Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program impact”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Analytical combustion/emissions research related to the NASA high-speed research program

Increasing the pressure and temperature of the engines of new generation supersonic airliners increases the emissions of nitrogen oxides to a level that would have an adverse impact on the Earth's protective ozone layer. In the process of implementing low emissions combustor technologies, NASA Lewis Research Center has pursued a combustion analysis program to guide combustor design processes, to identify potential concepts of greatest promise, and to optimize them at low cost, with short turn-around time. The approach is to upgrade and apply advanced computer programs for gas turbine applications. Efforts have been made to improve the code capabilities of modeling the physics. Test cases and experiments are used for code validation. To provide insight into the combustion process and combustor design, two-dimensional and three-dimensional codes such as KIVA-II and LeRC 3D have been used. These codes are operational and calculations have been performed to guide low emissions combustion experiments.

Nguyen, H. Lee↗

Exploring the impact of the local environment on charge transfer states at molecular donor-acceptor heterojunctions

This program explored a broad range of charge transfer (CT) states in organic solar cells with the goal of understanding how molecular energetics, structure, and morphology influence CT state energy and dynamics, and how this in turn influences solar cell performance. We identified new types of delocalized CT states at ordered molecular heterojunctions, determined the factors that dictate CT state energetic disorder in bulk heterojunctions, determined that hot CT state dissociation is negligible for most systems, that the occupation of CT states is generally non-thermal in disordered heterojunctions, and that quasi-equilibrium generally does not hold in organic solar cells. These findings allowed us to demonstrate the lowest loss in potential of any organic solar cell to date and provide valuable guidance for designing higher efficiency organic solar cells in the future.

14 SOLAR ENERGY↗

Impact of new instrumentation on advanced turbine research

A description is presented of an orderly test program that progresses from the simplest stationary geometry to the more complex, three dimensional, rotating turbine stage. The instrumentation requirements for this evolution of testing are described. The heat transfer instrumentation is emphasized. Recent progress made in devising new measurement techniques has greatly improved the development and confirmation of more accurate analytical methods for the prediction of turbine performance and heat transfer. However, there remain challenging requirements for novel measurement techniques that could advance the future research to be done in rotating blade rows of turbomachines.

Graham, R. W.↗

The Impact of NPG 7120.5A Upon Training and Development

NASA Procedures and Guidance 7120.5A for Program and Project Management Processes and Requirements should have minimal effect upon current Agency training and development programs - mainly because the new directive simply formalizes what we have been teaching and learning in the NASA Program/Project Management Initiative all along. A frequent complaint we get from the 8,000 or so graduates of our PPMI courses over the years, however, deals with resistance to what they may have learned in the classroom or training site. Brimming with new ideas, these young men and women often run up against an entrenched program or project manager who insists that things be done "the old way," too often perceived as "the NASA way" or even "the Goddard way." Management was all too often in the eyes of the manager; now we're all reading from the same book, 7120.5A, Still, there is no single method or "one size fits all" approach to project management in NASA. While each Center is responsible for developing policies, processes and procedures to comply with the new NPG, individual program and project managers will still need to tailor their requirements to the specific needs of the project, consistent with the size, complexity, risk and criticality of the project. Under NPG 7120.5A, the results of such tailoring are to be documented in agreements among managers, directors, Enterprise Associate Administrators and the Administrator.

Hoffman, Edward J.↗

2010 NASA Range Safety Annual Report

this report provides a NASA Range Safety overview for current and potential range users. This report contains articles which cover a variety of subject areas, summaries of various NASA Range Safety Program activities conducted during the past year, links to past reports, and information on several projects that may have a profound impact on the way business will be done in the future. Specific topics discussed in the 2010 NASA Range Safety Annual Report include a program overview and 2010 highlights; Range Safety Training; Range Safety Policy revision; Independent Assessments; Support to Program Operations at all ranges conducting NASA launch/flight operations; a continuing overview of emerging range safety-related technologies; and status reports from all of the NASA Centers that have Range Safety responsibilities. Every effort has been made to include the most current information available. We recommend this report be used only for guidance and that the validity and accuracy of all articles be verified for updates. Once again, the web-based format was used to present the annual report.

