Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

LASER ABLATION-INDUCTIVELY COUPLED PLASMA-ATOMIC EMISSION SPECTROSCOPY STUDY AT THE 222-S LABORATORY USING HOT-CELL GLOVE BOX PROTOTYPE SYSTEM

This report describes the installation, testing and acceptance of the Waste Treatment and Immobilization Plant procured laser ablation-inductively coupled plasma-atomic emission spectroscopy (LA-ICP-AES) system for remotely analyzing high-level waste samples in a hot cell environment. The 2005-003; ATS MP 1027, Management Plan for Waste Treatment Plant Project Work Performed by Analytical Technical Services. The APD group at the 222-S laboratory demonstrated acceptable turnaround time (TAT) and provide sufficient data to assess sensitivity, accuracy, and precision of the LA-ICP-AES method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2013 SRNL LDRD Annual Report

This report demonstrates the execution of our LDRD program within the objectives and guidelines outlined by the Department of Energy (DOE) through the DOE Order 413.2b. The projects described within the report align purposefully with SRNL’s strategic vision and provide great value to the DOE. The diversity exhibited in the research and development projects underscores the DOE Office of Environmental Management (DOE-EM) mission and enhances that mission by developing the technical capabilities and human capital necessary to support future DOE-EM national needs. As a multiprogram national laboratory, SRNL is applying those capabilities to achieve tangible results for the nation in National Security, Environmental Stewardship, Clean Energy and Nuclear Materials Management.

99 GENERAL AND MISCELLANEOUS↗

Progress in Norwegian-Russian Regulatory Cooperation in Management of the Nuclear Legacy

The Norwegian Radiation Protection Authority (NRPA) and the Federal Medical-Biological Agency (FMBA) of the Russian Federation have a collaboration programme which forms part of the Norwegian government's Plan of Action to improve radiation and nuclear safety in northwest Russia. The background to the NRPA-FMBA collaboration programme has been described in previous WM presentations. This paper presents the substantial progress made within that programme, describes ongoing progress within specific projects and sets out the value arising from wider involvement in the programme of other organisations such as NATO and the technical support derived from other national agencies such as the IAEA, and regulatory authorities from the USA, the UK and France. The main activities of the cooperation projects are concerned with the management of the nuclear legacy in northwest Russia, in particular the remediation of facilities, and related spent fuel and radioactive waste management, at the former Shore Technical Bases at Andreeva Bay and Gremikha Village. New regulatory guidance documents have been developed, necessary because of the special abnormal situation at these sites, now designated as Sites of Temporary Storage (STS), but also because of the transition from military to civilian regulatory supervision and the evolving regulatory system in the Russian Federation. The work has involved major technical inputs from the Russian Federation Institute of Biophysics, as well as review and advice on international recommendations and good practice in other countries provided by other technical support organisations. Projects on-going in 2007 are described which involve regulatory guidance on very Low-Level Waste management, specifically for the licensing and operation of new VLLW disposal facilities; optimisation of operational radiation protection, particularly in areas of high ambient radiation dose rate as are found in some parts of the STSs; determination of factors which can be used to identify when to apply emergency procedures before the full emergency is obvious; and development of the radio-ecological basis for identifying radiation supervision area boundaries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Advanced Scientific Computing Advisory Committee (ASCAC) Subcommittee Report on Scientific and Technical Information

The Advanced Scientific Computing Advisory Committee (ASCAC) was charged to form a standing subcommittee to review the Department of Energy’s Office of Scientific and Technical Information (OSTI) and to begin by assessing the quality and effectiveness of OSTI’s recent and current products and services and to comment on its mission and future directions in the rapidly changing environment for scientific publication and data. The Committee met with OSTI staff and reviewed available products, services and other materials. This report summaries their initial findings and recommendations.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management and Disposal of U.S. Department of Energy Spent Nuclear Fuel - 19133

