Assemby, test, and launch operations for the Mars Exploration Rovers

In January of 2004, NASA's twin Mars rovers, Spirit and Opportunity, successfully landed on opposite sides of the Red Planet after a seven month Earth to Mars cruise period. Both vehicles have operated well beyond their 90 day primary mission design life requirements. The Assembly, Test, and Launch Operations (ATLO) program for these missions presented unique technical and schedule challenges to the team at the Jet Propulsion Laboratory (JPL). Among these challenges were a highly compressed schedule and late deliveries leading to extended double shift staffing, dual spacecraft operations requiring test program diversification and resource arbitration, multiple atypical test configurations for airbag/rocket landings and surface mobility testing, and verification of an exceptionally large number of separations, deployments, and mechanisms. This paper discusses the flight system test philosophies and approach, and presents lessons learned.

Assembly, Test, and Launch Operations (ATLO)↗

X-57 Traction Power and Command Systems Development

This paper describes the final, as-built design of the X‑57 Maxwell aircraft power and command system architecture that implements the electrified propulsion capability. The development of the traction power, command, and avionics power subsystems proceeded as planned at the initial project critical design review, but improvements to the design were identified following the development of detailed operations concepts and integrated subsystem and system testing. The redundant architecture with A‑side and B‑side buses provided a robust framework for a developmental system that would turn out to have a lower technology readiness than had been assumed upon project formulation. As the project team identified reliability or performance gaps in the electrified propulsion powertrain components and their interactions with the other vehicle systems, the traction power, command, and avionics architectures were modified to accommodate the modified systems. Following the publication of the planned design approach at the critical design review milestone [1], the project team developed the flight hardware and software, integrated the systems, and adjusted the design and qualification activities to address gaps in the components, system architecture, and requirements as the gaps were realized. In addition to inherent challenges in development of these subsystems, the integration of this new technology with adjacent critical systems in an aircraft configuration posed additional challenges that drove design considerations across the subsystem development and the other vehicle systems. Integration complications included electromagnetic compatibility, thermal performance, and tolerance of single-point failures internal and external to the powerplant. Development of a qualification program was required for the new motors, inverters, and batteries, and hardware performance during component qualification fed back into the development process and led lessons learned and redesign of key elements.

distributed propulsion↗

Raising TRL of Your Lunar Payload

Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.

Lunar Regolith Simulant↗

Raising TRL of Your Lunar Payload

Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.

Laboratories↗

Selection of Solar Simulator for Solar Dynamic Ground Test

The 2 kWe Solar Dynamic (SD) Ground Test Demonstration (GTD) experiment will be conducted in 1995 at NASA Lewis Research Center (LeRC). This solar dynamic power system test will be conducted in a simulated space environment and will require an artificial sun. To address the solar simulator requirements for the GTD, Arnold Engineering Development Center (AEDC) was hired under contract to review and visit four existing solar simulator facilities. The four facilities included, AEDC's Mark 1 Chamber, NASA-JSC Chamber A, AEDC's 12V Chamber, and NASA-JPL Space Simulator Chamber. Two design concepts were considered following several months of evaluating existing solar simulator facilities throughout the United States. To satisfy system requirements for the SD GTD experiment the solar simulator needs to provide a uniform light flux to the SD concentrator, provide the light within a subtense angle of one degree, and provide an intensity of one solar constant (1.37 kW/sq m) at airmass zero. Most solar simulators are designed for supplying heat loads to spacecraft where a cone angle as large as 3 degrees is acceptable. It was also concluded that a solar simulator, such like these considered in the AEDC study, would require major facility modifications for NASA LeRC and result in significant impacts to the program. The advanced solar simulator concept developed by NASA LeRC will meet the system requirements for the SD GTD experiment Since SD GTD solar simulator requirements could not be addressed by existing simulator, an advanced concept was considered.