Dumont, Alan G.↗

The Evolution of the Impact Evidence Library Methods – What We Learned

During fiscal years 2020-2022 NASA’s Human Research Program, Exploration Medical Capability Element has worked to source this evidence for the model. During the process several lessons learned have been identified and drive recommendations for future efforts. The ICL 1.0: Spaceflight Medical Operational expertise should be consulted regarding the addition of future conditions. A clinician experienced with the nuances of spaceflight is recommended to have a minimum of 20 hours per condition to adequately source the evidence. Condition definitions should be carefully crafted to maintain mutual exclusivity. Common side effects from medications, common and consequential incidental findings in laboratory studies, and consequential side effects of diagnostic and procedural capabilities should be considered for inclusion as unique conditions in future iterations of the ICL 1.0. Incidence: Spaceflight incidence, although based on small population sizes, is the gold standard. Terrestrial incidence should be applied cautiously. Probability of minor vs. severe cases of the condition: Data informing severity probability of the medical condition are nearly always terrestrial. Special attention should be paid to this metric as it drives outcomes in the model and terrestrial data often overestimate severity of expected cases in spaceflight. Condition duration: Three clinical phases currently exist in the model. They represent the time necessary for diagnosis, treatment/convalescence/recurrence, and the remaining duration of the mission after maximal recovery, respectively. Further subdivision of acute and convalescent treatment/recurrence is recommended. Probability of need for evacuation: Surrogates for “Return to Definitive Care” were chosen prior to data collection. In most cases these surrogates were “need for hospitalization” or “need for surgery.” For many conditions these may not be realistic drivers of “Return to Definitive Care” and should be re-examined. Probability of Crew Mortality: Terrestrial mortality data is difficult to apply to astronauts who, invariably, have less comorbidities than terrestrial subjects. It must be applied judiciously. The proportion of mission tasks impaired by the condition: “Task Impairment” was assigned to each condition prior to the condition duration data becoming available. Future efforts should assign Task Impairment as the final step in sourcing the evidence.

A.J. Kreykes↗

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance

Earned value management systems (EVMS) are used by industry practitioners to successfully manage projects and programs; however, there has been no past study to characterize and evaluate the impact of EVMS maturity on project performance. This paper introduces a novel framework, developed to measure the EVMS maturity, composed of 56 attributes arrayed across ten subprocesses, which together make up an integrated project/program management system. This paper describes how the framework was conceived and developed, based on literature review and data collected from industry workshops. Then, it examines the relationship between EVMS maturity and ten project performance metrics through statistical analyses. The study analyzed project data from 35 projects and programs worth over $21.8 billion in total cost. For this sample, results showed statistically significant differences between projects with high and low EVMS maturity; on average, projects exhibiting high EVMS maturity have 54% less cost overruns and 19% less change orders versus their performance measurement baseline. Higher maturity projects and programs also achieve better customer satisfaction, meet business objectives more often, and are more often in compliance with EVMS standards and guidelines. This paper contributes to the body of knowledge by providing a practical and novel framework for assessing the maturity of earned value management systems. Practitioners can use the framework to improve their integrated project and program management.

99 GENERAL AND MISCELLANEOUS↗

Wind and Wildlife Co-Exist With Help From ECO Wind

Sustainable deployment of wind energy requires a balance of conservation, energy, and economic goals. The Enabling Coexistence Options for Wind Energy and Wildlife (ECO Wind) program at the U.S. Department of Energy National Renewable Energy Laboratory (NREL) supports efforts to reduce wildlife impacts at land-based and offshore wind energy facilities with monitoring and minimization technology solutions.

50 EE - Wind and Water Power Program - Water (EE-4↗

MARS Science Laboratory Post-Landing Location Estimation Using Post2 Trajectory Simulation

The Mars Science Laboratory (MSL) Curiosity rover landed safely on Mars August 5th, 2012 at 10:32 PDT, Earth Received Time. Immediately following touchdown confirmation, best estimates of position were calculated to assist in determining official MSL locations during entry, descent and landing (EDL). Additionally, estimated balance mass impact locations were provided and used to assess how predicted locations compared to actual locations. For MSL, the Program to Optimize Simulated Trajectories II (POST2) was the primary trajectory simulation tool used to predict and assess EDL performance from cruise stage separation through rover touchdown and descent stage impact. This POST2 simulation was used during MSL operations for EDL trajectory analyses in support of maneuver decisions and imaging MSL during EDL. This paper presents the simulation methodology used and results of pre/post-landing MSL location estimates and associated imagery from Mars Reconnaissance Orbiter s (MRO) High Resolution Imaging Science Experiment (HiRISE) camera. To generate these estimates, the MSL POST2 simulation nominal and Monte Carlo data, flight telemetry from onboard navigation, relay orbiter positions from MRO and Mars Odyssey and HiRISE generated digital elevation models (DEM) were utilized. A comparison of predicted rover and balance mass location estimations against actual locations are also presented.

