Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Improving Efficacy and Safety of Pharmacological Treatment Through Precision Health and Pharmacogenomics

INTRODUCTION: Future spaceflight will require increased crew medical autonomy as exploration class missions expand in duration and distance from Earth, especially for Mars missions. As mission duration increases, it will be essential to have appropriate amounts of effective medication to ensure the maintenance of crew health and performance. Conversely, mass and volume constraints will become more severe as future spaceflight expands beyond low Earth orbit, where resupply is difficult or becomes impossible. These constraints thus convey an urgency to tailor medications for individual crewmembers and further examine appropriate dosing regimens. BACKGROUND: Precision Health is an exciting area of medicine focused on maintaining an individual’s health and performance through in-depth understanding of an individual’s unique clinical and environmental history, genetic makeup, and molecular profiles. This approach can be adapted to better predict, monitor, and address physiological responses to the spaceflight environment. A subset of this field is pharmacogenomics (PGX), the study of how the expressed genome impacts drug responses with the goal of prescribing the right dose of the right drug at the right time. Specifically, PGX testing provides valuable information on an individual’s precise allelic variations to guide physicians in making informed decisions on drug choice and dosing to avoid adverse events and maximize efficacy. The study goal was to identify which current space pharmacy drugs could be evaluated using PGX testing and to understand the potential impact on the health and wellness of the astronaut population. Additionally, we sought to evaluate clinically available FDA-approved PGX testing solutions to better understand its applicability. METHODS: A complete list of drugs on the ISS was analyzed for risk and likelihood of drug failure and PGX actionability. This analysis encompassed both astronauts’ personal medications, including supplements and over the counter drugs (n=151) contained in the ISS medical accessory kit (IMAK), and ISS MedKit formulary medications (n=95). Duplicate medications and different formulations were removed, which resulted in a total of 157 drugs used in the subsequent analysis. A 5x5 risk assessment table was produced by examining the likelihood of drug failure compared to the consequence of drug failure (LxC). Likelihood of individual drug failure was defined by whether existing processes are sufficient to prevent ineffective treatment or impactful side effect events, as ranked from 1 (very low, can easily be prevented) to 5 (very high, cannot be prevented) during a Mars mission. In contrast, the consequence of drug failure was defined by impact to safety, schedule, cost, or technical criteria and ranked from 1 (very low) to 5 (very high). An assessment of PGX reference laboratories is currently underway to evaluate sample requirements, benefit analysis (cost vs. utility of allele variant analysis), relevance to inflight medication usage, quality of reporting in enabling clinical application, and ease of integration into electronic medical records. RESULTS: Risk assessments (LxC 5x5 table) indicated 128 medications were in the green zone where risk is acceptable, with the remaining 29 of the medications in the yellow or red zone driven predominantly due to drug failure or safety concerns. We found that current PGX testing results could impact 21% of the total medications in the ISS MedKit and IMAK; of these, 9 medications currently have direct clinically actionable guidance available. Results of the clinical PGX solution evaluations as related to these medications will be presented. CONCLUSION: PGX testing has demonstrated clear benefits in terrestrial medicine and clinical environments for the selection of proper medications, avoiding adverse drug reactions, and maximizing drug efficacy. We propose that similar benefits would be bestowed on the astronaut and commercial spaceflight passenger population by performing preemptive preflight PGX testing to reduce risk of mission failure due to ineffective or toxic medications, improve drug efficacy, and further open the door to countermeasure research. For example, PGX results could allow tailoring of specific medications at optimal doses more precisely to each individual astronaut, particularly in areas of space motion sickness, sleep aids, and analgesics. An additional benefit is that PGX results could provide information for better planning of the components of a space pharmacy for deep space missions to be more effective and efficient in the utilization of limited pharmaceutical resources. Finally, while PGX testing of the astronaut corps is not currently conducted, this approach could provide immediate impact in support of mission success by reducing risks, optimizing astronaut performance, and providing valuable insights into long-term astronaut health. Such advancements in clinical decision making are important next steps in building dynamic individual risk profiles for astronauts, increasing selection of the best treatment choice, and providing tailored countermeasures for individual crewmembers.

