Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Salt Heater Test (FY19)

This report discusses the fiscal year 2019 (FY19) design, implementation, and preliminary data interpretation plan for a set of borehole heater tests call the brine availability tests in salt (BATS), which is funded by the DOE Office of Nuclear Energy (DOE-NE) at the Waste Isolation Pilot Plant (WIPP). The organization of BATS is outlined in Project Plan: Salt In-Situ Heater Test. An early design of the field test is laid out in Kuhlman et al., including extensive references to previous field tests, which illustrates aspects of the present test. The previous test plan by Stauffer et al., places BATS in the context of a multi-year testing strategy, which involves tests of multiple scales and processes, possibly culminating in a drift-scale disposal demonstration.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gear Test Assembly - Status Report For FY2019

The final stages of pre-sodium commissioning were completed for the Gear Test Assembly (GTA) in late 2018 and all the components were moved to building 308 for final preparations for insertion into the Mechanisms Engineering Test Loop (METL). The GTA was fully assembled in the experimental test assembly workstation and all supporting electrical and hardware systems were installed on the METL Mezzanine. The GTA was installed in Test Vessel 1 after performing a final systems check, and the vessel and article were raised to operating temperature and held for two weeks to bake-out any moisture present in the components. Test Vessel 1 was filled with sodium and a purification process was completed using the cold trap system. When the sodium was sufficiently clean, Test Vessel 1 was isolated from the rest of METL, and experimental operation of the GTA commenced. The experimental operations consisted of rotating two shafts using Parker servomotors to apply a prototypic torque of a fuel handling mechanism removing and inserting a sodium fast reactor fuel assembly. This removing and inserting motion was repeated until the system seized, indicating component degradation of either the gears or the bearings in the test gearbox. A total of 19,600 cycles were completed, corresponding to the removal and insertion of 9,800 fuel assemblies. The system was shut down and then prepared for removal. The Flexicask System was successfully used to remove the GTA from Test Vessel 1 while keeping both vessel and article inert during the process. The GTA was installed in the Carbonation System, where the process of slowly reacting the sodium away using moist CO 2 has been started. Once the GTA is fully cleaned, it will be disassembled and the gears will undergo the same NDE process performed before testing to quantify the wear that occurred. A report on this, along with the data analysis from the experimental operations will be submitted in late 2019.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Sierra/SolidMechanics 4.54 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

AOI2 - Initial Engineering, Testing, and Design of a Commercial-Scale Postcombustion CO 2 Capture System on an Existing Coal-Fired Generating Unit (Project Carbon)