Davis, J. L.↗

Knowledge-based simulation using object-oriented programming

Simulations have become a powerful mechanism for understanding and modeling complex phenomena. Their results have had substantial impact on a broad range of decisions in the military, government, and industry. Because of this, new techniques are continually being explored and developed to make them even more useful, understandable, extendable, and efficient. One such area of research is the application of the knowledge-based methods of artificial intelligence (AI) to the computer simulation field. The goal of knowledge-based simulation is to facilitate building simulations of greatly increased power and comprehensibility by making use of deeper knowledge about the behavior of the simulated world. One technique for representing and manipulating knowledge that has been enhanced by the AI community is object-oriented programming. Using this technique, the entities of a discrete-event simulation can be viewed as objects in an object-oriented formulation. Knowledge can be factual (i.e., attributes of an entity) or behavioral (i.e., how the entity is to behave in certain circumstances). Rome Laboratory's Advanced Simulation Environment (RASE) was developed as a research vehicle to provide an enhanced simulation development environment for building more intelligent, interactive, flexible, and realistic simulations. This capability will support current and future battle management research and provide a test of the object-oriented paradigm for use in large scale military applications.

Sidoran, Karen M.↗

Analysis of Multiple Precipitation Products and Preliminary Assessment of Their Impact on Global Land Data Assimilation System (GLDAS) Land Surface States

Land surface models (LSMs) are computer programs, similar to weather and climate prediction models, which simulate the stocks and fluxes of water (including soil moisture, snow, evaporation, and runoff) and energy (including the temperature of and sensible heat released from the soil) after they arrive on the land surface as precipitation and sunlight. It is not currently possible to measure all of the variables of interest everywhere on Earth with sufficient accuracy and space-time resolution. Hence LSMs have been developed to integrate the available observations with our understanding of the physical processes involved, using powerful computers, in order to map these stocks and fluxes as they change in time. The maps are used to improve weather forecasts, support water resources and agricultural applications, and study the Earth's water cycle and climate variability. NASA's Global Land Data Assimilation System (GLDAS) project facilitates testing of several different LSMs with a variety of input datasets (e.g., precipitation, plant type). Precipitation is arguably the most important input to LSMs. Many precipitation datasets have been produced using satellite and rain gauge observations and weather forecast models. In this study, seven different global precipitation datasets were evaluated over the United States, where dense rain gauge networks contribute to reliable precipitation maps. We then used the seven datasets as inputs to GLDAS simulations, so that we could diagnose their impacts on output stocks and fluxes of water. In terms of totals, the Climate Prediction Center (CPC) Merged Analysis of Precipitation (CMAP) had the closest agreement with the US rain gauge dataset for all seasons except winter. The CMAP precipitation was also the most closely correlated in time with the rain gauge data during spring, fall, and winter, while the satellitebased estimates performed best in summer. The GLDAS simulations revealed that modeled soil moisture is highly sensitive to precipitation, with differences in spring and summer as large as 45% depending on the choice of precipitation input.

Gottschalck, Jon↗

Mitigation-Aware Bidding Strategies in Electricity Markets

Market power exercise in the electricity markets distorts market prices and diminishes social welfare. Many markets have implemented market power mitigation processes to eliminate the impact of such behavior. The design of mitigation mechanisms has a direct influence on investors' profitability and thus mid-/long-term resource adequacy. In order to evaluate the effectiveness of the existing market power mitigation mechanisms, this paper proposes a mitigation-aware strategic bidding model and studies the bidding strategies of the market participants under current practice. The proposed bidding model has a bilevel structure with strategic participant's profit maximization problem in the upper level and the dispatch problem for market operators in the lower level. In particular, the consideration of potential offer mitigation is incorporated as upper-level constraints based on the conduct and impact tests. This bilevel problem is reduced to a single-level mixed-integer linear program using the KKT optimality conditions, duality theory, and linearization. Numerical results illustrate how a strategic player can exercise market power to achieve a higher profit even under the current market power mitigation process and we analyze the social impact that the market power exercise results.

Wu, Yiqian↗

Operations analysis of gravity assisted rapid transit

Gravity assisted rapid transit (GART) with 6 percent grades before and after each station are compared with conventional systems in terms of energy consumption, run time, line capacity and schedule stability under abnormal circumstances. Parametric analyses of run times and energy consumption include the impact of alternate accelerating and braking levels. The capcity analysis uses a network simulation program to determine the location and severity of all signal delays. Based on results of initial simulations, the block design was revised to eliminate bottlenecks in normal operations. The systems are then compared at headways of 80 to 180 seconds. One month of incidence reports of a modern operating transit system are reviewed to determine the failures to be simulated. The impact of failures resulting in station delays (30 to 360 seconds), speed limit reduction (20 mph and 30 mph to one or more trains), vehicle performance (75 percent acceleration) are compared at scheduled headway of 90 to 180 seconds.

