Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

James Webb Space Telescope: Frequently Asked Questions for Scientists and Engineers

JWST will be tested incrementally during its construction, starting with individual mirrors and instruments (including cameras and spectrometers) and building up to the full observatory. JWST's mirrors and the telescope structure are first each tested individually, including optical testing of the mirrors and alignment testing of the structure inside a cold thermal-vacuum chamber. The mirrors are then installed on the telescope structure in a clean room at Goddard Space Flight Center (GSFC). In parallel to the telescope assembly and alignment, the instruments are being built and tested, again first individually, and then as part of an integrated instrument assembly. The integrated instrument assembly will be tested in a thermal-vacuum chamber at GSFC using an optical simulator of the telescope. This testing makes sure the instruments are properly aligned relative to each other and also provides an independent check of the individual tests. After both the telescope and the integrated instrument module are successfully assembled, the integrated instrument module will be installed onto the telescope, and the combined system will be sent to Johnson Space Flight Center (JSC) where it will be optically tested in one of the JSC chambers. The process includes testing the 18 primary mirror segments acting as a single primary mirror, and testing the end-to-end system. The final system test will assure that the combined telescope and instruments are focused and aligned properly, and that the alignment, once in space, will be within the range of the actively controlled optics. In general, the individual optical tests of instruments and mirrors are the most accurate. The final system tests provide a cost-effective check that no major problem has occurred during assembly. In addition, independent optical checks of earlier tests will be made as the full system is assembled, providing confidence that there are no major problems.

Gardner, Jonathan P.↗

Experience with integrally-cast compressor and turbine components for a small, low-cost, expendable-type turbojet engine

Experiences with integrally-cast compressor and turbine components during fabrication and testing of four engine assemblies of a small (29 cm (11 1/2 in.) maximum diameter) experimental turbojet engine design for an expendable application are discussed. Various operations such as metal removal, welding, and re-shaping of these components were performed in preparation of full-scale engine tests. Engines with these components were operated for a total of 157 hours at engine speeds as high as 38,000 rpm and at turbine inlet temperatures as high as 1256 K (1800 F).

Dengler, R. P.↗

Experience with integrally-cast compressor and turbine components for a small, low-cost, expendable-type turbojet engine

A discussion regarding experiences with integrally-cast compressor and turbine components during fabrication and testing of four engine assemblies of a small (29 cm (11-1/2 in.) maximum diameter) experimental turbojet engine design for an expendable application is presented. Various operations such as metal removal, welding, and re-shaping of these components are performed in preparation of full-scale engine tests. Engines with these components have been operated for a total of 157 hours at engine speeds as high as 38,000 rpm and at turbine inlet temperatures as high as 1256 K (1800 F).

Dengler, R. P.↗

Initial Sailplane Project: The RP-1

The annual static loading tests were made on the assembled wing/fuselage structure of the RP-1 sailplane. Simple wing bending and wing bending/torsion tests up to about four G's were made, using sand bag loading on the inverted aircraft. Bending a torsion deflections were measured and compared to those obtained in previous years' tests. It appears that the structure is retaining its original strength and stiffness very well. This aircraft has been disassembled and stored on the Jonsson Engineering Center under ambient, indoor conditions of temperature and humidity.

Source record↗

Halbach Magnetic Rotor Development

The NASA John H. Glenn Research Center has a wealth of experience in Halbach array technology through the Fundamental Aeronautics Program. The goals of the program include improving aircraft efficiency, reliability, and safety. The concept of a Halbach magnetically levitated electric aircraft motor will help reduce harmful emissions, reduce the Nation s dependence on fossil fuels, increase efficiency and reliability, reduce maintenance and decrease operating noise levels. Experimental hardware systems were developed in the GRC Engineering Development Division to validate the basic principles described herein and the theoretical work that was performed. A number of Halbach Magnetic rotors have been developed and tested under this program. A separate test hardware setup was developed to characterize each of the rotors. A second hardware setup was developed to test the levitation characteristics of the rotors. Each system focused around a unique Halbach array rotor. Each rotor required original design and fabrication techniques. A 4 in. diameter rotor was developed to test the radial levitation effects for use as a magnetic bearing. To show scalability from the 4 in. rotor, a 1 in. rotor was developed to also test radial levitation effects. The next rotor to be developed was 20 in. in diameter again to show scalability from the 4 in. rotor. An axial rotor was developed to determine the force that could be generated to position the rotor axially while it is rotating. With both radial and axial magnetic bearings, the rotor would be completely suspended magnetically. The purpose of this report is to document the development of a series of Halbach magnetic rotors to be used in testing. The design, fabrication and assembly of the rotors will be discussed as well as the hardware developed to test the rotors.

