Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

A Comparative Analysis of Occupant Response Between Component and Full Vehicle Tests of Fokker F28 Aircraft Hardware

In 2019, the National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) conducted a full-scale crash test of a Fokker F28 MK1000 aircraft. This test concluded a multi-year research effort in which two component fuselage sections of a matching Fokker F28 aircraft were previously tested under similar vertical impact conditions. Due to facility and cost constraints of full-scale testing, aircraft are typically evaluated through component level tests (i.e. vertical drops of fuselage subsections or isolated seat tests). Although more practical, these tests are limited in their ability fully replicate the complex multi-axis loading environment induced on the occupants during a full-aircraft crash event. Because of this, there is risk that component level testing does not provide a complete assessment of vehicle crashworthiness. Comparative analysis between full-scale and component level testing of the Fokker F28 aircraft provides an excellent opportunity to evaluate differences in crashworthiness prediction made between these levels of test fidelity. In this study, Anthropomorphic Test Device (ATD, a.k.a crash test dummies) responses measured during the Fokker full scale impact test were compared to those measured in the component fuselage section drops. A variety of ATD configurations (5th, 50th, 95th) and positions (upright, braced) were tested in both the full-scale and component tests. ATD injury metric response comparisons were made across these ATD variations in addition to comparisons made with respect to ATD location within the vehicle. Results found the addition of horizontal impact velocity, achieved in the full-scale testing, along with aircraft structural effects altered ATD based crashworthiness assessment of the vehicle.

Crashworthiness↗

Use of nucleic acid amplification testing for rapid detection of Mycobacterium tuberculosis complex among U.S. tuberculosis patients from 2011–2017

Background: Nucleic acid amplification (NAA) tests rapidly detect Mycobacterium tuberculosis complex directly from clinical specimens, providing valuable results for those evaluated for tuberculosis. Methods: We analyzed characteristics of cases with NAA testing performed, compared cases with positive and negative NAA test results, and calculated turnaround time and time to treatment for all verified cases reported to the National Tuberculosis Surveillance System in the United States during 2011–2017. Results: Among 67082 verified tuberculosis cases with NAA testing information, 30820 (45.9%) were reported as not having an NAA test performed; the proportion without NAA testing declined annually, from 60.5% in 2011 to 33.6% in 2017. Of 67082 verified cases, 27912 (41.6%) had positive, 8215 (12.2%) had negative, and 135 (0.2%) had indeterminate NAA test results. Among the 33937 cases with an acid-fast bacilli (AFB) smear-positive result, 24093 (70.9%) had an NAA test performed; 11490 of the 30244 (38.0%) with an AFB smear-negative result had an NAA test performed. Although sputum was the most common specimen type tested, 79.8% (7023/8804) of nonsputum specimen types had a positive NAA test result. Overall, 63.7% of cases with laboratory testing had NAA test results reported <6 days following specimen collection; for 13891 cases not yet on treatment, median time to treatment after the laboratory report date was 2 days. Conclusions: Our analyses demonstrate increased NAA test utilization between 2011 and 2017. However, a large proportion of cases did not have an NAA test performed, reflecting challenges in broader uptake, suggesting an opportunity to expand use of this diagnostic methodology.

59 BASIC BIOLOGICAL SCIENCES↗

Automated Generation and Assessment of Autonomous Systems Test Cases

This slide presentation reviews some of the issues concerning verification and validation testing of autonomous spacecraft routinely culminates in the exploration of anomalous or faulted mission-like scenarios using the work involved during the Dawn mission's tests as examples. Prioritizing which scenarios to develop usually comes down to focusing on the most vulnerable areas and ensuring the best return on investment of test time. Rules-of-thumb strategies often come into play, such as injecting applicable anomalies prior to, during, and after system state changes; or, creating cases that ensure good safety-net algorithm coverage. Although experience and judgment in test selection can lead to high levels of confidence about the majority of a system's autonomy, it's likely that important test cases are overlooked. One method to fill in potential test coverage gaps is to automatically generate and execute test cases using algorithms that ensure desirable properties about the coverage. For example, generate cases for all possible fault monitors, and across all state change boundaries. Of course, the scope of coverage is determined by the test environment capabilities, where a faster-than-real-time, high-fidelity, software-only simulation would allow the broadest coverage. Even real-time systems that can be replicated and run in parallel, and that have reliable set-up and operations features provide an excellent resource for automated testing. Making detailed predictions for the outcome of such tests can be difficult, and when algorithmic means are employed to produce hundreds or even thousands of cases, generating predicts individually is impractical, and generating predicts with tools requires executable models of the design and environment that themselves require a complete test program. Therefore, evaluating the results of large number of mission scenario tests poses special challenges. A good approach to address this problem is to automatically score the results based on a range of metrics. Although the specific means of scoring depends highly on the application, the use of formal scoring - metrics has high value in identifying and prioritizing anomalies, and in presenting an overall picture of the state of the test program. In this paper we present a case study based on automatic generation and assessment of faulted test runs for the Dawn mission, and discuss its role in optimizing the allocation of resources for completing the test program.