The continued long-term use of North Dakota lignite is likely dependent on creating a business case for carbon capture, utilization, and storage (CCUS) that also addresses society’s desire to reduce carbon emissions. CCUS coupled with enhanced oil recovery appears to be the most feasible option for utilities to sustain and grow the lignite industry. Establishing a market where lignite-powered utilities provide carbon dioxide (CO 2 ) to oil producers depends upon having a cost-effective method to capture CO 2 . The application of CO 2 capture technology to lignite-fired flue gas has challenges in addition to the cost of capture, including the effects of the buildup of heat-stable salts, aerosol formation, degradation of solvents or solid sorbents, or subsequent solvent loss. Lignite, especially North Dakota lignite, presents its own set of challenges that include the combination of high sodium, sulfur, and ash contents; NO x reduction; and footprint limitations. Project Carbon was designed to address these technical barriers and provide pre-FEED (preliminary front-end engineering and design) information necessary for additional commercial demonstrations to move forward. A long-term pilot-scale evaluation of Mitsubishi Heavy Industries’ (MHI’s) KS-1™ solvent at Minnkota Power Cooperative’s lignite-fired Milton R. Young Station Unit 2 (MRY2) was a major objective of the project. The purpose of the test was to demonstrate the technology’s compatibility with MRY2’s flue gas over an extended period of time. During the long-term test, aerosol sampling and measurement were performed, and a pilot-scale baghouse was tested to determine the effect of bag material and operation on aerosol concentrations in the flue gas. Project engineering and design work were performed to support the other major project objective: a pre-FEED study of CO 2 capture at MRY2. Finally, a techno-economic assessment (TEA) of the application of CO 2 capture to MRY2 was performed. This project was performed over a period of 28 months, with a total budget of $12,700,000. The U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory, through the Energy & Environmental Research Center’s (EERC’s) Cooperative Agreement, the North Dakota Industrial Commission, and industry partners ALLETE and Minnkota Power Cooperative, funded the project. The pilot-scale test system at MRY2 performed very well for the continuous test period of 83 days. The CO 2 capture plant achieved stable operation while utilizing MHI’s KS-1™ solvent and the MHI amine emission reduction unit. No major concerns were encountered when capturing CO 2 from lignite-fired flue gas. Challenges were encountered because the cooling water temperature was warmer than needed for the capture system to operate efficiently. This affected the ability of the solvent to capture CO 2 and promoted solvent loss through solvent entrainment caused by high CO 2 gas temperature within a cyclone separator. The KS-1™ solvent and the lignite-derived flue gas were analyzed during the long-term test. Analysis of the solvent indicates that, although some metals and heat-stable salts increased over the course of the long-term test, they were at levels that can be treated with filtration and reclaiming and do not pose a concern for effective solvent operation. Fourier transform infrared (FTIR) spectrometry was successfully used to determine the composition of the lignite-derived flue gas as well as concentrations of select components of the flue gas at various locations within the EERC’s CO 2 capture system. The formation of aerosols during the capture process is of interest, as are approaches for their reduction, especially in a baghouse. Testing of aerosol removal was performed using the EERC’s portable baghouse. It was found that both Ryton and polytetrafluoroethylene (PTFE) membrane bags were effective at reducing the level of aerosols during steady-state operation. During backpulse events, however, the amount of aerosols passing through the bags was an order of magnitude lower for the Ryton bags than the PTFE membrane bags. The testing showed that proper design of the baghouse air-to-cloth ratio as well as minimization of backpulsing can dramatically reduce the amount of aerosols that pass through the bags and remain in the flue gas stream exiting a baghouse system. A technology maturation plan (TMP) was performed to enable successful development of the Kansai Mitsubishi Carbon Dioxide Recovery® (KM CDR®) Process for application to a combustion flue gas for which the process has not yet been demonstrated. In the TMP, new challenges to the MHI CO 2 capture technology during its application to MRY2 were identified. These challenges included capture from lignite-fired (as opposed to subbituminous coal-fired) flue gas, a larger scope than previous applications of the technology, and implementation in a colder climate that could affect process and equipment operability. Because MRY2 is located where stack icing in the winter could be problematic, a rime icing study was performed. Rime icing modeling indicated that, under both 100% and 50% operating loads, there is a potential for many icing events during any given part of the year in which below-freezing weather conditions exist. The models showed that a critical amount of rime ice could be formed at the stack top during two or more events per year. CO 2 capture plant stack height and location will need to be determined in order to minimize the formation of rime ice. It was found that the integration of the MHI CO 2 capture process into the normal operation of the MRY2 steam turbine is a viable alternative to a cogeneration facility to provide steam and power for the carbon capture facility. The research performed under this project showed that CO 2 capture at a lignite-fired power plant can successfully be performed. No known fatal flaws that would prevent the continued development of the MRY2 CO 2 capture facility were identified during the pre-FEED study. A TEA performed following DOE methodology shows that applying capture technology to MRY2 may not only meet but exceed the DOE-recognized state-of-the-art baseline.

20 FOSSIL-FUELED POWER PLANTS↗

Criticality Control Overpack Fire Testing (Phase III)

This report will describe the one test conducted during phase III of the Pipe Overpack Container (POC) test campaign, present preliminary results from these tests, and discuss implications for the Criticality Control Overpack (CCO). The goal of this test was to see if aerosol surrogate material inside the Criticality Control Container (CCC) gets released when the drum lid of the CCO comes off during a thirty-minute long, fully-engulfing, fire test. As expected from POC tests conducted in Phase I and II of this test campaign, the CCO drum lid is ejected about one minute after the drum is exposed to fully-engulfing flames. The remaining pressure inside the drum is high enough to eject the top plywood dunnage a considerable distance from the drum. Subsequently, most of the bottom plywood dunnage supporting the CCC burns off during and after the fire. High pressure buildup inside the CCC and inside two primary containers holding the surrogate powder also results in damage to the filter media of the CCC and the filter-house, thread attachment of the primary canisters. No discernable release of surrogate powder material was detected from the two primary containers when pre- and post-test average mass were compared. However, when the average masses are corrected to account for possible uncertainties in mass measurements, error overlap does not preclude the possibility that some surrogate powder mass may have been lost from these primary canisters. Still, post-test conditions of the secondary canisters enclosing these two primary canisters suggest it is very unlikely this mass loss would have escaped into the CCC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Slide Test FY 2019 Report

