Ready Home (ZERH) in Minnesota's cold climate using reasonable, cost-effective, and replicable construction materials and practices. The result is a passive solar, super-efficient 3542-ft2 walkout ranch-style home with all the creature comforts. Along with meeting ZERH standards, Amaris also achieved certifications for Leadership in Energy & Environmental Design for Homes v4, MN Green Path Emerald, and a Builders Association of the Twin Cities Reggie Award of Excellence. The home achieves a HERS score of 41 without photovoltaics; with PV, the home achieves a HERS score of 5.

Building America↗

Technology Solutions Case Study: Low-Load Space-Conditioning Needs Assessment

Low-load options in the heating, ventilating, and air-conditioning (HVAC) market are limited, so many new-construction housing units are being fitted with oversized equipment that results in penalties in system efficiency, comfort, and cost. To bridge the gap between currently available HVAC equipment and the rising demand for low-load HVAC equipment in the marketplace, HVAC equipment manufacturers need to be fully aware of the needs of the multifamily building and attached single-family home markets. Over the past decade, Steven Winter Associates, Inc. has provided certification and consulting services for hundreds of housing projects and has accrued a large pool of data that describe multifamily and attached single-family home characteristics. In this project, the research team Consortium for Advanced Residential Buildings (CARB) compiled and analyzed the data from 941 low-load buildings in the Northeast and Mid-Atlantic regions to outline the heating and cooling design load characteristics of low-load dwellings. Within this data set, CARB found that only 1% of the dwellings had right-sized (within 25% of design load) heating equipment and 6% had right-sized cooling equipment.

Air-source heat pumps↗

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Coupeville, Washington

Ted Clifton, founder of Clifton View Homes, achieved an impressive Home Energy Rating System (HERS) score of 34 (without solar panels) on a two-story home completed in July 2011 that also earned him his first Challenge Home certification from the U.S. Department of Energy (DOE). This home also garnered a 2013 Housing Innovation Award in the "systems builder" category.

Challenge Home↗

DOE Zero Energy Ready Home Case Study: Mandalay Homes, Phoenix, Arizona

This builder built fourteen homes in the Gordon Estates subdivision that achieved Challenge Home certification with HERS 38–58 on an affordable budget for homeowners. Every Mandalay home in the development also met the National Green Building Standard gold level. The Gordon Estates subdivision is also serving as a showcase of energy efficiency, and Mandalay is hosting education workshops for realtors, state and local officials, other builders, students, potential homeowners, and the public. The builder won a 2013 Housing Innovation Award in the affordable builder category.

Building America↗

Building America Top Innovations 2013 Profile – Zero Energy-Ready Single-Family Homes

Building homes that are zero energy-ready is a goal of the U.S. Department of Energy’s Building America program and one embodied in Building America’s premier home certification program, the Challenge Home program. This case study describes several examples of successful zero energy-ready home projects completed by Building America teams and partner builders.

Building America↗

New Whole-House Case Study: Transformations, Inc. Net Zero Energy Communities, Devens, Easthampton, Townsend, Massachusetts

In 2009, Transformations, Inc. partnered with Building America team Building Science Corporation (BSC) to build new net zero energy houses in three developments in Massachusetts. The company has been developing strategies for cost-effective super-insulated homes in the New England market since 2006. After years of using various construction techniques, it has developed a specific set of assemblies and specifications that achieve a 44.9% reduction in energy use compared with a home built to the 2009 International Residential Code, qualifying the houses for the DOE’s Challenge Home. The super-insulated houses provide data for several research topics in a cold climate. BSC studied the moisture risks in double stud walls insulated with open cell spray foam and cellulose. The mini-split air source heat pump (ASHP) research focused on the range of temperatures experienced in bedrooms as well as the homeowners’ perceptions of equipment performance. BSC also examined the developer’s financing options for the photovoltaic (PV) systems, which take advantage of Solar Renewable Energy Certificates, local incentives, and state and federal tax credits.