Testing challenges↗

James Webb Space Telescope Optical Telescope Element / Integrated Science Instrument Module (OTIS) Cryogenic Vacuum Test Part II: Thermal Analysis

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, was completed in 2017 at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A comprehensive thermal analysis campaign was undertaken to predict the behavior of the test payload during its transition to cryogenic temperatures and back to ambient, and exhaustive preparations for off-nominal scenarios were studied due to the increased possibility of unanticipated events during the 100-day test length. This current four-part online course for the NASA Engineering and Safety Center (NESC) Academy gives a thorough overview of the multiple years of preparation executed by hundreds of individuals to ensure the success of the JWST OTIS CV Test. Part I will introduce the major components of James Webb and specifically the OTIS CV Test thermal architecture. Part II will encompass the extensive thermal analysis performed to prepare for the test. Part III will talk about the preparations for off-nominal events: what analysis was done, and how steps were taken pre-test to anticipate unexpected circumstances and mitigate their impacts to hardware and test timeline. Part IV is a recap of the lessons learned from the thermal perspective for both the payload and ground support equipment (GSE) test conductors. It is hoped that the insight gained from the OTIS CV test campaign will benefit planning and execution for upcoming large cryogenic missions.

Testing↗

Remotely Administered Psychoacoustic Test for sUAS Noise to Gauge Feasibility of Remote UAM Noise Study

The National Aeronautics and Space Administration (NASA) remotely administered a psychoacoustic test in fall of 2022 as the first of two phases of a cooperative Urban Air Mobility (UAM) vehicle noise human response study. The first phase, the Feasibility Test, described in this paper, determined the feasibility of the remote test method, in contrast to a previous in-person psychoacoustic test that found an annoyance response difference between small unmanned aerial system (sUAS) noise and ground vehicle noise. This paper discusses the Feasibility Test online layout, sound calibration method, remote test software development, stimuli selection, test subject recruitment, and test administration. Test performance is measured through comparison of annoyance response data with the previous in-person test results. The paper also investigates if providing a contextual cue to test subjects influenced their annoyance response. Response differences between test subjects in geographically distinct areas are analyzed. Administrative challenges that were encountered during the test are discussed. The second phase of this study, the implementation phase, will use a remote (web-based) test method and leverage the cooperation of multiple government agencies, academia, and industry to gain human response insights from a wide range of UAM vehicle sounds that would be challenging for a single organization to acquire. Improvements to administering a remote test for the implementation phase of the UAM vehicle noise human response study are recommended.

Remote Psychoacoustic Test↗

Remotely Administered Psychoacoustic Test for sUAS Noise to Gauge Feasibility of Remote UAM Noise Study

The National Aeronautics and Space Administration (NASA) remotely administered a psychoacoustic test in fall of 2022 as the first of two phases of a cooperative Urban Air Mobility (UAM) vehicle noise human response study. The first phase, the Feasibility Test, described in this paper, determined the feasibility of the remote test method, in contrast to a previous in-person psychoacoustic test that found an annoyance response difference between small unmanned aerial system (sUAS) noise and ground vehicle noise. This paper discusses the Feasibility Test online layout, sound calibration method, remote test software development, stimuli selection, test subject recruitment, and test administration. Test performance is measured through comparison of annoyance response data with the previous in-person test results. The paper also investigates if providing a contextual cue to test subjects influenced their annoyance response. Response differences between test subjects in geographically distinct areas are analyzed. Administrative challenges that were encountered during the test are discussed. The second phase of this study, the implementation phase, will use a remote (web-based) test method and leverage the cooperation of multiple government agencies, academia, and industry to gain human response insights from a wide range of UAM vehicle sounds that would be challenging for a single organization to acquire. Improvements to administering a remote test for the implementation phase of the UAM vehicle noise human response study are recommended.