Pharmacogenomics↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Safety Analysis of FeCrAl Accident-Tolerant Fuels with Increased Enrichment and Extended Burnup

The U.S. nuclear industry is facing a strong challenge to maintain regulatory-required levels of safety while ensuring economic competitiveness to stay in business. Safety remains a key parameter for all aspects related to the operation of light water reactor nuclear power plants (NPPs), and it can be achieved more economically by using a risk-informed ecosystem, such as that being developed by the Risk-Informed Systems Analysis Pathway under the U.S. Department of Energy Light Water Reactor Sustainability Program. This program is promoting a wide range of research and development activities to maximize both the safety and economically efficient performance of NPPs through improved scientific understanding, especially given that many plants are considering a second license renewal. The Risk-Informed Systems Analysis Pathway has two main goals: (1) The deployment of methodologies and technologies that enable a better representation of the safety margins and factors that contribute to cost and safety, and (2) The development of advanced applications that enable cost-effective plant operation. As part of this pathway, the Enhanced Resilient Plant project refers to an NPP where safety is improved by implementing various measures, such as accident-tolerant fuels, diverse and flexible coping strategies, enhancements to plant components and systems, incorporation of augmented or new passive cooling systems, and utilization of advanced battery technologies. The objective of the Enhanced Resilient Plant project is to use novel methods and computational tools to enhance existing reactors’ safety while reducing operational costs. This report documents research and development conducted in support of deployment of accident-tolerant fuels. This project performed safety analyses for the steady-state normal operation, anticipated operational occurrences, and design-basis accidents of a representative four-loop pressurized water reactor model with Zr and FeCrAl accident-tolerant fuel clad with higher enrichment and burnup supporting plant refueling cycles of 18 and 24 months. The source terms and environmental impacts were studied for a large-break loss of coolant accident, including uncertainty analyses.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Comparative Analysis of Static and Dynamic Probabilistic Risk Assessment

This study examines three different methodologies for producing loss-of-mission (LOM) and loss-of-crew (LOC) risks estimates for probabilistic risk assessments (PRA) of crewed spacecraft. The three bottom-up, component-based PRA approaches examined are a traditional static fault tree, a dynamic Monte Carlo simulation, and a fault tree hybrid that incorporates some dynamic elements. These approaches were used to model the reaction control system thruster pod of a generic crewed spacecraft and mission, and a comparative analysis of the methods is presented. The methodologies are assessed in terms of the process of modeling a system, the actionable information produced for the design team, and the overall fidelity of the quantitative risk evaluation generated. The system modeling process is compared in terms of the effort required to generate the initial model, update the model in response to design changes, and support mass-versus-risk trade studies. The results are compared by examining the top-level LOM/LOC estimates and the relative risk driver rankings at the failure mode level. The fidelity of each modeling methodology is discussed in terms of its capability to handle real-world system dynamics such as cold-sparing, changes in mission operations due to loss of redundancy, and common cause failure modes. The paper also discusses the applicability of each methodology to different phases of system development and shows that a single methodology may not be suitable for all of the many purposes of a spacecraft PRA. The fault tree hybrid approach is shown to be best suited to the needs of early assessments during conceptual design phases. As the design begins to mature, the level of detail represented in the risk model must go beyond redundancy and nominal mission operations to include dynamic, time- and state-dependent system responses as well as diverse system capabilities. This is best accomplished using the dynamic simulation approach, since these phenomena are not easily captured by static methods. Ultimately, once the design has been finalized and the goal of the PRA is to provide design validation and requirement verification, more traditional, static fault tree approaches may become as appropriate as the simulation method.