Gallo, Christopher A.↗

Unreal Engine Testbed for Computer Vision of Tall Lunar Tower Assembly

The Tall Lunar Tower project at the NASA Langley Research Center is focused on the design, modeling, fabrication, and testing of a supervised autonomously assembly engineering development unit for tall lunar towers. The lunar south pole environment poses many challenges for robotic assembly of the tall tower, particularly to computer vision camera systems due to a high-contrast lighting environment. This paper will present an Unreal Engine 5 video game engine Lunar South Pole Lighting Testbed to simulate realistic lunar lighting conditions for synthetic image generation. The fidelity of the simulation environment is investigated by comparing the accuracy of computer vision models trained using synthetic image data and trained from real image data collected in a lunar analog environment.

Unreal Engine↗

Unreal Engine Testbed for Computer Vision of Tall Lunar Tower Assembly

The Tall Lunar Tower project at the NASA Langley Research Center is focused on the design, modeling, fabrication, and testing of a supervised autonomously assembled engineering development unit for tall lunar towers. The lunar south pole environment poses many challenges for robotic assembly of the tall tower, particularly to computer vision camera systems due to a high-contrast lighting environment. This paper will present an Unreal Engine 5 video game engine Lunar South Pole Lighting Testbed to simulate realistic lunar lighting conditions for synthetic image generation. The fidelity of the simulation environment is investigated by comparing the accuracy of computer vision models trained using synthetic image data and trained from real image data collected in a lunar analog environment.

Unreal Engine↗

Unreal Engine Testbed for Computer Vision of Tall Lunar Tower Assembly

The Tall Lunar Tower project at the NASA Langley Research Center is focused on the design, modeling, fabrication, and testing of a supervised autonomously assembly engineering development unit for tall lunar towers. The lunar south pole environment poses many challenges for robotic assembly of the tall tower, particularly to computer vision camera systems due to a high-contrast lighting environment. This paper will present an Unreal Engine 5 video game engine Lunar South Pole Lighting Testbed to simulate realistic lunar lighting conditions for synthetic image generation. The fidelity of the simulation environment is investigated by comparing the accuracy of computer vision models trained using synthetic image data and trained from real image data collected in a lunar analog environment.

Unreal Engine↗

Iris Deep-Space Transponder for SLS EM-1 CubeSat Missions

Several key design upgrades have been recently made to the Iris Deep-Space Transponder baselined to be used on secondary payload missions of the upcoming Space Launch System Exploration Mission One (SLS EM-1). The Iris Transponder is a reconfigurable software-defined radio (SDR) designed for missions requiring interoperability with NASA's Deep Space Network (DSN) on X-band frequencies (7.2 GHz uplink, 8.4 GHz downlink). The transponder provides radiometric tracking support with the DSN to provide navigational products for precise orbit determination while performing standard uplink and downlink communications in a CubeSat/SmallSat-applicable package size. The recent hardware changes include a volume reduction of 30% from previous models, with the main transponder unit weighing less than 1.0 kg, while maintaining total ionizing dose (TID) radiation tolerance of >23 krads (Si) for deep-space missions. Lab tests indicate maximum downlink rates of up to 6.25 Msps can be supported by the transponder in conventional BPSK modulation, but most SLS EM-1 CubeSat missions are link-performance limited to less than 256 kbps. A prototype unit of the flight production units has been assembled and various performance and characterization tests are underway. This talk discusses the key design aspects and specifications of the Iris Transponder and presents preliminary results from early testing of the assembled transponder.

Kobayashi, M. Michael↗

Random vibration (stress screening) of printed wiring assemblies

The results of a random vibration test screening (RVSS) study of the determination of the upper and lower vibration limits on printed wiring assemblies (PWA) are summarized. The study results are intended to serve as a guide for engineers and designers who make decisions on PWA features that need to withstand the stresses of dynamic testing and screening. The maximum allowable PWA deflection, G levels, and PSD levels are compared to the expected or actual levels to determine if deleterious effects will occur.

Bastien, Gilbert J.↗

Trace Contaminant Control During the International Space Station's On-Orbit Assembly and Outfitting

During the International Space Station’s (ISS’s) on-orbit assembly and outfitting, a series of engineering analyses was conducted to evaluate how effective the passive trace contaminant control (TCC) methods were relative to providing adequate operational margin for the active TCC equipment’s capabilities aboard the ISS. These analyses were based on habitable module and cargo vehicle offgassing test results. The offgassing test for the fully assembled module or cargo vehicle is an important preflight spacecraft evaluation method that has been used successfully during all crewed spacecraft programs to provide insight into how effectively the passive contamination control methods limit the equipment offgassing component of the overall trace contaminant generation load. The progression of TCC assessments beginning in 1998 with the ISS’s first habitable element launch and continuing through the final pressurized element’s arrival in 2010 are presented. Early cargo vehicle flight assessments between 2008 and 2011 are also presented as well as a discussion on predictive methods for assessing cargo via a purely analytical technique.