Remote Psychoacoustic Test↗

Validation Testing for Molten Chloride Reactor Experiment Equipment Removal and Disposal Techniques

The Molten Chloride Reactor Experiment (MCRE) will be the first reactor featuring a fast-spectrum molten chloride circulating nuclear fuel system in the world. Planning for equipment removal and disposal (ERD) of MCRE has identified several technology gaps due to the unique environment of this nuclear experiment. Some of the gaps arise from the application of existing disassembly and/or sizing methods to novel material forms or in novel configurations. Others arise from unknown material behavior. This paper summarizes proposed test plans for ERD validation experiments to address these complicated or unknown equipment removal procedures. At the Waste Management Symposia in 2024, the Idaho National Laboratory (INL) MCRE ERD team presented the challenges associated with hosting multiple nuclear experiments in series with only brief transition periods between systems. Such difficulties include higher dose rates, the presence of radioisotopes infrequently encountered in reactor decommissioning and radioactive waste management, lack of intrinsic remote-operations infrastructure in the test bed, space constraints in the test bed, and contamination minimization requirements. To address these challenges, remote or semi-remote technologies are planned to be implemented in a non-hot cell environment with limited space availability. The team also discussed how a systems engineering approach is being used for conceptual development and design of equipment removal systems to address these challenges. For example, to reduce constraints for the removal of more difficult components, non-activated, noncontaminated elements are planned to be taken out first where possible. Still, there are complexities associated with the remaining components. In this work, the operational framework for MCRE ERD was reviewed for technical gaps and open questions, and test plans were drafted to address these areas. The tests plans were written for the following categories: vision systems, pipe cutting, drill/grout/filler, flush salt, and miscellaneous, with the miscellaneous group consisting of tests like techniques for removing bearings and reflector bricks. The test plans explore material, infrastructure, and staffing requirements needed for test execution. The test plans additionally focus on the evaluation of success. Determining the outcome of a test is imperative - as these explorative actions have the potential to rearrange or re-scope planned ERD activities. Success criteria identified thus far include required tool output, required area(s), debris production and mitigation, and repeatability. Test plans are an essential aspect of the systems engineering approach to MCRE ERD. They are used as the beginning steps in defining use cases for the ERD system. Performance of the validation tests is expected to begin in the summer of 2025 and will take approximately 9 to 12 months to complete. Execution of these plans will be expedited by specifying test needs ahead of time, facilitating efficient interactions with any subcontractors tasked with running the requested tests. Evaluating the outcomes of these tests will inform MCRE ERD procedures and timing and will also identify additional technical constraints for the MCRE ERD System. This upfront process optimization effort will help the project save time and resources at the end of the experiment.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Analysis of Air-Purifying Respirator (APR) and Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on a Hanford AP Tank Farm Exhauster Slipstream (Volume 1)

Washington River Protection Solutions (WRPS) tested four types of chemical cartridges for use in air-purifying respirators (APR) and powered air-purifying respirators (PAPR). These tests were undertaken to determine the period of time that the cartridges would provide adequate performance1 for APRs and PAPRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from vapors exiting the Hanford AP tank farm exhauster slipstream. The Occupational Safety and Health Administration (OSHA) considers cartridge testing to be a valid approach for establishing cartridge change schedules. Testing commonly is applied in situations where mixtures of COPCs exist and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate the cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Cartridge testing on a slipstream from the Hanford AP tank exhauster was conducted on March 23-24, 2018. This testing focused on both APR and PAPR cartridges. Previous testing of APR cartridges was conducted on the AP exhauster in June of 2016. However, an AP exhauster upgrade was completed in September 2016. In the most recent testing, slipstream vapors from the new AP exhauster were fed to two respirator cartridge test stands, one for the PAPR respirator cartridges and the other for the APR respirator cartridges. Both the APR and PAPR test stands were developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose APR cartridges—SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina)—were assessed on separate days using the APR cartridge test stand. Multipurpose PAPR cartridges—MSA OptiFilter TL (MSA Safety Inc., Pittsburgh, Pennsylvania) and 3M FR-57 (3M Company, Maplewood, Minnesota)—were also tested consecutively over the same two days as the APR cartridge tests, using the PAPR cartridge test stand. Sample media (i.e., sorbent tubes) were used to collect samples of the vapor stream entering and exiting the respirator cartridges, and the samples then were analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life. The key conclusions from the analysis are described below.