air source heat pump↗

New Whole-House Solutions Case Study: Hood River Passive House

The Hood River Passive Project was developed by Root Design Build of Hood River Oregon using the Passive House Planning Package (PHPP) to meet all of the requirements for certification under the European Passive House standards. The Passive House design approach has been gaining momentum among residential designers for custom homes and BEopt modeling indicates that these designs may actually exceed the goal of the U.S. Department of Energy's (DOE) Building America program to "reduce home energy use by 30%-50%" (compared to 2009 energy codes for new homes). This report documents the short term test results of the Shift House and compares the results of PHPP and BEopt modeling of the project. The design includes high R-Value assemblies, extremely tight construction, high performance doors and windows, solar thermal DHW, heat recovery ventilation, moveable external shutters and a high performance ductless mini-split heat pump. Cost analysis indicates that many of the measures implemented in this project did not meet the BA standard for cost neutrality. The ductless mini-split heat pump, lighting and advanced air leakage control were the most cost effective measures. The future challenge will be to value engineer the performance levels indicated here in modeling using production based practices at a significantly lower cost.

BA-PIRC↗

DOE ZERH Case Study: BPC Green Builders, Taft School, Watertown, CT

Case study of a DOE 2015 Housing Innovation Award winning custom home in the cold climate that got a HERS 33 without PV or HERS -14 with PV, with 8.5” double 2x4 walls with 8.5” (R-32) blown cellulose plus R-6 rigid foam, basement with 3” ccsf on interior plus 2x4 stud walls with R-13 blown cellulose, with R-20 around slab, R-38 under slab; a vented attic with R-100 blown cellulose; a central heat pump; HRV; heat pump water heater; 100% LED; and Passive House Institute U.S.+, LEED platinum, and Living Building Challenge certifications.

Building America↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗

Electronic Medical Business Operations System

Electronic Management of medical records has taken a back seat both in private industry and in the government. Record volumes continue to rise every day and management of these paper records is inefficient and very expensive. In 2005, the White House announced support for the development of electronic medical records across the federal government. In 2006, the DOE issued 10 CFR 851 requiring all medical records be electronically available by 2015. The Y-12 National Security Complex is currently investing funds to develop a comprehensive EMR to incorporate the requirements of an occupational health facility which are common across the Nuclear Weapons Complex (NWC). Scheduling, workflow, and data capture from medical surveillance, certification, and qualification examinations are core pieces of the system. The Electronic Medical Business Operations System (EMBOS) will provide a comprehensive health tool solution to 10 CFR 851 for Y-12 and can be leveraged to the Nuclear Weapon Complex (NWC); all site in the NWC must meet the requirements of 10 CFR 851 which states that all medical records must be electronically available by 2015. There is also potential to leverage EMBOS to the private4 sector. EMBOS is being developed and deployed in phases. When fully deployed the EMBOS will be a state-of-the-art web-enabled integrated electronic solution providing a complete electronic medical record (EMR). EMBOS has been deployed and provides a dynamic electronic medical history and surveillance program (e.g., Asbestos, Hearing Conservation, and Respirator Wearer) questionnaire. Table 1 below lists EMBOS capabilities and data to be tracked. Data to be tracked: Patient Demographics – Current/Historical; Physical Examination Data; Employee Medical Health History; Medical Surveillance Programs; Patient and Provider Schedules; Medical Qualification/Certifications; Laboratory Data; Standardized Abnormal Lab Notifications; Prescription Medication Tracking and Dispensing; Allergies; Non-Occupational Illness and Injury Visits; Occupational Recommendations/Restrictions; Diagnosis/Vital Signs/Blood Pressures; Immunizations; Return to Work Visits Capabilities: Targeted Health Assessments; Patient Input Capabilities for Questionnaires; Medical Health History; Surveillance Programs; Human Reliability Program; Scheduling; Automated Patient Check-in/Check-out; Provider & Patient Workflow; Laboratory Interface & Device Integration; Human Reliability Program Processing; Interoperability with SAP, IH, IS, RADCON; Coding: ICED-9/10; Desktop Integration; Interface/Storage of Digital X-Rays (PACS)