At Los Alamos, the Slide Test was developed in 2019 to investigate whether the mass of a main charge of explosive sliding on a gritty surface, in the absence of impact, is sufficient to heat grit to ignition temperatures in PBX 9501. This is a practical test to address frictional ignition during assembly/disassembly operations at the Pantex Plant. Twenty-seven Slide Tests were performed in total, testing PBX 9501 at various slide velocities, grit diameters, grit patterns, and charge masses. Time-resolved velocimetry of the slide event (from PDV) and spot area of the explosive charge (obtained from image analysis) is reported. High-speed videography is used to diagnose explosive reaction. Eighteen of these tests were performed with a charge mass of 30 lbs at velocities ≤ 4 m s-1 and grit diameters between 75 and 1000 µm. Nine Slide Tests were performed with a 15 lb charge mass at similar parameters. No ignition was observed in any of the tests. These data provide evidence that the mass of a main charge, caused to slide on a surface at the low velocities achievable during routine handling, is insufficient stimulus to heat grit to ignition temperatures. These findings are relevant to risk assessment for explosive handling operations and provide evidence that PBX 9501 is safe within the constraints that were tested. However, because ignitions were not observed in any of the tests, we cannot determine which variables (mass or velocity) dominate the explosive response and to what extent. The absence of observed ignition also precludes the determination of a safety margin. To identify this safety margin, further research would be necessary to define the velocity and/or mass threshold at which ignition occurs.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Sierra/SolidMechanics 4.56 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra / SolidMechanics (Sierra / SM) verication test suite. Most of these tests are run nightly with the Sierra / SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra / SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to conrm that a given code capability is veried or referenced as a compilation of example problems. Additional example problems are provided in the Sierra / SM Example Problems Manual. Note, many other verication tests exist in the Sierra / SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

SDU7 Interior Liner Testing & Evaluation

The Saltstone Disposal Unit 7 (SDU7) project requested the Savannah River National Laboratory (SRNL), Materials Science & Engineering (MS&E) organization to evaluate an alternative bromobutyl liner and adhesives for potential use in SDU7 based on applicable ASTM testing standards. SRNL performed similar testing for the liner system used in SDU6. Bonded and non-bonded samples of the alternative liner (Blair Rubber Marflex™ RCHB60HT) were subjected to specific ASTM tests after immersion in two Saltstone leachate simulants, designated S1 and S2, for 1000 hours at 60 °C. Immersion exposures were performed at the Savannah River Ecology Laboratory (SREL). Post-immersion testing involved mechanical property and hardness testing of base material, lap-shear testing of bonded samples and rubber-to-concrete paver interrogation. The liner exhibited an approximate 40% drop in tensile strength and 25% drop in elongation at failure from baseline values after immersion, though final values are comparable to previous SDU6 liner values and are within liner manufacturer property ranges. Overall lap-shear strength behavior of the four adhesives showed a similar pattern, with short-term reduction and subsequent increase in peak load values. However, ranking of adhesives varied with the metric used for comparison. Two of the four adhesives tested (Normac 900 and REMA SC 4000) showed overall better behavior, collectively considering immersion performance, lap-shear data and bonded paver interrogation. Lap-shear samples bonded with the REMA adhesive showed the best combination of final retained bond strength, 6-week average bond strength and bond failure mode. Only one paver (REMA SC4000) was noted to have no defects after immersion. This document details the testing performed and provides conclusions and recommendations. The testing suggests that SDU liner performance is highly dependent upon seam integrity, which collectively depends on a combination of adhesive properties, installation workmanship and inspection/quality control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Ion Exchange Testing Using a Three-Column System with Crystalline Silicotitanate and Hanford Tank Waste 241-AP-107