Tolbert, Carol M.↗

The design, fabrication and delivery of a spacelab neutral buoyancy Instrument Pointing System (IPS) mockup

Underwater simulations of EVA contingency operations such as manual jettison, payload disconnect, and payload clamp actuation were used to define crew aid needs and mockup pecularities and characteristics to verify the validity of simulation using the trainer. A set of mockup instrument pointing system tests was conducted and minor modifications and refinements were made. Flight configuration struts were tested and verified to be operable by the flight crew. Tasks involved in developing the following end items are described: IPS gimbal system, payload, and payload clamp assembly; the igloos (volumetric); spacelab pallets, experiments, and hardware; experiment, and hardware; experiment 7; and EVA hand tools, support hardware (handrails and foot restraints). The test plan preparation and test support are also covered.

Vanvalkenburgh, C. N.↗

A data acquisition and storage system for the ion auxiliary propulsion system cyclic thruster test

A nine-track tape drive interfaced to a standard personal computer was used to transport data from a remote test site to the NASA Lewis mainframe computer for analysis. The Cyclic Ground Test of the Ion Auxiliary Propulsion System (IAPS), which successfully achieved its goal of 2557 cycles and 7057 hr of thrusting beam on time generated several megabytes of test data over many months of continuous testing. A flight-like controller and power supply were used to control the thruster and acquire data. Thruster data was converted to RS232 format and transmitted to a personal computer, which stored the raw digital data on the nine-track tape. The tape format was such that with minor modifications, mainframe flight data analysis software could be used to analyze the Cyclic Ground Test data. The personal computer also converted the digital data to engineering units and displayed real time thruster parameters. Hardcopy data was printed at a rate dependent on thruster operating conditions. The tape drive provided a convenient means to transport the data to the mainframe for analysis, and avoided a development effort for new data analysis software for the Cyclic test. This paper describes the data system, interfacing and software requirements.

Hamley, John A.↗

Plant growth and mineral recycle trade-offs in different scenarios for a CELSS

Data for hydroponic plant growth in a manned system test is combined with nutritional recommendations to suport trade-off calculations for closed and partially closed life support system scenarios. Published data are used as guidelines for the masses of mineral nutrients needed for higher plant production. The results of calculations based on various scenarios are presented for various combinations of plant growth chamber utilization and fraction of mineral recycle. Estimates are made of the masses of material needed to meet human nutritional requirements in the various scenarios. It appears that food production from a plant growth chamber with mineral recycle is favorable to reduction of the total launch weight in missions exceeding 3 years.

Ballou, E. V.↗

Automated load management for spacecraft power systems

An account is given of the results of a study undertaken by NASA's Marshall Space Flight Center to design and implement the load management techniques for autonomous spacecraft power systems, such as the Autonomously Managed Power System Test Facility. Attention is given to four load-management criteria, which encompass power bus balancing on multichannel power systems, energy balancing in such systems, power quality matching of loads to buses, and contingency load shedding/adding. Full implementation of these criteria calls for the addition of a second power channel.

Lollar, Louis F.↗

Numerical propulsion system simulation

The cost of implementing new technology in aerospace propulsion systems is becoming prohibitively expensive. One of the major contributors to the high cost is the need to perform many large scale system tests. Extensive testing is used to capture the complex interactions among the multiple disciplines and the multiple components inherent in complex systems. The objective of the Numerical Propulsion System Simulation (NPSS) is to provide insight into these complex interactions through computational simulations. This will allow for comprehensive evaluation of new concepts early in the design phase before a commitment to hardware is made. It will also allow for rapid assessment of field-related problems, particularly in cases where operational problems were encountered during conditions that would be difficult to simulate experimentally. The tremendous progress taking place in computational engineering and the rapid increase in computing power expected through parallel processing make this concept feasible within the near future. However it is critical that the framework for such simulations be put in place now to serve as a focal point for the continued developments in computational engineering and computing hardware and software. The NPSS concept which is described below will provide that framework.