61 RADIATION PROTECTION AND DOSIMETRY↗

FY23 Report on Water NSTF Testing at Two-Phase Conditions: Off-normal Scenarios

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report details the experimental activities and upgrades performed during the program’s fifth year of water-based operation. The theme of this year of testing was examining off-normal scenarios. In practice, that meant examining scenarios with blockages or other design basis conditions. From a maintenance and capability standpoint that meant assessing valving options for implementing blockages, assessing drain and refill capabilities, and ensuring in all cases that operators could safely, efficiently, and repeatably bring the facility to an off-normal condition and return it to the normal operating state. In one notable case, no solution existed, nor was a solution commercially available, that met the facility needs for implementing blockages within the two-phase region of the chimney. A valve and feedthrough were custom-designed for NSTF to operate submerged in saturated water while being safely actuated from outside the tank. The fifth year of testing included eight matrix tests consisting of 162 hours of active heating, 9,735 kWh of electrical heating, with seven tests classified as Accepted per NQA-1 and one as Trending. All matrix tests were performed at two-phase flow conditions. The power parametric series from previous years was extended to include another scenario with a decay load equivalent to 1.75 MWt, full scale, further resolving the system flow oscillation response as a function of input power. A depletion test was performed to extend previous work and examine the system’s approach to stagnation and geysering that were not previously observed. This test began at an initial inventory level of 50%, prototypic power of 2.1 MWt, and employed an accelerated drain of 0.75 gpm plus boiloff until stagnation conditions were achieved and multiple geysering events were recorded. Further exploring the geysering phenomenon was a separate effects test examining static boiling in the risers and chimney. This static boiling test was performed at 48 kWe, a higher power than testing in the previous year, and included enhancements to the drain system to remove inventory in a better-controlled and more reliable manner. Two tests were performed, at prototypic conditions of 1.4 MWt and 2.4 MWt, respectively, examining the system response to throttled conditions in the singlephase region of the piping. A ball valve immediately before he riser inlet header was increasingly throttled, progressing the system through a repeatable pattern of two-phase oscillations and stable regimes before ultimately inducing stagnation and geysering. Concluding the year, two tests were performed at baseline conditions of 70% initial inventory level and 2.1 MWt of prototypic decay heat to examine both repeatability and the response to throttling within the two-phase region, at the inventory tank inlet using the custom valve mentioned above. The first such test repeated transient operating conditions and revealed significant sensitivity t

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Radiometric Testing of Germicidal UV Products, Round 1: UV-C Towers and Whole-Room Luminaires (CALiPER Summary Report)

This summary report analyzes the independently tested performance of 13 germicidal ultraviolet (GUV) products purchased between February and July 2022. A companion full report (DOE 2023) provides additional information and discussion of the tested products, test methods, and results. The products were of three different types: • Seven portable, consumer-oriented GUV towers designed to be placed on the floor or a desk of an unoccupied room to disinfect air and surfaces. Five of these products used LED sources and two products had low-pressure mercury (LPM) sources. • One GUV whole-room luminaire designed to be installed on a ceiling to disinfect air when a room is occupied. This product had LED sources. • Five GUV troffer or high-bay style whole-room luminaires designed to be installed in or suspended from a ceiling to disinfect air and surfaces when a room is unoccupied. All five had LPM sources. Product testing covered radiometric and electrical performance for all 13 products as well as photobiological safety evaluation if product documentation included testable claims. Measurement results enable comparison between products and against manufacturer or vendor claims. Testing identified numerous issues related to the accuracy of claimed GUV product performance. Claims were often untestable, contradictory, ambiguous, or used incorrect units and/or terminology. When claims were testable, they often did not match test results. For example, three LED products that claimed to emit UV-C emitted only UV-A. Product claim issues were more common among consumer-oriented tower products, but all product types exhibited problems with accurate performance claims. The UV-C radiant efficiency (calculated as UV-C output power divided by electrical input power) of the products varied widely, even among similar products using the same source technologies. For example, the UV-C radiant efficiency of LPM products varied by greater than a factor of three for the same product type, indicating a large potential energy savings opportunity for products that are better designed for efficiency. LED products had orders-of-magnitude lower UV-C radiant efficiency than LPM products. This study also identified several testing challenges and limitations. Most significant among these is the capability to accurately test and report the performance of larger GUV products. Whereas integrating spheres are used to quickly measure total radiant flux (i.e., output power) and spectral distribution, goniometers are used to measure radiant intensity distribution (from which radiant flux can be calculated). Integrating spheres require a specialized and costly coating to test UV, and the testing laboratory for this round of products had only a 20-inch diameter hemisphere with this capability. The integrating sphere accommodated just 2 of the 10 UV-C emitting products. Goniometer testing had a different size limitation in that mirrors typically used to increase goniometer test distance to the far field reflect little to no UV. As a result, the study evaluated only 6 of 13 products in the far field. Electronic files of UV-C intensity data for the other 7 products, which would typically be imported into design software for designing GUV applications, may not be reliable for predicting irradiance at arbitrary far-field distances (IES 2022a; CIE 2020). Specifiers and buyers of GUV products need accurate performance claims and data to deploy GUV technology safely and effectively. This CALiPER GUV Round 1 report demonstrates the significant education and training manufacturers and vendors still require to accurately test and report the performance of their GUV products. Further industry standards and guidelines may address testing limitations and improve test methods, product performance, and the accuracy of performance claims.