Washington River Protection Solutions (WRPS) is working to support early production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) facility. This goal incorporates the design of a Tank-Side Cesium Removal (TSCR) system, which in effect filters tank waste supernate and processes it through a cesium ion exchange medium to remove 137Cs. The 137Cs-depleted product is sent to the WTP for vitrification. Rovira et al. (2018) reported the successful Cs removal from Hanford tank 241-AP-107 waste (hereafter called AP-107) using crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC (product IONSIVTM R9140-B, Batch 2081000057) in a lead-lag column system. Since that testing, WRPS has changed the column design to a three-column system. WRPS requested a repeated study with AP-107 tank waste using a different batch of IONSIVTM R9140-B, Lot 2002009604, in a three-column format. A small-scale test platform was constructed to demonstrate solids filtration, Cs removal, and LAW vitrification and installed at Pacific Northwest National Laboratory. This report describes the small-scale ion exchange testing system component of the test platform and the processing of approximately 8.55 L of filtered AP-107 supernate using CST, Lot 8056262-999, that passed through a 25-mesh filter. This report also describes the Cs ion exchange batch contact testing to determine the Cs distribution coefficient and the maximum Cs loading capacity in the AP-107 tank waste matrix. Batch contact testing helps to evaluate CST performance on tank waste supernate and is often used prior to processing tank waste through ion exchange columns to assess some performance metrics (e.g., 50% Cs breakthrough). Batch contact tests were performed with the filtered AP-107 tank waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass). The distribution coefficient (K d ) at the equilibrium condition of 9.2 µg Cs/mL (AP-107 feed condition) was determined to be 806 mL AP 107/g CST. With a CST bed density of 1.01 g/mL (<25 mesh CST), this K d corresponded to a predicted 50% Cs breakthrough of 814 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 8.3 mg Cs/g dry CST. The three-column format testing was prototypic to the intended TSCR operations, albeit on a small scale with 10-mL CST beds. Flowrate was adjusted to match the CST contact time expected for the full-scale operation, i.e., matched bed volumes per hour (BV/h) flow rate. The feed was processed downflow through the lead column, then through the middle column, and then through the polish column. Loading continued at an average of 1.88 BV/h (1.83 to 2.04 BV/h range) until the entire available AP-107 feed was processed. The Cs-decontaminated product will be provided for vitrification testing. The lead column only reached 45% Cs breakthrough after processing 855 BVs of feed. The 50% Cs breakthrough was extrapolated to occur at ~900 BVs. This extrapolated 50% Cs breakthrough value differed from the batch contact estimate (814 BVs) by 13%. The waste acceptance criteria (WAC) or contract limit for the WTP LAW vitrification facility is 3.18E-5 Ci 137 Cs per mole Na. For the AP-107 tank waste, only 0.127% of the influent 137 Cs concentration may be delivered to the WTP; this required a Cs decontamination factor of 787. The Cs effluent from the middle column reached the WAC after processing 590 BVs. Cs breakthrough from the polish column began at 590 BVs, reaching 6.3E-3 µCi/mL or 4.3E-3% Cs breakthrough after processing 844 BVs of feed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparison of Extended and Accelerated VOG Tests

The reprocessing of used nuclear fuel would release volatile radionuclides into the off-gas streams of a processing plant, including ¹²⁹I. The dissolver off-gas and more dilute vessel off-gas streams (VOG) must both be targeted when mitigating ¹²⁹I environmental release because each contains some amount of iodine. Iodine-129 will likely be found as elemental iodine (I₂) and methyl iodide (CH₃I) in these off-gas streams. Reduced silver-exchanged mordenite (AgZ or Ag⁰Z) has been investigated as a potential sorbent for iodine abatement and is studied here under prototypic VOG conditions. Because of the relatively low iodine abundance and high flow rates of the VOG, total iodine concentrations are expected to be in the parts per billion range. Thus, VOG experiments need to run for extended durations at low concentrations to reach sorbent saturation. Because the sorbent will be exposed to oxidizing gas streams for extended periods of time, aging effects and sorbent degradation need to be considered when designing a sorbent-based abatement system. Three sets of experiments were performed with the aim of determining how the adsorption of iodine by AgZ is affected by differing test durations and gas compositions. The first tested the capacity of sorbent aged for 8 months under a humid air stream. The second tested differences in sorbent capacity and mass transfer zone (MTZ) length during high-concentration (1200 ppb v ) CH₃I loading in a humid nitrogen gas (N₂) stream and a humid air gas stream over 28 days. The third tested sorbent capacity and MTZ length during low concentration (< 200 ppb v ) CH₃I and I₂ loading in a humid air stream over 9 months. The results of these tests suggest that AgZ capacity drops by ~50% after 1 month of aging, by ~60% after 2 months of aging, and then does not continue to decrease significantly at up to 8 months of aging. One-month aging tests that compared N₂ and air as the gas stream diluent resulted in similar maximum loading capacities and overall loading curves, indicating that the effects of aging cannot be mitigated by avoiding air as the balance gas. The 9-month extended VOG tests did not result in clear sorbent saturation at the inlet, but it can be inferred using an assumption of a maximum capacity of 45 mg I/g AgZ. Applying this assumption, then the MTZ of CH₃I is 12.8 cm, and the MTZ of I₂ is 12.4 cm. These results are similar to previous tests. Comparisons to tests completed at Idaho National Laboratory suggest that the CH₃I MTZ may be dependent on concentration. Future work should re-evaluate the design of the VOG iodine capture system with this updated data and should seek to understand fundamental characteristics of CH₃I adsorption by AgZ, such as the effect of concentration, gas velocity, and gas composition.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Initial development of an in-situ, passive material surveillance test article for monitoring high temperature reactor structural components

