Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Preload Characterization of Short Models of MQXF the Nb 3 Sn Low-β Quadrupole for the Hi-Lumi LHC

MQXF is the Nb3Sn Low-β Quadrupole magnet that the HL-LHC project is planning to install in the LHC interaction regions in 2026 as part of an upgrade to increase the LHC inte-grated luminosity by about a factor of ten. The magnet will be fab-ricated in two different lengths: 4.2 m for MQXFA, built in the US by the Accelerator Upgrade Project (AUP), and 7.15 m for MQXFB, fabricated by CERN. In order to qualify the magnet de-sign and characterize its performance with different conductors, cable geometries and pre-load configuration, five short model magnets, called MQXFS, were fabricated, assembled and tested. The latest model, MQXFS6, uses a new powder-in-tube (PIT) su-perconducting wire, featuring a bundle barrier surrounding the filaments. The coil and the support structure were equipped with strain gauges and optical fibres to monitor strain during assembly, cool-down and excitation. In this paper we further develop the conventional azimuthal preload analysis and introduce a new set of tools for MQXF coil pack characterization which we use to an-alyse the behaviour of MQXFS6 room temperature preload and to reanalyse all the short models tested at CERN. A comparison is made between all the studied magnets revealing new characteriz-ing preload parameters.

43 PARTICLE ACCELERATORS↗

Magnetic Field Measurements of First Pre-series Full -Length 4.2 m Quadrupole MQXFA03 Using PCB Rotating Coils for the Hi Hi-Lumi LHC Project

The U.S. Hi-Lumi LHC Accelerator Upgrade Project (AUP) and CERN have joined efforts to develop high field quad-rupoles for the Hi-Lumi LHC upgrade. The US national laborato-ries in the AUP project will deliver 10 magnets and each cryostat has two 4.2 m high gradient quadrupoles in it. These magnets are made of Nb3Sn conductors, with large aperture (150 mm) and in-tegrated gradient of 556.9 T. This paper reports on magnetic measurements performed during the vertical test at Brookhaven National Laboratory (BNL) in 2019-2020. A warm measurement Z-Scan (+/- 15 A) with 42 Z-positions before cool-down was per-formed at BNL. The results were directly compared to field data measured at LBNL during magnet assembly. Measured harmonics and magnetic center offsets (ΔX and ΔY) have provided timely and informative diagnostics on the magnet structure’s shape at both warm and cold temperatures. A new centering fixture was de-signed and added to better center the warm bore tube which con-tains the rotating coil probe. After the quench training to 16.47 kA was achieved, a complete set of cold measurements (Z-Scan at 16.47 kA and I-Scan from 960 A to 16.47 kA and back to 960 A) was made. Periodic axial variation of allowed and nonallowed harmonics was observed which is related to the coil radial and/or mid-plane variations along the magnet axis. Overall, the average harmonics in the straight section are within the required field boundaries.

43 PARTICLE ACCELERATORS↗

Magnetic Measurements of $\mathrm{HL-LHC AUP}$ Cryo-Assemblies at Fermilab

LQXFA/B production series cryogenic assemblies are being built for the LHC upgrade by the HL-LHC Accelerator Upgrade Project (AUP). These contain a pair of MQXFA quadrupole magnets combined as a cold mass within a vacuum vessel, and are to be installed in the IR regions of the LHC. The LQXFA/B are being tested at 1.9 K to assess alignment and magnetic performance at Fermilab's horizontal test facility. The ~10 m long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis location, and for variations in axis position and local field profiles. A multi-probe, PCB-based rotating coil and a Single Stretched Wire system are employed for these measurements. To accurately determine rotating coil location and angles within the cold mass, a laser tracker is utilized to record multiple targets at one end of the probe. Here this paper describes the measurements, probes/equipment, and techniques used to perform the necessary characterization of the cold mass.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

A 50 kA Superconducting Transformer for the Upcoming High-Field High-Current Testing Station at the BNL