Contamination control↗

Demonstration of NEAMS Multiphysics Tools for Fast Reactor Applications

The SHARP toolkit is a high-fidelity reactor simulation tool developed under the U.S. Department of Energy, Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) Campaign. SHARP toolkit is comprised of the neutronics module PROTEUS thermal hydraulics module Nek5000, and structural mechanics module Diablo. During FY17 and FY18, the PROTEUS and Nek5000 components of SHARP were applied to solve challenging sodium-cooled fast reactor (SFR) problems. In particular, selected hot channel factors (HCF) for a prototype metal-fueled SFR design (the AFR-100) were analyzed in high fidelity, and the “SHARP zooming capability” for SFRs was developed and demonstrated to reduce computational expense for full core problems in cases where detailed data is needed in selected fuel assemblies. After the previous success applying SHARP to challenging SFR problems, the focus in FY19 and FY20 expanded to additional fast reactor applications including lead cooled fast reactors (LFR) and sodium cooled fast reactors (SFR). The specific technical tasks were (1) assessment of hot channel factors for LFR, for which no data currently exists, and (2) demonstration of zooming capability in assemblies of the Versatile Test Reactor (VTR). First-of-a-kind hot channel factor (HCF) estimation for LFR with high fidelity codes (PROTEUS/Nek5000) was successfully demonstrated in this study which began in FY19 and continued in FY20. Selected HCF were computed and compared with SFR data (AFR-100, EBR-II). The findings confirm that different reactor types, design parameters and uncertainties lead to different HCFs. Careful estimation of HCF for a specific design is necessary to obtain appropriate HCFs. In addition to improvement in HCF accuracy, high fidelity tools generate data to help the designer better understand the mechanism of the impact from these uncertainties. For example, the impact of cladding thickness manufacturing tolerance resulted in non-intuitive effects in the corner pins of the LFR assembly. This procedure of computing HCF using high fidelity models shows promise and flexibility for being repeated for any arbitrary reactor of choice. Along with the application on SFR and LFR, the capability of the tools has also been matured to deal with different reactor types and designs. Progress was made towards extending the previously demonstrated SHARP zooming capability to non-fueled SFR assemblies. In particular, in FY19 a gamma transport capability was implemented in both high fidelity PROTEUS solvers in order to accurately account for heat deposition caused by gamma particles, which accounts for ~10% of total core power. Neutronics verification cases were carried out for a candidate Versatile Test Reactor (VTR) design using the new gamma transport capability in PROTEUS. Comparisons were made with continuous energy MCNP calculations and shown to agree well. The models for the full core design with heterogeneous control and fuel assemblies is in progress for PROTEUS-SN and completed with MCNP. The MCNP power distributions were transferred to Nek5000 to perform thermal hydraulic calculations of the control and fuel assembly.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Green Propellant Demonstration with Hydrazine Catalyst of F-16 Emergency Power Unit

Some space vehicle and aircraft Auxiliary Power Units (APUs) use hydrazine propellant for generating power. Hydrazine is a toxic, hazardous fuel which requires special safety equipment and processes for handling and loading. In recent years, there has been development of two green propellants that could enable their use in APU's: the Swedish LMP-103S and the Air Force Research Laboratory (AFRL) AF-M315E. While there has been work on development of these propellants for thruster applications (Prisma and Green Propulsion Infusion Mission, respectively), there has been less focus on the application to power units. Beginning in 2012, an effort was started by the Marshall Space Flight Center (MSFC) on the APU application. The MSFC plan was to demonstrate green propellants with residual Space Shuttle hardware. The principal investigator was able to acquire a Solid Rocket Booster gas generator and an Orbiter APU. Since these test assets were limited in number, an Air Force equivalent asset was identified: the F-16 Emergency Power Unit (EPU). In June 2013, two EPU's were acquired from retired aircraft located at Davis Monthan Air Force Base. A gas generator from one of these EPU's was taken out of an assembly and configured for testing with a version of the USAF propellant with a higher water content (AF-M315EM) to reduce decomposition temperatures. Testing in November 2014 has shown that this green propellant is reactive with the Hydrazine catalyst (Shell 405) generating 300 psi of pressure with the existing F-16 EPU configuration. This paper will highlight the results of MSFC testing in collaboration with AFRL.