R.W. Claus↗

Numerical propulsion system simulation

The cost of implementing new technology in aerospace propulsion systems is becoming prohibitively expensive. One of the major contributors to the high cost is the need to perform many large scale system tests. Extensive testing is used to capture the complex interactions among the multiple disciplines and the multiple components inherent in complex systems. The objective of the Numerical Propulsion System Simulation (NPSS) is to provide insight into these complex interactions through computational simulations. This will allow for comprehensive evaluation of new concepts early in the design phase before a commitment to hardware is made. It will also allow for rapid assessment of field-related problems, particularly in cases where operational problems were encountered during conditions that would be difficult to simulate experimentally. The tremendous progress taking place in computational engineering and the rapid increase in computing power expected through parallel processing make this concept feasible within the near future. However it is critical that the framework for such simulations be put in place now to serve as a focal point for the continued developments in computational engineering and computing hardware and software. The NPSS concept which is described will provide that framework.

Lytle, John K.↗

An Axial-Torsional, Thermomechanical Fatigue Testing Technique

A technique for conducting strain-controlled, thermomechanical, axial-torsional fatigue tests on thin-walled tubular specimens was developed. Three waveforms of loading, namely, the axial strain waveform, the engineering shear strain waveform, and the temperature waveform were required in these tests. The phasing relationships between the mechanical strain waveforms and the temperature and axial strain waveforms were used to define a set of four axial-torsional, thermomechanical fatigue (AT-TMF) tests. Real-time test control (3 channels) and data acquisition (a minimum of 7 channels) were performed with a software program written in C language and executed on a personal computer. The AT-TMF testing technique was used to investigate the axial-torsional thermomechanical fatigue behavior of a cobalt-base superalloy, Haynes 188. The maximum and minimum temperatures selected for the AT-TMF tests were 760 and 316 C, respectively. Details of the testing system, calibration of the dynamic temperature profile of the thin-walled tubular specimen, thermal strain compensation technique, and test control and data acquisition schemes, are reported. The isothermal, axial, torsional, and in- and out-of-phase axial-torsional fatigue behaviors of Haynes 188 at 316 and 760 C were characterized in previous investigations. The cyclic deformation and fatigue behaviors of Haynes 188 in AT-TMF tests are compared to the previously reported isothermal axial-torsional behavior of this superalloy at the maximum and minimum temperatures.

Kalluri, Sreeramesh↗

International Low-Earth-Orbit Spacecraft Materials Test Program Initiated for Better Prediction of Durability and Performance

Spacecraft in low Earth orbit (LEO) are subjected to many components of the environment, which can cause them to degrade much more rapidly than intended and greatly shorten their functional life. The atomic oxygen, ultraviolet radiation, and cross contamination present in LEO can affect sensitive surfaces such as thermal control paints, multilayer insulation, solar array surfaces, and optical surfaces. The LEO Spacecraft Materials Test (LEO-SMT) program is being conducted to assess the effects of simulated LEO exposure on current spacecraft materials to increase understanding of LEO degradation processes as well as to enable the prediction of in-space performance and durability. Using ground-based simulation facilities to test the durability of materials currently flying in LEO will allow researchers to compare the degradation evidenced in the ground-based facilities with that evidenced on orbit. This will allow refinement of ground laboratory test systems and the development of algorithms to predict the durability and performance of new materials in LEO from ground test results. Accurate predictions based on ground tests could reduce development costs and increase reliability. The wide variety of national and international materials being tested represent materials being functionally used on spacecraft in LEO. The more varied the types of materials tested, the greater the probability that researchers will develop and validate predictive models for spacecraft long-term performance and durability. Organizations that are currently participating in the program are ITT Research Institute (USA), Lockheed Martin (USA), MAP (France), SOREQ Nuclear Research Center (Israel), TNO Institute of Applied Physics (The Netherlands), and UBE Industries, Ltd. (Japan). These represent some of the major suppliers of thermal control and sensor materials currently flying in LEO. The participants provide materials that are exposed to selected levels of atomic oxygen, vacuum ultraviolet radiation, contamination, or synergistic combined environments at the NASA Lewis Research Center. Changes in characteristics that could affect mission performance or lifetime are then measured. These characteristics include changes in mass, solar absorptance, and thermal emittance. The durability of spacecraft materials from U.S. suppliers is then compared with those of materials from other participating countries. Lewis will develop and validate performance and durability prediction models using this ground data and available space data. NASA welcomes the opportunity to consider additional international participants in this program, which should greatly aid future spacecraft designers as they select materials for LEO missions.