Mattenberger, Christopher J.↗

Developing a Comprehensive Risk Assessment Framework for Geological Storage CO 2

The operational risks for CCS projects include: risks of capturing, compressing, transporting and injecting CO₂; risks of well blowouts; risk that CO 2 will leak into shallow aquifers and contaminate potable water; and risk that sequestered CO 2 will leak into the atmosphere. This report examines these risks by using information on the risks associated with analogue activities such as CO 2 based enhanced oil recovery (CO 2 -EOR), natural gas storage and acid gas disposal. We have developed a new analysis of pipeline risk based on Bayesian statistical analysis. Bayesian theory probabilities may describe states of partial knowledge, even perhaps those related to non-repeatable events. The Bayesian approach enables both utilizing existing data and at the same time having the capability to adsorb new information thus to lower uncertainty in our understanding of complex systems. Incident rates for both natural gas and CO 2 pipelines have been widely used in papers and reports on risk of CO 2 pipelines as proxies for the individual risk created by such pipelines. Published risk studies of CO 2 pipelines suggest that the individual risk associated with CO2 pipelines is between 10 -3 and 10 -4 , which reflects risk levels approaching those of mountain climbing, which many would find unacceptably high. This report concludes, based on a careful analysis of natural gas pipeline failures, suggests that the individual risk of CO 2 pipelines is likely in the range of 10-6 to 10-7, a risk range considered in the acceptable to negligible range in most countries. If, as is commonly thought, pipelines represent the highest risk component of CCS outside of the capture plant, then this conclusion suggests that most (if not all) previous quantitative- risk assessments of components of CCS may be orders of magnitude to high. The potential lethality of unexpected CO 2 releases from pipelines or wells are arguably the highest risk aspects of CO 2 enhanced oil recovery (CO2-EOR), carbon capture, and storage (CCS). Assertions in the CCS literature, that CO 2 levels of 10% for ten minutes, or 20 to 30% for a few minutes are lethal to humans, are not supported by the available evidence. The results of published experiments with animals exposed to CO 2 , from mice to monkeys, at both normal and depleted oxygen levels, suggest that lethal levels of CO 2 toxicity are in the range 50 to 60%. These experiments demonstrate that CO 2 does not kill by asphyxia, but rather is toxic at high concentrations. It is concluded that quantitative risk assessments of CCS have overestimated the risk of fatalities by using values of lethality a factor two to six lower than the values estimated in this paper. In many dispersion models of CO 2 releases from pipelines, no fatalities would be predicted if appropriate levels of lethality for CO 2 had been used in the analysis.

54 ENVIRONMENTAL SCIENCES↗

Space Radiation Cancer, Circulatory Disease and CNS Risks for Near Earth Asteroid and Mars Missions: Uncertainty Estimates for Never-Smokers