Congress created the U.S. Nuclear Waste Technical Review Board (NWTRB) in the 1987 Nuclear Waste Policy Amendments Act (Public Law 100-203) to evaluate the technical and scientific validity of activities undertaken by the Secretary of Energy to implement the Nuclear Waste Policy Act. In accordance with this mandate, the NWTRB reviewed the U.S. Department of Energy's (DOE) efforts to manage the inventory of spent nuclear fuel (SNF) that is under its control (DOE SNF) at several facilities around the country: the Hanford Site in Washington, the Idaho National Laboratory (INL) in Idaho, the Savannah River Site (SRS) in South Carolina, and the Fort St. Vrain independent spent fuel storage installation (ISFSI) in Colorado. While disposal of SNF and high-level radioactive waste (HLW) in a deep geologic repository remains the ultimate objective of the DOE nuclear waste management program, there is significant uncertainty about when such a repository will be constructed in the United States. Until disposal occurs, it is essential to manage DOE SNF in a way that will facilitate its eventual disposal, and it is also important to improve understanding of processes related to packaging and storage of the SNF that could affect its future transportation and disposal. The NWTRB's review, which was a multi-year effort, was documented in a report to Congress and the Secretary of Energy and is summarized here. The NWTRB reviewed the quantities and characteristics of DOE SNF at each of the four sites. It also examined DOE packaging and storage activities and plans at each of the sites. The NWTRB highlighted three main issue areas in its review. First, the review identified issues related to managing the aging of DOE SNF and the facilities used to store the DOE SNF. Second, the review addressed issues related to packaging of stored non-naval DOE SNF into a standard canister. Third, the NWTRB assessed issues that could affect disposal of DOE SNF if DOE continues to evaluate a range of repository settings. Based on the information and findings developed as part of its review, the NWTRB made six recommendations to Congress and the Secretary of Energy related to aging management, packaging, and disposal of DOE SNF. DOE has begun to address some of the NWTRB recommendations. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The D and D of Nuclear Facilities: a Systemic Approach for Project Organization and Monitoring - 18099

The Decontamination and Decommissioning (D and D) of Licensed Nuclear facilities takes place under circumstances which make it a very complex field. On the one hand, more and more facilities of widely varying types are concerned, and many D and D projects are currently running or planned. A nuclear facility's life cycle is often very long and the building may be modified or impacted by incidents during its operation. These changes need to be known and taken into account for the D and D plans, in order to ensure safety at all times. In addition, the numerous stakeholders involved in a project express needs which impose many requirements. These encompass various points of view, and data from different detail levels must be managed to satisfactorily meet them. On the other hand, legacy data (including records, plans etc.) is a recurring issue for D and D projects. The quality and availability of relevant data regarding the different phases of the nuclear facility lifetime may be insufficient, for instance due to the lack of traceability practices in the past. The uncertainty level is not always specified and explained, old documents can be damaged and are not necessarily digitized, etc. It is therefore particularly important to define the relevant type of raw data to be collected and traced for D and D projects as early as possible. In this context, CEA (Commissariat a l'energie Atomique et aux energies Alternatives) has been analyzing past D and D projects for many years. The goal is to facilitate reproducibility by generalizing best practices and promoting efficient organizational rules and technical solutions. A method is currently being studied to help project managers to prepare specifications for future D and D operations and improve both the efficiency and the relevance of the decommissioning strategy throughout each project, depending on the expected quality of its end-state. This method first consists in formalizing and specifying the entire set of requirements to be taken into consideration, e.g. technical, operational, logistical, regulatory, financial, organizational, safety and security, human, ethical, or, naturally, environmental aspects. Second, based on these requirements, it will enable the project team to structure, check, and then to demonstrate the coherence and feasibility of the project from both the technological and organizational points of view. Lastly, the method will enable the evaluation of the various possible solutions for the management of dismantling products, for instance, regarding the waste outlets: direct disposal or interim storage. To conclude, the method should permit a constant re-evaluation of the D and D strategy depending on the possible evolution of the stakeholders' requirements, and thus it should optimize the monitoring of D and D projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing Programmatic Risk for Complex Space System Developments

Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

Panetta, Peter V.↗

Improving Workplace Management and Performance - A Lost Art? - 16004

Undertaking projects on nuclear licensed sites or on sites with a radiological connotation will undoubtedly lead to a variety of challenges. In many instances these challenges will be slightly different to those affiliated with projects on sites which do not have a radiological concern. However, common approaches can still often be found and transferable learning from other industries can also be applied. The majority of these challenges relate to worker safety (both occupationally and radiologically), protection of the public and the environment, public communication, and the choice of technical and logistical approaches taken (e.g. for areas like decommissioning, waste management, environmental remediation). Notwithstanding these challenges the success of site-related projects also depends heavily on the functionality of the project team. The aim here is to highlight a number of logical approaches that are too often overlooked and which might often lead to improvements in workplace management and performance. A successful project team is rarely built overnight, as it relies on the establishment of a harmonious working atmosphere, and continuous communication as well as demonstrable recognition of the relevance of the role of the different team members. Improving workplace management and performance can be approached through a number of ways. First, there are clear benefits in developing an industry-specific culture, but of equal importance is the application of learning from other industries. Second, improving workplace performance often comes down to treating people in the right manner and showing them respect. A culture of competition and blame in the workplace often results in individuals being too defensive or withholding useful information. Creating a harmonious atmosphere can help to overcome some of these barriers. The third area of improving workplace management and performance is through developing and empowering personnel on a more formal basis. This can be achieved through initiatives like the Investors In People (IiP) National Standard, which many countries now support. Achieving this National Standard provides an opportunity to demonstrate to both your personnel and your clients that you are committed to this initiative and that you want to improve workplace performance. The IiP National Standard can lead to a range of benefits. A combination of formal initiatives, developing sector-specific approaches and applying learning from other industries can lead to noticeable improvements in workplace management and performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. DOE's environmental management site-specific advisory board: 20 years of effective community involvement - 15377

This paper provides an overview of the U.S. DOE's Environmental Management Site-Specific Advisory Board from its roots in the early 1990's at the Keystone Center to its current activities. The Environmental Management Site-Specific Advisory Board has a unique mandate to provide input regarding the cleanup of nuclear legacy sites in the United States. Chartered under the Federal Advisory Committee Act, the Environmental Management Site-Specific Advisory Board comprises eight local boards. The Office of Environmental Management has made public participation a fundamental component of its cleanup mission and has found that the Environmental Management Site-Specific Advisory Board has contributed greatly to bringing community input regarding values and priorities to the cleanup decision-making processes. Public participation that involves ongoing community engagement has inherent challenges; the Environmental Management Site-Specific Advisory Board operates with additional challenges that reflect the political and technical nature of U.S. DOE's work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Management for the International Space Station

The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

Sebastian, J.↗

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

54 ENVIRONMENTAL SCIENCES↗

Used Fuel Management System Architecture Evaluation, Fiscal Year 2012

In the 1990s the U.S. Department of Energy (DOE) completed a number of system analyses investigating consolidated interim storage as a part of the waste management solution. These analyses are “dated” and do not reflect the present situation regarding at-reactor used nuclear fuel (UNF) management, alternatives for away from reactor management of used nuclear fuel, and alternatives for the ultimate disposal of UNF. The Blue Ribbon Commission for America’s Nuclear Future and the Nuclear Waste Technical Review Board have also pointed out the need for such analyses. The Used Fuel Management System Architecture Evaluation effort provides the DOE and others with information regarding the various alternatives for managing UNF generated by the current fleet of light water reactors operating in the U.S. The objectives are to: • Provide quantitative information with respect to a broad range of UNF management alternatives and considerations • Develop an integrated approach to evaluating storage, transportation, and disposal options, with emphasis on flexibility • Evaluate impacts of storage choices on UNF storage, handling, and disposal options • Identify alternative strategies and evaluate with respect to cost and flexibility • Consider a broad range of factors including repository emplacement capability, thermal constraints, repackaging needs, storage and transportation alternatives, and impacts on utility operations. In Fiscal Year 2012 system-level analyses of the overall interface between at-reactor, consolidated storage, and ultimate disposition along with the development of supporting logistic simulation tools were initiated. The objective of the Fiscal Year 2012 effort was two-fold: 1) develop methodologies, approaches, and tools (capability development), and 2) evaluate select UNF disposition scenarios (capability demonstration). The scenarios chosen for evaluation and the assumptions, inputs, and boundary conditions selected allowed for an initial set of analyses to gain insight regarding integrated system dynamics and an understanding of trends. This initial set of analyses also points to where additional system architecture analyses should focus.