Brookhaven national laboratory is upgrading its existing user facility to support R&D for High Energy Physics (HEP) and Fusion Energy Sciences (FES). The goal of this upgrade is to host the testing of the superconducting cables, conductors, joints and insert coils under high magnetic field (10 T), with currents up to 50 kA (present limit 20 kA) and at temperatures varying from 4 K to 40 K. To provide a current up to 50 kA to the sample, a superconducting core-less transformer is under construction. The superconducting transformer would additionally reduce the heat loss at the current leads at high currents. The SC transformer consists of two coaxial coils. The primary coil is inside the secondary coil. The primary coil consists of 3048 turns of rectangular wires (1.91 mm x 1.27 mm), wound in 24 layers. The secondary coil consists of 13 turns of the secondary cable (18.35 mm x 5.96 mm), wound in one layer. The parameters of the transformer are chosen to satisfy the space restrictions while using the available conductor. Here this paper presents the design of the 50-kA transformer.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Application of Distributed Fiber Optic Strain Sensors to LMQXFA Cold Mass Welding

The future High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include the low-beta inner triplets (Q1, Q2a/b, Q3) for two LHC insertion regions. The Q1, Q3 components consist of eight 10 m-long LMQXFA cryo-assemblies fabricated by the HL-LHC Accelerator Upgrade Project. Each LMQXFA Cold mass contains two Nb 3 Sn magnets connected in series. A stainless-steel shell is welded around the two magnets before the insertion into the cryostat. There is a limit on how much coil preload increase induced by the shell welding is allowed. Distributed Rayleigh backscattering fiber optics sensors were used for the first time to obtain a strain map over a wide area of a Nb 3 Sn magnet cold mass shell. Finally, data were collected during welding of the first LMQXFA cold mass and the results confirm that the increase of the coil pole azimuthal pre-stress after welding do not exceed requirements.

43 PARTICLE ACCELERATORS↗

The Challenges and Solutions of Meeting the Assembly Specifications for the 4.5 m Long MQXFA Magnets for the Hi-Luminosity LHC

The U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) has, in the recent years, developed assembly specifications for the 4.5 m long MQXFA magnets, which are 150 mm aperture high-field Nb 3 Sn low-β quadrupole magnets that are being built for the CERN Hi-Luminosity LHC (HL-LHC) upgrade. While the specifications were based on lessons learned from the LHC Accelerator Research Program (LARP) effort and the MQXFS and MQXFA prototype magnets, the experience gained from having both MQXFA07 and MQXFA08 magnets not meeting performance specifications during cold testing actually catalyzed a better understanding of the impact of the target assembly specifications and a subsequent refinement of the same. This paper summarizes a body of assembly data from the Pre-Series (MQXFA03-MQXFA07) and Series magnets (MQXFA08-MQXFA11) that have been built to date, and discusses the processes employed to successfully face the challenge of ensuring that the assembly specifications are met for the duration of the project.

43 PARTICLE ACCELERATORS↗

Magnetic Measurements and Alignment Results of LQXFA/B Cold Mass Assemblies at Fermilab

MQXFA production series quadrupole magnets are being built for the Hi-Lumi (HL) LHC upgrade by the U.S. Accelerator Upgrade Project (US-HL-LHC AUP). These magnets are being placed in pairs, as a cold mass, within cryostats at Fermilab, and are being tested to assess alignment and magnetic performance at Fermilab's horizontal test stand facility. The ~10 m - long assembly must meet stringent specifications for quadrupole strength and harmonic field integrals determination, magnetic axis position, and for magnet variations in positioning and local field profile. Here this paper describes the results of the magnetic and alignment measurements which characterize the first LQXFA/B assembly.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Quench Performance of the First Pre-series AUP Cryo-assembly

The High Luminosity upgrade of the Large Hadron Collider (HL-LHC) at CERN will include eight cryo-assemblies that are expected to be fabricated and delivered to CERN by the US HL-LHC Accelerator Upgrade Project (AUP) as part of the U.S. contributions to the HL-LHC. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 and Q3 inner triplet optical elements in front of the two interaction points. Each cryo-assembly consists of two 4.2 m long Nb 3 Sn quadrupole magnets with aperture 150 mm and operating gradient 132.6 T/m. The first pre-series cryo-assembly has been fabricated and successfully tested at the horizontal test facility at Fermi National Accelerator Laboratory. Here in this manuscript we report the quench test results of the LQXFA/B-01 cryo-assembly. The primary objective of the horizontal test is full cryo-assembly qualification and validation of the performance requirements.