The uncertainties in estimating the health risks from galactic cosmic rays (GCR) and solar particle events (SPE) are a major limitation to the length of space missions and the evaluation of potential risk mitigation approaches. NASA limits astronaut exposures to a 3% risk of exposure induced cancer death (REID), and protects against uncertainties in risks projections using an assessment of 95% confidence intervals after propagating the error from all model factors (environment and organ exposure, risk coefficients, dose-rate modifiers, and quality factors). Because there are potentially significant late mortality risks from diseases of the circulatory system and central nervous system (CNS) which are less well defined than cancer risks, the cancer REID limit is not necessarily conservative. In this report, we discuss estimates of lifetime risks from space radiation and new estimates of model uncertainties are described. The key updates to the NASA risk projection model are: 1) Revised values for low LET risk coefficients for tissue specific cancer incidence, with incidence rates transported to an average U.S. population to estimate the probability of Risk of Exposure Induced Cancer (REIC) and REID. 2) An analysis of smoking attributable cancer risks for never-smokers that shows significantly reduced lung cancer risk as well as overall cancer risks from radiation compared to risk estimated for the average U.S. population. 3) Derivation of track structure based quality functions depends on particle fluence, charge number, Z and kinetic energy, E. 4) The assignment of a smaller maximum in quality function for leukemia than for solid cancers. 5) The use of the ICRP tissue weights is shown to over-estimate cancer risks from SPEs by a factor of 2 or more. Summing cancer risks for each tissue is recommended as a more accurate approach to estimate SPE cancer risks. 6) Additional considerations on circulatory and CNS disease risks. Our analysis shows that an individual s history of smoking exposure has a larger impact on GCR risk estimates than amounts of radiation shielding or age at exposure (amongst adults). Risks for never-smokers compared to the average U.S. population are estimated to be reduced between 30% and 60% dependent on model assumptions. Lung cancer is the major contributor to the reduction for never-smokers, with additional contributions from circulatory diseases and cancers of the stomach, liver, bladder, oral cavity and esophagus, and leukemia. The relative contribution of CNS risks to the overall space radiation detriment is potentially increased for never-smokers such as most astronauts. Problems in estimating risks for former smokers and the influence of second-hand smoke are discussed. Compared to the LET approximation, the new track structure derived radiation quality functions lead to a reduced risk for relativistic energy particles and increased risks for intermediate energy particles. Revised estimates for the number of safe days in space at solar minimum for heavy shielding conditions are described for never-smokers and the average U.S. population. Results show that missions to near Earth asteroids (NEA) or Mars violate NASA's radiation safety standards with the current levels of uncertainties. Greater improvements in risk estimates for never-smokers are possible, and would be dependent on improved understanding of risk transfer models, and elucidating the role of space radiation on the various stages of disease formation (e.g. initiation, promotion, and progression).

Cucinotta, Francis A.↗

Analysis of the cost, schedule, and risk for Lynx mirror assembly production

This paper analyzes a recently published model for Lynx Mirror Assembly production duration, to understand the sensitivity of duration to various factors. The factors considered are finite process yield, knowledge of the individual process times and finite server reliability. In all of these cases, closed form estimates are given along with numerical examples. This initial analysis indicates that accurate and precise knowledge of the process times is fundamental to making an accurate prediction of schedule duration. Analysis of the failure of any given server is also explained and can be used as the basis of a rational sparing policy.

Jonathan W. Arenberg↗

The Effect of Radiation Timing on Patients With High-Risk Features of Parameningeal Rhabdomyosarcoma: An Analysis of IRS-IV and D9803

Purpose: Radiation therapy remains an essential treatment for patients with parameningeal rhabdomyosarcoma (PMRMS), and early radiation therapy may improve local control for patients with intracranial extension (ICE). Methods and Materials: To address the role of radiation therapy timing in PMRMS in the current era, we reviewed the outcome from 2 recent clinical trials for intermediate-risk RMS: Intergroup Rhabdomyosarcoma Study (IRS)-IV and Children's Oncology Group (COG) D9803. The PMRMS patients on IRS-IV with any high-risk features (cranial nerve palsy [CNP], cranial base bony erosion [CBBE], or ICE) were treated immediately at day 0, and PMRMS patients without any of these 3 features received week 6-9 radiation therapy. The D9803 PMRMS patients with ICE received day 0 X-Ray Therapy (XRT) as well; however, those with either CNP or CBBE had XRT at week 12. Results: Compared with the 198 PMRMS patients from IRS-IV, the 192 PMRMS patients from D9803 had no difference (P<.05) in 5-year local failure (19% vs 19%), failure-free-survival (70% vs 67%), or overall survival (75% vs 73%) in aggregate. The 5-year local failure rates by subset did not differ when patients were classified as having no risk features (None, 15% vs 19%, P=.25), cranial nerve palsy/cranial base of skull erosion (CNP/CBBE, 15% vs 28%, P=.22), or intracranial extension (ICE, 21% vs 15%, P=.27). The D9083 patients were more likely to have received initial staging by magnetic resonance imaging (71% vs 53%). Conclusions: These data support that a delay in radiation therapy for high-risk PMRMS features of CNP/CBBE does not compromise clinical outcomes.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Full-scale Demonstration of Pressurized Water Reactor Core Design Optimization using Multi-Cycle Optimization Methodology