Nutt, Mark↗

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

Nuclear Safety [Vol. 30, No. 1, January-March 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 International Conference on Thermal Reactor Safety: NUCSAFE 88 by A. P. Malinauskas and J. G. Pruett; ACCIDENT ANALYSIS: 18 Chernobyl Today: State of Research by A. Yu. Gagarinskii; CONTROL AND INSTRUMENTATION: 23 Problems Associated with Routine In-Plant Radioactive Effluent Monitoring Systems at U.S. Light-Water Reactors by Barry G. Wahlig, David M. Walker, Mahmoud R. Ghavi, and John M. Palms; DESIGN FEATURES: 34 Twentieth DOE/NRC Nuclear Air-Cleaning Conference by R. R. Bellamy, D. W. Moeller, and M. W. First, 46 Design Options for the Core Support Structure for Liquid-Metal-Cooled Reactor Plants by J. P. Burelbach, W. J. Kann, J. G. Saiveau, and R. W. Seidensticker; ENVIRONMENTAL EFFECTS: 53 The Radiological Consequences of the Chernobyl Accident by L. V. Konstantinov and A. J. González; WASTE AND SPENT FUEL MANAGEMENT: 70 Activities Related to Waste Management Compiled by E. G. Silver; OPERATING EXPERIENCES: 80 Fuel Performance Annual Report for 1986 by W. J. Bailey, 103 Safety Considerations Related to 12-Hour Shift Schedules by S. Gould, 105 Reactor Shutdown Experience Compiled by J. W. Cletcher, 108 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 130 General Administrative Activities Compiled by E. G. Silver, 140 Reports, Standards, and Safety Guides by D. S. Queener, 145 Status of Power-Reactor Licensing Activities Compiled by E. G. Silver, 153 Proposed Rule Changes as of Sept. 30, 1988; ANNOUNCEMENTS: 69 Northwestern University Short Course on Radiation Safety, 79 International Seminar on Fission Product Transport Processes in Reactor Accidents, 129 Harvard School of Public Health Offers Short Courses, 152 MIT Offers Summer Short Courses on Reactor Safety and Nodal Analysis, 152 Seminar on Use of PCs in Probabilistic Safety Analysis, 157 The Authors, 160 Indexes to Nuclear Safety, Volume 29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Tank Elutriation Test Report And Independent Assessment

The Department of Energy (DOE) Office of Environmental Management (EM) funded Technology Development and Deployment (TDD) to solve technical problems associated with waste tank closure for sites such as Hanford Site and Savannah River Site (SRS). One of the tasks supported by this funding at Savannah River National Laboratory (SRNL) and Pacific Northwest Laboratory (PNNL) was In-Tank Elutriation. Elutriation is the process whereby physical separation occurs based on particle size and density. This report satisfies the first phase of Task WP_1.3.1.1 In-Tank Elutriation, which is to assess the feasibility of this method of separation in waste tanks at Hanford Site and SRS. This report includes an analysis of scoping tests performed in the Engineering Development Laboratory of SRNL, analysis of Hanford's inadvertent elutriation, the viability of separation methods such as elutriation and hydrocyclones and recommendations for a path forward.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