43 PARTICLE ACCELERATORS↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗

Oakridge PPU Magnets: Results and Measurements

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab’s Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ∼3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)↗

Magnetic Measurements of Fermilab Rapid-Cycling Booster Gradient Magnets

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)↗

Evaluation of the Room Temperature Field Quality Measurements of HL-LHC MQXFA Magnet Assemblies

As a member of the multi-lab U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), Lawrence Berkeley National Laboratory (LBNL) is assembling high-field Nb3Sn low-beta MQXFA quadrupole magnets for eventual installation at CERN as part of the HL-LHC upgrade. Each magnet undergoes room temperature magnetic measurements at two points during the assembly process: once after completion of the coil pack sub-assembly and once after the magnet is fully assembled and pre-loaded. Beyond its use to verify that each magnet assembly can meet operational requirements, the data from this two-stage measurement process allow for investigation into the impact of the pre-loading operation on field quality. Recent measurements on magnet rebuilds as well as exploratory coil pack reconfigurations also provide an opportunity to see in isolation the effects of changes to a magnet’s coil selection or coil layout. In this work, we present the magnetic measurement results of MQXFA magnets assembled or currently in process, focusing particularly on magnets with data corresponding to multiple builds, and discuss trends and insights which may be beneficial for the remaining MQXFA magnet production or for future Nb3Sn accelerator magnets.

Doyle, Jennifer [LBNL, Berkeley] (ORCID:0009000079↗

Development of a High-Rate Front-End ASIC for X-Ray Spectroscopy and Diffraction Applications

We developed a new front-end application-specific integrated circuit (ASIC) to upgrade the Maia X-ray microprobe. The ASIC instruments 32 configurable channels that perform either positive or negative charge amplification, pulse shaping, peak amplitude, and time extraction along with buffered analog storage. At a gain of 3.6 V/fC, 1-μs peaking time, and a temperature of 248 K, an electronic resolution of 13 and 10 e- rms was measured with and without a silicon drift detector (SDD) sensor, respectively. A spectral resolution of 170-eV full-width at half-maximum (FWHM) at 5.9 keV was obtained with an 55Fe source. The channel linearity was better than ± 1% with rate capabilities up to 40 kcps. The ASIC was fabricated in a commercial 250-nm process with a footprint of 6.3 mm × 3.9 mm and dissipates 167 mW of static power.

Vernon, Emerson↗

Plasma Facing Component Characterization and Correlation With Plasma Conditions in Lithium Tokamak Experiment-β

Lithium coatings in the Lithium Tokamak eXperiment (LTX) led to flat temperature profiles. The flat temperature profiles were observed along with a hot, low density edge, implying a broad, collisionless scrape-off layer (SOL). Additionally, in vacuo X-ray photoelectron spectroscopy (XPS) measurements established that lithium coatings evaporatively deposited onto high-Z plasma facing components (PFCs) became oxidized while retaining the ability to achieve good plasma performance long after lithium was applied to the PFCs. Longstanding theory predicted flat temperature profiles with low recycling walls, which was presumed to be due to hydrogen binding with elemental lithium to form lithium hydride. The presence of oxidized lithium, however, raised questions regarding the exact mechanism of hydrogen retention in LTX. To investigate these questions, the upgraded facility LTX- β includes a new sample exposure probe (SEP) for more detailed in vacuo analysis of PFC samples. The SEP is equipped with a vacuum suitcase capable of transporting samples representative of the LTX- β outer midplane PFCs to a stand-alone XPS system while maintaining pressures lower than the LTX- β base vacuum to limit the contamination between sample exposure and analysis. The low-energy resolution XPS system used in past experiments could only enable the determination of elemental percentages on the PFC sample surfaces. Because the new XPS system has higher energy resolution, it is more direct to assign chemical compounds to the measured binding energies. This capability has been confirmed by comparing XPS data from PFC test samples with measurements using a commercial high-resolution XPS system. Quartz crystal microbalances (QCMs) were used to quantify the thickness of the deposited lithium on the LTX- β PFCs. This article describes the application of the SEP to characterize the PFC surfaces using XPS and their relationship to plasma conditions.