The U.S. nuclear sector encounters a difficulty in upholding essential safety standards while also securing economic viability for continued operation. Safety stands as a pivotal factor across all facets of operations within light-water reactor nuclear power plants. Achieving economic feasibility alongside safety can be facilitated through the utilization of a risk-informed framework, exemplified by the ongoing development within the Risk-Informed Systems Analysis Pathway under the auspices of the U.S. Department of Energy's LWRS Program. This initiative advocates for a diverse array of research and development endeavors aimed at optimizing both safety and economic efficacy within nuclear power plants, particularly pertinent as many plants contemplate second license renewals. The Risk-Informed Systems Analysis Pathway has two main goals: deploy methodologies and technologies that better represent safety margins and cost and safety factors and develop advanced applications that enable cost-effective plant operation. This report assesses the potential for resolving multi-cycle plant reload challenges through real-world scenarios utilizing the Plant ReLoad Optimization (PRLO) framework. This framework offers reactor core design developers analytic tools of reactor safety and fuel performance with the assistance of artificial intelligence (AI) to enhance core design solutions. Multi-objective genetic algorithm alongside acceleration techniques is explored as an enabling technology for improving fuel efficiency while upholding safety thresholds. The demonstration of multi-cycle core design optimization is performed. This report investigates the practical application of the PRLO platform in addressing real-world core design challenges, supporting AI efforts, and contrasting outcomes with those derived from heuristic or conventional algorithms.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Constructing vulnerabilty and protective measures indices for the enhanced critical infrastructure protection program.

The US Department of Homeland Security (DHS) has directed its Protective Security Advisors (PSAs) to form partnerships with the owners and operators of assets most essential to the Nation's well being - a subclass of critical infrastructure and key resources (CIKR) - and to conduct site visits for these and other high-risk assets as part of the Enhanced Critical Infrastructure Protection (ECIP) Program. During each such visit, the PSA documents information about the facility's current CIKR protection posture and overall security awareness. The primary goals for ECIP site visits (DHS 2009) are to: (1) inform facility owners and operators of the importance of their facilities as an identified high-priority CIKR and the need to be vigilant in light of the ever-present threat of terrorism; (2) identify protective measures currently in place at these facilities, provide comparisons of CIKR protection postures across like assets, and track the implementation of new protective measures; and (3) enhance existing relationships among facility owners and operators; DHS; and various Federal, State, local tribal, and territorial partners. PSAs conduct ECIP visits to assess overall site security; educate facility owners and operators about security; help owners and operators identify gaps and potential improvements; and promote communication and information sharing among facility owners and operators, DHS, State governments, and other security partners. Information collected during ECIP visits is used to develop metrics; conduct sector-by-sector and cross-sector vulnerability comparisons; identify security gaps and trends across CIKR sectors and subsectors; establish sector baseline security survey results; and track progress toward improving CIKR security through activities, programs, outreach, and training (Snyder 2009). The data being collected are used in a framework consistent with the National Infrastructure Protection Plan (NIPP) risk criteria (DHS 2009). The NIPP framework incorporates consequence, threat, and vulnerability components and addresses all hazards. The analysis of the vulnerability data needs to be reproducible, support risk analysis, and go beyond protection. It also needs to address important security/vulnerability topics, such as physical security, cyber security, systems analysis, and dependencies and interdependencies. This report provides an overview of the approach being developed to estimate vulnerability and provide vulnerability comparisons for sectors and subsectors. the information will be used to assist DHS in analyzing existing protective measures and vulnerability at facilities, to identify potential ways to reduce vulnerabilities, and to assist in preparing sector risk estimates. The owner/operator receives an analysis of the data collected for a specific asset, showing a comparison between the facility's protection posture/vulnerability index and those of DHS sector/subsector sites visited. This comparison gives the owner/operator an indication of the asset's security strengths and weaknesses that may be contributing factors to its vulnerability and protection posture. The information provided to the owner/operator shows how the asset compares to other similar assets within the asset's sector or subsector. A 'dashboard' display is used to illustrate the results in a convenient format. The dashboard allows the owner/operator to analyze the implementation of additional protective measures and to illustrate how such actions would impact the asset's Protective Measures Index (PMI) or Vulnerability Index (VI).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

