Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

System Validation on the Europa Clipper mission in Early Implementation Phase

NASA’s next flag-ship mission - Europa Clipper, will embark on a journey to Jupiter’s icy moon Europa in 2024 to assess its environment and habitability with a highly capable spacecraft. Post Jupiter-Orbit-Insertion, the spacecraft will be commanded to perform intricate, yet meticulously planned Europa flybys to perform science investigations using a suite of instruments, while withstanding Jupiter’s harsh radiation environment. The success of this mission is dependent on a well-coordinated project and its elements such as the flight hardware and software, the ground support and mission operations teams, procedures and other cross-cutting elements. The Europa Clipper project needs to ensure that these elements are realized at a reasonable confidence level prior to launch and other mission critical events. System Validation test and analysis activities exercise and confirm the integrity of the system of all project elements in the expected flight environment with reasonable stressing conditions. These activities go beyond system design requirements verification and are driven by validation objectives that describe the end-to-end functional and operational capabilities required during nominal and off-nominal flight-like scenarios and critical events. The challenges associated with validating that the Europa Clipper project as a whole can function and perform correctly to meet the intended mission objectives with the as-delivered capabilities of all of its elements are daunting. This paper discusses the systematic methodology established in the early implementation phase of the Europa Clipper project for developing System Validation activities and their validation objectives, and addressing any validation-related challenges on the project. Approaches include decomposition of mission objectives using activity timelines in the Mission Design plan for developing nominal scenarios, use of fault trees for exploring off-nominal cases and system boundaries, and use of Model-based Systems Engineering (MBSE) tools for planning and prioritizing these activities.

Wang, Xu↗

Enabling International Data Relay at Mars

The most commonly used mode of communications be-tween Earth and a Mars surface mission is ultra-high fre-quency (UHF) radio relay via a Mars orbiter. There are four orbiters and two surface rovers operating at Mars and by October there should be five orbiters and three landers or rovers. There has been some collaboration between ESA’s Mars Express orbiter and NASA’s rovers, but 2016 is when Mars relay becomes fully international. In October, ESA will deliver the ExoMars Trace Gas Orbiter (TGO) and En-try, Descent, and Landing (EDL) Demonstrator Module (EDM) lander to Mars. The ExoMars program includes both ESA and ROSCOSMOS, with NASA participation (the Electra UHF transceiver on TGO). NASA orbiters will pro-vide relay for EDM and future ESA Mars landers and rov-ers. TGO will provide relay for NASA's current and future surface assets (as Mars Express will continue to do). Inter-national collaboration is enabled in several steps. At the in-struction of the space agencies, the Mars mission projects negotiate and write a “Service Agreement.” This describes at a high level how a new Mars orbiter would operate with its corresponding surface missions or how a new surface mis-sion would operate with its corresponding orbiters. It in-cludes the roles of the different projects, how the new mis-sion would communicate with existing or planned missions, the general flow of data and commands, and the capabilities or requirements of the new mission. After completing the Service Agreement, the projects write Interface Control Doc-uments (ICDs), each of which describes data and command flow in greater detail and quantitative aspects of the relay link and operations timeline between an orbiter and a cor-responding lander/rover. Interfaces and operations are test-ed before a new mission arrives at Mars. Once at Mars, a new orbiter performs some “practice” relay contacts with its partners. For a new lander (e.g. EDM), relay operations gen-erally begin before atmospheric entry at Mars, with record-ing of the UHF relay signal from the lander (including open-loop wide-bandwidth recording) as it enters and traverses Mars’s atmosphere and lands on its surface. After Mars EDL or orbit injection, each relay contact is negotiat-ed and scheduled using the Mars Relay Operations Service (MaROS). This paper describes the international approach to develop inter-agency agreements, inter-project interfaces, and specifics of how MaROS is used in actual relay opera-tions between international partners.