42 ENGINEERING↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

The Space Shuttle's testing gauntlet

The Space Shuttle verification program is detailed, with verification network flowcharts. Performance qualification tests, life endurance tests, structural verification tests, and vibration/dynamic tests of components, subsystems, and major systems at various test levels are dealt with. Ground tests, static firings of the Shuttle main engine, external-tank separation tests, ground vibration tests of vehicle mated to external tank, and main propulsion tests and test scheduling are described. Functions of the Shuttle avionics integration laboratory and electronic systems test laboratory are discussed. Test preparations and procedures for orbital flight testing, launch pad tests, and Shuttle approach- and landing-tests are described.

Mcintosh, G. P.↗

Transient Pressure Test Article (TPTA) 1.1 and 1.1A, volume 1

This final test report presents the results obtained during the static hot firing and cold-gas high Q tests of the first Transient Pressure Test Article (TPTA) 1.1. The TPTA consisted of field test joints A and B, which were the original RSRM J-insulation configuration, with a metal capture feature. It also consisted of a flight configuration nozzle-to-case test joint (Joint D) with shorter vent slots. Fluorocarbon O-rings were used in all the test joints. The purpose of the TPTA tests is to evaluate and characterize the RSMR field and nozzle-to-case joints under the influence of ignition and strut loads during liftoff anf high Q. All objectives of the cold-gas high Q (TPTA 1.1A) test were met and all measurements were close to predicted values. During the static hot-firing test (TPTA 1.1), the motor was inadvertently plugged by the quench injector plug, making it a more severe test, although no strut loads were applied. The motor was depressurized after approximately 11 min using an auxiliary system, and no anomalies were noted. In the static hot-firing test, pressure was incident on the insulation and the test joint gaps were within the predicted range. During the static hot-firing test, no strut loads were applied because the loading system malfunctioned. For this test, all measurements were within range of similar tests performed without strut loads.

Rebells, Clarence A.↗

M-52 spray booth qualification test

The procedures, performance, and results obtained from the M-52 spray booth qualification test are documented. The test was conducted at Thiokol Corporation, Space Operations, M-52 Inert Parts Preparation facility. The purpose of this testing sequence was to ensure the spray booth would produce flight qualified hardware. The testing sequence was conducted in two series. The first series was conducted under CTP-0142, Revision 1. The second series was conducted in accordance with CTP-0142, Revision 2. The test sequence started with CTP-0142, Revision 1. The series consisted of the contamination removal test and the performance test. The contamination removal test was used to assess the Teflon level in the spray booth. The performance test consisted of painting and Chemloking a forward dome inside the spray booth per flight procedures. During the performance test, two sets of witness panels (case/insulation and steel/epoxy/steel) were prepared and pull tested. The CTP-0142, Revision 2, series of testing consisted of re-testing the steel/epoxy/steel witness panels. The pull tests analysis indicates the results of the tensile tests were comparable to the systems tunnel witness panel database. The exposed panel set and the control panel set average tensile values were above the 1-basis lower limits established on the systems tunnel witness panel database. It is recommended that the M-52 spray booth be qualified for producing flight hardware.