FORCE Update 2024

The Framework for Optimization of Resources and Economics (FORCE) tool suite is the U.S. Department of Energy’s Nuclear Integrated Energy Systems (IES) Program flagship tool suite for technoeconomic IES analysis of IES. This tool suite is useful for analysis designed to evaluate and improve the technoeconomics of energy production systems, particularly for systems including nuclear technology. In this report, we document the development activity for the FORCE tool suite to extend its capabilities as performed during fiscal year 2024. In addition to reliability and accessibility, capability is one of the three standards guiding the development of the FORCE tool suite and the software codes that are its constituent parts. Extending the capabilities of the FORCE tool suite allows analysis both within the IES program as well as industry, university, and laboratory partners to perform analysis with more accuracy, insight, and impactful narrative. Four areas of capability development were the focus of activity this year: economic parameter uncertainty quantification, multiresolution analysis, components-to-optimization workflow automation, and statespace construction workflows for real-time optimal control. In economic parameter uncertainty quantification, the ability of HERON to capture risk due to scenarios (weather and energy demand uncertainty) was expanded to also include uncertainties in financial parameters such as capital cost or operation and maintenance costs. By including these sources of uncertainty, which are sometimes very large compared with scenario uncertainty, HERON is better able to capture the risk posed by investment in various IES technology. Because of this, analysts can also consider the reduction in risks that can be realized by choice of some technologies. In multiresolution analysis, development activity extended on work completed previously. In fiscal year 2023, methods for decomposing time series signals, such as demand, solar and wind availability, and price profiles, were analyzed and down-selected to those most effective at splitting signals into different resolutions. These resolutions allow considering the influence of different energy demand and supply behaviors across different time scales. For example, energy demand might be divided into seasonal, weekly, and hourly profiles. In fiscal year 2024, this preliminary work was extended and implemented within the Risk Analysis Virtual Environment (RAVEN) risk and uncertainty analysis platform, which is used throughout the FORCE framework. This development of the “multi-resolution time series analysis” (MR-TSA) module in RAVEN allows training synthetic history generators on complex time series. These synthetic history generators can then be used in HERON for generating scenarios that represent possible market and weather scenarios that can be analyzed on different time scales. We envision completing this work in the future, implementing multiresolution dispatch optimization strategies that can make the most beneficial use of these stratified time histories. In components-to-optimization workflow development, workflows for translating user inputs of components into algorithms for algebraic optimization were selected and implemented. Similar algorithms within the Holistic Energy Resource Optimization Network (HERON) were separated from the main code base of HERON and gathered with the components-to-optimization workflows in the new Dispatch Optimization Variable Engine (DOVE) software library. This modularization allows FORCE users to analyze dispatch optimization and energy system duty cycles independently of HERON, which previously was a burdensome task. Additionally, these dispatch optimization algorithms, set up in an independent library, can now be used across all software applications within FORCE, especially including the real-time optimal control software Optimization of Real-time Capacity Allocation (ORCA). Allowing FORCE software to share dispatch optimization algorithms within a single library allows for improved software maintenance and reliability. In statespace characterization workflow development, alternative workflows for optimizing dispatch with additional technical accuracy was the focus, particularly to improve the real-time optimization decision making in ORCA. Using algorithms and workflows initially developed for the Feasible Actuator Range Modifier (FARM), workflows for determining the statespace representation of IES were identified and demonstrated. The resulting dispatch optimization required a more robust optimization algorithm than that originally used in HERON (and moved to DOVE), which required adding an alternate workflow to DOVE that can more accurately match the behavior of physical systems using a partial differential equation representation. In conclusion, capability developments in the FORCE tool suite in fiscal year 2024 have improved the ability of the FORCE tool suite to perform