Winton, Alistair J.↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3) was deployed on Mars in February 2019and began attempting to penetrate to its target depth range of3-5 meters shortly thereafter. However, the mole’s downwardprogress stopped after only 35 cm of penetration. In response,the project convened an Anomaly Response Team (ART) andsince then has been attempting to diagnose the problem andassist the mole using the tools available on Mars. The key assetused in this effort has been the Instrument Deployment System(IDS), which includes two cameras and a robotic InstrumentDeployment Arm (IDA). Since the IDS was originally intendedonly to deploy InSight’s primary instruments to the Martiansurface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to bedeveloped on a short timeline. The HP3 Mole ART first focusedon gathering all observable data on Mars about the state ofthe mole and Support Structure Assembly (SSA), as well asthe physical properties of the Martian regolith. This includedusing the robotic arm to point the IDC at the SSA duringdiagnostic hammering attempts to observe motion of the SSAand science tether. Images taken during these attempts revealedsome motion of the SSA, but no apparent change in mole depth.At JPL, the IDS and Testbed teams re-created the hardwareconfiguration on Mars based on limited knowledge of the mole’sstate. They devised and tested techniques to use the roboticarm and cameras to accomplish previously untested activitieson Mars, including imaging the HP3, using the IDA to interactwith the terrain, and using the IDA to move the SSA awayfrom the partially-embedded mole. The team executed the morepromising techniques on Mars. After diagnostic hammering onMars, the team decided to move the SSA to gain visibility ofthe mole’s configuration and access to the soil around the mole.After developing the technique and practicing the maneuver inthe InSight testbed, the team lifted the SSA on Mars and placedit behind the mole. This revealed a pit surrounding the nowexposed mole, observations of which provided essential cluesfor determining the root cause of the mole’s lack of progress.The IDS and Testbed teams altered the testbed to match thesituation on Mars. They devised IDA techniques to determinethe Martian soil properties and assist the mole’s descent. Theytested these techniques in the testbed and executed the more978-1-7281-2734-7/20/$31.00 c 2021 IEEE. Copyright 2020 CaliforniaInstitute of Technology. U.S. Government sponsorship acknowledged.promising ones on Mars. These include using the robotic arm toalter the regolith near the mole and to push on the mole while ithammers. This paper discusses the anomaly resolution testing inthe testbed at JPL, describes how the IDS team prepared for theanomaly recovery activities on Mars, and provides preliminaryresults of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3 ) was deployed on Mars in February 2019 and began attempting to penetrate to its target depth range of 3-5 meters shortly thereafter. However, the mole’s downward progress stopped after only 35 cm of penetration. In response, the project convened an Anomaly Response Team (ART) and since then has been attempting to diagnose the problem and assist the mole using the tools available on Mars. The key asset used in this effort has been the Instrument Deployment System (IDS), which includes two cameras and a robotic Instrument Deployment Arm (IDA). Since the IDS was originally intended only to deploy InSight’s primary instruments to the Martian surface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to be developed on a short timeline. The HP3 Mole ART first focused on gathering all observable data on Mars about the state of the mole and Support Structure Assembly (SSA), as well as the physical properties of the Martian regolith. This included using the robotic arm to point the IDC (Instrument Deployment Camera) at the SSA during diagnostic hammering attempts to observe motion of the SSA and science tether. Images taken during these attempts revealed some motion of the SSA, but no apparent change in mole depth. At JPL, the IDS and Testbed teams re-created the hardware configuration on Mars based on limited knowledge of the mole’s state. They devised and tested techniques to use the robotic arm and cameras to accomplish previously untested activities on Mars, including imaging the HP3 , using the IDA to interact with the terrain, and using the IDA to move the SSA away from the partially-embedded mole. The team executed the more promising techniques on Mars. After diagnostic hammering on Mars, the team decided to move the SSA to gain visibility of the mole’s configuration and access to the soil around the mole. After developing the technique and practicing the maneuver in the InSight testbed, the team lifted the SSA on Mars and placed it behind the mole. This revealed a pit surrounding the now exposed mole, observations of which provided essential clues for determining the root cause of the mole’s lack of progress. The IDS and Testbed teams altered the testbed to match the situation on Mars. They devised IDA techniques to determine the Martian soil properties and assist the mole’s descent. They tested these techniques in the testbed and executed the more promising ones on Mars. These include using the robotic arm to alter the regolith near the mole and to push on the mole while it hammers. This paper discusses the anomaly resolution testing in the testbed at JPL, describes how the IDS team prepared for the anomaly recovery activities on Mars, and provides preliminary results of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

The Man-machine Integration Design and Analysis System (MIDAS) Software Training Documentation

This document is a training manual for MIDAS v5 that takes an user through the hardware and software requirements for the MIDAS V5 software, the steps required to download the software, and the steps that a user needs to take to create a MIDAS simulation. The training guide also illustrates how the models interact to generate MIDAS predictions of operator performance along task, workload, and situation awareness timelines and provides the test routines that were conducted to verify the operation of the integrated MIDAS models. The training guide shows the user how the MIDAS task model interacts with and controls an anthropometric model through its use of behavioral primitives. The training documentation also illustrates one approach that has been used to filter and analyze MIDAS output.