Maan, Anurag↗

Real-Time Ethernet Interface for NSTX-U’s Thomson Scattering Diagnostic (2023)

Here, the multipoint Thomson scattering (MPTS) diagnostic system at the National Spherical Torus Experiment Upgrade (NSTX-U) facility is undergoing an upgrade to operate in real-time and interface with the plasma control system (PCS) for NSTX-U. Previous prototyping efforts have shown that spectral analysis and rapid calculations of electron temperature and density are possible on a real-time Linux machine when using up to a 100-Hz laser pulse repetition rate. A remaining challenge was transferring the real-time data to NSTX-U’s PCS, which utilizes the front panel data port (FPDP) protocol. The original proposed method was to convert the real-time data into analog values, but a new solution was developed to keep the output format digital by using an Ethernet controller with a field-programmable gate array (FPGA). This article focuses on a new input module that has been developed to accept incoming user datagram protocol (UDP) packets sent over Ethernet, convert into FPDP format, and integrate into the existing data stream under NSTX-U’s real-time framework.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Technical Impacts of Light-Duty and Heavy-Duty Transportation Electrification on a Coordinated Transmission and Distribution System

In this study, we propose a strategy to model the required spatiotemporal charging demand from light-duty (LD) and medium- and heavy-duty (MHD) electric vehicles (EVs) using actual transportation data by mapping the demand for the required EV charging to a realistic and coordinated distribution and transmission electric grid at the predicted times of the day to study their impact on the power system in a variety of load, weather, and EV penetration scenarios. This work is the first study that includes the actual weather data and transportation data with realistic and coordinated distribution and transmission grid data in a large industry-scale level study. The main goal of this study is to identify possible issues and required upgrades in the electric grid, caused by an increase in EV integration. The transmission case study is a large grid with 6717 buses over a Texas footprint, and the distribution grid is over Houston, a city in Texas, covering over three million customers. The resulting overloads and voltage violations experienced in the system are discussed, and required planning upgrades to avoid these issues are suggested.

AC optimal power flow (AC-OPF)↗

The Power Reclamation of Utilizing Micro-Hydro Turbines in the Aeration Basins of Wastewater Treatment Plants

Upgrading the aeration basin technology can improve the oxygen transfer efficiency (OTE), while keeping the energy consumption at its minimum level. Therefore, this paper introduces a new idea of installing micro-propeller turbines in the aeration basin of a wastewater treatment plant (WWTP) to extract power from the high-velocity location in the water column. This extracted power can be used to operate a mixer at the top of the membrane to induce the mixing in that region, which will drive the less oxygenated wastewater into the water column. The rest of the extracted power will rotate microturbine rotors for electric power generation. By applying the proposed microturbines to the 13 audited facilities, it was demonstrated to achieve a gross annual energy-savings of 3,836.9 MWh, a gross annual cost-saving of $260,497, and total CO 2 emissions that would be reduced by 2,714 metric tons/year. Generally, the addition of the proposed microturbines can save up to 15.7% of the annual plant electricity consumption (1.3–12.8% of the plant annual electricity bills).

13 HYDRO ENERGY↗

HAZARD ANALYSIS OF DIGITAL ENGINEERED SAFETY FEATURES ACTUATION SYSTEM IN ADVANCED NUCLEAR POWER PLANTS USING A REDUNDANCY-GUIDED APPROACH

Replacing the existing aging analog instrumentation and control (I&C) systems with modern safety control and protection digital technology offers one of the foremost means of performance improvements and cost reductions for the existing nuclear power plants (NPPs). However, the qualification of digital I&C systems remains a challenge, especially considering the issue of software common-cause failures (CCFs), which are difficult to address. With the application and upgrades of advanced digital I&C systems, software CCFs have become a potential threat to plant safety because most redundant designs use similar digital platforms or software in the operating and application systems. With complex designs of multilayer redundancy to meet the single-failure criterion, digital I&C safety systems (e.g., engineered safety-features actuation system [ESFAS]) are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. This paper applies a modularized approach to conduct redundancy-guided systems-theoretic hazard analysis for an advanced digital ESFAS with multilevel redundancy designs. Systematic methods and risk-informed tools are incorporated to address both hardware and software CCFs, which provide guidance to eliminate the triggers of potential single points of failure in the design of digital safety systems in advanced plant designs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