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development and Analysis of the Automated Object Reentry Survival Analysis Tool Parametric Study Wrapper

The NASA Orbital Debris Program Office (ODPO) studies all aspects of spacecraft end-of-life and orbital debris measurement, modeling, and mitigation. The reentry safety group within the ODPO uses the Object Reentry Survival Analysis Tool (ORSAT) to calculate the casualty risk due to reentry of spacecraft and other types of orbital debris. ORSAT models spacecraft as a collection of fragments that break apart from the parent object at a pre-defined “breakup altitude.” It then calculates the trajectory and aero-heating of these fragments to determine which fragments are completely destroyed and which survive to the ground and pose a risk to human population. Because of the historically high computational cost of these calculations, many simplifying assumptions have been made in the traditional calculation and analysis process used by the ODPO, some of which have been shown by recent research by the ODPO and others to be incorrect. Improvements to the ORSAT code and advancements in computer technology have vastly decreased the program’s processing time, and have allowed the ODPO to develop a capability for large-scale parametric studies and Monte Carlo reentry simulations that can aid in both the initial spacecraft design and provide more detailed and accurate risk analysis to spacecraft operators.

Smith, Andrew N.↗

Safeguarding Nuclear Waste - A Study in Risk Management and Overcoming Significant Challenges - 16439

Three years after what is commonly referred to as the 'Y-12 Incident', where three individuals trespassed and defaced a building at the Department of Energy's (DOE) Y-12 National Security Complex early on July 28, 2012, the DOE commissioned study after study to review security practices and internal risk management safeguarding protocols that preserves safety and a secure environment. These studies highlighted systemic organizational dysfunctions, critical leadership shortcomings, and communications failures. Much attention has been focused on risk management and security oversight practices. This analysis presents an update on the Department's Environmental Management (EM)-wide security leadership improvements designed to restore public confidence and explain how a deeper risk analysis has elevated security oversight into a common-core Department of Energy achievement. While EM is not the managing Program Office for Y-12, this event had a DOE-corporate wide impact. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Roles of Radiation Dose and Chemotherapy in the Etiology of Stomach Cancer as a Second Malignancy

Purpose: To evaluate the roles of radiation dose, chemotherapy, and other factors in the etiology of stomach cancer in long-term survivors of testicular cancer or Hodgkin lymphoma. Methods and Materials: We conducted a cohort study in 5,142 survivors of testicular cancer or Hodgkin lymphoma treated in the Netherlands between 1965 and 1995. In a nested case-control study, detailed information on treatment, smoking, gastrointestinal diseases, and family history was collected for 42 patients with stomach cancer and 126 matched controls. For each subject, the mean radiation dose to the stomach was estimated. Relative risks (RRs) of stomach cancer and the radiation-related excess relative risk (ERR) per gray were calculated by conditional logistic regression analysis. Results: The risk of stomach cancer was 3.4-fold increased compared with the general population. The risk increased with increasing mean stomach dose (p for trend, <0.001), at an ERR of 0.84 per Gy (95% confidence interval [CI], 0.12-15.6). Mean stomach doses of more than 20 Gy were associated with a RR of 9.9 (95% CI, 3.2-31.2) compared with doses below 11 Gy. The risk was 1.8-fold (95% CI, 0.8-4.4) increased after chemotherapy and 5.4-fold (95% CI, 1.2-23.9) increased after high doses of procarbazine (>=13,000 mg) vs. <10,000 mg. The RR of smoking more than 10 cigarettes per day vs. no smoking was 1.6 (95% CI, 0.6-4.2). Conclusions: Stomach cancer risk is strongly radiation dose dependent. The role of chemotherapy, particularly of procarbazine and related agents, needs further study, because of the relatively small numbers of chemotherapy-treated subjects.

62 RADIOLOGY AND NUCLEAR MEDICINE↗