Brian F. Gore↗

1.9 MWe Nuclear Electric Propulsion-Chemical Propulsion Piloted Mars Opposition Vehicle

To assess ‘quick’ missions to Mars, a study was performed to determine the feasibility of a two-year roundtrip class mission concept of operation that enables boots on Mars in the 2030s. After performing a Phase 1.1 2036 Mars opposition design case, the more difficult 2039 opposition design was pursued. This Phase 1.2 also sought to further refine the concept, building on feasibility, and addressing several challenges brought by independent team reviews. Given the date of 2039, nearer-term technologies, primarily nuclear thermal and nuclear electric were deemed as the most viable for these missions. This paper explores a nuclear electric and chemical combined propulsion approach to achieve the desired mission timeline.

Nuclear Electric Propulsion↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Battery Key Performance Projections based on Historical Trends and Chemistries

Recent improvements in state-of-the-art (SOA) batteries driven by the automotive sector have led to many electrified aircraft concepts choosing batteries as the preferred energy-storage method. Current SOA batteries are at the point of enabling certain hybrid and all-electric aircraft, particularly small, short range, lower speed aircraft. Higher performance batteries improve aircraft range and can enable larger, higher speed aircraft. In this work, we develop specific energy projections for future electrified aircraft. The projections are developed based on examining historical commercial SOA trends as well as practical limitations of future chemistries. Accurate projections of future specific energy values are important for estimating the timeline for commercial introduction of electrified aircraft. This work estimates nominal cell level specific energies for rechargeable batteries of 489 Wh/kg by 2030, 638 Wh/kg by 2040, and 764 Wh/kg by 2050. More conservative as well as more aggressive estimates are also provided.

Blake Tiede↗

m:N Working Group

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N). This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT). This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust). This presentation discusses the background and progress of the m:N working group.

multi-vehicle control↗

Future Operations

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N). This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT). This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust). This presentation discusses the future of GCS control stations and need for Human Systems Integration.

multi-vehicle control↗

m:N Operations and Future

The principles and reasons for employing Human Autonomy Teaming is discussed. Application of these techniques to multi-vehicle control is described. In several operational environments from small drone delivery to air taxi to autonomous cargo, many companies will need technologies that will allow for the operation of an unmanned aircraft (UAS or eVTOL) by a small crew of individuals that are located in a remote network operations center. That is, Multiple operators supervising an increasing Number of vehicles (M:N).This will require a new control/supervisory paradigm where the supervisors team with automation to achieve their joint tasks; Human Autonomy Teaming (HAT).This task will follow the HAT philosophy and tenants (e.g., trust, bi-directional communication, pilot directed interfaces). It will also develop and employ specific HAT tools (e.g., playbook, working agreements, predictive timeline displays, transparent interfaces to build trust). This presentation discusses the barriers and requirements for future m:N operations.

multi-vehicle control↗

NASA Passive Thermal Control Engineering Guidebook

The NASA Passive Thermal Control Engineering Guidebook provides recommendations, including best practices and lessons learned, related to the passive thermal control engineering discipline. Topics include analysis (including documentation and review), thermal hardware (design/selection, vendors, and integration), testing, and flight operations. The passive thermal discipline includes thermal control and thermal protection systems. The passive thermal control discipline, which is addressed in this Guidebook, is broad and covers internal and external systems, component passive thermal analysis, vehicle on-orbit attitude timeline analysis, integrated thermal analysis, various thermal control apparatus (heaters and controls, coatings, blankets and insulations, isolators, geometric design for view factors, materials emissivity/absorptivity properties), passive cooling of avionics, purge, vent, and drain for vehicle cavities and compartments, thermal model development and correlation, thermal cycle and thermal-vacuum testing. Topics related to thermal protection systems (TPS) are not within the scope of this document. The Guidebook provides a consolidated reference for early career as well as experienced engineers embarking on a new task. Leveraging the experience of the group minimizes the learning curve that exists at the start of new projects, reduces the risk of repeating mistakes, and improves the organization’s ability to deliver high-quality products efficiently. The intent of this document is to provide guidance based on collective experience, and is not intended impose constraints on project work. Best practices can vary substantially and it is important to apply judgment wisely based on careful consideration of the specific design and requirements. Implementation of the methods described will vary from project to project and should be applied in conjunction with the judgment of the thermal engineers performing and reviewing the work. The recommendations in this document are not intended to replace program, project, branch, Center, or NASA requirements and/or policies.

thermal↗

Testing and validation of the microbial environment of the NASA rodent spaceflight habitat water delivery system.