This report describes the development of a family of passively-actuated surveillance test articles, suitable for use in an in-situ reactor test program monitoring the degradation in structural material properties caused by the reactor environment. The test articles apply creep-fatigue-type cyclic load to a test section driven by changes in the reactor coolant temperature converted to mechanical force by differential thermal expansion. The report describes three types of test articles, all of which apply the load to a 316H test section using Alloy 617 as the driver material. The three types of specimens each serve a unique purpose: (1) initial proof-of-concept, (2) validation of the models used to size the specimens to achieve a given strain range, and (3) demonstration that the articles can be miniaturized for use in an actual operating reactor. In addition to the specimen design, fabrication, and testing, this report describes the outline of two types of in-situ monitoring programs, using the test article. Monitoring programs such as these could be a critical component in gaining regulator acceptance for Molten Salt Reactor (MSR) designs using structural materials for which there is little long-term experimental environmental testing or operating experience available for calibrating the component structural design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sierra/SolidMechanics 4.58 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

Drop Analysis of the Advanced Test Reactor Fresh Fuel Shipping Container with Heavier Low-Enriched Uranium Fuel Contents

The Advanced Test Reactor Fresh Fuel Shipping Container (ATR FFSC) is a rectangular stainless steel container used for shipping radioactive material. The container is described in the ATR FFSC Safety Analysis Report (SAR). Per the ATR FFSC SAR, the ATR FFSC is designated a Type AF-96 packaging per the definition of 10 CFR §71.4, and was originally designed to transport high enriched uranium (HEU) reactor fuel elements for the Advanced Test Reactor (ATR), the Advanced Test Reactor Critical (ATRC) facility, the Massachusetts Institute of Technology Reactor (MITR), and the University of Missouri Research Reactor (MURR). The Department of Energy, National Nuclear Security Administration’s (NNSA), Office of Material Management and Minimization (M3) is working with the Idaho National Laboratory (INL) to develop and qualify new low enriched uranium (LEU) fuels and technologies for use in the ATR, ATRC, MITR, and MURR reactors. The LEU fuel elements will weigh significantly more than the current HEU designs and, combined with their associated Fuel Handling Enclosures for packaging, some configurations will exceed the 50 lbf used in the ATR FFSC qualifying drop tests. There are LEU versions of MITR, MURR, and ATR fuel elements. However, for this evaluation, drop analysis of the ATR FFSC with only the heavier ATR Low Enrichment (LOWE) fuel element is considered in this evaluation because the LOWE fuel element is the heaviest of the considered LEU fuel elements. The ATR HEU fuel element and the ATR LOWE fuel element are identical in every design aspect except for the fuel meat inside the 19 fuel plates. The LEU fuel meats are made using a U-10Mo high-density foil rather than uranium dispersed in aluminum in the HEU fuel elements. The high density of the uranium in the LEU fuel meat increases the LOWE fuel element weight to just under 44 lbf (versus the 22.1 lbf weight of the tested ATR HEU fuel element). ATR fuel elements are placed in a thin-gauge aluminum weldment called a "Fuel Handling Enclosure" during packaging. The Fuel Handling Enclosure is used to cover and protect the element during loading and unloading operations. The ATR Fuel Handling Enclosure weighs about 15 lbf per the drawings in the ATR FFSC SAR and the weight is accounted for in this evaluation. Transporting the heavier LEU fuel elements require evaluation of two issues. The first is the effect of the increased mass of the LEU fuel elements on the survivability of the ATR FFSC package following the requisite drop qualifications. The second is the effect of the increased mass of the fuel plates on the fuel element during the same drops. The ATR FFSC containing an ATR HEU fuel element in an ATR Fuel Handling Enclosure was physically dropped multiple times to qualify the container as a Type AF-96 package. The ATR FFSC SAR describes the drop tests performed with an actual ATR HEU fuel element weighing 22.1 lbf contained in a 14.3 lbf Fuel Handling Enclosure for a total payload of 36.4 lbf. Those drop tests showed that the ATR FFSC maintained containment of the ATR HEU fuel element and the fuel element was not significantly damaged. (Containment herein is not defined as a leak tight but is retention of the radioactive contents.) The purpose of the evaluation is to analytically show that, for a similar set of tests, the ATR FFSC maintains containment of the heavier ATR LOWE fuel element and to assess the damage to the fuel element during the drops. The approach was to create finite element analysis (FEA) models that produce the same results as the physical drops. Those models were then used as the benchmarks for the follow-on analyses using the heavier contents. FEA models of the drops of ATR FFSC using up to a 115 lbf fuel element were run and evaluated. Likewise, drops of a LOWE fuel element weighing 44 lbf in the ATR FFSC were run and evaluated. It is important to note that this report was done at the quality level necessary to be included in a nuclear facility safety basis. However, it is not the intent of this report to conclude the suitability of the ATR FFSC for transporting the heavier payloads. This report only describes the results of the FEA as related to the required drop scenarios. Incorporation of the FEA into the safety basis will be evaluated by the ATR FFSC design authority. The physical drop tests of the HEU fuel element and FEA drop analysis for the LOWE fuel element showed noteworthy damage to the fuel plates. An aluminum protective block was conceived to mitigate the damage. The concept requires the blocks to be placed in the fuel element between the end boxes and fuel plates. Additional FEA drop analyses were performed using the protective block. The addition of the blocks is primarily intended to mitigate the damage to the LOWE fuel element fuel plates. However, FEA drop analyses of the ATR HEU fuel element with the blocks were also performed and included for information.