Cannon, D. T.↗

The Business Value of Superior Energy Performance

Industrial facilities participating in the U.S. Department of Energy’s (US DOE) Superior Energy Performance (SEP) program are finding that it provides them with significant business value. This value starts with the implementation of ISO 50001-Energy management system standard, which provides an internationally-relevant framework for integration of energy management into an organization’s business processes. The resulting structure emphasizes effective use of available data and supports continual improvement of energy performance. International relevance is particularly important for companies with a global presence or trading interests, providing them with access to supporting ISO standards and a growing body of certified companies representing the collective knowledge of communities of practice. This paper examines the business value of SEP, a voluntary program that builds on ISO 50001, inviting industry to demonstrate an even greater commitment through third-party verification of energy performance improvement to a specified level of achievement. Information from 28 facilities that have already achieved SEP certification will illustrate key findings concerning both the value and the challenges from SEP/ISO 50001 implementation. These include the facilities’ experience with implementation, internal and external value of third-party verification of energy performance improvement; attractive payback periods and the importance of SEP tools and guidance. US DOE is working to bring the program to scale, including the Enterprise-Wide Accelerator (SEP for multiple facilities in a company), the Ratepayer-Funded Program Accelerator (supporting tools for utilities and program administrators to include SEP in their program offerings), and expansion of the program to other sectors and industry supply chains.

McKane, Aimee↗

Building America Case Study: Rehabilitation of USDA Multifamily Homes, Georgia (Climate Zones 2-4)

Rea Ventures Group, LLC, (Rea Ventures) partnered with Southface Energy Institute (Southface) on the rehabilitation of 418 low-income rental multifamily apartments located at 14 different properties in Georgia (Climate Zones 2-4). These 22-year old, individually-metered units were arranged in rowhouse or townhouse style units. Rehabilitation plans were developed using a process prescribed by the US Department of Agriculture (USDA) Rural Development program, who partially funded the building upgrades. The USDA is responsible for building, upgrading, and subsidizing housing in rural areas nationwide. In 2012, over $100 million was allocated in grants and loans. Due to the unique financing mechanism as well as long-term ownership requirements, property owners are especially motivated to invest in upgrades that will increase durability and tenant retention. These buildings represent a large stock of rural affordable housing that have the potential for significant energy and cost savings for property owners and tenants. Southface analyzed the energy upgrade potential of one stereotypical property in the Rea Ventures portfolio. This study will provide insight into the most cost-effective, implementable energy efficiency and durability upgrades for this age multifamily housing, having an enormous impact not only on the portfolio of Rea Ventures but on the vast USDA and larger Federal portfolio. Additionally, Southface will identify gaps in the current capital needs assessment process, examine available audit and simulation tools and protocols, and evaluate additional auditor training or certification needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

simuwatt - A Tablet Based Electronic Auditing Tool

'simuwatt Energy Auditor' (TM) is a new tablet-based electronic auditing tool that is designed to dramatically reduce the time and cost to perform investment-grade audits and improve quality and consistency. The tool uses the U.S. Department of Energy's OpenStudio modeling platform and integrated Building Component Library to automate modeling and analysis. simuwatt's software-guided workflow helps users gather required data, and provides the data in a standard electronic format that is automatically converted to a baseline OpenStudio model for energy analysis. The baseline energy model is calibrated against actual monthly energy use to ASHRAE Standard 14 guidelines. Energy conservation measures from the Building Component Library are then evaluated using OpenStudio's parametric analysis capability. Automated reporting creates audit documents that describe recommended packages of energy conservation measures. The development of this tool was partially funded by the U.S. Department of Defense's Environmental Security Technology Certification Program. As part of this program, the tool is being tested at 13 buildings on 5 Department of Defense sites across the United States. Results of the first simuwatt audit tool demonstration are presented in this paper.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