Sterilized, deionized water within a closed, self-sufficient system has been used in NASA spaceflight rodent studies for several decades. Within the specialized spaceflight rodent habitat, water is delivered through a compression spring-loaded bag system to maintain positive pressure. Refill of the drinking water occurs every 30 days by direct transfer of potable water from aboard the International Space Station (ISS). This enables long term use without a weekly water change out, which meets spaceflight requirements, but contrasts with the general guidelines for the sanitation of water delivery systems. Even though the water is iodinated to minimize microbial growth, rodents are fed a special diet of high moisture nutrient-rich food bars based on the AIN-93 diet that may contribute to microbial growth in this water system. We designed a ground study to assess the quality of drinking water that is given to rodents throughout a mission. We conducted the ground test using 20 female C57BL/6J mice housed in this specialized habitat to mimic the timeline of a 90-day mission as well as the environmental conditions (temperature, humidity, and pCO2) within the ISS. We used a novel sampling method to test water at 2-week intervals for the 90-days, and also after each 30-day refill of the water delivery system. Mice in standard vivarium cages with water bottles were also included for comparison to the habitat. The results showed that overall microbial load remained close to zero for the duration, while total organic compound concentrations increased from 1370g/L to 10650g/L over the course of 90 days but remained below the level of concern. Inorganic ions and pH were also found to be at acceptable levels. Overall, we conclude that this system is effective in delivering clean, potable water to rodents for the 90-day duration of current missions to the ISS.

water↗

Rapid Development of Instrument Thermal Models: Perspectives and Guidelines from NASA Goddard’s Instrument Design Laboratory

- The design and development of robotic spaceflight instruments is a critical part of NASA’s vision to discover and expand knowledge for the benefit of humanity - For typical flight instrument projects, thermal engineers will develop initial instrument thermal models over weeks or months, then iterate them over a project’s lifespan – In each iteration, the engineer will: - Refine their thermal models and thermal designs in accordance with updates from other subsystems - Perform trade studies - Solve very detailed and complex analysis problems, including worst-cases and contingencies - Pick hardware and plan for testing and integration - However, prior to a project being established, or for proposal development at an early conceptual stage, the luxury of multiple instrument design iterations may be limited or nonexistent – Within a short timeline, how do you complete a thermal model or explore multiple possible instrument configurations? – What are the critical parameters for your model? Which details do you include or leave out?

Kan Yang↗

JWST REAL-TIME MID-COURSE CORRECTION MANEUVER MONITORING CONTINGENCY PREPARATION

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Wayne Yu↗

JWST Real-Time Mid-Course Correction Maneuver Monitoring Contingency Preparation

The NASA James Webb Space Telescope (JWST) mission successfully launched on Dec 25, 2021, at 12:20 Coordinated Universal Time (UTC). During the 30-day transfer to the second Sun-Earth-Moon (SEM) libration point (L2), JWST executed three mid-course correction (MCC) maneuvers to insert into a quasi-halo orbit about L2. This paper covers the design and modeling for these three maneuvers with a focus on the timeline around the execution of each MCC maneuver. It will summarize the actual on-board events as well as the contingency preparation done for maneuver planning, monitoring, and final post-burn reconstruction of all three MCC maneuvers.

Toni Santacroce↗

Ultraviolet Astronomy in the XXI Century

The US 2020 Astrophysics Decadal Survey (Astro2020) has recommended NASA develop the first observatory designed to search for signs of life on exoplanets and enable transformative astrophysics. These ambitious goals demand a large and highly capable space telescope with broad wavelength coverage from the far-UV to the near-IR, in the tradition of the Hubble Space Telescope. Realizing this vision will require aggressive technology development — as well as respect for and careful balancing of the needs of many scientific communities. In this talk, I will review the Decadal recommendations, including the development approach and timeline envisioned for the recommended UV/O/IR flagship. The LUVOIR and HabEx pre-Decadal mission concepts that fed into that flagship will also be reviewed. Finally, I’ll highlight some key technical considerations for the future UV/O/IR Great Observatory.

Aki Roberge↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