Source record↗

Influence of test configuration on the combustion characteristics of polymers as ignition sources

The experimental evaluation of polymers as ignition sources for metals was accomplished at the NASA White Sands Test Facility (WSTF) using a standard promoted combustion test. These tests involve the transient burning of materials in high-pressure oxygen environments. They have provided data from which design decisions can be made; data include video recordings of ignition and non-ignition for specific combinations of metals and polymers. Other tests provide the measured compositions of combustion products for polymers at select burn times and an empirical basis for estimating burn rates. With the current test configuration, the detailed analysis of test results requires modeling a three-dimensional, transient convection process involving fluid motion, thermal conduction and convection, the diffusion of chemical species, and the erosion of sample surface. At the high pressure extremes, it even requires the analysis of turbulent, transient convection where the physics of the problem are not well known and the computation requirements are not practical at this time. An alternative test configuration that can be analyzed with a relatively-simple convection model was developed during the summer period. The principal change constitutes replacing a large-diameter polymer disk at the end of the metal test rod with coaxial polymer cylinders that have a diameter nearer to that of the metal rod. The experimental objective is to assess the importance of test geometries on the promotion of metal ignition by testing with different lengths of the polymer and, with an extended effort, to analyze the surface combustion in the redesigned promoted combustion tests through analytical modeling of the process. The analysis shall use the results of cone-calorimeter tests of the polymer material to model primary chemical reactions and, with proper design of the promoted combustion test, modeling of the convection process could be conveniently limited to a quasi-steady boundary layer analysis where the economical solution of parabolic equations is involved. The products for the summer period are: (1) a conceptual-level redesign of the test apparatus, and (2) the development and use of an approximate integral boundary layer analysis to demonstrate the influence of geometry changes prior to testing. A computer code STAN5, an accurate numerical boundary layer model whose earlier versions were developed for the NASA Lewis Research Center by the Fellow, also was installed and validated on the WSTF and New Mexico State University computer systems as a starting point in the development of a more detailed fluid mechanics and combustion model.

Julien, Howard L.↗

Recent Advances in Hydrogen Peroxide Propulsion Test Capability at NASA's Stennis Space Center E-Complex

In recent years, the rocket propulsion test capability at NASA's John C. Stennis Space Center's (SSC) E-Complex has been enhanced to include facilitization for hydrogen peroxide (H2O2) based ground testing. In particular, the E-3 test stand has conducted numerous test projects that have been reported in the open literature. These include combustion devices as simple as small-scale catalyst beds, and larger devices such as ablative thrust chambers and a flight-type engine (AR2-3). Consequently, the NASA SSC test engineering and operations knowledge base and infrastructure have grown considerably in order to conduct safe H2O2 test operations with a variety of test articles at the component and engine level. Currently, the E-Complex has a test requirement for a hydrogen peroxide based stage test. This new development, with its unique set of requirements, has motivated the facilitization for hydrogen peroxide propellant use at the E-2 Cell 2 test position in addition to E-3. Since the E-2 Cell 2 test position was not originally designed as a hydrogen peroxide test stand, a facility modernization-improvement project was planned and implemented in FY 2002-03 to enable this vertical engine test stand to accomodate H2O2. This paper discusses the ongoing enhancement of E-Complex ground test capability, specifically at the E-3 stand (Cell 1 and Cell 2) and E-2 Cell 2 stand, that enable current and future customers considerable test flexibility and operability in conducting their peroxide based rocket R&D efforts.

Jacks, Thomas E.↗

Expanding Hydrogen Peroxide Propulsion Test Capability at NASA's Stennis Space Center E-Complex

In recent years, the rocket propulsion test capability at NASA s John C. Stennis Space Center's (SSC) E-Complex has been enhanced to include facilitization for hydrogen peroxide (H2O2) based ground testing. In particular, the E-3 test stand has conducted numerous test projects that have been reported in the open literature. These include combustion devices as simple at small-scale catalyst beds, and larger devices such as ablative thrust chambers and a flight-type engine (AR2-3). Consequently, the NASA SSC test engineering and operations knowledge base and infrastructure have grown considerably in order to conduct safe H2O2 test operations with a variety of test articles at the component and engine level. Currently, the E-Complex has a test requirement for a hydrogen peroxide based stage test. This new development, with its unique set of requirements, has motivated the facilitization for hydrogen peroxide propellant use at the E-2 Cell 2 test position in addition to E-3. Since the E-2 Cell 2 test position was not originally designed as a hydrogen peroxide test stand, a facility modernization- improvement project was planned and implemented in FY 2002-03 to enable this vertical engine test stand to accommodate H2O2. This paper discusses the ongoing enhancement of E-Complex ground test capability, specifically at the E-3 stand (Cell 1 and Cell 2) and E-2 Cell 2 stand, that enable current and future customers considerable test flexibility and operability in conducting their peroxide based rocket R&D efforts.

Jacks, Thomas E.↗