Rutledge, Sharon K.↗

Capability Description for NASA's F/A-18 TN 853 as a Testbed for the Integrated Resilient Aircraft Control Project

The NASA F/A-18 tail number (TN) 853 full-scale Integrated Resilient Aircraft Control (IRAC) testbed has been designed with a full array of capabilities in support of the Aviation Safety Program. Highlights of the system's capabilities include: 1) a quad-redundant research flight control system for safely interfacing controls experiments to the aircraft's control surfaces; 2) a dual-redundant airborne research test system for hosting multi-disciplinary state-of-the-art adaptive control experiments; 3) a robust reversionary configuration for recovery from unusual attitudes and configurations; 4) significant research instrumentation, particularly in the area of static loads; 5) extensive facilities for experiment simulation, data logging, real-time monitoring and post-flight analysis capabilities; and 6) significant growth capability in terms of interfaces and processing power.

Hanson, Curt↗

SSV Launch Monitoring Strategies: HGDS Design Implementation Through System Maturity

With over 500,000 gallons of liquid hydrogen and liquid oxygen, it is of vital importance to monitor the space shuttle vehicle (SSV) from external tank (ET) load through launch. The Hazardous Gas Detection System (HGDS) was installed as the primary system responsible for monitoring fuel leaks within the orbiter and ET. The HGDS was designed to obtain the lowest possible detection limits with the best resolution while monitoring the SSV for any hydrogen, helium, oxygen, or argon as the main requirement. The HGDS is a redundant mass spectrometer used for real-time monitoring during Power Reactant Storage and Distribution (PRSD) load and ET load through launch or scrub. This system also performs SSV processing leak checks of the Tail Service Mast (TSM) umbilical quick disconnects (QD's), Ground Umbilical Carrier Plate (GUCP) QD's and supports auxiliary power unit (APU) system tests. From design to initial implementation and operations, the HGDS has evolved into a mature and reliable launch support system. This paper will discuss the operational challenges and lessons learned from facing design deficiencies, validation and maintenance efforts, life cycle issues, and evolving requirements

Shoemaker, Marc D.↗

Environmental Testbed Development to Evaluate Power Distribution Materials in Electrified Aircraft (EA)

NASA is pursuing the development of electrified propulsion (EP) technologies to improve air transportation in terms of efficiency, affordability, and sustainability. The power requirements are expected to reach 20 megawatts for large EP commercial airliners. A key challenge is transmission and distribution of the high voltage (20 kilovolts) needed for some EP systems. This is a challenge because the risk of electrical failure in aircraft at high altitude (low pressure) due to corona discharge and other forms of partial discharge increases significantly when voltages exceed 327 V. Corona discharge is a form of partial discharge in which gaseous molecules are ionized by strong electric fields. Corona discharge leads to aging in power transmission lines. Aging is a leading cause of electrical failure in electrical insulation materials. In particular, aging from electrical, vibrational, and thermal stresses decrease the performance life of insulation materials. There are currently no test standards or equipment that can effectively age materials under high altitude, voltage and frequency conditions. This poster proposes a design for a test system including an environmental chamber that can simulate the environment of future EP systems for material and component aging tests.

Materials Test chamber Design↗

Facilities and support systems for a 90-day test of a regenerative life support system

A 90-day test is reported of a regenerative life support system which was completed in a space station simulator. The long duration of the test and the fact that it was manned, imposed rigid reliability and safety requirements on the facility. Where adequate reliability could not be built into essential facility systems, either backup systems or components were provided. Awareness was intensified by: (1) placing signs on every piece of equipment that could affect the test, (2) painting switches on all breaker panels a bright contrasting color, (3) restricting access to the test control area, and (4) informing personnel in the facility (other than test personnel) of test activities. It is concluded that the basic facility is satisfactory for conducting long-duration manned tests, and it is recommended that all monitor and alarm functions be integrated into a single operation.

Malin, R. L.↗