Robinson, Joel W.↗

CEQATR Thermal Test Overview

A thermal test overview of the Constellation Environmental Qualification and Acceptance Test Requirement (CEQATR) is presented. The contents include: 1) CEQATR Thermal Test Overview; 2) CxP Environments; 3) CEQATR Table 1.2-1; 4) Levels of Assembly; 5) Definitions for Levels of Assembly; 6) Hardware Applicability; 7) CEQATR Thermal-Related Definitions; 8) Requirements for unit-level thermal testing; 9) Requirements for major assembly level thermal testing; 10) General thermal testing requirements; 11) General thermal cycle, thermal vacuum profiles; 12) Test tolerances; 13) Vacuum vs Ambient; 14) Thermal Gradient; 15) Sequence of Testing; 16) Alternative Strategies; 17) Protoflight; 18) Halt/Hass; 19) Humidity; and 20) Tailoring.

Balusek, Alan R.↗

A mobile transporter concept for EVA assembly of future spacecraft

This paper details the ground test program for the NASA Langley Research Center Mobile Transporter concept. The Mobile Transporter would assist EVA astronauts in the assembly of the Space Station Freedom. 1-g and simulated O-g (neutral buoyancy) tests were conducted to evaluate the use of the Mobile Transporter. A three-bay (44 struts) orthogonal tetrahedral truss configuration with a 15-foot-square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices. The average unit assembly time was 28 seconds/strut. The results of these tests indicate that the use of a Mobile Transporter for EVA assembly of Space Station size structure is viable and practical. Additionally, the Mobile Transporter could be used to construct other spacecraft such as the submillimeter astronomical laboratory, space crane, and interplanetary (i.e., Mars and lunar) spacecraft.

Watson, Judith J.↗

Advanced launch system. Advanced development oxidizer turbopump program

On May 19, 1989, Pratt & Whitney was awarded contract NAS8-37595 by the National Aeronautics and Space Administration, Marshall Space Flight Center, Huntsville Alabama for an Advanced Development Program (ADP) to design, develop and demonstrate a highly reliable low cost, liquid oxygen turbopump for the Advanced Launch System (ALS). The ALS had an overall goal of reducing the cost of placing payloads in orbit by an order of magnitude. This goal would require a substantial reduction in life cycle costs, with emphasis on recurring costs, compared to current launch vehicles. Engine studies supporting these efforts were made for the Space Transportation Main Engine (STME). The emphasis on low cost required design simplification of components and subsystems such that the ground maintenance and test operations was minimized. The results of the Oxygen Turbopump ADP technology effort would provide data to be used in the STME. Initially the STME baseline was a gas generator cycle engine with a vacuum thrust level of 580,000 lbf. This was later increased to 650,000 lbf and the oxygen turbopump design approach was changed to reflect the new thrust level. It was intended that this ADP program be conducted in two phases. Phase 1, a basic phase, would encompass the preliminary design effort, and Phase II, an optional contract phase to cover design, fabrication and test evaluation of an oxygen turbopump at a component test facility at the NASA John C. Stennis Space Center in Mississippi. The basic phase included preliminary design and analysis, evaluation of low cost concepts, and evaluation of fabrication techniques. The option phase included design of the pump and support hardware, analysis of the final configuration to ensure design integrity, fabrication of hardware to demonstrate low cost, DVS Testing of hardware to verify the design, assembly of the turbopump and full scale turbopump testing. In December 1990, the intent of this ADP to support the design and development was changed. The design effort for the oxygen turbopump became part of the STME Phase B contract. The status of the pump design funded through this ADP was presented at the Preliminary Design Review (PDR) at the MSFC on October 24, 1990. Advancements in the design of the pump were subsequently continued under the Phase B Contract. The emphasis of this ADP became the demonstration of individual technologies that would have the greatest potential for reducing the recurring cost and increasing reliability. In October of 1992, overall program funding was reduced and work on this ADP was terminated.

Source record↗

Development of an Ion Thruster and Power Processor for New Millennium's Deep Space 1 Mission

The NASA Solar Electric Propulsion Technology Applications Readiness Program (NSTAR) will provide a single-string primary propulsion system to NASA's New Millennium Deep Space 1 Mission which will perform comet and asteroid flybys in the years 1999 and 2000. The propulsion system includes a 30-cm diameter ion thruster, a xenon feed system, a power processing unit, and a digital control and interface unit. A total of four engineering model ion thrusters, three breadboard power processors, and a controller have been built, integrated, and tested. An extensive set of development tests has been completed along with thruster design verification tests of 2000 h and 1000 h. An 8000 h Life Demonstration Test is ongoing and has successfully demonstrated more than 6000 h of operation. In situ measurements of accelerator grid wear are consistent with grid lifetimes well in excess of the 12,000 h qualification test requirement. Flight hardware is now being assembled in preparation for integration, functional, and acceptance tests.

Sovey, James S.↗