42 ENGINEERING↗

Sierra/SolidMechanics 4.52 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

Sierra/SolidMechanics 5.0 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra/SM) verification test suite. Most of these tests are run nightly with the Sierra / SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra / SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗

Out-of-Pile Furnace Tests on Fast Reactor Metallic Fuels Conducted at the AGHCF

An extensive out-of-pile furnace test program was conducted at Argonne’s Alpha-Gamma Hot Cell Facility (AGHCF) from 1987-1994 to evaluate the fuel/clad compatibility and performance of fast reactor metallic fuels. This test program included over 150 tests on irradiated fuels conducted in two furnace apparatuses. The available records of these tests have been preserved with the support of the Advanced Reactor Technology program and organized in the OPTD (Out-of-Pile Transient Database). This report provides at-a-glance summary information for each of the out-of-pile furnace tests, including information about the tested fuel samples, test conditions, purpose of the tests, and key results. It is intended for open and unlimited distribution to allow all interested persons to view key information about the out-of-pile tests.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Production Facility Prototype Blower 1000 Hour Test Results V

Long duration operations tests of the Aerzen GM 12.4 roots style blower in a closed loop configuration provides valuable data and lessons learned for long-term operation at the Mo-99 production facility. The blower was operated in a closed loop configuration with the flow conditions anticipated in plant operation with a Mo-100 target inline. The additional thermal energy generated from beam heating of the Mo-100 disks was not included in these tests. Thirteen long duration 500 to 1000 hour tests have been completed since the first test was performed in January of 2016. All thirteen long duration tests have proven successful in exposing preventable issues related to oil and helium leaks. All blower tests to this date have resulted in stable blower performance and consistency. A summary of the results for the end of the thirteenth test is included in this report. Complete details for the previous tests are shown in the reports, Production Facility Prototype Blower 1000 Hour Test Results, II, III, and IV.

36 MATERIALS SCIENCE↗

Sierra/SolidMechanics 5.2 Verification Tests Manual

Presented in this document is a small portion of the tests that exist in the Sierra/SolidMechanics (Sierra / SM) verification test suite. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the test are checked versus the correct analytical result. For each of the tests presented in this document, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This document can be used to confirm that a given code capability is verified or referenced as a compilation of example problems. Additional example problems are provided in the Sierra/SM Example Problems Manual. Note, many other verification tests exist in the Sierra/SM test suite, but have not yet been included in this manual.

97 MATHEMATICS AND COMPUTING↗