Source record↗

Contracts, grants and funding summary of supersonic cruise research and variable-cycle engine technology programs, 1972 - 1982

NASA-SCAR (AST) program was initiated in 1972 at the direct request of the Executive Office of the White House and Congress following termination of the U.S. SST program. The purpose of SCR was to conduct a focused research and technology program on those technology programs which contributed to the SST termination and, also, to provide an expanded data base for future civil and military supersonic transport aircraft. Funding for the Supersonic Cruise Research (SCR) Program was initiated in fiscal year 1973 and terminated in fiscal year 1981. The program was implemented through contracts and grants with industry, universities, and by in-house investigations at the NASA/OAST centers. The studies included system studies and five disciplines: propulsion, stratospheric emissions impact, materials and structures, aerodynamic performance, and stability and control. The NASA/Lewis Variable-Cycle Engine (VCE) Component Program was initiated in 1976 to augment the SCR program in the area of propulsion. After about 2 years, the title was changed to VCE Technology program. The total number of contractors and grantees on record at the AST office in 1982 was 101 for SCR and 4 for VCE. This paper presents a compilation of all the contracts and grants as well as the funding summaries for both programs.

Hoffman, S.↗

Examining Topography of Mars Impact Basins to Determine If Impact Basins Have Topographic Characteristics of a Crater

Determining the topography of suspect craters on Mars will help scientists better understand the land deformation that occurs from an asteroid or comet impact. This will provide a better understanding of how Mars has changed over time and the topography data could be used for planning future missions to Mars. We have begun a program at the Southwestern Indian Polytechnic Institute (SIPI), a Bureau of Indian Affairs junior college, to analyze large impact basins on Mars (>300 km diameter) utilizing Geographic Information System (GIS) technology. Collaborators at the University of New Mexico and the U.S. Geological Survey are providing technical support for this effort.

Livingston, A.↗

Performance of resin transfer molded multiaxial warp knit composites

Composite materials that are subjected to complex loads have traditionally been fabricated with multidirectionally oriented prepreg tape materials. Some of the problems associated with this type of construction include low delamination resistance, poor out-of-plane strength, and labor intensive fabrication processes. Textile reinforced composites with through-the-thickness reinforcement have the potential to solve some of these problems. Recently, a relatively new class of noncrimp fabrics designated as multiaxial warp knits have been developed to minimize some of the high cost and damage tolerance concerns. Multiple stacks of warp knit fabrics can be knitted or stitched together to reduce layup labor cost. The through-the-thickness reinforcement can provide significant improvements in damage tolerance and out-of-plane strength. Multilayer knitted/stitched preforms, in conjunction with resin transfer molding (RTM), offer potential for significant cost savings in fabrication of primary aircraft structures. The objectives of this investigation were to conduct RTM processing studies and to characterize the mechanical behavior of composites reinforced with three multiaxial warp knit fabrics. The three fabrics investigated were produced by Hexcel and Milliken in the United States, and Saerbeck in Germany. Two resin systems, British Petroleum E9O5L and 3M PR 500, were characterized for RTM processing. The performance of Hexcel and Milliken quasi-isotropic knitted fabrics are compared to conventional prepreg tape laminates. The performance of the Saerbeck fabric is compared to uniweave wing skin layups being investigated by Douglas Aircraft Company in the NASA Advanced Composites Technology (ACT) program. Tests conducted include tension, open hole tension, compression, open hole compression, and compression after impact. The effects of fabric defects, such as misaligned fibers and gaps between tows, on material performance are also discussed. Estimated material and labor cost savings are projected for the Saerbeck fabric as compared to uniweave fabric currently being used by Douglas in the NASA ACT wing development program.

Dexter, H. Benson↗

The J-2X Fuel Turbopump - Turbine Nozzle Low Cycle Fatigue Acceptance Rationale

The J-2X Fuel Turbopump (FTP) turbine, which drives the pump that feeds hydrogen to the J-2X engine for main combustion, is based on the J-2S design developed in the early 1970 s. Updated materials and manufacturing processes have been incorporated to meet current requirements. This paper addresses an analytical concern that the J-2X Fuel Turbine Nozzle Low Cycle Fatigue (LCF) analysis did not meet safety factor requirements per program structural assessment criteria. High strains in the nozzle airfoil during engine transients were predicted to be caused by thermally induced stresses between the vane hub, vane shroud, and airfoil. The heritage J-2 nozzle was of a similar design and experienced cracks in the same area where analysis predicted cracks in the J-2X design. Redesign options that did not significantly impact the overall turbine configuration were unsuccessful. An approach using component tests and displacement controlled fracture mechanics analysis to evaluate LCF crack initiation and growth rate was developed. The results of this testing and analysis were used to define the level of inspection on development engine test units. The programmatic impact of developing crack initiation/growth rate/arrest data was significant for the J-2X program. Final Design Certification Review acceptance logic will ultimately be developed utilizing this test and analytical data.

Hawkins, Lakiesha V.↗